MGMT_404- Kendra Smith 1 The Tina Whitehead Birthday Bash Kendra Smith D01596416 MGMT_404 Project Management DeVry University 10/22/12

Transcript of The Tina Whitehead Birthday Bash · Web viewCommunication Management Plan13 Business Memo15 Lessons...

MGMT_404- Kendra Smith 2

The Tina Whitehead Birthday Bash

Kendra Smith D01596416

MGMT_404 Project Management

DeVry University

10/22/12

Table of Contents

Scope Statement3

Work Breakdown Structure..5

Network Diagram6

Risk Management Plan9

Resource Management Plan13

Communication Management Plan13

Business Memo15

Lessons Learned16

EXECUTIVE SUMMARY

This project is to make the Tina Whiteheads 50th birthday memorable. Your 50th birthday marks a milestone in your life that many never make. Therefore, we were hired to plan a birthday bash that will celebrate this special day using our expertise in project planning. I will independently be working with all of the areas in the planning and executing this project to the full expectations of the customer.

PROJECT OBJECTIVE

To plan and successfully throwing a 2- hour 50th Birthday Bash at the Fabulous Fox Theatres Egyptian Ballroom for Mrs. Tina Whitehead while staying in the budget of $20,000.

PROJECT DELIVERABLES

Provide a marquee displaying Happy 50th Birthday to Tina Smith.

Provide reserved parking for the guests coming to the party.

Provide a coat check station for guest.

Provide buffet style caterer.

Provide an A life to remember themed photo section.

Provide a photographer.

Provide a host by hour premium brand bar.

Provide a disk jockey.

Provide an audio visual.

MILESTONES

Milestones

Date

Scope Defined and Approved

September 20

Project Requirements Completed

September 23

Rental Agreement Signed

September 25

Call and confirm Caterer

September 30

Guests Arrive and Check in

October 19

Guest safely depart from Atlanta

October 20

Lessons Learned

October 20

TECHNICAL REQUIREMENTS

There will be several outlets being utilized by the entertainment; therefore; several adapters and switches are needed to be available. The customer has requested that we use all white linens and pink lights so make sure this has been provided for her. To accommodate the number of guest that is invited to the event, there will need to be 15 round tables that seat 8-10 people. There will need to be a podium with microphone included available for the master of ceremonies and the speakers chosen by the customer.

LIMITS AND EXCLUSIONS

This project package has limitations for the guest to follow. Guests are responsible for parking themselves in the designated parking lots. Guests are responsible for paying for street parking if designated lot is full. Guest is responsible for own transportation to event. Guest is to drink responsibly and at own risk.

WORK BREAKDOWN STRUCTURE

The following Work Breakdown Structure chart will be displayed in snapshots taken out of Microsoft Project.

NETWORK DIAGRAM

The following network diagram is expressed as a series of snapshots from the Microsoft Project application. The over allocations and the longest project date is being expressed in the snapshots.

RISK MANANGEMENT PLAN

This matrix shows the level and impact the top five risks have on a project. With 5 being the worst case scenario and 1 meaning little impact at all, this chart will assist you in how to label the list of possible risk you made.

Defined Conditions for Risk Management Analysis

Project Objective

Relative or Numerical Scales

Very Low - 1

Low - 2

Moderate - 3

High - 4

Very High - 5

Cost

Insignificant cost impact

< 10% cost impact

10-20% cost impact

20-40% cost impact

> 40% cost impact

Time

Insignificant schedule impact

< 5% schedule impact

5-10% schedule impact

10-20% schedule impact

> 20% schedule impact

Scope

Barely noticeable

Minor areas impacted

Major areas impacted

Changes unacceptable to sponsor

Product becomes effectively useless

Quality

Barely noticeable

Only very demanding applications impacted

Sponsor must approve quality reduction

Quality reduction unacceptable to sponsor

Product becomes effectively useless

RISK ASSESMENT TABLE (USE MATRIX ABOVE FOR SCORING)

