The Scientific Costing Guide BBuuiillddCCOOSSTTbuildsystem.in/userfiles/SamplepagesBuildCost.pdf ·...

34
The Scientific Costing Guide Building Construction Cost Data BuildCOST BuildCOST Item of Work Cost Database 2018

Transcript of The Scientific Costing Guide BBuuiillddCCOOSSTTbuildsystem.in/userfiles/SamplepagesBuildCost.pdf ·...

The Scientific Costing Guide

Building Construction Cost Data

BuildCOSTBuildCOSTBuildCOST

Item of Work Cost Database

2018

Div. No. Title Page Div. No. Title Page

01 GENERAL REQUIREMENTS 1 06 WOOD, PLASTICS, AND COMPOSITES 43

01 45 Quality Control 3 06 17 Shop-Fabricated Structural Wood 45

01 45 23 Testing and Inspecting Services 3 06 17 53 Shop-Fabricated Wood Trusses 45

02 EXISTING CONDITIONS 5 06 22 Millwork 45

02 32 Geotechnical Investigations 7 06 22 13 Standard Pattern Wood Trim 45

02 32 19 Exploratory Excavations 7 06 26 Board Paneling 46

02 41 Demolition 7 06 26 13 Profile Board Paneling 46

02 41 13 Selective Site Demolition 7 06 42 Wood Paneling 46

03 CONCRETE 11 06 42 10 Wood Paneling 46

03 05 Common Work Results for Concrete 13 06 43 Wood Stairs and Railings 47

03 05 13 Basic Concrete Materials 13 06 43 13 Wood Stairs 47

03 11 Concrete Forming 13 06 48 Wood Frames 47

03 11 13 Structural Cast-in-Place Concrete Forming 13 06 48 16 Interior Wood Door Frames 47

03 15 Concrete Accessories 15 07 THERMAL AND MOISTURE PROTECTION 49

03 15 05 Concrete Forming Accessories 16 07 11 Dampproofing 51

03 15 13 Waterstops 16 07 11 17 Damp-Proof Course 51

03 21 Reinforcing Bars 17 07 13 Sheet Waterproofing 51

03 21 10 Uncoated Reinforcing Steel 17 07 13 13 Bituminous Sheet Waterproofing 51

03 22 Welded Wire Fabric Reinforcing 17 07 16 Cementitious And Reactive Waterproofing 52

03 22 05 Uncoated Welded Wire Fabric 17 07 16 16 Crystalline Waterproofing 52

03 31 Structural Concrete 17 07 21 Thermal Insulation 55

03 31 05 Normal Weight Structural Concrete 17 07 21 14 Building Insulation 56

03 35 Concrete Finishing 21 07 22 Roof and Deck Insulation 56

03 35 29 Tooled Concrete Finishing 21 07 22 16 Roof Board Insulation 57

03 41 Precast Structural Concrete 21 07 26 Vapor Retarders 57

03 41 05 Precast Concrete Members 21 07 26 10 Vapor Retarders 57

03 41 16 Precast Concrete Slabs 23 07 32 Roof Tiles 57

03 45 Precast Architectural Concrete 23 07 32 13 Clay Roof Tiles 57

03 45 13 Faced Architectural Precast Concrete 23 07 41 Roof Panels 58

04 MASONRY 25 07 41 13 Metal Roof Panels 58

04 21 Clay Unit Masonry 27 07 41 34 Asbestos Roof Panels 60

04 21 13 Brick Masonry 27 08 OPENINGS 61

04 22 Concrete Unit Masonry 31 08 09 Metal Doors, Windows And Frames 63

04 22 10 Concrete Masonry Units 31 08 09 16 Aluminum Doors, Windows and Frames 63

04 23 Glass Unit Masonry 32 08 09 21 Steel Doors, Windows and Frames 63

04 23 13 Vertical Glass Unit Masonry 32 08 12 Metal Frames 64

04 43 Stone Masonry 33 08 12 21 Steel Frames 64

04 43 10 Stone Masonry 33 08 14 Wood Doors 65

05 METALS 39 08 14 50 Wood Shutters 65

05 05 Common Work Results for Metals 41 08 33 Coiling Doors and Grilles 69

05 05 23 Metal Fastenings 41 08 33 23 Overhead Coiling Doors 69

05 12 Structural Steel Framing 41 08 33 33 Side Coiling Doors 69

05 12 23 Structural Steel for Buildings 41 08 44 Curtain Wall and Glazed Assemblies 69

05 51 Metal Stairs 41 08 44 13 Glazed Aluminum Curtain Walls 69

05 51 16 Metal Floor Plate Stairs 41 08 71 Door Hardware 71

05 55 Metal Stair Treads and Nosings 42 08 71 20 Hardware 71

05 55 13 Metal Stair Treads 42 08 75 Window Hardware 75

05 73 Decorative Metal Railings 42 08 75 10 Windows Hardware 75

05 73 23 Ornamental Railings 42 09 FINISHES 77

06 WOOD, PLASTICS, AND COMPOSITES 43 09 21 Plaster and Gypsum Board Assemblies 79

06 11 Wood Framing 45 09 21 13 Plaster Assemblies 79

06 11 10 Wood Framing 45

Unit Price Section - Table of Contents

Div. No. Title Page Div. No. Title Page

Unit Price Section - Table of Contents

09 FINISHES 77 22 PLUMBING 115

09 22 Supports for Plaster And Gypsum Board79

22 11 Facility Water Distribution120

09 22 26 Suspension Systems 79 22 11 13 Facility Water Distribution Piping 120

09 23 Gypsum Plastering 80 22 11 19 Domestic Water Piping Specialties 126

09 23 20 Gypsum Plaster 80 22 12 Facility Potable-Water Storage Tanks 126

09 24 Portland Cement Plastering80

22 12 23 Facility Indoor Potable-Water Storage Tanks126

09 24 20 Portland Cement Plaster 80 22 13 Facility Sanitary Sewerage 127

09 24 26 Pointing On Walls And Floors 82 22 13 16 Sanitary Waste and Vent Piping 12709 28 Backing Boards and Underlayments 83 22 13 23 Sanitary Waste Interceptors 136

09 28 13 Cementitious Backing Boards 83 22 33 Electric Domestic Water Heaters 136

09 30 TILING 84 22 33 30 Residential, Electric Domestic Water Heaters 136

09 30 10 Precast Pre-polished Tiling 84 22 41 Residential Plumbing Fixtures 136

09 30 13 Ceramic Tiling 84 22 41 13 Residential Water Closets, Urinals, & Bidets 136

09 30 23 Glass Mosaic Tiling 85 22 41 16 Residential Lavatories and Sinks 139

09 30 35 Terrazo Tiling 86 22 41 19 Residential Bathtubs 141

09 51 Acoustical Ceilings 86 22 41 39 Residential Faucets, Supplies, and Trim 141

09 51 23 Acoustical Tile Ceilings 86 22 42 Commercial Plumbing Fixtures 143

09 63 Masonry Flooring87

22 42 13 Commercial Water Closets, Urinals, & Bidets143

09 63 13 Brick Flooring87

23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

145

09 63 30 Marble Flooring 87 23 07 HVAC Insulation 147

09 63 35 Granite Flooring 93 23 07 13 Duct Insulation 147

09 63 40 Stone Flooring 94 23 09 Instrumentation and Control for HVAC 148

09 64 Wood Flooring97

23 09 33 Electric and Electronic Control System for HVAC 148

09 64 16 Wood Block Flooring97

23 09 53 Pneumatic and Electric Control System for HVAC 151

09 65 Resilient Flooring 98 23 21 Hydronic Piping and Pumps 151

09 65 16 Resilient Sheet Flooring 98 23 21 20 Hydronic HVAC Piping Specialties 151

09 66 Terrazzo Flooring 98 23 21 23 Hydronic Pumps 152

09 66 13 Portland Cement Terrazzo Flooring 98 23 21 24 Hydronic Piping 159

09 91 Painting 100 23 31 HVAC Ducts and Casings 161

09 91 13 Exterior Painting 100 23 31 13 Metal Ducts 161

09 91 23 Interior Painting 101 23 33 Air Duct Accessories 161

10 SPECIALTIES 105 23 33 11 Air Duct Accessories 161

10 14 Signage 107 23 34 HVAC Fans 161

10 14 53 Traffic Signage 107 23 34 11 Fans 161

10 28 Toilet, Bath, and Laundry Accessories 107 23 41 Particulate Air Filtration 164

10 28 16 Bath Accessories 107 23 41 13 Panel Air Filters 164

10 44 Fire Protection Specialties 109 23 52 Heating Boilers 165

10 44 13 Fire Extinguisher Cabinets 109 23 52 13 Electric Boilers 165

10 44 16 Fire Extinguishers 109 23 52 23 Cast-Iron Boilers 165

21 FIRE SUPPRESSION 111 23 64 Packaged Water Chillers 166

21 12 Fire-Suppression Standpipes 113 23 64 10 Packaged Water Chillers 166

21 12 13 Fire-Suppression Hoses and Nozzles 113 23 64 13 Absorption Water Chillers 168

21 13 Fire-Suppression Sprinkler Systems 113 23 65 Cooling Towers 170

21 13 13 Wet-Pipe Sprinkler Systems 114 23 65 11 Cooling Towers 170

22 PLUMBING115

23 73 Indoor Central-Station Air-Handling Units171

22 05 Common Work Results for Plumbing 117 23 73 13 Modular Indoor Central-Station Air-Handling 171

22 05 23 General-Duty Valves for Plumbing Piping 117 23 74 Packaged Outdoor HVAC Equipment 172

22 05 76 Facility Drainage Piping Cleanouts 119 23 74 33 Packaged, Outdoor, Heating and Cooling 172

Div. No. Title Page Div. No. Title Page

Unit Price Section - Table of Contents

23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

14531 50 EXCAVATION SUPPORT and

PROTECTION246

23 76 Evaporative Air-Cooling Equipment 172 31 50 13 Excavation Support And Protection 246

23 76 13 Direct Evaporative Air Coolers 172 31 62 Driven Piles 247

23 81 Decentralized Unitary HVAC Equipment 173 31 62 13 Concrete Piles 247

23 81 19 Self-Contained Air-Conditioners 173 31 63 Bored Piles 247

23 81 26 Split-System Air-Conditioners 173 31 63 23 Bored Concrete Piles 247

23 82 Convection Heating and Cooling Units 174 32 EXTERIOR IMPROVEMENTS 249

23 82 16 Air Coils 174 32 11 Base Courses 251

23 82 19 Fan Coil Units 175 32 11 23 Aggregate Base Courses 251

26 ELECTRICAL 177 32 11 26 Asphaltic Base Courses 251

26 05 Common Work Results for Electrical 179 32 12 Flexible Paving 252

26 05 13 Medium -Voltage Cables 179 32 12 16 Asphalt Paving 252

26 05 19 Low-Voltage Electrical Power Conductors and Cables 185

32 13 Rigid Paving253

26 05 26 Grounding & Bonding for Electrical Systems 193 32 13 13 Concrete Paving 253

26 05 29 Hangers & Supports for Electrical Systems 194 32 14 Unit Paving 253

26 05 33 Raceway and Boxes for Electrical Systems194

32 14 13 Precast Concrete Unit Paving253

26 05 36 Cable Trays for Electrical Systems196

32 16 Curbs, Gutters, Sidewalks, And Driveways

254

26 05 90 Residential Wiring 199 32 16 13 Curbs And Gutters 254

26 24 Switchboards and Panelboards 219 32 31 Fences and Gates 254

26 24 13 Switchboards 219 32 31 13 Chain Link Fences and Gates 254

26 27 Low-Voltage Distribution Equipment 220 33 UTILITIES 257

26 27 26 Wiring Devices 220 33 11 Water Utility Distribution Piping 259

26 28 Low-Voltage Circuit Protective Devices 223 33 11 13 Public Water Utility Distribution Piping 259

26 28 16 Enclosed Switches and Circuit Breakers 223 33 36 Utility Septic Tanks 268

26 41 Facility Lightning Protection 230 33 36 13 Utility Septic Tank and Effluent Wet Wells 268

26 41 13 Lightning Protection for Structures 230 33 41 Storm Utility Drainage Piping 269

26 51 Interior Lighting 230 33 41 13 Public Storm Utility Drainage Piping 269

26 51 13 Interior Lighting Fixtures, Lamps, & Ballasts 230 33 44 Storm Utility Water Drains 271

27 COMMUNICATIONS 233 33 44 13 Utility Area Drains 271

27 15 Communications Horizontal Cabling 235

27 15 10 Special Communications Cabling 235

28 ELECTRONIC SAFETY AND SECURITY 237

28 31 Fire Detection and Alarm 239

28 31 23 Fire Detection and Alarm Annunciation Panels and Fire Stations 239

31 EARTHWORK 241

31 11 Clearing and Grubbing 243

31 11 10 Clearing and Grubbing 243

31 14 Earth Stripping and Stockpiling 243

31 14 13 Soil Stripping and Stockpiling 243

31 22 Grading 243

31 22 16 Fine Grading 243

31 23 Excavation and Fill 243

31 23 16 Excavation 243

31 23 19 Dewatering 245

31 23 23 Fill 245

31 31 Soil Treatment 246

31 31 16 Termite Control 246

BuildCOST GENERAL REQUIREMENTS

45 Quality Control01

23 Testing And Inspecting Services UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

4501TOTAL

Pile Test21

Vertical load testing ( INITIAL ) of piles in

accordance with IS 2911 (Part IV) including

installation of loading platform / or reaction piles

and preparation of pile head or construction of

test cap and dismantling of test cap after test

etc. to 150% of designed load, complete, of pile

capacities :

