The RWE Group’s Coal-based Power Plant Projects on Carbon Capture and Storage Dr. Dietmar Keller, Prof. Dr. Wolfgang Straßburg, RWE Power AG National Conference of State Legislatures 31 October to 2 November 2007 Tampa, Florida

Transcript of The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility),...

Page 1: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

The RWE Group’s Coal-based Power Plant Projects on Carbon Capture and Storage

Dr. Dietmar Keller, Prof. Dr. Wolfgang Straßburg, RWE Power AG

National Conference of State Legislatures31 October to 2 November 2007Tampa, Florida

Page 2: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

211/9/2007 RWE Power • National Conference of State Legislatures 2007

Contents

Introduction

Overview of CCS activities of the RWE Group

IGCC-CCS project

– Power plant technology

– Development of CO2 storage facility

– CCS power generation costs

– Necessary prerequisites to ensure timely implementation

– Next steps in the project

Page 3: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

311/9/2007 RWE Power • National Conference of State Legislatures 2007

Climate protection policy and trend in energy demand are setting the framework

RWECoal dominates RWE's generation mixTotal power output in 2006: 184 billion kWhShare of energy sources in %

Lignite33%

Hard coal32%

Gas11%

Renewables+ other3%

Nuclear21%

Conflicting energy demand and climate protection goals require acomprehensive CO2 mitigation strategy

6,9

14,73,41,2

7,0

7,8

0,9

2,7

3,3

3,2

WorldFossil fuels will retain their outstanding global position in power generation

billion MWh 33.8

17.4

+ 113 %

+ 94 %

Renewables

Fossil

Nuclear

Source: IEA's World Energy Outlook 20062004 2030

Coal

GasOil

Page 4: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

411/9/2007 RWE Power • National Conference of State Legislatures 2007

RWE's Clean Coal Power

Application of state of the art technologies

Horizon 1 Horizon 2 Horizon 3

Further development of advanced power plant technology

Development of zero-CO2 power plants

Efficiency increase(primary measure for CO2 reduction)

CO2 capture and storage(secondary measure)

2010 2015 < 2020

Page 5: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

511/9/2007 RWE Power • National Conference of State Legislatures 2007

R&D commitment− COORIVA (IGCC), COORETEC programme− OXYCOAL AC (Oxyfuel), COORETEC programme− ADECOS (Oxyfuel), COORETEC programme− ENCAP (IGCC, Oxyfuel), 6th framework programme of the EU− CASTOR (PCC), 6th framework programme of the EU− CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding− Further R & D contracts of RWE for carbon storage been prepared

Lignite-based pilot plant Lignite-based demonstration plant

IGCC power plant with CO2 capture, 450 MWgross, 2.6 mill. t/a CO2

Planning, pipeline planning and erection

Screening, exploration, construction; developm. of standards and methods

IGCC-CCS

Post-combustion CO2 scrubbing (PCC, also as retrofit option)

Hard coal-based pilot plant

20142010 20122008

Hard coal-based demonstration plant

− Powerplant

− Transport− Storage

facility

− Amine, D

Legal framework

− Amine, UK

RWE’s activities for zero-CO2 coal-based power generation

− Chilled Ammonia

Pilot plant HC, USA

Page 6: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

611/9/2007 RWE Power • National Conference of State Legislatures 2007

IGCC Technology

IGCC offers favourable preconditions as zero-CO2 power plant technology

All process steps are commercially available

Technical and economic statements are robust

Power plant can also be operated efficiently without capture

IGCC has reserves for further reducing classic emissions

High fuel flexibility, high product flexibility

CCGTplant

CCGTplant

Gasification1,000 MWth

Gasification1,000 MWth

CO2capture

CO2capture

desulphuri-zation

desulphuri-zation

COconversion

COconversion

CO2 to storage facility

(optional) (optional)

O2

Coal 450 MWgross

Commercial Operational Experience

Four commercial coal-based IGCC plants exist world-wide (without carbon capture), some of them having been operated for more than 10 years

Commercial-scale coal gasification, gas cleaning, combined cycle and also carbon capture components have been available for a long time now

Buggenum IGCC

Page 7: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

711/9/2007 RWE Power • National Conference of State Legislatures 2007

CO2 storage: Intermediate result of storage site screening by RWE Dea for the North West of Germany

Further regions of Germany currently under investigation:– the German North Sea – Central and Eastern Germany

RWE Dea has identified an onshore storage potential of 4.8 bn t of CO2 for the North West of Germany alone

Gas fields1.55 bn. tDeep saline

formations(DSF)

3.1 bn t H2S gas0.95 bn. t

Oil fields0.15 bn t

Due to high percentage of H2S not suitable for EGR

Page 8: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

811/9/2007 RWE Power • National Conference of State Legislatures 2007

Carbon storage and pipeline project

today

Screening:Storage site screeningFeasibility study for 2 – 3 sitesFeasibility study for pipelineApproximate routing

Exploration:Exploration (2D/3D seismics, drilling)Selection and approval of storage siteRouting approvalFEED (pipeline)

Construction:Sink boreholes

Above-ground facilities

Installation of pipeline

Commissioning

Monitoring plan

2008 2010 2014Phase 1 Phase 2 Phase 3

Joint tasks of companies, policy-makers, R&D institutions and authorities

Important parallel activities:Establishing methods and standards for evaluating carbon storage sites and their long-term tightness ⇒ collaboration with research institutes and expertsEstablishing a framework under approval law (laws and regulations, technical rules) ⇒ European and national legislatorsAchieving public acceptance of CCS technology and facilities

Page 9: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

911/9/2007 RWE Power • National Conference of State Legislatures 2007

Costs of power generation with CCS Lignite-based

Industrial-scale Dry lignite-firedIGCC-CCS PC twin unitplant with CO2 scrubbing

95 - 100

65 - 70

0

50

100

330 MW35.5 %

€5,000/kW

DAC* in €/MWh

*) Discounted average costs in today’s monetary value incl. transport and storage;CO2 scenario with full auctioning; development of CO2 prices: €20 to 40/t; after-tax IRR: 8 %

Net capacityEfficiencySpec. invest.