Risk Evaluation

Risk

Probability

Cost

Schedule

Scope

Quality

Risk Score

0

Property damage

10%

3

1

1

1

0.60

Invitations get lost in the mail

10%

1

4

1

1

0.70

Late Equipment

10%

3

5

4

3

1.50

Drink Limits

70%

1

1

1

1

2.80

Cake Problems

30%

1

5

3

2

3.30

Physical injuries

30%

5

3

3

1

3.60

Over population

30%

5

2

2

3

3.60

Food Allergies

50%

4

1

1

2

4.00

Guest flights late

50%

4

3

2

1

5.00

Equipment not working

50%

4

4

2

2

6.00

RISK RESPONSE MATRIX

This next matrix will give you an overview of response that would take place if anything should veer from the original plan.

Risk Event

Response*

Contingency Plan

Trigger

Person Responsible

Invitations get lost in the mail

Mitigation: Use mail certification method

Track all mail that has been certified so the status can be checked.

Person in furthest state has not received invite after month of sending them out.

Keosha L.

Property damage

Transferring: Get renters insurance with the Fox Theatre.

Check venue after everyone has left.

Missing or broken equipment or property damage.

Curtis W., Event Planner

Food Allergies

Mitigation: Talk to chef for substitutes of allergic ingredients.

Have a allergy comment box in the invitation.

If someone reports a major allergy.

Event Planner

Equipment not working

Mitigate: Test equipment

Bring back ups

Equipment does not run during testing.

Equipment Technician

Physical injuries

Mitigate: Utilize EMT

Have EMT to monitor the party.

Someone gets hurt during the party.

EMT

Cake Problems

Avoid: Keep in touch with bakery.

Call to confirm order and message on cake.

Problems reported with cake order.

Event Planner

Drink Limits

Mitigation: Keep everyone at a legal drinking level

Monitor the bar for people who are drinking over the limit.

Guest becoming belligerent and sloppy.

Samuel D.

Late Equipment

Transferring: Find another place to rent equipment until it arrives.

Rent equipment from the Fox Theatre.

Equipment is more than 30 minutes late.

Equipment Technician

Over population

Mitigation: rent joining ballroom.

Rent joining ballroom for more space.

If more than the maximum amount of people are in the Egyptian ballroom.

Event Coordinator

Guest Flights Late

Mitigation: Arrange flights a day before event.

Arrive a day before if possible. If you cannot, provide transportation to the venue from the airport.

If flight times are due to be late

Event Planner

Highest Risk #1 - Food Allergies

The risk of food allergies at the birthday bash are anticipated as a high risk because the risk of it happening is very severe. I chose to avoid the risk all together by having the guest write their allergies on the RSVP letter.

Added cost:

Changing the menu

Highest Risk #2 Guest flights late

Guest flights being late can cause the party to not go off the way it is supposed to. If we plan for the guests who are flying in to come a day early, we can avoid the chance of needing to arrange transportation.

Added cost:

Overtime Costs

Transportation

Highest Risk #3- Equipment Not Working

If the equipment does not work the night of the birthday bash, the customers scope will be ruined. The only solution that we can put into play to insure equipment functioning is to make sure that there is an extra pair of equipment just in case one fails.

Added Cost:

Bonus paid for immediate work

Material costs

Overtime costs

RESOURCE MANANGEMENT PLAN

I assigned resources to the tasks that best matched the particular skill set. Doing this made my budget increased 10,000 dollars over my original budget; therefore, I decreased some of the days where it was not necessary to have multiple days to complete the tasks. After doing this, my dates were right on schedule and I was under budget. I then leveled the project with and without available slack and it did not change the dates or the budget but, I still have 3 resources with an over-allocation conflict. To fix this I would have to make a plan to reschedule dates for when there is enough slack to get the project done on time. If I were to tweak the dates around this will keep me under budget and I will not have to hire another resource to finish that task.

