The status of Production of Pulses during Kharif-11 in Andhra Pradesh
description
Transcript of The status of Production of Pulses during Kharif-11 in Andhra Pradesh
The status of Production of Pulses during Kharif-11 in
Andhra Pradesh
1
In a nutshell the production targets allotted by Government of India under NFSM -Pulses and achievement are as follows:
S.No Crop YearTarget (lakh
ha)
Achievement (lakh ha)
Remarks
1 Pulses2006-07 7.42 11.20 2007-08 7.77 14.41 The programme was implemented in Rabi2008-09 8.12 12.50 2009-10 8.83 12.37
NFSM - Targets & Achievements from 2006-07 to 2009-10
Crop wise area sown position of Kharif pulses during Kharif-11 as compared to last year. Kharif- 2011 Area
3
1 Redgram 700 382 630 248
2 Greengram 261 173 261 88
3 Blackgram 85 65 82 17
4 Horsegram 20 3 6 3
5 Other pulses 15 6 9 3
6 Total pulses 1081 629 988 359
1. Andhra Pradesh received a deficit rainfall of -39% during June which is the period for pulses sowing being rainfed to the extent of 98.5%. 2. Low MSP to pulses. Therefore the area under pulses is reduced by about 28% as on 24.08.11.
1. Crop wise area sown position of Kharif pulses during Kharif-11 as compared to last year.
Kharif-11 area:
Crop-wise Production targets and expected production of Kharif pulses during Kharif-11 as compared to last year
4
S.NoName of
pulse crop
Target of Production (000 tonnes)
Expected producti
on Kharif-
11
Production Kharif-
10
Difference of production
between target and
achievements
Reason of difference in production
1 Redgram 600 194 261 67 Due to heavy defecit rainfall during June 2011, the area is reduced and the productivity is also affected hence the shortfall
2 Greengram 200 64 122 583 Blackgram 50 25 46 214 Horsegram 13 2 3 15 Other pulses 7 2 3 1
6 Total pulses 870 287 435 148
1. Crop wise area sown position of Kharif pulses during Kharif-11 as compared to last year.
Kharif-11 area:
Crop wise area and production targets of Rabi pulses during Rabi-2011-12 as compared to last year
S.NoName of
pulse crop
Target of area (000 ha) Rabi-
11-12
Rabi Area-2010-11
Target of Production
(000 tonnes)
Production during Rabi-2010-
11
Proposed additional area during 2011-12 as compared to
last year
Proposed additional
production during 2011-12 as
compared to last year
1 Bengalgram 625 586 883 724 39 159
2 Redgram 70 8 45 4 62 41
3 Greengram 125 117 63 44 8 19
4 Blackgram 350 379 273 206 0 67
5 Horsegram 30 31 17 13 0 4
6 Other pulses 19 21 8 13 0 0
7 Total pulses 1219 1142 1289 1004 109 290
5
Details of Contingent planning during Rabi-2011-12 to meet the deficient
a) Through area expansion of Rabi Pulses
6
S.No Crop2010-11 (Area, lakh ha)
Target AchievementKharif Rabi Total Kharif Rabi Total
1 Bengalgram 0.00 6.50 6.50 0.00 5.86 5.862 Redgram 5.00 0.05 5.05 6.30 0.08 6.383 Greengram 3.10 1.40 4.50 2.61 1.17 3.784 Blackgram 0.90 3.50 4.40 0.82 3.79 4.615 Horsegram 0.03 0.25 0.28 0.06 0.31 0.376 Other pulses 0.05 0.20 0.25 0.09 0.21 0.307 Total pulses 9.08 11.90 20.98 9.88 11.42 21.30
Area Target & Achievement during 2010-11
7
Area sown as on 30.08.11 compared to Normal – Kharif-11
S.No Crop
Kharif- 11 Area (lakh ha)Normal
Current year as on 30.8.11Season
As on date
1 Redgram 4.73 4.00 3.822 Greengram 2.43 2.43 1.733 Blackgram 0.82 0.72 0.65
4 Horsegram 0.10 0.02 0.03
5 Other pulses 0.10 0.10 0.06
6 Total pulses 8.18 7.27 6.29
Andhra Pradesh received a deficit rainfall of -39% during June-11 and pulses are mainly ranifed i.e to the extent of 98.5% and june-11 is the period for pulses sowing. Hence the short fall.
8
To make the short fall of Kharif 11, it is planned to bring in an additional area of 4.10 lakh ha during the ensuing Rabi season. The crop wise plan is as follows.
S.NoName of
pulse crop
Target of area (lakh ha)
Rabi-11-12
Proposed additional
area during 2011-12 (Lakh ha)
1 Bengalgram 6.25 2.402 Redgram 0.70 03 Greengram 1.25 0.704 Blackgram 3.50 1.005 Horsegram 0.30 06 Other pulses 0.19 07 Total pulses 12.19 4.10
b) Additional area under IPM in in pigeonpea
9
2010-11 target under IPM – 42500 ha and Achievement is 25794 ha which includes A3P units as well as Polambadi and IPM component under NFSM – Pulses.