10005 /testupto 50 ton 44840.00 - - 44840.00 51566.00

10010 /testabove 50 ton and upto 100 ton 82600.00 - - 82600.00 94990.00

10015 /test/50 tadd for every additional 50 ton or part thereof 44840.00 - - 44840.00 51566.00

Vertical load testing ( ROUTINE ) of piles in

accordance with IS 2911 (Part IV) including

installation of loading platform / or reaction piles

and preparation of pile head or construction of

test cap and dismantling of test cap after test

etc. to 150% of designed load, complete, of pile

capacities :

10020 /testUpto 50 ton 44840.00 - - 44840.00 51566.00

10025 /testabove 50 ton and upto 100 ton 82600.00 - - 82600.00 94990.00

10030 /test/50 tadd for every additional 50 ton or part thereof 35400.00 - - 35400.00 40710.00

Cyclic vertical load testing of pile in accordance

with IS:2911 (part IV) including preparation of pile

head etc., to 150% of designed load, complete,

of pile capacities :

10035 /testupto 50 ton 44840.00 - - 44840.00 51566.00

10040 /testabove 50 t and upto 100 ton 82600.00 - - 82600.00 94990.00

10045 /test/50 tadd for every additional 50 ton or part thereof 44840.00 - - 44840.00 51566.00

Lateral load testing of single pile in accordance

with IS:2911 (Part IV) to 150% of designed load,

complete, of pile capacities :

10050 /testupto 50 ton 44840.00 - - 44840.00 51566.00

10055 /testAbove 50 ton and upto 100 ton 70800.00 - - 70800.00 81420.00

10060 /test/50 tAdd for every additional 50 ton or part

thereof.

44840.00 - - 44840.00 51566.00

Vertical load testing ( INITIAL ) of piles in

accordance with IS 2911 (Part IV) including

installation of loading plateform / or reaction piles

and preparation of pile head or construction of

test cap and dismantling of test cap after test

etc. to 250% of designed load complete, of pile

capacities :

10065 /testupto 50 ton 44840.00 - - 44840.00 51566.00

10070 /testabove 50 ton and upto 100 ton 82600.00 - - 82600.00 94990.00

10075 /test/50 tadd for every additional 50 ton or part thereof 44840.00 - - 44840.00 51566.00

Vertical load testing ( ROUTINE ) of piles in

accordance with IS 2911 (Part IV) including

installation of loading plateform / or reaction piles

and preparation of pile head or construction of

test cap and dismantling of test cap after test

etc. to 250% of designed load, complete, of pile

capacities :

10080 /testupto 50 ton 44840.00 - - 44840.00 51566.00

10085 /testabove 50 ton and upto 100 ton 67260.00 - - 67260.00 77349.00

10090 /test/50 tadd for every additional 50 ton or part thereof 44840.00 - - 44840.00 51566.00

Testing50

Conducting laboratory tests at approved

laboratory, including preparation and taking of

samples to laboratory, testing of samples and

getting and submitting test results :

3

BuildCOST GENERAL REQUIREMENTS

45 Quality Control01

23 Testing And Inspecting Services UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

4501TOTAL

10005 /testCompressive strength test on rock samples 1888.00 - - 1888.00 2171.20

10010 /testChemical analysis of soil samples 1888.00 - - 1888.00 2171.20

10015 /testChemical analysis of water samples 1770.00 - - 1770.00 2035.50

4

BuildCOST EXISTING CONDITIONS

32 Geotechnical Investigations02

19 Exploratory Excavations UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

3202TOTAL

Test Pit17

Drilling 150 mm diameter bore holes in all type of

soils by manual auguring, conducting standard

penetration tests, collecting disturbed and

undisturbed soil samples, conducting necessary

laboratory tests, recommending suitable type of

foundation and allowable bearing pressure and

submission of report in three copies :

10005 mGround level to 6.0 m or refusal,

whichever is earlier

531.00 - - 531.00 610.65

10010 mOver 6.0 m and upto 10.0 m or refusal,

whichever is earlier

590.00 - - 590.00 678.50

10015 mOver 10.0 m and upto 12.0 m or refusal,

whichever is earlier

649.00 - - 649.00 746.35

Drilling 150 mm diameter bore holes in all type of

soils by Calyx drilling, conducting standard

penetration tests, collecting disturbed and

undisturbed soil samples, conducting necessary

laboratory tests, recommending suitable type of

foundation and allowable bearing pressure and

submission of report in three copies :

10020 mGround level to 6.0 m or refusal, which is

earlier

1121.00 - - 1121.00 1289.15

10025 mOver 6.0 m and upto 10.0 m or refusal,

which is earlier

1180.00 - - 1180.00 1357.00

10030 mOver 10.0 m and upto 12.0 m or refusal,

which is earlier

1298.00 - - 1298.00 1492.70

Drilling 100 mm dia bore hole in rock using

double core barrel Diamond/TC including

recovery of cores, wherever possible and

keeping a log of the same :

10035 mWeathered / disintegrated rock 2478.00 - - 2478.00 2849.70

10040 mHard rock 5428.00 - - 5428.00 6242.20

41 Demolition02

13 Selective Site Demolition UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

4102TOTAL

Concrete / Rcc / Masonry Demolition21

10005 cumDemolishing lime concrete / cement

concrete in all mixes, in foundations, super

structure and basement, at all heights /

depths, including disposal of unserviceable

materials upto a 50 m lead.

- 325.22 - 325.22 374.00

10010 cumDemolishing RCC work in foundations, super

structure and basement, at all heights /

depths, including cutting, straightening

scrapping, cleaning and stacking of

reinforcement bars and disposal of

unserviceable materials upto a 50 m lead.

- 1333.39 - 1333.39 1533.39

10015 cumDemolishing RB work in foundations, super

structure and basement, at all heights /

depths, including cutting, straightening

scrapping, cleaning and stacking of

reinforcement bars and disposal of

unserviceable materials upto a 50 m lead.

- 1212.18 - 1212.18 1394.01

10020 cumDismantling / Demolishing brick work in

cement / lime mortar in foundations, super

structure and basement, at all heights /

depths, including removing of mortar ,

cleaning bricks and stacking of serviceable

materials and disposed of unserviceable

materials upto 50 m lead

- 1481.55 - 1481.55 1703.79

7

BuildCOST EXISTING CONDITIONS

41 Demolition02

13 Selective Site Demolition UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

4102TOTAL

10025 cumDismantling / demolishing stone rubble

masonry in cement / lime mortar in

foundations, super structure and basement

at all heights / depths including stacking of

serviceable materials and disposal of

unserviceable materials upto a 50 m lead.

- 930.29 - 930.29 1069.83

Ceiling Demolition22

Dismantling false ceiling, partitions, wall lining,

etc supported / fixed to wooden / aluminium /

metal frame including dismantling of frame,

stacking of serviceable material and disposal of

unserviceable material upto a 50 m lead, with :

10005 sqmPlaster of Paris /Gypsum / Plywood / Block

board / Particle board / MDF sheets / tiles

- 63.49 - 63.49 73.01

10010 sqmWooden planks - 95.24 - 95.24 109.53

10015 sqmGlass / Mirror / Fabric / Extruded metal - 127.22 - 127.22 146.30

10020 sqmAsbestos cement, celotax or other hard

board

- 63.49 - 63.49 73.01

Flooring Demolition24

Dismantling tile work in floors and roofs in

cement mortar/lime mortar including stacking of

serviceable material and disposal of

unserviceable material upto a lead of 50 m, of

thickness :

10005 sqm10 mm to 25 mm - 31.70 - 31.70 36.45

10010 sqmover 25 mm and upto 40 mm - 48.51 - 48.51 55.78

10015 sqmDismantling dry brick pitching in floors,

drains etc, including stacking of serviceable

materials and disposal of unserviceable

materials within a 50 m lead.

- 57.56 - 57.56 66.20

10020 sqmDismantling stone slab flooring in cement

mortar / lime mortar, including stacking of

serviceable materials and disposal of

unserviceable materials within a 50 m lead.

- 100.77 - 100.77 115.88

Demolition of flooring including stacking of

serviceable materials and disposal of

unserviceable materials upto a 50m lead, with :

10025 sqmParquet flooring - 36.01 - 36.01 41.42

10030 sqmPVC flooring - 8.00 - 8.00 9.20

10035 sqmCarpet flooring - 8.00 - 8.00 9.20

Framing Demolition25

Dismantling woodwork in frames, trusses, purlins

and rafters upto a 10 metres span and 5 metres

height including stacking the material within a 50

m lead, of sectional areas :

10005 mupto 4000 sqmm - 8.01 - 8.01 9.21

10010 cumover 4000 sqmm - 2001.28 - 2001.28 2301.47

10015 QuintalDismantling steel work in built up sections at

all heights and depths, in angles, tees, flats,

channels and tubes including all gusset

plates, bolts, nuts, cutting rivets, welding

etc. including dismembering and stacking

within 50 m lead.

- 235.12 - 235.12 270.38

10020 QuintalDismantling steel work in single sections at

al l heights and depths inc luding

dismembering and stacking within a 50 m

lead.

- 141.07 - 141.07 162.23

Lining Dismantling26

Dismantling and removing wooden boardings in

lining of walls and partitions, excluding

supporting members, but including stacking

8

BuildCOST CONCRETE

05 Common Work Results For Concrete03

13 Basic Concrete Materials UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

0503TOTAL

Admixture, Concrete20

Providing and mixing admixtures, conforming to

IS:9103, in recommended proportions, in

concrete :

10005 kgAccelerating admixtures 76.99 8.00 - 84.99 97.74

10010 kgRetarding admixtures 84.92 8.00 - 92.92 106.85

10015 kgAir entraining admixture 73.59 8.00 - 81.59 93.83

10020 kgW a t e r r e d u c i n g a d m i x t u r e s

(Plasticizer/Super Plasticizer)

115.49 8.00 - 123.49 142.01

Concrete Additives21

10005 kgProviding and mixing water proofing

compound, conforming to IS:2645, in cement

concrete/reinforced concrete works.

97.37 8.00 - 105.37 121.18

11 Concrete Forming03

13 Structural Cast-in-place Concrete

Forming

UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1103TOTAL

Forms In Place18

Providing and fixing centering and shuttering for

concrete work (plain and reinforced) in following

locations, including strutting, propping, bracing,

bolting tie bolt / spring coil / plastic cone,

wedging, easing, striking, removal etc, complete.

Allow for forming grooves, drips, throats,

chamfers, cut-outs, openings etc. where called

for and for dressing with approved shuttering oil

to prevent adhesion. The works are at all levels .

The floor height is up to 4.00 m :

10005 sqmSides of footings of columns and walls and

sides of base slabs.

70.95 101.52 - 172.47 198.34

10010 sqmFoundation beams, floor channels, kerb

stones and drain walls.

70.95 101.52 - 172.47 198.34

10015 sqmSides of columns, piers and pedestals of any

shape, size and profile.

93.73 322.24 - 415.97 478.36

10020 sqmSides of walls, retaining walls, attached

columns, pilasters.

69.58 291.20 - 360.79 414.90

10025 sqmSoffits and sides of beams, plinth beams,

lintels, ties, ribs, pergolas and such other,

string courses, cornices, corbels.

74.52 232.04 - 306.55 352.54

10030 sqmSides of facias, parapets, railings, planting

boxes and such other vertical elements.

65.61 406.21 - 471.82 542.59

10035 sqmSoffits and sides of suspended slabs, floor

and roof projections, landing slabs ,

canopies, chajjas, slabs of planting boxes

and such other horizontal elements, coffer

ribs and slabs.

72.42 322.24 - 394.66 453.85

10040 sqmSoffits and sides of waist slabs of stairs,

sides of risers and stepped waist slabs,

spiral staircases, etc.

53.48 352.84 - 406.32 467.27

10045 sqmSides of mullions, suspenders, struts, ties,

slings including flarings or taperings of any

shape and profile.

85.48 690.14 - 775.62 891.96

10050 sqmSoffits of inclined slabs and ramps, folded

plates. ( slopes more than 15o and upto 45o)

74.90 406.21 - 481.11 553.28

10055 sqmArches, archribs, domes, shells, vaults, etc. 383.61 732.99 - 1116.60 1284.08

10060 sqmWell Steinings 81.15 1620.88 - 1702.03 1957.33

10065 sqmVertical and horizontal fins individually or

forming boxes

65.61 406.21 - 471.82 542.59

10070 sqmChimney shafts 69.58 291.20 - 360.79 414.90

13

BuildCOST MASONRY

21 Clay Unit Masonry04

13 Brick Masonry UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

2104TOTAL

Brick Work, Conventional Bricks46

Providing brick work with bricks of class 75,

joints finished flush/raked to 12 mm depth, cured

including necessary scaffolding complete in

cement mortar 1:6 with coarse sand, in :

10005 cumFoundations and plinths (1.5 m below and

upto 1.2 m above GL)

2523.91 1141.15 44.25 3709.30 4265.70

10010 cumSuperstructures upto 20.0 m above plinth

level.

