The Scottish Ferries Review
Consultation Document 2010
Arran - 12 July 2010
Graham Laidlaw
![Page 2: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/2.jpg)
Introduction
• Consultation Document, not a Plan• Runs to 30 September 2010• Questionnaires to complete and return• 33 key questions• [email protected]• 0131 244 1539• Documents available on our website
![Page 3: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/3.jpg)
Commitment to Ferries
• Essential part of our transport network• Essential for access to vital services• Enable movement of freight• Encourage sustainable and growing
communities• Must provide a safe, sustainable system• Quality employment
![Page 4: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/4.jpg)
Summary of the Review:
• Inform a long term Ferries Strategy – to 2022• Influence next round of tendering for services• Investment programme for vessels and ports
and harbours• All publicly funded ferries included – Scottish
Government and local authority funded• No potential routes excluded• Needs of passengers, cars, commercial vehicles
and freight all to be considered
![Page 5: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/5.jpg)
Lack of consistency
• Funding services• Funding vessels• Funding harbour infrastructure• Responsibility for delivery• What routes and what level of service• Tendered services• Provision of vessels
![Page 6: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/6.jpg)
What we’ve done so far
• Been helped in forming opinions by project groups
• Consultants and CMAL carried out specific pieces of work to inform us
• Public consultation events last year
• Extensive data collection
![Page 7: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/7.jpg)
Challenges
• Less money available to invest in and support ferries
• Ageing fleet and need for investment
• Ageing harbour infrastructure and need for investment
• Escalating fuel and crew costs
• Subsidy levels increasing
![Page 8: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/8.jpg)
Funding and Procurement• To 2022 need £604m for vessels• To 2022 need £180m for ports and
harbours replacement• To 2022 need £7.5m p.a. annually for
ports and harbours maintenance• The services also need to be funded -
2007/8 cost for all c. £103m, 2008/9 for DML c.£90m
• We are asking you to consider options
![Page 9: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/9.jpg)
Funding Options
• The status quo
• CMAL to access funds through alternative structural or financing routes
• Ports and harbours could be self-funding
• Users of the service to pay more
• Open the market up to greater competition
![Page 10: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/10.jpg)
Fares Options• Increase all fares• Increase visitor fares• Reduce fares for island/peninsula
residents• Reduce fares for commercial vehicles• RET or other distance based• To manage demand• Mixed approach
![Page 11: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/11.jpg)
Fares Questions• Asking you to consider what the rationale
for/purpose of the fares policy should be.
• Should fares differentiate between islanders/residents of peninsular communities and other ferry users?
• One fares policy across Scotland or different policies dependant on needs of communities?
![Page 12: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/12.jpg)
What services should be funded?
• We have developed a methodology – based on Summer timetables - for determining what routes and services are needed
• We will now do the same for Winter timetable
![Page 13: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/13.jpg)
Other Issues?
• Accessibility
• Environment
![Page 14: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/14.jpg)
Current Issues for Arran
• Reliability issues at Ardrossan harbour – during bad weather
• Last sailing to Arran too early in the evening
• Summer capacity and second vessel
![Page 15: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/15.jpg)
Arran –Household survey results
• Overall people in Arran who use the ferry most are either quite or highly satisfied with their current services – 74% (Average all network – 73% satisfaction)
![Page 16: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/16.jpg)
Routes and Services Methodology
1. Define current and future needs relevant to other communities
2. Define the ferry service required to meet those needs
3. Define current service and current issues4. Define gaps between steps 2 and 35. Consider options to address gaps6. Prioritise future spending
![Page 17: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/17.jpg)
Step 1 - Define current needs
• Commuting
• Personal
• Supply chain
• Export/import
• Tourism
![Page 18: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/18.jpg)
Results of step 1 – Arran
• Supply Chain and Export/Import are equally important
• Followed by Personal and Tourism then Commuting
![Page 19: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/19.jpg)
Defining a service to meet these needs
• Chosen four attributes that largely define a ferry service:1.Crossing time;2.number of sailings per day;3. length of operating day; and, 4. the number of days per week the service runs
• Taken dependencies identified in step 1 andmatched them against these four attributes
![Page 20: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/20.jpg)
Results of steps 2 and 3 – Arran
Attribute Proposed Actual
• Crossingtime medium short
(75-180 mins) (less than 75-mins)
• Sailingper day medium medium
(3-6) (3-6)
![Page 21: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/21.jpg)
Results of steps 2 and 3
Attribute Proposed Actual
• Oper/day high high(full oper/day) (full oper day)
• Day/wk high high(full week) (full week)
![Page 22: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/22.jpg)
Results of Step 4 – initial analysis for Arran
• A longer crossing time• And no change to:
sailings per day;operating day;days per week.
• However sense checking and Steps 5 and 6 yet to be applied
![Page 23: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/23.jpg)
Steps 5 and 6• Identify options to address proposed
changes at Step 4
• STAG based appraisal
• Objectives to take account of current issues
• Prioritise future spend across the Scottish ferries network
![Page 24: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/24.jpg)
What’s the way forward?• Majority of services will continue to receive
public funding• Responsibility for delivery will continue to be split
between SG and LAs• Must explore ways of bringing additional money
into the system for delivery of ferry services• Need an open and transparent way to determine
what routes and services and level of service should be funded
![Page 25: The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.](https://reader036.fdocuments.us/reader036/viewer/2022062515/56649f515503460f94c75120/html5/thumbnails/25.jpg)
What happens next?
• Public consultation to 30 September 2010• 43 events within this period• Draft Ferries Plan with more detailed Strategic
Environmental Assessment and an Equalities Impact Assessment
• Further minimum 6 week consultation period• Final Ferries Plan