The area planned for the year 2011-12 is 50100 ha under IPM which includes A3P units of Kharif-2010, Kharif-2011 as well as IPM coverage under NFSM – Pulses and polambadi.
c) Additional area under Certified seeds distribution
10
S.NoName of
pulse crop
Seed distribution
planned during Rabi-
2011-12 (Lakh qtls)
Seed distributed during Rabi-
2010-11 (Lakh qtls)
Additional qty of seed
distribution planned for
Rabi-2011-12 (lakh qtls)
Addl. Area planned under certified seed distribution
(Lakh ha)
1 Bengalgram 3.50 2.36 1.80 2.402 Redgram 0.009 0.0015 0.00 0.003 Greengram 0.12 0.06 0.21 0.704 Blackgram 0.68 0.44 0.40 1.00
Total 4.31 2.86 2.41 4.10
An additional area of 4.10 lakh ha will be covered under distribution of certified seed of pulses, a quantity of 2.41 lakh qtls is planned to be distributed additionally during Rabi-2011-12 mainly under Bengal gram.
5. Progress of Pulses production Schemes
Physical Financial Physical Financial
1 2 3 4 5 6 7 81 Seed
(i) Purchase of Breeder Seeds of Pulses from ICAR
Full cost as per uniform rate fixed by DAC (Approx. Rs.5234/- per qtls.
Qtl. 350 18.319
( ii) Production of Foundation Seeds. Rs. 1000/-per qtls Qtl. 8000 80.000(iii) Production of Certified Seeds. Rs. 1000/-per qtls Qtl. 40630 406.300(iv) Distribution of Certified Seeds. subsidy limited to Rs. 1200/-per qtls Qtl. 130500 1566.000 15920 191.04
(v) Strengthening of State Seed Certification Agency
Rs. 25.00 lakh per year year 0 0
Sub total seeds (I to v) 2070.619 191.042 Organisation of Technology
Demonstrations of 0.4 ha.Rs. 2000/-per demo Nos. 0 0
3 Frontline Demonstrations of Pulses. Rs. 5000/-per Dem. Of one ha Ha 0 0Sub total demo.(2+3) 0.000 0.000
4 Integrated Nutrient Management:(a) Lime/Gypsum 50% subsidy limited to Rs. 750/-per Ha Ha 35000 262.500 536 2.54(b) Micro-nutrients. 50% subsidy limited to Rs. 500/-per Ha Ha 35000 175.000 132 0.55(c ) Assistance for Rizobium Culture/Phosphate Solublizing bacteria distribution
50% subsidy limited to Rs. 100/-per HaHa
40000 40.000 2500 2.50
Sub-Total INM (4-a to 4-c) Ha 477.500 5.595 Integrated Pest Management (IPM) 50% subsidy limited to Rs. 750/-per Ha Ha 16200 121.500 1011 1.876 Assistance for Distribution of NPV 50% subsidy limited to Rs. 250/-per ha Ha 0 0.0007 Assistance for Distribution of PP
Chemicals.50% subsidy limited to Rs. 500/-per ha. Ha 25000 125.000 945 1.03
Sub-Total IPM (5 to 7) 246.500 2.90
Approved Rate of assistance UnitTarget Achievement Sl.
No Interventions
11Contd..
5.1. Physical and Financial Progress of NFSM – Pulses up to August-11 (Tentative)
5. Progress of Pulses production Schemes5.1. Physical and Financial Progress of NFSM – Pulses up to August-11 (Tentative)
Physical Financial Physical Financial
1 2 3 4 5 6 7 88 Assistance for Weedicides 50% subsidy limited to Rs. 500/-per ha. Ha 2500 12.500 206 1.03
9 Incentive for Knap Sack Sprayers. 50% subsidy limited to Rs. 3000/-per Sprayer
Nos. 2203 66.090
10 Distribution of Zero Till Seed Drills. 50% subsidy limited to Rs. 15,000/-per machine
Nos. 441 66.150
11 Distribution of Multi-crop Planters. 50% subsidy limited to Rs. 15,000/-per machine
Nos. 450 67.500
12 Distribution on Zero Till Multi crop planters
50% Limited to Rs.15000/- per implement
Nos 450 67.500
13 Distribution of Seed Drills. 50% subsidy limited to Rs. 15,000/-per machine
Nos. 0 0.000
14 Distribution of Rotavators. 50% subsidy limited to Rs. 30000/-per machine
Nos. 500 150.000
15 Leaser Land lever 50% subsidy limited to Rs.150000/-per machine for group of 10 farmers
Nos. 110 165.000
Sub-Total Machinery (Items 9 to 13) Nos. 4154 514.740 0.00016 Incentive for Pump sets. 50% subsidy limited to Rs. 10000/-per
per machineNos 0 0
17 Distribution of Sprinkler Sets. 50% subsidy limited to Rs. 7500/-per set Ha 3200 240.000
18 Assistance for Pipe for carrying water from source to the field (limited to 800 mtrs per farmer)
50% subsidy limited to Rs. 15000/- per farmer
Nos. 0 0.000
19 (a) Extension, Training including Award to best performing districts
50% subsidy limited to Rs. 15000/- per farmer
(i) Training on Pattern of FFS. Rs. 17,000/- per trag. Nos. 220 37.400 22 3.74(ii) State Level Trainings for Trainers. Rs. 1.00 lakh per trag. Nos. 1 1.000 0.50( iii) Award for Best Performing District. Rs. 5.00 Lakh per dist Nos 1 5.000
20 Local Initiatives (Activity-wise) 139.58521 Miscellaneous Expenses relating to
PMTincluding contractual services, Pol and other expenses.(a) District Level (Existing NFSM Districts)
Rs. 4.47 lakh per dist. Nos 14 62.580 25.20
(b) State Level Rs. 6.28 lakh Nos 1 6.280 3.52(c ) Misc. expenses to State for other districts
Rs. 1.00 lakh per dist. 8 8.000 2.00
TOTAL FINANCIAL (1-20) 3821.704 235.518
Approved Rate of assistance UnitTarget Achievement Sl.