2523.91 2186.57 120.36 4830.84 5555.47

10015 cumBasement, under ground water tank and the

like, upto 7.0 m below GL

2523.91 1605.07 70.39 4199.37 4829.27

10020 cumArches, vaults, domes, etc., in super

structures/basements and the like in cement

mortar 1:3 with coarse sand including

centering, shuttering, struting, proping ,

wedging, bolting and removal, etc. ,

complete.

3774.20 3367.89 97.00 7239.08 8324.95

10025 cumAdd for every additional 4.0 m height or part

thereof for brick work/exposed brick work

beyond 7.0 m below GL

- 300.78 - 300.78 345.89

10030 cumAdd for every additional 20.0 m height or

part thereof for brick work/exposed brick

work beyond 20.0 m above plinth level

- 597.03 - 597.03 686.58

10035 cumAdd for brick work in cement mortar 1:4 in

place of 1:6

195.00 - - 195.00 224.25

10040 cumAdd for brick work in cement mortar 1:3 in

place of 1:6

390.00 - - 390.00 448.50

10045 cumDeduct for brick work in cement mortar with

fine sand in place of coarse sand

59.94 - - 59.94 68.93

10050 cumAdd for brick work/exposed brick work in

square or rectangular pillars

- 432.76 - 432.76 497.67

10055 cumAdd for brick work, curved in plan/elevation,

upto mean radius not exceeding 6.0 m

136.08 368.61 - 504.69 580.40

10060 mAdd for cutting or chamfering the bricks to

required shape in masonry work

- 17.61 - 17.61 20.26

10065 cumDeduct for using bricks of class 50 in place

of class 75

155.61 - - 155.61 178.95

10070 mProviding 70 mm thick and 57 mm projected

string course/ band with bricks of class 75 in

cement mortar 1:4 with coarse sand

11.00 10.67 0.50 22.16 25.49

10075 100 mm/mProviding and making mouldings, cornices &

corbels with bricks of class 75 in cement

mortar 1:4 with coarse sand (girth to be

measured in mm and length in running

metres)

10.24 12.00 0.49 22.72 26.13

Providing brick work with bricks of class 75 in

half brick thick walls in any shape and profile

including curvilinear, laid in cement mortar 1:4

with coarse sand, joints finished flush/raked to 12

mm depth, cured, including scaffolding and flat

reinforcement (25 x 3 mm) at every fourth course

and embedding the same in adjoining

masonry/columns by drilling holes etc complete :

10080 sqmSuper structure upto 20.0 m above plinth

level.

407.57 255.15 8.73 671.45 772.17

10085 sqmBasements, and the like, upto 7.0 m below

GL

407.57 209.61 9.79 626.97 721.02

10090 sqmArches, domes, vaults at all levels in cement

mortar 1:3 with coarse sand including

centring and shuttering strutting, propping,

bolting and removal complete. (Flat iron

reinforcement 25 x 3 mm not to be provided)

704.64 1001.91 9.79 1716.35 1973.80

10095 sqmAdd for every 4.0 m height or part thereof for - 34.48 - 34.48 39.65

27

BuildCOST METALS

05 Common Work Results For Metals05

23 Metal Fastenings UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

0505TOTAL

Bolts & Hex Nuts10

10005 kgProviding and fixing MS bolts upto 300 mm

in length including nuts and washers,

complete.

53.63 38.02 - 91.66 105.40

Welding88

10005 10 mm/mGas welding including mobilization at site,

complete, (for designed structural welding).

295.00 - - 295.00 339.25

10010 10 mmGas welding including mobilization at site,

complete, (for non structural welding).

4.23 - - 4.23 4.87

10015 10 mm/mElectric arc welding including mobilization at

site, complete (for designed structural

welding).

224.20 - - 224.20 257.83

10020 10 mmElectric arc welding including mobilization at

site, complete (for non structural welding).

3.40 - - 3.40 3.91

12 Structural Steel Framing05

23 Structural Steel For Buildings UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1205TOTAL

Structural Steel Built Up Section23

Providing, fabricating and erecting built up steel

tubular trusses, welded and bolted including

special shaped washers, etc. and applying a

primer coat of zinc chromate on duly prepared

surfaces, complete :

10005 kgHot finished, welded tubes 105.66 30.71 - 136.37 156.83

10010 kgHot finished, seamless tubes 105.66 30.71 - 136.37 156.83

10015 kgElectric resistance or induction welded tubes 105.66 30.71 - 136.37 156.83

10020 kgProviding, fabricating and erecting bolted

structural steel built up sections, trusses and

frames and applying a primer coat of zinc

chromate on duly prepared surfaces,

complete.

63.96 21.52 - 85.48 98.31

10025 kgProviding, fabricating and erecting welded

structural steel built up sections in trusses

and frames and applying a primer coat of

zinc chromate on duly prepared surfaces,

complete.

67.09 14.63 - 81.72 93.98

10030 sqmProviding and applying three finish coats of

synthetic enamel paint on steel surfaces,

complete.

2696.47 80.69 - 2777.15 3193.73

Structural Steel Single Section81

10005 kgProviding, fabricating and erecting structural

steel, single sections, and applying a primer

coat of zinc chromate on duly prepared

surfaces, complete.

72.90 12.49 - 85.39 98.20

10010 kgProviding and fixing wind ties of MS section 62.46 10.50 - 72.96 83.91

51 Metal Stairs05

16 Metal Floor Plate Stairs UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

5105TOTAL

Steel Stairs13

Providing, fabricating and erecting MS welded

built up sections/ frames and applying a primer

coat of zinc chromate on duly prepared surfaces ,

complete :

10005 kgIn stringers, treads, landings, etc. of

staircases including chequered plates

wherever required, all complete.

86.45 6.28 - 92.73 106.64

41

BuildCOST METALS

51 Metal Stairs05

16 Metal Floor Plate Stairs UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

5105TOTAL

10010 kgIn guard bars, ladders, railings, and similar

works.

67.55 35.99 - 103.54 119.07

Providing, fabricating and erecting hand rails by

welding to steel ladders/railings, balcony railings,

and staircase railings including primer coat of

zinc chromate on duly prepared surfaces,

complete :

10015 kgMS black tubes 221.32 32.28 - 253.60 291.64

10020 kgERW tubes 221.32 32.28 - 253.60 291.64

10025 kgGalvanised steel pipes 205.07 32.28 - 237.34 272.94

10030 kgStructural steel sections, flats, angles ,

channels, etc.

86.85 30.26 - 117.11 134.67

55 Metal Stair Treads And Nosings05

13 Metal Stair Treads UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

5505TOTAL

Stair Treads And Nosing51

10005 kgProviding and fixing MS angles 50 x 50 x 5

mm nosing with lugs of MS flats 10 x 5 mm,

100 mm long and forked at ends, 600 mm

apart (minimum three lugs to be provided)

including necessary welding and applying a

primer coat on exposed surfaces etc.,

complete.

79.67 28.14 - 107.81 123.98

10010 kgProviding and fixing aluminium angles 35 x

35 x 3 mm nosing with lugs of flats 10 x 3

mm, 100 mm long and forked at ends, 600

mm apart (minimum three lugs to be

provided) including necessary welding, etc.,

complete.

342.29 180.88 - 523.17 601.64

Providing and fixing aluminum strip edge to

staircases including fixing with rawl plugs and

stainless steel screws, with under layer of

cement mortar 1:3 with coarse sand, of strip

edging of size :

10015 m57 x 12 x 3 mm 243.76 104.94 - 348.71 348.71

10020 m38 x 12 x 3 mm 233.75 104.94 - 338.69 389.50

73 Decorative Metal Railings05

23 Ornamental Railings UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

7305TOTAL

Railings, Ornamental50

Providing, fabricating and erecting MS balusters

in stair flight slabs, landing balconies and similar

other railings, anchored to steps, landings etc .,

all fixing accessories including providing pockets

in concrete/brick works and grouting with ironite

or other equivalent, applying three coats of

synthetic enamel paint over a primer coat of zinc

chromate on duly prepared surfaces, complete.

10005 kgSolid sections 207.98 107.44 - 315.42 362.73

10010 kgHollow sections 215.49 107.44 - 322.93 371.37

42

BuildCOST WOOD, PLASTICS, AND COMPOSITES

11 Wood Framing06

10 Wood Framing UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1106TOTAL

Ceiling Framing12

Providing, fabricating and fixing in position

selected quality seasoned and chemically treat

ed wood work in frames of false ceilings,

partitions, etc., complete :

10005 cumIst class Deodar wood. 54083.88 6254.00 - 60337.88 69388.57

10010 cum2nd class Deodar wood. 52582.22 6254.00 - 58836.22 67661.65

10015 cumSal wood 31809.14 6254.00 - 38063.14 43772.61

10020 cum2nd class Kail wood 25301.91 6254.00 - 31555.91 36289.30

10025 cumHollock wood 34061.64 6254.00 - 40315.64 46362.99

Wall Framing40

Providing and fixing wooden frame with 50 mm x

50 mm battens, fixed at 600 mm centre to centre

(both ways). Allow for solignum treatment to the

timber framework :

10005 sqmSal wood 389.85 207.01 - 596.86 686.39

10010 sqm2nd class CP teak Wood 691.23 207.01 - 898.24 1032.97

Providing and fixing wooden framework with 50

mm x 75 mm battens, fixed at 600 mm centre to

centre(both ways). Allow for solignum treatment

to the timber framework :

10015 sqmSal wood 541.58 301.25 - 842.83 969.25

10020 sqm2nd class CP Teak Wood 993.64 301.25 - 1294.89 1489.13

17 Shop-fabricated Structural Wood06

53 Shop-fabricated Wood Trusses UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1706TOTAL

Roof Trusses10

Providing, fabricating and fixing in position

selected quality seasoned & chemically treated

wrought wood work in trusses, rafters, runners

posts, struts, walls plates etc. of size and profile

in inclind roofs including anchoring to concrete

members with holding down bolts, fixing

accessories & all incidental works (Flat, angles,

other steel sections and holding down bolts used

in connections will be paid separately), complete

:

10005 cum2nd class CP teak wood 66252.16 8453.34 - 74705.50 85911.32

10010 cumIst class Deodar wood 50813.58 8453.34 - 59266.92 68156.96

10015 cum2nd class Deodar wood 48625.44 8453.34 - 57078.78 65640.59

10020 cumSal wood 31120.28 8453.34 - 39573.62 45509.66

10025 cumHollock wood 31606.54 8453.34 - 40059.87 46068.85

22 Millwork06

13 Standard Pattern Wood Trim UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

2206TOTAL

Mouldings12

Providing and fixing select quality seasoned and

chemically treated wooden moulded beadings to

door and window frames with mild steel

screws/headless nails and a primer coat on

unexposed surface, etc. complete, of beading

sizes :

Burma teak wood :

10005 m30 x 12 mm 35.25 71.13 - 106.38 122.34

45

BuildCOST WOOD, PLASTICS, AND COMPOSITES

22 Millwork06

13 Standard Pattern Wood Trim UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

2206TOTAL

10010 m40 x 12 mm 49.62 71.13 - 120.75 138.87

10015 m40 x 20 mm 79.64 71.13 - 150.77 173.38

10020 m50 x 12 mm 61.02 71.13 - 132.15 151.98

10025 m50 x 20 mm 98.41 71.13 - 169.54 194.97

2nd class CP teak wood :

10030 m30 x 12 mm 28.18 71.13 - 99.31 114.20

10035 m40 x 12 mm 39.24 71.13 - 110.37 126.93

10040 m40 x 20 mm 62.33 71.13 - 133.46 153.48

10045 m50 x 12 mm 48.04 71.13 - 119.17 137.05

10050 m50 x 20 mm 88.50 71.13 - 159.63 183.58

Ghana teak wood :

10055 m30 x 12 mm 24.74 71.13 - 95.87 110.25

10060 m40 x 12 mm 34.21 71.13 - 105.34 121.14

10065 m40 x 20 mm 64.29 71.13 - 135.42 155.73

10070 m50 x 12 mm 41.75 71.13 - 112.88 129.81

10075 m50 x 20 mm 66.29 71.13 - 137.42 158.03

2nd class Deodar wood :

10080 m30 x 12 mm 22.73 71.13 - 93.86 107.93

10085 m40 x 12 mm 39.53 71.13 - 110.66 127.25

10090 m40 x 20 mm 48.94 71.13 - 120.07 138.08

10095 m50 x 12 mm 39.00 71.13 - 110.13 126.65

10100 m50 x 20 mm 71.85 71.13 - 142.98 164.43

Rubber wood :

10105 m30 x 12 mm 16.03 71.13 - 87.16 100.24

10110 m40 x 12 mm 21.43 71.13 - 92.56 106.45

10115 m40 x 20 mm 32.65 71.13 - 103.78 119.35

10120 m50 x 12 mm 25.78 71.13 - 96.91 111.45

10125 m50 x 20 mm 39.68 71.13 - 110.81 127.43

26 Board Paneling06

13 Profile Board Paneling UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

2606TOTAL

Paneling, Boards10

Providing and fixing in wall lining flat pressed

three layer & graded (medium density) particle

boards, prelaminated, one side decorative

lamination and on other side balancing

lamination, grade I, Type II, conforming to

IS:12823, with necessary fixing arrangements

and screws etc. complete, of thicknesses :

10005 sqm12 mm 2509.28 160.76 - 2670.04 3070.55

10010 sqm18 mm 3240.29 160.76 - 3401.05 3911.20

Pre-finished Paneling11

10005 sqmProviding and fixing 9 mm thick laminated

wall panelling made of melamine

impregnated MDF board having tonge and

groove jointing system, complete with

accessories like wall base skirting and other

profiles complete.

