SCAFFOLDING & FORMWORK SPECIALISTS THE WACO JUMPFORM

Transcript of THE WACO JUMPFORM - Waco Kwikform€¦ · FORMWORK ENQUIRIES NSW Block 1-3/1B Unwin Street Rosehill...

Page 1: THE WACO JUMPFORM - Waco Kwikform€¦ · FORMWORK ENQUIRIES NSW Block 1-3/1B Unwin Street Rosehill NSW 2142 T: (02) 9684 8880 E: formworknsw@wacokwikform.com.au QLD Building 3/84

SCAFFOLDING & FORMWORK SPECIALISTS

THE WACO JUMPFORM

Page 2: THE WACO JUMPFORM - Waco Kwikform€¦ · FORMWORK ENQUIRIES NSW Block 1-3/1B Unwin Street Rosehill NSW 2142 T: (02) 9684 8880 E: formworknsw@wacokwikform.com.au QLD Building 3/84

JUMPFORM Benefits and Advantages

• Crane Independent Core JumpformMachine

• Safe working and loading platformswith fully enclosed perimeter providesfall and weather protection. Thisensures safety when working at severallevels above slab construction level.

• Innovative and safe way to installpre-assembled jumpform platforms,perimeter cladding and access stairs.

• German engineered hydraulicclimbing devices with 10-ton loadcapacity. The Hydraulic Load Distribution Technology enables the jumpform to be lifted evenly during climbing stage.

• Greater stability during climbing stagedue to positive fixings to walls andeven distribution of braced posts.

• Experienced Specialist JumpformSupervisors and Engineers will provideservice and support throughout theproject.

• Due to the higher loads that can becarried by the hydraulic climbingdevices, other safety and operationalfeatures can be installed on thejumpform system; such as externalaccess stairs, reinforcement steelloading area and concrete boompump.

• Large working spaces enables betterproductivity.

• Typical climbing speed is about300mm per minute.

• Fast construction cycle times can beachieved.

• The jumpform is anchored topreviously poured walls which allowsfaster core construction cycles wellahead of the typical slab constructioncycles.

• Shutters are suspended from theoverhead steelwork by girder trolleysand with the help of push-pull propsmanual striking, roll back, closing andplumbing of formwork are achievedwith ease.

Index Date Description AuthorA 23/06/2016 FOR CONSTRUCTION G.McG

ONEFORM A3NTSONEFORM PTY. LTD.396 New Cleveland RdTingalpa, QLD, 4173Ph: 07 3890 0249Fax: 07 3890 0217

FABRICATION QA CHECKLISTNAME DATE

FABRICATED BYCHECKED BYHOURS TAKEN 9036D.KING A

1602

BURANDA TOD

G.McG

ACS-AU JUMP FORM

1602-JF-000

15/06/2016GENERAL NOTES:1. ALL HOLES TO BE 22Ø U.N.O.2. ALL WELDS TO BE 6mm FILLET U.N.O.3. THIS DRAWING MUST NOT BE SCALED.

ITEM CHECKED SIGNED

SHUTTER ROLLERS WITH HANGER BRACKETS

CLIMBING RAILS (6.3m FOR POURS 3M OR LESS)

CAST IN THREADED ANCHOR PLATES (DW26) 1PER SHOE (CONSUMABLE)SCREW IN CONE (M30/DW26) - 1 PER SHOESW22 HEX DRIVER46mm SOCKET FOR M303 PHASE POWER LEAD (CHECK SITE FORLENGTH)SHUTTER HANGING PLATFORM BRACKETS(STEEL FIXERS)SCAFFOLD PLANKS FOR PLATFORMCORNER HANDRAILSACCESS LADDERSRUBBER TRIMS FROM PLATFORM WALLCONCRETE PUMP ANCHORSLIGHTING INSTALLEDRUBBER STRIPS FOR GAPSMOTORSHYDRAULIC FLUID (HC68)HYDRAULIC LINESEMERGENCY ACCESS PANELACCESS STAIR TOWERSOVERALL CHECKED BY YARD MANAGER

ITEM CHECKED SIGNED

LIFTING POINTS LOCATEDCRANE RADIUS CHECKED FOR LOADSITE CLEARANCES CHECKEDSHUTTERS DESIGNED FOR ROLLERSACCESS PROVIDEDEMERGENCY ACCESSWIDE LOAD ROUTE ACCEPTABLESYSTEM REACTIONS PROVIDEDOVERALL CHECKED BY ENG. MANAGER

Page 3: THE WACO JUMPFORM - Waco Kwikform€¦ · FORMWORK ENQUIRIES NSW Block 1-3/1B Unwin Street Rosehill NSW 2142 T: (02) 9684 8880 E: formworknsw@wacokwikform.com.au QLD Building 3/84

LEVEL X LEVEL X

LEVEL X

LEVEL X + 1

LEVEL X

LEVEL X LEVEL X

LEVEL X + 1

STEP 1Steel fixing

STEP 4Strike and Retract Formwork

STEP 2Concrete pour

STEP 5Climb upper platforms and Formwork

STEP 3Climb lower platform

STEP 6Jumpform on upper anchors ready for steel fixing

CONSTRUCTION SEQUENCE: 6 Easy Steps

Page 4: THE WACO JUMPFORM - Waco Kwikform€¦ · FORMWORK ENQUIRIES NSW Block 1-3/1B Unwin Street Rosehill NSW 2142 T: (02) 9684 8880 E: formworknsw@wacokwikform.com.au QLD Building 3/84

Most of the system is pre-assembled in the yard.

System is finally assembled in easy-to-use sections on site.

PRE-ASSEMBLY

Page 5: THE WACO JUMPFORM - Waco Kwikform€¦ · FORMWORK ENQUIRIES NSW Block 1-3/1B Unwin Street Rosehill NSW 2142 T: (02) 9684 8880 E: formworknsw@wacokwikform.com.au QLD Building 3/84

THE POWER OF JUMPFORM

Due to the higher loads that can be carried by the hydraulic climbing devices, other

safety and operational features can be installed on the jumpform system; such as external access stairs, reinforcement steel

loading area and concrete boom pump.

Panorama Project in Brisbane. Watefront Project in Melbourne

Page 6: THE WACO JUMPFORM - Waco Kwikform€¦ · FORMWORK ENQUIRIES NSW Block 1-3/1B Unwin Street Rosehill NSW 2142 T: (02) 9684 8880 E: formworknsw@wacokwikform.com.au QLD Building 3/84

www.wacokwikform.com.au

Fast, safe, affordable.Experience the Waco difference.

FORMWORK ENQUIRIES

NSWBlock 1-3/1B Unwin Street Rosehill NSW 2142T: (02) 9684 8880E: [email protected]

QLDBuilding 3/84 Christensen Road South Stapylton QLD 4207T: (02) 9684 8880E: [email protected]

VIC50-60 Emu RoadMaidstone VIC 3012T: (03) 8368 9211E: [email protected]

WACO KWIKFORM GROUP

CORPORATE HEAD OFFICE Suite 2.02, Level 23 Rider Blvd Rhodes NSW 2138

T: (02) 8399 9100 E: [email protected]

SCAFFOLDING ENQUIRIEST: 1300 333 113