No Interventions
5.2. Physical and Financial progress of A3P during Kharif-2011
Full Payments to APSSDC & APSAIDC etc are not yet made under this programme
13
S.No CropA3P Physical A3P Financial Addl. A3P Phy Addl. A3P Fin
Target Achieve Target Achieve Target Achieve Target Achieve
1 Redgram 13 13 702 324.61 11 11 594 274.67
2 Greengram 5 5 240 124.85 1 1 48 24.97
3 Blackgram 4 4 192 99.88 2 2 96 49.94
Total 22 22 1134 549.34 14 14 738 349.58
5.3. Physical and Financial progress of 60,000 village programme during Kharif-2011
Full Payments to APSSDC & APSAIDC etc are not yet made under this programme
S.No Crop60000 Villages Phy 60000 Villages Fin
Target Achievement Target Achievement1 Redgram 3 3 162 74.912 Greengram 3 3 144 74.913 Blackgram 3 3 144 74.91 Total 9 9 450 224.73
14
5.4. Physical and Financial progress of e-pest surveillance under A3P during Kharif-2011
It is proposed to implement e-pest surveillance in last year 27 blocks, Kharif A3P areas and current year 45 blocks areas for which 28 officers have been trained for two days at MANAGE in coordination with NCIPM / ANGRAU, followed by another one day training of about 70 officers at SAMETI in coordination with NCIPM / ANGRAU.
15
S.No Crop
No. of units organized during 2010-11
No. of units organized during 2011-12
Kahrif Rabi Total KahrifRabi
(planned)Total
1 Redgram 12 0 12 27 0 272 Blackgram 10 15 25 9 9 183 Greengram 5 7 12 9 15 244 Bengalgram 0 13 13 0 22 22 Total 27 35 62 45 46 91
Accordingly the e-pest surveillance is in progress.
An amount of Rs. 72,48,000/- has already been released to the P.Ds ATMA to meet the honorarium and other charges of Master Trainers, ADAs, MAOs and Farmer’s scout.
5.5. Scheme-wise reasons of less achievements in pulses programme, if any.
16
Seasonal Conditions:
MonthNormal as
on date
Actual Rainfall (m.m)% deviation
to Normal as on date
Status2009 2010 2011
June 108.4 65.0 113.0 66.1 -39% DeficitJuly 188.8 85.8 278.3 198.0 +5 NormalAugust (up to 24.08.11)
144.4 90.2 152.7 143.4 -0.7 Normal
A.P. 441.6 241.0 544.0 407.5 -8 NormalThe reasons for low achievements are as follows.
1.Deficit rainfall to the extent of 39% in June 11 which is the proper period of sowing.
2.Low MSP to pulse crops.
Therefore the area is reduced by 28%
17
All the 45 units allotted for kharif-11 have been organized under A3P. 46 units are being organized during Rabi-2011-12 as given below.
The implementation of NFSM Pulses is in progress.
S.No CropNormal A3P 60000 villages A3P Addl. A3P from Savings Grand Total
Kharif Rabi Total Kharif Rabi Total Kharif Rabi Total Kharif Rabi Total
1 Redgram 13 0 13 3 0 3 11 0 11 27 0 27
2 Greengram 5 5 10 3 0 3 1 4 5 9 9 18
3 Blackgram 4 11 15 3 1 4 2 3 5 9 15 24
4 Bengalgram 0 10 10 0 2 2 0 10 10 0 22 22
Total 22 26 48 9 3 12 14 17 31 45 46 91
5.6. Requirement of Additional funds for additional programme of pulses.
18
To bring an additional area of 4.10 lakh ha, an amount of Rs. 954.36 lakhs is required for distribution of certified seed under NFSM on 50% subsidy.
An amount of Rs. 250.00 lakhs is required to cover an additional area of 50000 ha under distribution of P.P. Chemicals for 2011-12.
Thus the total additional funds requirement is Rs. 1204.36 lakhs For Rabi-2011-12.
19