3043.06 232.10 3.54 3278.70 3770.51

42 Wood Paneling06

10 Wood Paneling UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

4206TOTAL

46

BuildCOST THERMAL AND MOISTURE PROTECTION

11 Dampproofing07

17 Damp-proof Course UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1107TOTAL

Damp-proof Course10

Providing and laying damp-proof course with

cement concrete 1:2:4 with graded stone

aggregate 12.5 mm nominal size, including side

shuttering, compacting etc., complete.

10005 sqm40 mm thick 162.51 128.11 19.47 310.09 356.60

10010 sqm50 mm thick 201.56 141.91 21.59 365.06 419.82

10015 kg/50kgProviding and mixing waterproofing material

in cement concrete work @ 1.0 kg per 50 kg

bag of cement used in the mix.

97.37 8.00 - 105.37 121.18

10020 sqmApplying a cost of residual petroleium

bitumen of penetration 80/100 @ 1.70 kg/sq.

on damp-proof course.

83.08 21.55 - 104.63 120.33

13 Sheet Waterproofing07

13 Bituminous Sheet Waterproofing UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1307TOTAL

Built-Up Sheet Waterproofing13

Providing and laying vapour barrier of low density

polythene film (700 microns), laid in blown grade

bitumen at 1 kg. per. sqm, over a coat of primer

at 400 gms per sqm and finished with a coat of

bitumen at 1 kg per sqm as per specifications ,

complete :

10005 sqmOver RCC roof surfaces. 240.54 32.61 - 273.15 314.12

10010 sqmOn external wall surfaces. 240.54 38.04 - 278.58 320.37

Providing and laying vapour barrier of aluminium

foil 0.075 mm thick, laid in blown grade bitumen

at 2 kg per sqm over a coat of primer at 400 gms

per sqm and finished with a coat of bitumen at 1

kg per sqm as per specifications, complete :

10015 sqmOver RCC roof surfaces 151.50 43.66 - 195.16 224.44

10020 sqmOn external wall surfaces 151.50 43.66 - 195.16 224.44

10025 sqmAdd for aluminum foil of thickness 0.1 mm

instead of 0.075 mm

24.09 - - 24.09 27.70

10030 sqmPainting top of roof surface with 80 / 100

penetration bitumen @ 1.7 kg per sqm

impregnated with coarse sand, 6 mm thick,

including cleaning of slab surface with brush

and finally with a cloth soaked in kerosene

oil.

87.97 42.00 - 129.97 149.47

10035 sqmProviding and laying damp-proofing

treatment comprising a primer coat, one

layer of aluminium foil 0.1 mm thick and two

layers of bitumen at the rate of 2 kg per sqm

per layer to ground floor/paving, complete.

186.20 43.66 - 229.86 264.34

10040 sqmProviding and laying waterproofing treatment

to roof slabs comprising of Primer coat, one

layer of fibre glass RP tissue, one layer of

aluminium foil 0.10 mm thickness, three

layers of bitumen at the rate of 2 Kg per sqm

per layer, sealing of edges and corners as

called for, complete.

237.21 65.22 - 302.43 347.79

10045 sqmProviding and laying damp-proofing

treatment comprising a primer coat, one

layer of fibre-glass RP tissue and two layers

of bitumen at the rate 2 kg per sqm per layer

in toilets and other areas including side and

end laps, etc., complete.

115.52 65.22 - 180.74 207.85

10050 sqmAdd for additional layer of aluminium foil ,

(0.10 mm thick) and additional layer of

121.30 21.56 - 142.86 164.29

51

BuildCOST THERMAL AND MOISTURE PROTECTION

13 Sheet Waterproofing07

13 Bituminous Sheet Waterproofing UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1307TOTAL

bitumen at the rate of 2 kg per sqm in roof

surface treatment.

10055 sqmProviding and laying at roof ridges and other

locations, where called for, waterproofing

treatment consisting of one layer of blown

grade bitumen at 1 kg per sqm followed by

one layer of fibreglass tissue laid and

finished with one layer of bitumen at 1 kg per

sqm.

96.01 43.66 - 139.67 160.62

10060 sqmAdd for finishing the waterproofing treatment

with 6 mm pea-size gravel at the rate of 1

cum per 100 sqm (bitumen layer for laying

gravel included in waterproofing item).

8.01 2.76 - 10.77 12.38

10065 sqmAdd for providing polymeric polythene felt

membrane instead of fibre-glass RP tissue.

99.49 - - 99.49 114.41

10070 sqmDeduct for providing hessian based self

finish bitumen felt instead of fibre-glass RP

tissue.

-78.21 - - -78.21 -89.94

10075 sqmAdd for every additional coat of blown /

residual bitumen applied hot @ 2 kg per

sqm.

22.28 22.11 - 44.39 51.05

10080 sqmAdd for every additional layer of fibre-glass

RP tissue and bitumen @ 2 kg per sqm.

50.44 32.61 - 83.05 95.50

16 Cementitious And Reactive Waterproofing07

16 Crystalline Waterproofing UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1607TOTAL

Cementitious Waterproofing20

10005 sqmBrick bat coba waterproofing treatment to

terraces, terrace gardens, roof surfaces and

such other locations where called for, by

providing an even base layer of minimum 20

mm thick cement mortar 1:4 with coarse

sand admixed with acrylic waterproofing

compound, brick bats of size ranging from

40 mm to 100 mm, laid with gaps of 10 to 15

mm between them and grouted with cement

mortar 1:4 with coarse sand and admixed

with acrylic waterproofing compound, laid to

slope of 1:120 or as specified and a

protective coat of 20 mm thick cement

mortar 1:4 with coarse sand admixed with

acrylic waterproofing compound, fixing of

rough Kotah stone of 18-20 mm thickness

over a bed of cement mortar 1:4 with coarse

sand admixed with acrylic waterproofing

compound and joints grouted to full depth of

stone with cement slurry admixed with

acrylic waterproofing compound. Kotah

stone shall be fixed within 48 hours of

completing and laying the protective coat to

brick coba treatment. Treatment to vertical

faces of parapets, walls, beams, etc. will

comprise 20 mm thick cement plaster 1:4

with coarse sand admixed with acrylic

waterproofing compound and finished neet

upto a height of 300 mm (only horizontal

treatment area shall be measured for

payment). The average thickness, excluding

the Kotah stone and its bedding mortar, shall

be 120 mm. The minimum thickness at

khurra, excluding the Kotah stone and its

bedding mortar, shall be 80 mm.

1039.07 1120.11 23.01 2182.19 2509.52

52

BuildCOST OPENINGS

09 Metal Doors, Windows And Frames08

16 Aluminum Doors, Windows And

Frames

UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

0908TOTAL

Aluminum Doors, Windows And

Frames

10

Providing, fabricating and fixing aluminium doors,

windows and ventilators with sections (IS 733

and IS 1825), 60 microns pure polyster coated,

25 microns colour nutred anodised (IS 1868), of

grade AC 25, fixed with rawl plugs and screws /

fixing clips / expansion hold fasteners and filling

gaps with PVC / Neoprene felt along with

aluminium snap beadings, CP brass/stainless

steel screws for glazing / panelling complete

(cost of glazing / panelling not included)

(payment will be made for weight of aluminium

used in the work).

10005 kgFixed portion 282.02 23.76 - 305.78 351.64

10010 kgShutters of doors, windows and ventilators

including providing and fixing hinges/pivots

and making provision for fixing of fittings

including PVC/neoprene gasket, complete

(cost of fitting not included).

302.17 31.51 - 333.68 383.74

21 Steel Doors, Windows And Frames UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

0908TOTAL

Steel Doors, Windows And Frames10

Providing and fixing MS glazed doors, windows

and ventilators of standard heavy rolled steel

sections, conforming to IS 7452-1990, joints

mitred and welded with 15 x 3 mm lugs, 100 mm

long, embedded in cement concrete blocks 150 x

100 x 100 mm of 1:3:6 with coarse sand or with

wooden plugs and screws or rawl plugs and

screws/ with fixing clips/ with bolts and nuts as

required, incluing providing and fixing of 4 mm

thick glass panes with glazing clips and special

metal sash putty including three coats of

synthetic enamel paint over a primer coat of zinc

chromate on duly prepared surfaces excluding

the cost of metal beading and other fittings

except necessary hinges or pivot as required ,

complete :

10005 sqmDoors 6801.76 437.32 1.77 7240.84 8326.97

10010 sqmWindows fixed 6622.99 437.32 1.77 7062.07 8121.38

10015 sqmWindows-side hung 6801.76 437.32 1.77 7240.84 8326.97

10020 sqmVentilators-top hung 6563.40 437.32 1.77 7002.48 8052.85

10025 sqmVentilators-centre hung 6563.40 437.32 1.77 7002.48 8052.85

In composite units of doors, windows and

ventilator :

10030 sqm(For overall portion treated as fixed) 6622.99 437.32 1.77 7062.07 8121.38

Add for side hung portion :

10035 sqmDoors 178.77 - - 178.77 205.59

10040 sqmWindows 178.77 - - 178.77 205.59

10045 sqmAdd for top hung portion. -59.59 - - -59.59 -68.53

10050 sqmAdd for centre hung portion. -59.59 - - -59.59 -68.53

10055 mAdd for providing vertical coupling, mullion

bar, or horizontal coupling mullion bar (when

openable windows are to be coupled above

fixed ones or between two fixed windows) or

horizontal coupling mullion bar (where

windows are not exposed to weather).

124.42 16.20 - 140.63 161.72

10060 mExtra for providing horizontal coupling

mullion bar or weather bar (especially used

158.99 20.70 - 179.69 206.64

63

BuildCOST OPENINGS

09 Metal Doors, Windows And Frames08

21 Steel Doors, Windows And Frames UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

0908TOTAL

when the coupled unit is exposed to rain).

10065 mAdd for providing and fixing stainless steel /

aluminium beading of approved shape and

section with SS screws instead of glazing

clips and metal sash putty in steel doors ,

windows, ventilators and composite units.

78.11 10.81 - 88.92 102.26

11 Metal Doors And Frames08

13 Hollow Metal Doors And Frames UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1108TOTAL

Hollow Metal Doors and Frames11

10005 sqmProviding, fabricating and fixing 1 mm thick

MS sheet door with hollow MS section frame

of 40 x 40 x 3 mm and 3 mm gussets at the

junctions and corners with necessary fittings

and three coats of synthetic enamel paint

over a primer coat of zinc chromate on duly

prepared surfaces, complete.

8112.32 1310.21 - 9422.53 10835.91

10010 sqmProviding, fabricating and fixing 1 mm thick

MS sheet door with MS angle 40 x 40 x 6

mm frame, and 3 mm gussets at the

junctions and corners with necessary fittings ,

three coats of synthetic enamel paint over a

primer coat of zinc chromate on duly

prepared surfaces, complete.

8113.70 1310.21 - 9423.91 10837.50

10015 sqmAdd for MS angles 40 x 40 x 6 mm for

diagonal braces.

1212.34 296.15 - 1508.49 1734.76

10020 sqmAdd for MS flats 30 x 6 mm for diagonal

braces and central cross piece.

579.28 285.04 - 864.32 993.96

12 Metal Frames08

21 Steel Frames UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1208TOTAL

Steel Frames13

10005 kgProviding and fixing MS frames for doors,

w i n d o w s a n d v e n t i l a t o r s w i t h

Tee/angle/fabricated-sections, joints mitred

and welded with 15 x 3 mm lugs 100 mm

long embedded in cement concrete blocks

150 x 100 x 100 mm 1:3:6 with coarse sand

or with wooden plugs and screws or rawls

plugs and screws/with fixing clips/with bolts

and nuts as required including fixing of butt

hinges and screws and applying three coats

of synthetic enamel paint over a primer coat

of zinc chromate on duly prepared surfaces,

complete.

222.55 18.92 0.00 241.46 277.68

Providing and fixing pressed steel door frames,

manufactured from commercial mild steel sheet

of 1.25 mm thickness, including hinges jamb,

lock jamb, bead, and required threshold of mild

steel flat of section 30 x 3 mm/8 mm round or

square bar welded or rigidly fixed together by

mechanical means, adjustable lugs with split end

tail to each jamb including steel butt hinges 2.5

mm thick with mortar guards, lock strike - plate

and shock absorbers and applying three coats of

synthetic enamel paint over a primer coat of zinc

chromate on duly prepared surfaces i /c filling

hollows of the frame with CC 1:3:6, complete :

10010 mProfile A 1008.76 72.65 1.42 1082.82 1245.25

64

BuildCOST FINISHES

21 Plaster And Gypsum Board Assemblies09

13 Plaster Assemblies UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

2109TOTAL

Expansion Control With Chicken

Mesh

13

10005 sqmProviding and fixing galvanized chicken wire

mesh (24 gauge 12 mm size) to junctions of

concrete and masonry work and other

locations including cutting to required sizes ,

side laps of minimum 75 mm and fixing in

position with galvanized iron wire nails,

complete.

