Cris B. Liban, D.Env., P.E. Los Angeles County Metropolitan Transportation Authority
The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator,...
-
Upload
ethelbert-booker -
Category
Documents
-
view
217 -
download
3
Transcript of The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator,...
![Page 1: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/1.jpg)
The Way Forward – A 21st –Century Transportation Plan
Frank DePaola, P.E.
Administrator, Highway DivisionApril 2013
Massachusetts Department of Transportation
![Page 2: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/2.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
Highway Construction Expenditures by Source
![Page 3: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/3.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
Highway Construction Expenditures by Type
![Page 4: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/4.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
MEGA PROJECTS
![Page 5: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/5.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
MassDOT Pavement in Excellent or Good Condition (CRSI)
![Page 6: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/6.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
![Page 7: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/7.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
Projected ABP Spending(By State Fiscal Year)
![Page 8: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/8.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
Available Toll Revenue
![Page 9: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/9.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
Forecasted MHS Spending
![Page 10: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/10.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
I-90 over I-95, Charles St., the Charles R., and MBTA/CSX RR, Newton/Weston
Built in the mid-1960s Structure over CSX/MBTA RR is SD Structure over I-95/Charles River’s deck and
superstructure are rated 5; substructure rated 6
Additional lanes should be added ADT up to 104,393 MHS funding
![Page 11: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/11.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
![Page 12: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/12.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
State of Good Repair Priorities – The Next 10 Years
![Page 13: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/13.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
State of Good Repair Priorities – The Next 10 Years
Bridge Program $1.175 billion 1/3 of the proposed funding would be used for regional projects and the remainder would be used to accelerate repairs to bridges.
Multimodal Highway Program $1.25 billion Would fund a statewide portfolio of hundreds of local and regional projects.
Highway Preservation Facilities & Systems $400 million For municipal programs; roadside traffic and travel information; and completion of an integrated asset management system.
![Page 14: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/14.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
Bicycle & Pedestrian Facilities $430 million Dedicated funding to construct and improve bicycle and pedestrian facilities owned/managed by both MassDOT and the Department of Conservation & Recreation.
Chapter 90 $1.0 billion An additional $100 million per year to increase the annual allotment from $200 million to $300 million per year.
Regional Priority Projects $930 million Would funds three major highway projects of regional significance.
![Page 15: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/15.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
I-93/I-95 Interchange Improvements Reading, Woburn, and Stoneham Full Interchange Reconstruction
Busiest interchange in New England (375,000 vehicles per day) Highest crash rates (per million vehicles) of any of its kind in Mass. GOAL: Address geometric and operational deficiencies Remove the northwest and southeast loop ramps, remove all
weaves and provide a northbound connector ramp on Route 128/I-95 to I-93 with split ramps from Washington Street to remove the weave to I-93.
Add-a-lane on Route 128/I-95 through the interchange corridor to create 4-lane cross section, reducing congestion.
Substantially benefit regional travel with improved operations and safety.
Cost (2015): $320 Million
![Page 16: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/16.jpg)
Massachusetts Department of Transportation
I-93/I-95 Interchange Improvements
Bird’s Eye View showing reconstructed interchange with new flyover ramps
![Page 17: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/17.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
I-93/I-95/University Ave./Dedham St.Canton, Dedham, Norwood, Westwood Full Interchange Reconstruction
238,500 vehicles per day, high crash location with truck roll overs, multi-mile long queues on I-95/I-93 due to weaving movements on I-95
Address the geometric and operational deficiencies at I-95/I-93 interchange and at Dedham Street on-ramp to I-95 SB
Add-a-lane on I-95 NB from Dedham Street to I-93 and on I-95 SB from I-93 to Neponset Street.
Adds I-95 NB off-ramp to Dedham Street. Attracts cut-through traffic from residential Canton streets to I-95 Supports multi-modal travel by improving access to Route 128 Train
Station. Creates 43 acre park in place of MassDOT’s abandon 1970’s Inner Belt Substantially benefits regional travel with improved operations and
safety. Cost (2012): $225 Million
![Page 18: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/18.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
![Page 19: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/19.jpg)
April 18, 2023| Leading the Nation in Transportation Excellence |
www.mass.gov/massdot
Major structure that carries I-91 through Springfield over city streets and a parking garage
Combined length of 2,329 feet ADT = 107,100 Portions of deck are structurally deficient Superstructure and substructure are nearing
deficient status (currently rated as 5) Not on STIP Estimate for superstructure replacement:
$363,900,000
I-91 Viaduct, Springfield
![Page 20: The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649ccf5503460f9499ba28/html5/thumbnails/20.jpg)