Forward 2008baseload €54/MWh

Industrial-scale CCS plantsIGCC-CCS

1,600 MW37 %

€3,000/kW

The high costs and challenges for first-of-their-kind CCS plants require substantial funding, both on EU and national level.

75 %20 %

demonstration plant

Page 10: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

1011/9/2007 RWE Power • National Conference of State Legislatures 2007

Funding instrumentsfor CCS demonstration plants

Due to high costs and enormous challenges initial plants of this new technology need effective financial support from the EU and the member states.

Following proposed funding instruments should be discussed as soon as possible:

– Integration of CCS into the EU Emissions Trading Scheme (EU-ETS):In principle CCS demo plants should be allocated the full amount of free CO2-certificates as a plant without CCS would require.

– Alternative: Supply fee at a guaranteed price:By analogy with the supply fee for offshore wind (91 €/MWh at present)

– Direct investment aid:

• European funding appears difficult. German government is called upon to act.

• Examples of national commitments:US DOE-funding: up to 74% of the FutureGen project costs

(≈ $ 1.2 bn),UK-CCS funding: £ 400 m,Norway-CCS funding: € 200 m.

Page 11: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

1111/9/2007 RWE Power • National Conference of State Legislatures 2007

The creation of the necessary legal framework for CO2 transport and storage

EU Commission is currently drawing up a framework directive governing CCS.In November 2007 it is due to be submitted to the EU Parliament for deliberation.At the earliest in January 2009 it could be adopted by the EU Parliament.

The aspects planned to be the subject of EU legislation to date are rightly limited to a minimum. EU Commission expressly wishes a broad-based national framework.

EU Commission has stated that CO2 is not intended to be defined as waste.

Storing CO2 in depleted oil and gas reservoirs for the purposes of EOR and EGR is possible in Germany under the national mining law.

The storage potential of saline formations is very interesting, but there is no legal basis at all today. Since the legal issue of exploration and operation of a CO2-storage site is closely linked with mining activities, it would be useful to take the national mining law as the basis.

Page 12: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

1211/9/2007 RWE Power • National Conference of State Legislatures 2007

Establishment of legal framework

Establishmentof fundinginstruments

CCS framework dir.EU Commission

CCS framework dir.EU Parliament

In parallel: development of national legislation

11/07CCS framework directive draft

Nationalimplementation

National funding instruments

1/09Clarity about CCS funding

1/09Binding legal framework

EU directiveCCS in EU-ETS

Power plant

CO2 storage (in aquifer) Pipeline

Screening, exploration, approval

Detailengineering

Erection,commissioning

8/2008 12/2010 2014

Erection,commissioning

Projectdevelopment

Decision on overall process

11/2009

1st grid connectionApproval,decision to build

1/2009

Request forapproval.

12/07EU directive

Start of prepar.of request forapproval

Prepar. ofrequest for approval

Preparation of request for approval

Necessary prerequisites:

Prerequisites for timely realization of the IGCC-CCS project

RWE is leading the way in technology

at enormous challenges

We urgently need a legal framework for storage

to be created by politicians

Page 13: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

1311/9/2007 RWE Power • National Conference of State Legislatures 2007

The next steps in the power plant project: contracting

IGCC is a new power plant technology with many interfaces

Optimal exploitation of the improvement potential requires one contractor for the gas island and one for the CCGT plant

Gas island− WTA− Gasification− ASU− Gas proc.

CCGT

IGCC power plant

For both parts, the contracts governing planning and optional supply are to be concluded by mid-2008. Preparations are under way.

1) PDP: Process Design Package (objective: fix the IGCC process)2) FEED: Front End Engineering & Design (basic engineering and approval planning, basis for EPC)3) EPC: Engineering, Procurement & Construction

Gas island:

CCGT:

Gas island supply contr. PDP1) FEED2) EPC3)

CC supply contr.GT service contr. Support Support EPC3)

Today Mid-2008 2014

Page 14: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

1411/9/2007 RWE Power • National Conference of State Legislatures 2007

Status of RWE’s IGCC-CCS project

Basic technology: IGCCEl. capacity: 450 MWgross, 330 MWnet

Net efficiency: 36 %CO2 storage: 2.6 mill. t/a in gas deposits or deep saline formationsInvestment cost: € 1.6 bn (real 2007)Power cost: € 95 – 100 /MWh (discounted average costs; today’s monetary value)Commissioning: 2014

Pipelin

e

Storage region

Power plant

Page 15: The RWE Group’s Coal-based Power Plant Projects on Carbon ... · −CO2SINK (storage facility), 6th framework programme of the EU + BMWi funding −Further R & D contracts of RWE

1511/9/2007 RWE Power • National Conference of State Legislatures 2007

Thank you for your attention

contact: [email protected]