126.15 200.13 2.71 328.99 378.34

22 Supports For Plaster And Gypsum Board09

26 Suspension Systems UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

2209TOTAL

Aluminium Frame Work14

Providing and fixing frame work for suspended

ceiling with anodised aluminium 15 microns

coating/Polyester pre-coated (50 microns), main

runner T-sections 35 x 35 x 1.5 mm thick

suspended from ceiling with 6 mm dia MS

adjustable hangers, fixed to ceiling with MS cleat

25 x 25 x 5 mm and 50 mm long, fixed to RCC

surface with expandable fasteners 12.5 x 40 mm,

intermediate T-section 23.5 x 19 x 1.5 mm thick

fixed to main runner and perimeter angle 35 x 15

x 1.5 mm thick fixed to wall/beam with cadmium

plated steel screws with rawl plug @ 450 mm

etc., all complete, for panel sizes (cost of

hangers with cleat to be paid for separately) :

10005 sqm1220 x 610 mm 599.14 236.51 - 835.65 961.00

10010 sqm610 x 610 mm 650.88 236.51 - 887.38 1020.49

10015 sqmAdd for providing and making arrangement

for fixing light, fixture grills and diffusers in

the frame work.

538.16 236.30 - 774.45 890.62

Ms Frame Work15

Providing and fixing frame work for suspended

ceiling, made from 0.55 mm thick GS sheet

section consisting of GS channel main runner

suspended from ceiling with 6 mm dia MS

adjustable hanger fixed to ceiling with MS angle

of 25 x 25 x 5 mm thick and 50 mm long with

expandable fastners 12.5 x 40 mm, intermediate

T - sections fixed to main runner, and perimeter

channel section fixed to wall with cadmium

plated steel screw with rawl plug @ 450 mm

centre to centre, complete, for panel size (cost of

hangers with cleat to be paid for separately).

10005 sqm1220 x 610 mm 691.02 236.51 - 927.53 1066.66

10010 sqm610 x 610 mm 813.24 236.51 - 1049.75 1207.21

10015 sqmAdd for providing and making arrangement

for fixing light fixture grills and diffusers in the

frame work.

813.24 236.30 - 1049.54 1206.97

Ceiling Supports, Suspension16

10005 EachProviding and fixing level adjusting hangers

of 6 mm dia. MS Rods fixed to roof slabs by

means of MSangle ceiling cleats 40 x 40 x 5

mm size, 40 mm long and expansion hold

fastners 12.5 mm dia. 40 mm long including

applying a primer coat of zinc chromate,

complete.

84.37 15.66 - 100.03 115.03

79

BuildCOST SPECIALTIES

14 Signage10

53 Traffic Signage UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1410TOTAL

Traffic Signs20

10005 EachProviding and fixing Cats Eye (Glow studs),

heavy duty integral stem, reflective ,

aluminium dia cast with elegant finish, of

size 100 x 100 mm and 20 mm high, having

a stem of 50 mm screwed / nailed with 12

mm dia 90 mm long nail to fix into the road

surface or at the nosing of the central verge .

The road studs should have reflectors fitted

on one side of the studs, complete.

218.36 33.32 - 251.68 289.43

28 Toilet, Bath, And Laundry Accessories10

16 Bath Accessories UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

2810TOTAL

Bath Accessories10

Providing and fixing stainless steel curtain rods

with stainless steel brackets, complete, of size :

10005 m25 mm outer dia 384.18 210.04 - 594.22 683.35

10010 m32 mm outer dia 551.20 210.04 - 761.24 875.42

10015 mProviding and fixing CP brass curtain rod

with CP brass brackets 25 mm outer dia,

complete.

1270.28 210.04 - 1480.32 1702.37

10020 SetProviding and fixing CP brass brackets for

curtain rods 25 mm outer dia, complete.

554.60 157.43 - 712.03 818.83

Providing and fixing angular/bent grab bars

fabricated from 32 mm dia. seamless stainless

steel tubes with peened non-slip gripping

surface, polished flanges firmly fixed, to be fully

safe, with heavy duty anchor fastener having

finish/capping similar to the grab bar, complete,

including cutting and making good the

walls/floors for :

10025 EachWall-mounted /floor-mounted for European

type water closet - 830 mm high

1291.34 315.38 - 1606.71 1847.72

10030 EachBath tub - 1320 mm long 1401.83 315.38 - 1717.20 1974.78

10035 EachWash basin and shower - 610 mm long 1512.32 315.38 - 1827.69 2101.85

10040 EachProviding and fixing fully automatic "NO

TOUCH" hand driers of stainless steel body

suitable to operate on 230 V, single ph 50

Hz, AC power supply including brackets for

fixing on wall including cutting and making

good the walls, etc., complete.

10688.58 315.38 - 11003.96 12654.55

10045 EachProviding and fixing bevelled edge mirrors

5.5 mm thick of float glass, complete with 6

mm thick marine ply board backing, fixed

with CP brass screws and washers,

complete, of size 450 x 600 mm.

2276.80 367.25 - 2644.05 3040.66

Providing and fixing float glass mirror 5.5 mm

thick with plastic moulded frame and 6 mm thick

marine ply board backing, complete, of outer

dimensions :

10050 EachCircular shape 450 mm dia 528.49 367.25 - 895.74 1030.10

10055 EachRectangular shape 453 x 357 mm 445.22 367.25 - 812.47 934.34

10060 EachOval shape 450 x 350 mm 445.82 367.25 - 813.08 935.04

10065 EachRectangular shape 1500 x 450 mm 945.99 473.12 - 1419.10 1631.97

10070 sqmProviding and fixing rectangular float glass

mirror 5.5 mm thick of any size with 6 mm

thick marine ply board backing, supported on

clips fixed with CP brass screws and

washers, complete.

899.05 525.10 - 1424.15 1637.78

107

BuildCOST FIRE SUPPRESSION

12 Fire-suppression Standpipes21

13 Fire-suppression Hoses And Nozzles UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1221TOTAL

Fire Hose And Equipment52

10005 EachProviding and fixing stand post fire hydrants

Type A, conforming to IS:908, with 63 mm

dia. outlet f i t ted with gunmetal

instantaneous type coupling, 80 mm dia.

inlet, one number cast iron double flanged

sluice valve, CI duck foot bends and flanged

riser, painting with one coat of ready mixed

red oxide primer and two coats of synthetic

enamel paint of fire red colour, finished to an

even shade, complete, excluding the cost of

brick chamber.

19430.05 654.04 - 20084.08 23096.70

10010 EachProviding and fixing gun metal, under ground

type fire hydrants, conforming to IS-909, with

control valve and 63 mm dia single outlet

fitted with instantaneous type coupling,

conforming to IS-901 for connection to hose

and 80 mm dia inlet and chained cap,

complete, excluding the cost of brick

chamber.

27754.31 300.49 - 28054.80 32263.02

Providing and fixing gunmetal, hand wheel

operated fire hydrant valves Type A, conforming

to IS:5290, with 63 mm dia outlet fitted with

instantaneous female coupling, conforming to

IS:901, and 80 mm dia inlet, complete, with

blank caps and chains with :

10015 EachSingle outlet 10221.13 100.06 - 10321.20 11869.38

10020 EachDouble outlet 19651.69 120.08 - 19771.77 22737.54

10025 EachProviding and fixing first aid hose reels, of

heavy duty mild steel construction, with CI

brackets, wall mounted, swinging type, fitted

with 19 mm dia., 36.5 m long high pressure

hose, conforming to IS-5132, with 5 mm dia

outlet gunmetal nozzle and shut off valve,

conforming to IS 884-1967, complete.

14753.54 450.17 - 15203.71 17484.27

10030 EachProviding and fixing 63 mm dia, 15 m long

reinforced rubber lined hoses, conforming to

IS:636, including gunmetal male and female

instantaneous type coupling, conforming to

IS: 903, machine wound with galvanised

steel wire, complete.

8481.19 30.03 - 8511.22 9787.91

10035 EachProviding and fixing standard short size

gunmetal branch pipes, conforming to

IS-903, with 16 mm dia. outlet gunmetal

nozzle, suitable to fit with standard

instantaneous type 63 mm coupling along

with nozzle spanner, complete.

3893.30 30.03 - 3923.33 4511.83

10040 EachProviding and fixing standard firemans axes

with heavy insulated rubber handle ,

conforming to IS:926, complete.

835.58 30.03 - 865.62 995.46

Providing and fixing gunmetal fire brigade

connections, conforming to IS-905, with 63 mm

dia. instantaneous type inlet and 150 mm dia

flanged outlet with built in check valves for fire

risers complete in all respects :

10045 EachTwo-way 11749.53 150.00 - 11899.53 13684.46

10050 EachThree-way 17004.42 170.21 - 17174.63 19750.82

10055 EachProviding and fixing 25 mm size single acting

air valves with SCR inlet, conforming to

IS-12992, complete.

1519.50 200.13 - 1719.63 1977.58

13 Fire-suppression Sprinkler Systems21

113

BuildCOST PLUMBING

05 Common Work Results For Plumbing22

23 General-duty Valves For Plumbing

Piping

UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

0522TOTAL

Valve, Ball23

Providing, fixing and testing brass ball valve,

SCR lever operated, complete, of size:

10005 Each8 mm 206.96 50.03 - 256.99 295.54

10010 Each10 mm 206.96 70.04 - 277.00 318.55

Providing, fixing and testing brass ball valves

with carbon steel lever, complete of size :

10015 Each15 mm 293.32 70.04 - 363.36 417.86

10020 Each20 mm 831.60 70.04 - 901.64 1036.89

10025 Each25 mm 1318.19 80.05 - 1398.25 1607.98

10030 Each32 mm 1818.68 80.05 - 1898.73 2183.54

10035 Each40 mm 1969.99 100.06 - 2070.05 2380.56

10040 Each50 mm 2489.72 100.06 - 2589.79 2978.25

Providing, fixing and testing brass ball valves

with aluminium alloy lever of size :

10045 Each15 mm 503.73 70.04 - 573.77 659.84

10050 Each20 mm 762.71 70.04 - 832.76 957.67

10055 Each25 mm 952.86 80.05 - 1032.91 1187.84

10060 Each32 mm 1852.71 80.05 - 1932.76 2222.68

10065 Each40 mm 2627.36 100.06 - 2727.43 3136.54

10070 Each50 mm 4139.18 100.06 - 4239.25 4875.14

Valve, Balancing24

Providing, fixing and testing CI balancing valve,

body conforming to IS:210, with companion

flanges (IS:6392), complete, of size:

10005 Each80 mm 6840.00 126.79 - 6966.79 8011.80

10010 Each100 mm 9690.00 148.24 - 9838.24 11313.98

10015 Each125 mm 13395.00 185.26 - 13580.26 15617.30

10020 Each150 mm 18192.50 234.10 - 18426.60 21190.60

10025 Each200 mm 39900.00 312.09 - 40212.09 46243.90

10030 Each250 mm 64790.00 390.11 - 65180.11 74957.12

10035 Each300 mm 87590.00 506.60 - 88096.60 101311.08

Providing, fixing and testing G/Met balancing

valve SCR, conforming to IS:778, etc., complete,

of size:

10040 Each25 mm 1784.16 80.05 - 1864.21 2143.84

10045 Each32 mm 2183.74 95.06 - 2278.80 2620.62

10050 Each40 mm 2694.83 110.07 - 2804.90 3225.63

10055 Each50 mm 4553.33 120.08 - 4673.40 5374.41

10060 Each65 mm 8270.33 137.99 - 8408.31 9669.56

10065 Each80 mm 11046.92 160.10 - 11207.03 12888.08

Valve, Check27

Providing, fixing and testing CI check valve with

flanges, conforming to IS:9338 etc., complete, of

size:

10005 Each40 mm 2990.70 50.03 - 3040.73 3496.84

10010 Each50 mm 4516.16 54.03 - 4570.19 5255.72

10015 Each65 mm 5979.17 60.04 - 6039.20 6945.09

10020 Each80 mm 7289.04 65.04 - 7354.08 8457.19

10025 Each100 mm 10125.11 148.24 - 10273.35 11814.35

10030 Each125 mm 13395.32 185.26 - 13580.59 15617.67

10035 Each150 mm 14140.21 234.10 - 14374.32 16530.46

10040 Each200 mm 28901.16 312.09 - 29213.25 33595.24

10045 Each250 mm 37486.33 390.11 - 37876.44 43557.90

117

BuildCOST PLUMBING

05 Common Work Results For Plumbing22

23 General-duty Valves For Plumbing

Piping

UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

0522TOTAL

Providing, fixing and testing G/Met vertical check

valve, integral seat, flanged female connection,

conforming to IS:778, complete, of size:

10225 Each25 mm 810.13 42.03 - 852.16 979.98

10230 Each32 mm 1187.51 46.03 - 1233.54 1418.57

10235 Each40 mm 1564.16 50.03 - 1614.20 1856.32

10240 Each50 mm 2195.79 54.03 - 2249.83 2587.30

10245 Each65 mm 3804.40 57.04 - 3861.44 4440.65

10250 Each80 mm 6198.35 65.04 - 6263.39 7202.89

10255 Each100 mm 11313.37 147.23 - 11460.60 13179.69

Valve, Gate31

Providing, fixing and testing brass gate valves

with CI Wheel, conforming to IS:778, secrewed

ends, complete, of nominal size :

10005 Each25 mm 792.21 50.03 - 842.25 968.58

10010 Each32 mm 939.46 50.03 - 989.49 1137.91

10015 Each40 mm 1446.94 50.03 - 1496.97 1721.52

10020 Each50 mm 1983.47 50.03 - 2033.50 2338.53

10025 Each65 mm 4918.24 60.04 - 4978.28 5725.02

10030 Each80 mm 6118.63 60.04 - 6178.67 7105.47

Providing, fixing and testing G/Met gate valve,

non-rising stem SCR, conforming to IS:778,

complete, of size:

10035 Each15 mm 803.76 20.01 - 823.78 947.34

10040 Each20 mm 999.47 25.02 - 1024.49 1178.16

10045 Each25 mm 1822.73 28.02 - 1850.75 2128.36

10050 Each32 mm 2536.23 32.02 - 2568.25 2953.48

10055 Each40 mm 2999.13 35.02 - 3034.15 3489.28

10060 Each50 mm 5251.55 39.03 - 5290.57 6084.16

10065 Each65 mm 9610.51 42.03 - 9652.53 11100.41

10070 Each80 mm 13683.49 50.03 - 13733.52 15793.55

10075 Each100 mm 23212.39 50.03 - 23262.42 26751.78

Valve, Plastic60

Providing, fixing and testing PTMT stop cocks,

complete, of nominal size :

10005 Each15 mm 150.24 50.03 - 200.27 230.32

10010 Each20 mm 171.31 50.03 - 221.34 254.54

76 Facility Drainage Piping Cleanouts UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

0522TOTAL

Cleanouts10

10005 EachProviding and fixing 100 mm dia. flanged

clean-out plugs with CI flanged tail pieces,

blind flanges conforming to IS-1538 fixed

with necessary neoprene washers ,

galvanised fasteners, complete, (excluding

cost of tail piece and its joints).

518.35 125.08 - 643.43 739.94

Providing and fixing cast brass clean-out plugs

with suitable inset keys for opening, and

galvanised steel bends including fixing to

galvanised steel / sand cast iron/ centrifugally

spun pipes with lead joint, of nominal dia :

10010 Each50 mm 1018.32 195.05 - 1213.38 1395.38

10015 Each75 mm 1695.73 195.05 - 1890.78 2174.40

10020 Each100 mm 2852.82 292.43 - 3145.24 3617.03

10025 Each150 mm 6942.27 292.43 - 7234.70 8319.91

119

BuildCOST HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

07 Hvac Insulation23

13 Duct Insulation UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

0723TOTAL

Duct Insulation11

Providing and fixing, fiber-glass insulation ,

bonded by resin conforming to IS:8183, for

ducts, etc., with 0.5 mm thick aluminium sheet

cladding having 50 mm overlap at joints etc .,

complete, of following thickness and density:

10005 sqm25 mm thick 16kg per cum 660.13 272.17 - 932.30 1072.15

10010 sqm25 mm thick 24 kg per cum 709.30 272.17 - 981.48 1128.70

10015 sqm25 mm thick 32 kg per cum 760.82 272.17 - 1033.00 1187.94

10020 sqm50 mm thick 16 kg per cum 787.42 272.17 - 1059.60 1218.54

10025 sqm50 mm thick 24 kg per cum 883.43 272.17 - 1155.61 1328.95

10030 sqm50 mm thick 32 kg per cum 987.64 272.17 - 1259.81 1448.78

Providing and fixing, rigid polyurethane foam

(PUF) slab for thermal insulation, conforming to

IS:12436, paper laminated/ unfaced, complete,

of following thickness and density:

10035 sqm15 mm thick 32 kg per cum 522.82 208.01 - 730.83 840.45

10040 sqm20 mm thick 32 kg per cum 673.73 208.01 - 881.74 1014.00

10045 sqm25 mm thick 32 kg per cum 853.17 208.01 - 1061.19 1220.36

10050 sqm30 mm thick 32 kg per cum 1005.39 208.01 - 1213.40 1395.41

10055 sqm40 mm thick 32 kg per cum 1336.49 208.01 - 1544.50 1776.18

10060 sqm50 mm thick 32 kg per cum 1668.23 208.01 - 1876.24 2157.68

Providing and fixing, polyurethane rigid foam

insulation pipe section, conforming to IS:12436

and density 36 kg per m3 with 0. 5 mm thick

aluminium sheet cladding having 50 mm overlap

on joints and supports, complete, of following

thickness and nominal bo

25 mm thickness :

10065 m20 mm 325.45 32.00 - 357.45 411.07

10070 m25 mm 366.34 32.00 - 398.34 458.09

10075 m32 mm 405.68 32.00 - 437.68 503.33

10080 m40 mm 441.61 32.00 - 473.61 544.65

10085 m50 mm 492.66 32.00 - 524.66 524.66

10090 m65 mm 546.30 32.00 - 578.31 665.05

10095 m80 mm 605.16 48.00 - 653.16 751.13

10100 m100 mm 696.84 48.00 - 744.85 856.57

10105 m125 mm 832.51 48.00 - 880.52 1012.59

10110 m150 mm 937.21 48.00 - 985.21 1132.99

10115 m200 mm 1162.21 48.00 - 1210.21 1391.75

10120 m250 mm 1428.60 48.00 - 1476.60 1698.09

10125 m300 mm 1622.38 64.00 - 1686.38 1939.34

10130 m350 mm 2122.37 64.00 - 2186.38 2514.33

10135 m400 mm 2429.34 64.00 - 2493.34 2867.34

30 mm thickness :

10140 m20 mm 370.56 32.00 - 402.56 462.94

10145 m25 mm 433.20 32.00 - 465.20 534.98

10150 m32 mm 469.13 32.00 - 501.13 576.30

10155 m40 mm 507.42 32.00 - 539.42 620.33

10160 m50 mm 579.28 32.00 - 611.28 702.97

10165 m65 mm 627.72 32.00 - 659.72 758.68

10170 m80 mm 694.38 48.00 - 742.38 853.74

10175 m100 mm 809.24 48.00 - 857.24 985.82

10180 m125 mm 947.51 48.00 - 995.51 1144.84

147

BuildCOST ELECTRICAL

05 Common Work Results For Electrical26

13 Medium-Voltage Cables UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

0526TOTAL

Cable End Terminations With

Compression Glands

20

Providing and making end termination with single

compression brass gland and aluminium lugs for

PVC insulated and PVC sheathed / XLPE

aluminium conductor cable of 1.1 kV grade,

complete, of size :

10005 Set1 core 300 sqmm 300.91 250.16 - 551.07 633.73

10010 Set1 core 400 sqmm 511.02 250.16 - 761.18 875.36

10015 Set1 core 500 sqmm 558.13 300.49 - 858.63 987.42

10020 Set1 core 630 sqmm 644.25 300.49 - 944.74 1086.45

10025 Set2 core 6 sqmm 61.91 100.06 - 161.98 186.27

10030 Set2 core 10 sqmm 63.12 120.08 - 183.19 210.67

10035 Set2 core 16 sqmm 85.86 120.08 - 205.94 236.83

10040 Set2 core 25 sqmm 143.47 120.08 - 263.55 303.08

10045 Set2 core 35 sqmm 146.04 120.08 - 266.12 306.04

10050 Set2 core 50 sqmm 151.56 120.08 - 271.63 312.38

10055 Set2 core 70 sqmm 156.56 120.08 - 276.64 318.14

10060 Set3 core 10 sqmm 87.45 120.08 - 207.53 238.66

10065 Set3 core 16 sqmm 145.05 120.08 - 265.12 304.89

10070 Set3 core 25 sqmm 147.50 120.08 - 267.58 307.71

10075 Set3 core 35 sqmm 151.36 120.08 - 271.44 312.16

10080 Set3 core 50 sqmm 159.63 120.08 - 279.71 321.67

10085 Set3 core 70 sqmm 264.64 160.10 - 424.74 488.45

10090 Set3 core 95 sqmm 268.39 160.10 - 428.49 492.77

10095 Set3 core 120 sqmm 462.25 250.16 - 712.41 819.28

10100 Set3 core 150 sqmm 478.76 250.16 - 728.92 838.25

10105 Set3 core 185 sqmm 537.54 250.16 - 787.70 905.85

10110 Set3 core 240 sqmm 777.80 250.16 - 1027.96 1182.16

10115 Set3 core 300 sqmm 840.45 250.16 - 1090.61 1254.20

10120 Set3 core 400 sqmm 1059.16 330.21 - 1389.37 1597.77

10125 Set3½ core 25 sq. mm 150.71 120.08 - 270.79 311.41

10130 Set3½ core 35 sqmm 154.58 160.10 - 314.68 361.88

10135 Set3½ core 50 sqmm 163.67 160.10 - 323.77 372.33

10140 Set3½ core 70 sqmm 269.96 160.10 - 430.06 494.57

10145 Set3½ core 95 sqmm 276.47 250.16 - 526.63 605.62

10150 Set3½ core 120 sqmm 474.34 250.16 - 724.50 833.17

10155 Set3½ core 150 sqmm 531.46 250.16 - 781.62 898.86

10160 Set3½ core 185 sqmm 550.88 250.16 - 801.04 921.19

10165 Set3½ core 240 sqmm 796.48 250.16 - 1046.64 1203.64

10170 Set3½ core 300 sqmm 986.49 330.21 - 1316.71 1514.21

10175 Set3½ core 400 sqmm 1292.50 330.21 - 1622.71 1866.12

10180 Set4 core 10 sq. mm 90.13 120.08 - 210.20 241.73

10185 Set4 core 16 sqmm 148.26 120.08 - 268.34 308.59

10190 Set4 core 25 sqmm 151.53 160.10 - 311.64 358.38

10195 Set4 core 35 sqmm 156.68 160.10 - 316.79 364.31

10200 Set4 core 50 sqmm 260.69 160.10 - 420.79 483.91

10205 Set4 core 70 sqmm 258.97 250.16 - 509.13 585.50

10210 Set4 core 95 sqmm 294.06 250.16 - 544.22 625.86

10215 Set4 core 120 sqmm 538.11 250.16 - 788.27 906.51

Cable End Termination Kit, Cast

Resin Compound

22

179

BuildCOST ELECTRICAL

05 Common Work Results For Electrical26

13 Medium-Voltage Cables UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

0526TOTAL

Providing and making indoor/outdoor cable end

termination with heat shrinkage jointing kit, with

all accessories including lugs for XLPE

aluminium conductor cable of 33 kV (E) grade,

complete, of size :

