    This week, team S.C.I.F.I. took a giant step forward. First of all, they embarked on building hardware for HIVE Suite consisting ofArrow of Apo"o (previously called Laser Weenie), Cardio Gauntlet and DRADIS.Second, the team developed a user flow that turns the separate experience of each device into a firmlyconsolidated one. Third, they finalized detailed project schedule that is adjusted to the new order.

    !

    ISSUE 7 WWW.ETC.CMU.EDU/PROJECTS/LM-SCI-FI/ SEPTEMBER 2010

    PAGE 1

    The S.C.I.F.I. Weekly

    This week inside...The S.C.I.F.I. Weekly

    Under Construction.............................1

    Building the Hardware...............................1

    HIVE Suite of Application User Flow......2

    Prospective Scheme....................................3

    Inspirations..................................................3

    Components Ready............................... ......4

    Weekly Checklist................. .......................4

    Under Construction

    CARLOS SOKION SHIN

    Producer

    As expected, all components they neededarrived earlier this week. Michael and Hanika, bothprogrammers and hardware designers, startedworking with the components. They have focusedon having each component work to fulfill desiredpurposes. It has been a level road with a fewexceptions where some combinations of components did not work as they were supposedto. Many of them are fixed and they are positive

    that the rest will very soon as well. Thesechallenges, they believe, will add much value to theproject and their experience in the end.

    Building the Hardware

    http://www.etc.cmu.edu/projects/lm-sci-fi/http://www.etc.cmu.edu/projects/lm-sci-fi/http://www.etc.cmu.edu/projects/lm-sci-fi/
  • 8/8/2019 The S.C.I.F.I. Weekly Issue 7

    2/4

    CARLOS SOKION SHINProducer

    Last Tuesday(Oct. 5, 2010), the team had a meeting tocomplete a user flow chart. Having a visualrepresentation of user experience appears to be veryhelpful in many ways. First, it makes it much easier toexplain how they are going to work as a whole. Second, itfacilitates connecting the dotsand finding missing links. As amatter of fact, the team foundsome confusion from impliedassumptions (so-called CIA

    factors which is said to be the cause of about 90 percent of

    things going wrong on the planet) during the meeting. Ofcourse, they all are on the same page as for the suite's

    integrity. Third, it reminds the team of the big picture ofthe project so that they don't have to have a hard timecategorizing and prioritizing tasks. As a result of themeeting, the team decided to change the name of two

    gadgets and the suite to better fit their purposes: Arrowof Apollo for former LaserWeenie; DRADIS for formerHIVE which is now the nameof the whole package.

    !

    ISSUE 7 WWW.ETC.CMU.EDU/PROJECTS/LM-SCI-FI/ SEPTEMBER 2010

    PAGE 2

    User Interaction

    Concept Art for trinity of the HIVE Suites, by James Doughty

    James Doughty

    http://www.etc.cmu.edu/projects/lm-sci-fi/http://www.etc.cmu.edu/projects/lm-sci-fi/http://www.etc.cmu.edu/projects/lm-sci-fi/
  • 8/8/2019 The S.C.I.F.I. Weekly Issue 7

    3/4

    http://en.battlestarwiki.org/wiki/DRADIShttp://en.battlestarwiki.org/wiki/DRADIShttp://www.etc.cmu.edu/projects/lm-sci-fi/http://www.etc.cmu.edu/projects/lm-sci-fi/http://www.etc.cmu.edu/projects/lm-sci-fi/schedule/http://www.etc.cmu.edu/projects/lm-sci-fi/schedule/http://www.etc.cmu.edu/projects/lm-sci-fi/schedule/http://www.etc.cmu.edu/projects/lm-sci-fi/schedule/http://www.etc.cmu.edu/projects/lm-sci-fi/schedule/http://www.etc.cmu.edu/projects/lm-sci-fi/schedule/http://www.etc.cmu.edu/projects/lm-sci-fi/schedule/http://www.etc.cmu.edu/projects/lm-sci-fi/schedule/http://www.etc.cmu.edu/projects/lm-sci-fi/schedule/http://www.etc.cmu.edu/projects/lm-sci-fi/schedule/
  • 8/8/2019 The S.C.I.F.I. Weekly Issue 7

    4/4

    Upcoming Schedule

    October 15, 2010

    Due prototype and detailed

    schedule

    October 18, 20, 22, 2010

    1/2 Presentation

    October 28, 2010

    TEA/ETC Technology Mixer

    The S.C.I.F.I.

    Project Client

    (Lockheed Martin)

    James F. Burke Jr.

    Brad A. Michael

    Project Advisors

    Shirley Saldamarco

    Scott Stevens

    Team S.C.I.F.I.

    Carlos Sokion Shin

    James Doughty

    Michael Hill

    Hanika Karkhanis

    Programming Advisor

    John Conomikes

    Page Design

    Carlos Sokion Shin

    ISSUE 7 WWW.ETC.CMU.EDU/PROJECTS/LM-SCI-FI/ SEPTEMBER 2010

    PAGE 4

    Components Ready

    W E E K LY C H E C K L I S T

    This week

    Receive all necessary components.Start building prototypes.Have digital compass work with Servomotor.Retrieve data from both heart ratemonitor and Arduino.Work on detailed schedule.Develop concept arts for HIVE.Start working on 10 sec promo video.

    Next week

    Enable XBEE networking.Get bluetooth data from Arduino into

    Droid X.Get the retrieved data working withProcessing.Have presentation slide for halvesready.Prepare 3-slide project introduction.

    Arrow of Apollo Cardio Gauntlet DRADIS

    Droid XBluetooth module

    Arduino Pro Mini

    Servo motor

    Magnifying lens

    Fresnel Lens

    Laser printertransparencies

    Digital compass

    10mw Laser

    Conductive threadCustom circuit

    Arduino Pro Mini

    Bluetooth module

    Battery pack

    Battery charger

    Power supply for charger

    Glove

    Arduino LilypadXBEE Lilypad BreakoutBoard

    Electrodes

    USB weather board

    XBEE

    Polar HR transmitter

    Polar HR monitor

    Battery pack (900mAh)

    Battery charger (900mAh)

    General

    70w soldering station

    Lead-free solder

    Arduino Uno

    Solder wick

    9v Power supply forArduino

    Helping hands

    LilyPad LiPower

    Optoisolator

    Breakaway headers

    FTDI Basic Breakout

    6 Jumper wires

    DC power jack

    Breadboard

    Wire stripper

    Every component the team ordered has arrived. Currently the team isbuilding the custom circuit for the HIVE Suite and researching a proper glove

    for Cardio Gauntlet

    .

    Legend

    Ready

    Orders placed

    Building

    Researching

    http://www.etc.cmu.edu/projects/lm-sci-fi/http://www.etc.cmu.edu/projects/lm-sci-fi/http://www.etc.cmu.edu/projects/lm-sci-fi/