COMMUNICATION MANAGEMENT PLAN

Stakeholder Name/Title

Project Role

Project Manager

Kendra Smith, 678-613-6791

[email protected]

Customer expects the project manager to oversee all areas of the project and to make sure they have been executed according to the customers views.

Event Planner

Sashe Johnson, 404-649-7456

[email protected]

The customer will use expertise to successfully choose the locations and decorations.

Event Coordinator

Tim Duncan, 678-679-3098

[email protected]

The customer will use expertise to successfully choose the entertainment.

Equipment Technician

Jason Shadix, 404-696-0196

[email protected]

The equipment technician is to handle all of the technical equipment that needs to be set up for the other businesses.

Caterer

Molly Holwry, 404-488-4565

[email protected]

The caterer is responsible for provided tasty food for all guests to enjoy. Also, preparing food for guest with specific allergy request.

Photographer

Greg and Sandra Scott, 404-522-5559

[email protected]

Photographer will be responsible for taking all of the pictures during the event. As well as the Life to Remember section for guests.

Driver

Tony Jones, 770-751-7078

[email protected]

The driver is responsible for the transportation of the birthday girl the night of the event.

Floral Designer

Michele Lend, 404-869-8858

[email protected]

Responsible for using expertise to design a floral layout that suits the wants and needs of the customer.

Communication

Business

Audience

Expected Action

Comm. Class

Input Method

Output Method

Frequency

Responsible Resource

Event Planner

All project members.

Submit issues as they occur, Weekly updates.

Mandatory

In Person

Meeting notes in Word format

Weekly

Sam

Event Coordinator

All project members.

Submit issues as they occur, Weekly updates.

Mandatory

In person

Meeting notes in Word format

Weekly

Sam

Equipment Technician

Project technician.

Submit issues as they occur.

Mandatory

Formal status report template

Executive summary

Weekly per the expected action.

Steve

Caterer

All project lead members.

Submit issues as they occur

Mandatory

Formal Status report template

Executive summary

Weekly per the expected action.

Crystal

Photographer

Project photographer.

Submit Issues as they occur.

Mandatory

Formal Status report template

Executive summary

Weekly per the expected action.

Crystal

Floral Designer

All project members.

Update project status weekly.

Mandatory

In Person

Meeting notes in Word format

Weekly

Phoenix

A. Method for Updating the Communication Plan

The communication plan will continue to be updated as long as there is a need for it after each weekly meeting. All communication needed changes will be brought to and approved by the Project Manager, Kendra Smith.

B. Existing Systems

There are meetings that are being held weekly by the Project Manager. These meeting address current statuss of the different projects that are needed for a successful party.

C. Escalation Process

All issues and risks are to be addressed at the weekly meetings, for those who it is mandatory to attend. Others will send formal status reports to the project manager via email. There is a contingency plan set in place for each person to use as a template for most issues that may occur. The person in charge of fixing that problem will then be set in to place for getting around the obstacle.

BUSINESS MEMO

This week it I used the previous projects to create my final project plan. After tweaking a few things to fit into the final plan, I was finally able to make this project plan work. The plan includes the table of contents, scope statement, work breakdown structure, network diagram, risk management plan, resource management plan, and communication management plan.

LESSONS LEARNED

Only after tweaking the resources around a little bit, I was able to get the budget back under

20, 000. The project went well because the customer did not have too many unrealistic demands and we were able to book all of the entertainment extras even on short notice. While doing this project, I learned that I can do things on my own. Even though it was a lot of work, I was able to complete each task by myself. I came into this project ready to be told what to do but I ended up having to take the reins and get the job done by myself. This project could have been a better experience for me if I had someone to split the responsibilities and the decisions with. With more than one head working together you get more ideas going around. Because I was working by myself, ideas came a lot harder than they would have on a team setting.