Outdoor,

10005 Each2 core 25 sqmm 1459.01 370.64 - 1829.65 2104.10

10010 Each2 core 35 sqmm 1461.59 370.64 - 1832.22 2107.06

10015 Each2 core 50 sqmm 1467.10 370.64 - 1837.74 2113.40

10020 Each2 core 70 sqmm 1627.37 370.64 - 1998.01 2297.71

10025 Each3 core 25 sqmm 1463.04 370.64 - 1833.68 2108.73

10030 Each3 core 35 sqmm 1466.91 370.64 - 1837.54 2113.18

10035 Each3 core 50 sqmm 1627.43 500.32 - 2127.75 2446.91

10040 Each3 core 70 sqmm 1639.46 500.32 - 2139.78 2460.74

10045 Each3 core 95 sqmm 1873.90 800.51 - 2674.41 3075.58

10050 Each3 core 120 sqmm 1889.93 800.51 - 2690.45 3094.01

10055 Each3 core 150 sqmm 1906.44 800.51 - 2706.95 3112.99

10060 Each3 core 185 sqmm 2835.93 870.16 - 3706.08 4262.00

10065 Each3 core 240 sqmm 3511.20 1000.64 - 4511.84 5188.61

10070 Each3 core 300 sqmm 3573.84 1000.64 - 4574.48 5260.66

10075 Each3 core 400 sqmm 796.09 1124.32 - 1920.41 2208.47

10080 Each3½ core 25 sqmm 1470.47 370.64 - 1841.11 2117.27

10085 Each3½ core 35 sqmm 1622.38 500.32 - 2122.70 2441.10

10090 Each3½ core 50 sqmm 1631.46 658.32 - 2289.79 2633.25

10095 Each3½ core 70 sqmm 1875.47 658.32 - 2533.79 2913.86

10100 Each3½ core 95 sqmm 1881.98 800.51 - 2682.49 3084.86

10105 Each3½ core 120 sqmm 1902.02 800.51 - 2702.53 3107.91

10110 Each3½ core 150 sqmm 2829.85 870.16 - 3700.01 4255.01

10115 Each3½ core 185 sqmm 2849.26 870.16 - 3719.42 4277.33

10120 Each3½ core 240 sqmm 3590.06 1000.64 - 4590.70 5279.30

10125 Each3½ core 300 sqmm 3658.20 1124.32 - 4782.52 5499.90

10130 Each3½ core 400 sqmm 4398.61 1205.57 - 5604.18 6444.81

10135 Each4 core 25 sqmm 2380.61 500.32 - 2880.93 3313.07

10140 Each4 core 35 sqmm 2389.97 658.32 - 3048.29 3505.54

10145 Each4 core 50 sqmm 2401.00 658.32 - 3059.32 3518.22

10150 Each4 core 70 sqmm 2520.14 658.32 - 3178.46 3655.23

10155 Each4 core 95 sqmm 2525.15 800.51 - 3325.66 3824.51

10160 Each4 core 120 sqmm 2546.52 800.51 - 3347.03 3849.09

Indoor,

10165 Each3 core 70 sqmm 5559.21 500.32 - 6059.53 6968.46

10170 Each3 core 95 sqmm 5562.97 500.32 - 6063.29 6972.78

10175 Each3 core 120 sqmm 6419.18 800.51 - 7219.70 8302.65

10180 Each3 core 150 sqmm 6435.69 800.51 - 7236.20 8321.63

10185 Each3 core 185 sqmm 6453.85 800.51 - 7254.36 8342.51

10190 Each3 core 240 sqmm 7625.47 1000.64 - 8626.11 9920.02

10195 Each3 core 300 sqmm 7688.11 1000.64 - 8688.75 9992.07

10200 Each3 core 400 sqmm 9470.42 1124.32 - 10594.74 12183.95

Outdoor,

10205 Each3 core 70 sqmm 13909.97 500.32 - 14410.29 16571.83

10210 Each3 core 95 sqmm 13913.73 500.32 - 14414.05 16576.15

10215 Each3 core 120 sqmm 16923.15 800.51 - 17723.66 20382.21

10220 Each3 core 150 sqmm 16939.65 800.51 - 17740.16 20401.19

180

BuildCOST ELECTRICAL

05 Common Work Results For Electrical26

13 Medium-Voltage Cables UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

0526TOTAL

10225 Each3 core 185 sqmm 16957.81 800.51 - 17758.32 20422.07

10230 Each3 core 240 sqmm 20747.02 1000.64 - 21747.66 25009.81

10235 Each3 core 300 sqmm 20809.67 1000.64 - 21810.31 25081.86

10240 Each3 core 400 sqmm 23739.29 1124.32 - 24863.61 28593.15

Cable End Termination Kit, Cold

Shrinkage

24

Providing and making indoor/outdoor cold shrink

termination including aluminium lugs and all

other jointing materials for XLPE aluminium

conductor cable of 11 kV (E) grade, complete, of

size:

Indoor,

10005 Each3 core 70 sqmm 13768.68 400.26 - 14168.93 16294.27

10010 Each3 core 95 sqmm 13772.43 400.26 - 14172.69 16298.59

10015 Each3 core 120 sqmm 14898.70 658.32 - 15557.02 17890.58

10020 Each3 core 150 sqmm 14915.20 658.32 - 15573.52 17909.55

10025 Each3 core 185 sqmm 14933.36 658.32 - 15591.69 17930.44

10030 Each3 core 240 sqmm 17531.78 800.51 - 18332.29 21082.14

10035 Each3 core 300 sqmm 17594.43 800.51 - 18394.94 21154.18

10040 Each3 core 400 sqmm 17691.27 1000.64 - 18691.91 21495.70

Outdoor,

10045 Each3 core 70 sqmm 23748.18 400.26 - 24148.43 27770.70

10050 Each3 core 95 sqmm 23751.93 400.26 - 24152.19 27775.02

10055 Each3 core 120 sqmm 26724.14 658.32 - 27382.46 31489.83

10060 Each3 core 150 sqmm 26740.64 658.32 - 27398.97 31508.81

10065 Each3 core 185 sqmm 26758.81 658.32 - 27417.13 31529.70

10070 Each3 core 240 sqmm 29718.91 800.51 - 30519.42 35097.33

10075 Each3 core 300 sqmm 29781.55 800.51 - 30582.07 35169.38

10080 Each3 core 400 sqmm 29878.40 1000.64 - 30879.04 35510.89

Providing and making indoor/outdoor cold shrink

termination including aluminium lugs and all

other jointing materials for XLPE aluminium

conductor cable of 33 kV (E) grade, complete, of

size:

Indoor,

10085 Each3 core 50 sqmm 36949.57 500.32 - 37449.89 43067.38

10090 Each3 core 70 sqmm 36961.60 658.32 - 37619.92 43262.91

10095 Each3 core 95 sqmm 36965.35 658.32 - 37623.67 43267.23

10100 Each3 core 120 sqmm 36981.39 800.51 - 37781.90 43449.18

10105 Each3 core 150 sqmm 41583.68 800.51 - 42384.19 48741.82

10110 Each3 core 185 sqmm 41601.84 1000.64 - 42602.48 48992.85

10115 Each3 core 240 sqmm 41666.08 1000.64 - 42666.72 49066.73

10120 Each3 core 300 sqmm 45589.99 1124.32 - 46714.31 53721.45

Outdoor,

10125 Each3 core 50 sqmm 49137.28 500.32 - 49637.60 57083.24

10130 Each3 core 70 sqmm 49149.30 658.32 - 49807.63 57278.77

10135 Each3 core 95 sqmm 49334.36 658.32 - 49992.68 57491.58

10140 Each3 core 120 sqmm 49350.39 800.51 - 50150.90 57673.54

10145 Each3 core 150 sqmm 49366.89 800.51 - 50167.40 57692.51

10150 Each3 core 185 sqmm 49385.05 1000.64 - 50385.69 57943.55

10155 Each3 core 240 sqmm 54396.60 1000.64 - 55397.24 63706.83

10160 Each3 core 300 sqmm 54459.25 1124.32 - 55583.57 63921.10

181

BuildCOST COMMUNICATIONS

15 Communications Horizontal Cabling27

10 Special Communications Cabling UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1527TOTAL

Cable, Telephone25

Providing and drawing PVC insulated, PVC

sheathed, tinned copper conductor telephone

cable in the existing surface/recessed, PVC/steel

conduit/PVC casing and capping, of size :

0.51 mm dia,

10005 m1 pair 8.97 38.00 - 46.97 54.01

10010 m2 pair 17.09 38.00 - 55.09 63.35

10015 m3 pair 24.67 38.00 - 62.67 72.07

10020 m5 pair 37.59 38.00 - 75.59 86.93

10025 m10 pair 72.43 38.00 - 110.42 126.99

10030 m20 pair 139.58 38.00 - 177.57 204.21

10035 m50 pair 365.86 42.75 - 408.60 469.89

0.61 mm dia,

10040 m1 pair 11.72 38.00 - 49.72 57.17

10045 m2 pair 22.56 38.00 - 60.55 69.64

10050 m3 pair 33.10 38.00 - 71.10 81.76

10055 m5 pair 51.04 38.00 - 89.03 102.39

10060 m10 pair 98.69 38.00 - 136.69 157.19

10065 m20 pair 191.59 38.00 - 229.59 264.03

10070 m50 pair 519.85 42.75 - 562.60 646.99

0.71 mm dia,

10075 m1 pair 11.28 38.00 - 49.27 56.66

10080 m2 pair 35.39 38.00 - 73.39 84.39

10085 m3 pair 53.74 38.00 - 91.74 105.50

10090 m5 pair 88.41 38.00 - 126.40 145.36

10095 m10 pair 176.52 38.00 - 214.52 246.70

10100 m20 pair 350.62 38.00 - 388.61 446.90

10105 m50 pair 762.58 42.75 - 805.32 926.12

235

BuildCOST ELECTRONIC SAFETY AND SECURITY

31 Fire Detection And Alarm28

23 Fire Detection And Alarm

Annunciation Panels And Fire

Stations

UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

3128TOTAL

Fire Detection And Fire Alarm

System

10

P r o v i d i n g , i n s t a l l a t i n g , t e s t i n g a n d

commissioning of standard fire detection and

alarm control panel in 16 SWG sheet steel

enclosure duly painted, consisting of power

supply, automatic control battery charger, control

and zone cards, duplex talk back facility etc (but

without PA system) for operation on 24 V, DC,

complete with 2 numbers 12 V Lead Acid storage

batteries of suitable capacity, for :

10005 Each2 zones 17703.54 1557.97 - 19261.51 22150.73

10010 Each4 zones 21398.12 1604.45 - 23002.57 26452.95

10015 Each6 zones 26284.50 1653.84 - 27938.34 32129.10

10020 Each8 zones 29979.08 1747.97 - 31727.05 36486.10

10025 Each10 zones 33673.66 1791.63 - 35465.29 40785.09

10030 Each12 zones 37368.24 1837.60 - 39205.84 45086.71

Providing and fixing heat detector, conforming to

IS:2175, including making connections, of type :

10035 EachRate of rise (ROR) 2070.63 56.99 - 2127.62 2446.76

10040 EachFixed temperature 1812.07 56.99 - 1869.06 2149.42

10045 EachRate of rise - cum - fixed temperature 2005.99 56.99 - 2062.98 2372.43

Providing and fixing smoke detector, conforming

to IS:11360, including making connections, of

type :

10050 EachIonisation 2147.39 56.99 - 2204.38 2535.04

10055 EachPhoto-electric/optical 2031.37 113.99 - 2145.36 2467.16

10060 EachProviding and fixing spot (response) indicator

including making connection.

141.82 136.03 - 277.85 319.53

Providing and fixing sounder including making

connections, of intensity :

10065 EachLow 958.75 47.50 - 1006.25 1157.18

10070 EachHigh 1614.24 47.50 - 1661.74 1911.00

10075 EachProviding and fixing manual call box,

complete with cover, switch including making

connections.

1254.32 136.03 - 1390.35 1598.90

P r o v i d i n g , i n s t a l l a t i n g , t e s t i n g a n d

commissioning addressable fire detection and

alarm control panel in 16 SWG sheet steel

enclosures, duly painted, consisting of power

supply, automatic control battery charger, loop

cards, fire / fault event recorder, duplex talk back

facility etc. (but without PA system), suitable for

operation on 24V, DC, complete with 2 numbers

12 V Lead Acid storage batteries of suitable

capacity, for :

10080 Each2 loop 283594.12 1791.63 - 285385.75 328193.61

10085 Each4 loop 423511.44 2028.22 - 425539.66 489370.61

10090 Each6 loop 610862.40 2263.15 - 613125.55 705094.39

10095 Each8 loop 751018.08 2529.35 - 753547.43 866579.54

10100 Each10 loop 937773.14 2756.34 - 940529.48 1081608.91

10105 Each12 loop 1124528.20 2986.05 - 1127514.25 1296641.39

Providing and fixing, addressable heat detector ,

conforming to IS:2175, including making

connections, of type :

10110 EachRate of rise (ROR) 4914.79 56.99 - 4971.78 5717.55

10115 EachFixed temperature 4656.23 56.99 - 4713.22 5420.20

239

BuildCOST EARTHWORK

11 Clearing And Grubbing31

10 Clearing And Grubbing UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1131TOTAL

Clear And Grub10

10005 100 sqmClearing jungle including uprooting of rank

vegetation, grass, brush wood, trees and

saplings of girth upto 300 mm (measured at

a height of 1.0 m above GL) and removal of

rubbish up to a distance of 50 m outside the

periphery of the area cleared, complete.

- 666.71 - 666.71 766.72

Felling trees including cutting of trunks and

branches, removing the roots, stacking of

serviceable materials and disposal of

unserviceable materials within a 50 m lead,

complete, of girths (measured at a height of 1.0

m above GL.) :

10010 Eachover 300 mm and upto 600 mm - 200.01 - 200.01 230.01

10015 Eachover 600 mm and upto 1200 mm - 909.13 - 909.13 1045.49

10020 Eachover 1200 mm and upto 2400 mm - 4000.20 - 4000.20 4600.23

10025 Eachover 2400 mm - 8000.40 - 8000.40 9200.46

Clearing11

10005 100 sqmClearing grass and removal of the rubbish

upto a distance of 50 m outside the

periphery of the area cleared, complete.

- 339.02 - 339.02 389.87

14 Earth Stripping And Stockpiling31

13 Soil Stripping And Stockpiling UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1431TOTAL

Soil Stripping13

10005 100 sqmSurface dressing of the ground including

removing vegetation and inequalities not

exceeding 150 mm deep, in all types of soil

and disposal of rubbish upto a lead of 50 m,

complete.

- 1290.38 - 1290.38 1483.94

22 Grading31

16 Fine Grading UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

2231TOTAL

Topsoil11

10005 100 sqmEarth work in surface excavation not

exceeding 300 mm in depth but exceeding

1.5 m in width as well as 10 sqm on plan, in

all types of soil including disposal of

excavated earth up to 50 m and lift up to 1.5

m, disposed soil to be leveled and neatly

dressed, complete.

- 5000.25 - 5000.25 5750.29

23 Excavation And Fill31

16 Excavation UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

2331TOTAL

Excavating, Trench12

Earth work in excavation in foundation trenches

or drains (not exceeding 1.5 m in width or 10

sqm on plan) including dressing of sides and

ramming of bottoms, lift upto 1.5 m, including

getting out the excavated soil and disposal of

surplus excavated earth as directed, within a

lead of 50 m, complete :

10005 cumAll types of soil - 363.86 - 363.86 418.44

243

BuildCOST EARTHWORK

23 Excavation And Fill31

16 Excavation UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

2331TOTAL

10010 cumOrdinary and disintegrated rock 35.13 563.43 - 598.56 688.35

10015 cumHard rock (requiring blasting) 90.95 727.32 - 818.27 941.01

10020 cumHard rock (blasting prohibited) - 1176.77 - 1176.77 1353.28

Excavating, Utility Trench14

Earth work in excavation, in trenches, in all types

of soil, for pipes, cables, etc. including

excavation for sockets, and dressing of sides ,

ramming of bottoms, depth up to 1.5 m including

getting out the excavated earth and then

returning the soil as required, in layers not

exceeding 200 mm in depth including

consolidating each deposited layer by ramming ,

watering etc. and disposing of surplus excavated

soil as directed, within a lead of 50 m complete,

of pipes, cables of sizes :

10005 mupto 80 mm dia. (minimum width of trench

450 mm)

- 227.32 - 227.32 261.42

10010 mover 80 mm dia. and upto 300 mm dia.

(minimum width of trench 600 mm)

- 371.09 - 371.09 426.76

10015 mover 300 mm dia. (minimum width of trench

850 mm)

- 579.50 - 579.50 666.43

Earth work in excavation in trenches, for pipes ,

cables, etc. including excavation for sockets,

depth up to 1.5 m including getting out the

excavated materials, returning the soil as

required in layers not exceeding 200 mm in

depth including consolidating each deposited

layer by ramming, watering etc., stacking

serviceable material for measurement and

disposal of unserviceable material, within a lead

of 50 m complete, of pipes, cables of sizes,

Ordinary and disintegrated rock :

10020 mupto 80 mm dia. (minimum width of trench

450 mm)

16.60 325.00 - 341.60 392.84

10025 mover 80 mm dia. and upto 300 mm dia.

(minimum width of trench 900 mm)

41.11 804.62 - 845.73 972.59

10030 mover 300 mm dia. (minimum width of trench

900 mm)

47.31 925.45 - 972.76 1118.68

Hard rock (blasting prohibited) :

10035 mupto 80 mm dia. (minimum width of trench

450 mm)

- 617.58 - 617.58 710.22

10040 mover 80 mm dia. and upto 300 mm dia.

(minimum width of trench 900 mm)

- 1528.36 - 1528.36 1757.62

10045 mover 300 mm dia. (minimum width of trench

900 mm)

- 1758.66 - 1758.66 2022.46

Hard rock (requiring blasting) :

10050 mupto 80 mm dia. (minimum width of trench

450 mm)

42.98 402.81 - 445.79 512.66

10055 mover 80 mm dia. and upto 300 mm dia.

(minimum width of trench 900 mm)

106.41 996.76 - 1103.18 1268.65

10060 mover 300 mm dia. (minimum width of trench

900 mm)

122.48 1147.49 - 1269.96 1460.46

Add for excavating trenches for pipes, cable etc .

in ordinary/hard rock :

10065 mFor depth exceeding 1.5 m, but not

exceeding 3.0 m (Rate is over corresponding

basic item for depth upto 1.5 m)

84.66 1034.75 - 1119.41 1287.33

10070 mFor depth exceeding 3.0 m, but not

exceeding 4.5 m (Rate is over corresponding

basic item for depth upto 1.5 m)

185.51 2588.80 - 2774.31 3190.46

Excavating holes up to 0.5 cum including getting

out the excavated material, then returning the

244

BuildCOST EXTERIOR IMPROVEMENTS

11 Base Courses32

23 Aggregate Base Courses UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1132TOTAL

Aggregate Base Courses10

Providing and laying water bound macadam with

stone aggregate, stone screening and blinding

material including screening, sorting, spreading

to template and consolidation with power road

roller of 8 to 10 t capacity etc., complete, of

courses :

10005 cumSub-base with stone aggregate 90 to 45 mm

including stone screening 13.2 mm size

1838.99 404.27 163.14 2406.40 2767.36

10010 cumBase course with 63 to 45 mm size including

stone screening 13.2 mm size

1854.26 337.55 136.29 2328.10 2677.32

10015 cumBase course with 53 to 22.4 mm size

including stone screening 11.2 mm size

1798.50 337.55 136.29 2272.35 2613.20

Laying water bound macadam with stone

aggregate, stone screening and blinding material

including screening, sorting, spreading to

template and consolidation with power road

roller of 8 to 10 t capacity etc. complete

(payment for stone aggregate, screenings,

kankar, moorum and red bajri etc. to be made

separately) of courses:

10020 cumSub-base with stone aggregate 90 to 45 mm

including stone screening 13.2 mm size.

28.78 404.27 163.14 596.19 685.62

10025 cumBase course with 63 to 45 mm size including

stone screening 13.2 mm size.

39.31 337.55 136.29 513.16 590.13

10030 cumBase course with 53 to 22.4 mm size

including stone screening 11.2 mm size.

39.31 337.55 136.29 513.16 590.13

10035 100 sqmScarifying metalled (water-bound) road

surface including disposal of rubbish, lead

upto 50 m and consolidation of the

aggregate received from scarifying with

power road roller of 8 to 10 t capacity,

complete.

15.99 1025.69 529.47 1571.15 1806.82

10040 mProviding and edging with bricks of class 75

in full brick width and half brick depth

including excavation, refilling and disposal of

surplus earth, lead up to 50 m.

60.48 40.38 - 100.86 115.99

10045 mProviding and edging 70 mm wide, 114 mm

deep to plinth protection with bricks of class

75 including excavation, re-filling and

disposal of surplus earth upto lead of 50 m

and grouting with cement mortar 1:4 with fine

sand, complete.

28.40 11.73 0.71 40.84 46.97

Subgrade11

10005 100 sqmPreparation of subgrade by excavating or

filling with available earth to an average of

225 mm depth, dressing to camber, watering

and consolidating with road roller of 8-10 t

capacity including making good the

undulations etc. and disposal of surplus

earth / bringing earthfrom borrow pits within

a lead of 50 m, complete.

64.63 8125.67 221.37 8411.67 9673.42

10010 100 sqmConsolidation of sub-grade with road roller of

8 to 10t capacity including making good the

undulations, etc.with earth or quarry spoils,

etc. and rerolling the sub-grade, complete.

64.63 21.60 223.02 309.25 355.64

10015 100 cmAdd for compaction of earth work in

embankment under optimum moisture

conditions to give at least 95% of the

maximum dry density (Proctor density)

95.95 797.20 334.12 1227.26 1411.35

26 Asphaltic Base Courses UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1132TOTAL

251

BuildCOST EXTERIOR IMPROVEMENTS

11 Base Courses32

26 Asphaltic Base Courses UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1132TOTAL

Paving, Bitumen And Stone Grit15

10005 sqmProviding surface dressing on new surface

with paving bitumen of grade A-90 / S-90,

using 2.25 kg. of bitumen per sqm with 1.65

cum of stone chippings 13.2 mm nominal

size per 100 sqm of road surface including

consolidation with road roller of 6 to 8 t

capacity etc., complete.

116.33 28.54 12.05 156.92 180.46

10010 sqmProviding surface dressing on new surface in

two coats with bitumen of grade A-90/S-90,

using 1.8 kg. of bitumen per sqm with 1.5

cum of stone chippings 13.2 mm nominal

size per 100 sqm of road surface for first

coat and 1.1 kg. of bitumen per sqm. with

1.00 cum of stone chippings 11.2 mm

nominal size per 100 sqm. or road surface

for second coat, including consolidation of

each coat separately with road roller of 6 to 8

t capacity etc., complete.

152.45 41.18 16.81 210.44 242.01

Providing surface dressing one coat on new

surface with bitumen of specified grade at a rate

of 1.95 kg/ sqm.of surface area with 1.5 cum. of

stone chippings 13.2 mm nominal size per 100

sqm. of road surface including consolidation with

road roller of 6 to 8 t capacity etc., complete :

10015 sqmUsing cut back RC 3 (rapid curing) bitumen,

conforming to IS:217

77.68 26.21 11.12 115.01 132.26

12 Flexible Paving32

16 Asphalt Paving UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1232TOTAL

Asphaltic Concrete Pavement15

Providing and applying tack coat, using hot ,

straight run bitumen of grade 80/100 including

heating the bitumen, spraying the same with

mechanically operated spray unit fitted on

bitumen boiler, cleaning and preparing the

existing road surface, complete, on surfaces :

10005 sqmW.B.M, @ 0.75 kg/sqm 28.95 8.75 0.70 38.40 44.16

10010 sqmBituminous surface @ 0.50 kg/sqm 20.61 8.75 0.70 30.06 34.57

Providing and laying premix bituminous

macadam base course with stone aggregate of

20 mm and down gauge and straight run bitumen

of grade 80/100 @ 4% by weight of total mix

including hot mixing of stone aggregate and

bitumen in hot mix plant, transporting mixed

material and laying mixed material with paver

finisher to the required level and grade, rolling

with road roller of 8 to 10 t capacity to achieve

the specified compaction and density, complete,

of compacted thickness :

10015 cum40 mm 6283.66 100.03 1003.68 7387.37 8495.47

10020 cum50 mm 6283.66 100.03 1003.68 7387.37 8495.47

Providing 20 mm thick premix carpet with 1.8

cum and 0.90 cum of stone chippings of 13.2

mm size and 11.2 mm size respectively per 100

sqm. and 52 kg. and 56 kg. of hot bitumen per

cum. of stone chippings of 13.2 mm and 11.2

mm size respectively including a tack coat with

hot straight run bitumen and consolidation with

road roller of 6 to 8 t capacity etc., complete,

(cost of tack coat not included), of paving asphat

252

BuildCOST UTILITIES

11 Water Utility Distribution Piping33

13 Public Water Utility Distribution

Piping

UNIT TOTAL INCL

OHP

BARE COST

Material Labour Equipment

1133TOTAL

Water Supply Chamber, Brick

Masonry

50

Constructing brick masonry chambers with class

75 bricks in cement mortar 1:5 with fine sand,

RCC top slab 1:2:4 of avg. thickness 150 mm,

including reinforcement, excavation, refilling, 100

mm thick foundation concrete 1:5:10 with coarse

sand, 12 mm thick inside plastering with cement

mortar 1:3 with coarse sand, finished with a

floating coat of neat cement, and 15 mm thick

outside plastering in cement mortar 1:4 with fine

sand, complete with one brick thick wall, of size :

10005 Each600 x 600 x 750 mm deep inside, with CI

surface box 100 mm top dia., 160 mm

bottom dia. and 180 mm deep inside, with

chained lid.

4534.70 2317.52 96.64 6948.86 7991.19

10010 Each900 x 900 x 1000 mm deep inside, with CI

surface box 100 mm. top dia., 160 mm

bottom dia. and 180 mm deep inside, with

chained lid.

7264.34 3706.11 154.70 11125.15 12793.92

10015 Each1200 x 1200 x 1000 mm deep inside, with CI

surface box 100 mm. top dia., 160 mm

bottom dia. and 180 mm deep inside, with

chained lid.

9077.10 5586.16 188.33 14851.59 17079.33

10020 Each600 x 600 x 750 mm deep inside, with CI

surface box 350 x 350 mm and 165 mm

deep inside, with chained lid, for fire hydrant.

4988.29 2294.73 95.58 7378.59 8485.38

10025 Each600 x 450 x 500 mm, deep inside with CI

double flap surface box 400 x 200 x 200 mm.

inside, with locking arrangement, for water

meter.

4465.29 1731.43 76.82 6273.54 7214.57

Piping, Water Distribution Systems60

Providing, laying, jointing and testing double

flanged ductile iron pipes having screwed

flanges, conforming to IS:8329, including

compressed neoprene washers, galvanised steel

fasteners, complete, excluding trenching and

back filling, of nominal dia.:

10005 m80 mm 2461.66 35.51 - 2497.17 2871.75

10010 m100 mm 4084.83 62.14 - 4146.97 4769.01

10015 m150 mm 4100.27 62.14 - 4162.41 4786.77

10020 m200 mm 6068.31 71.01 - 6139.32 7060.22

10025 m250 mm 7184.25 97.64 - 7281.89 8374.17

10030 m300 mm 9361.57 111.01 - 9472.58 10893.47

10035 m350 mm 11621.66 142.02 - 11763.68 13528.24

10040 m400 mm 15306.41 150.90 - 15457.31 17775.91

10045 m450 mm 18593.51 190.94 - 18784.45 21602.12

10050 m600 mm 30781.34 284.05 - 31065.39 35725.19

Providing, laying, jointing and testing S&S ductile

iron pipes, conforming to IS:8329, with

pre-moulded rubber (IS:5382 and dimensions as

per IS:12820) joints complete, excluding

trenching and back filling, of nominal dia.:

10055 m80 mm 1608.01 35.51 - 1643.52 1890.04

10060 m100 mm 2223.65 39.89 - 2263.54 2603.07

10065 m150 mm 3246.11 62.14 - 3308.25 3804.48

10070 m200 mm 4125.94 71.01 - 4196.95 4826.50

10075 m250 mm 5436.66 97.64 - 5534.30 6364.45

10080 m300 mm 6936.35 111.01 - 7047.36 8104.47

259