THE ROLE OF EMIR UNIFIED INFORMATION SYSTEM IN MANAGEMENT VERIFICATIONS National Development Agency 9th June 2009

Transcript of THE ROLE OF EMIR UNIFIED INFORMATION SYSTEM IN MANAGEMENT VERIFICATIONS National Development Agency...

Page 1: THE ROLE OF EMIR UNIFIED INFORMATION SYSTEM IN MANAGEMENT VERIFICATIONS National Development Agency 9th June 2009.

THE ROLE OF EMIR UNIFIED INFORMATION SYSTEM IN MANAGEMENT VERIFICATIONS

National Development Agency

9th June 2009

Page 2: THE ROLE OF EMIR UNIFIED INFORMATION SYSTEM IN MANAGEMENT VERIFICATIONS National Development Agency 9th June 2009.

INSTITUTIONAL FRAMEWORK IN HUNGARY

• CENTRALISED MANAGAMENT STRUCTURE – ALL MANAGING AUTHORITIES IN NATIONAL DEVELOPMENT AGENCY

• 15 INTERMEDIATE BODIES – OPERATIONAL MANAGEMENT, SERVICE LEVEL AGREEMENTS, MANAGEMENT VERIFICATION DELEGATED

• CERTIFYING AUTHORITY – MINISTRY OF FINANCE • AUDIT AUTHORITY – GOVERNMENT AUDIT

OFFICE

Subtitle…

Page 3: THE ROLE OF EMIR UNIFIED INFORMATION SYSTEM IN MANAGEMENT VERIFICATIONS National Development Agency 9th June 2009.

REGULATORY FRAMEWORK

NATIONAL LEGISLATION (GOVERNMENT DECREE) – SETS OUT MINIMUM COVERAGE FOR ON-SITE CONTROL VISITS

EURO 35.000-90.000 GRANT: 25% OF PROJECTS (RISK ASSESSMENT) BEFORE CLOSURE

OVER EURO 90.000 GRANT: 100% OF PROJECTS BEFORE CLOSURE

OVER 900.000 GRANT: ANNUALLY + BEFORE CLOSURE

UNIFIED OPERARATIONAL MANUAL – DETAILED PROCEDURES, STANDARD DOCUMENTS TO BE USED

Page 4: THE ROLE OF EMIR UNIFIED INFORMATION SYSTEM IN MANAGEMENT VERIFICATIONS National Development Agency 9th June 2009.

EMIR COMPUTERISED INFORMATION SYSTEM

HISTORY – PREVIOUS EXPERIENCE MOTIVATION – ALL DATA INPUTTED, ALL

DOCUMENTS AUTOMATICALLY PRODUCED (BECAME A LOT MORE THAN MONITORING INFORMATION SYSTEM)

ACCESS TO DATA BY ALL MANAGEMENT AND CONTROL ENTITIES

LINKS WITH TREASURY, TAX AND TARIFF AUTHORITIES

SHORTCOMINGS – FULL AND UP-TO-DATE DATA (STICK AND CARROT USED)

Page 5: THE ROLE OF EMIR UNIFIED INFORMATION SYSTEM IN MANAGEMENT VERIFICATIONS National Development Agency 9th June 2009.

RISK ASSESSMENT (I)

DATA DIRECTLY COME FROM EMIR OR IMPORTED• STANDARD RISK FACTORS – SIZE, STRUCTURE, MATURITY OF PROJECT

PROMOTER FINANCIAL STABILITY EXTERNAL/INTERNAL CONTROL ENVIRONMENT PUBLIC PROCUREMENT PROJECT MANAGEMENT (OVER)AMBITIOUS INDICATORS

Page 6: THE ROLE OF EMIR UNIFIED INFORMATION SYSTEM IN MANAGEMENT VERIFICATIONS National Development Agency 9th June 2009.

RISK ASSESSMENT (II)

• PROBABILITY RISK FACTORS • EFFECT ON PROJECT IMPLEMENTATION

• EMIR LISTS PROJECT PROMOTERS IN RANKING ORDER

HELPS TO MEET REGULATORY REQUIREMENTS HELPS TO ALLOCATE CAPACITIES (E.G.

GEOGRAPHICAL LOCATION OF PROJECTS TO BE VISITED)

• EMIR LIMITS: FACTUAL DATA VIS A VIS PERSONAL IMPRESSIONS

Page 7: THE ROLE OF EMIR UNIFIED INFORMATION SYSTEM IN MANAGEMENT VERIFICATIONS National Development Agency 9th June 2009.

ON-SITE CONTROL VISITS

• TWIN AIMS ASSURANCE OF PHYSICAL AND FINANCIAL

PROGRESS, COMPLIANCE WITH COMMUNITY AND NATIONAL LEGISLATION, DELIVERY OF HORIZONTAL THEMES

HELP PROJECT PROMOTER AND FINANCIERS (IB AND MA)

• TIMING DEFINED ACCORDING TO SCHEME AND PROMOTER

• PREPARATION FOR AND DOCUMENTATION OF ON-SITE VISIT ON THE BASIS OF EMIR

Page 8: THE ROLE OF EMIR UNIFIED INFORMATION SYSTEM IN MANAGEMENT VERIFICATIONS National Development Agency 9th June 2009.

PRIORITIES FOR 2009

SPEEDING UP ACCESS TO GRANTS (E.G. PAYMENT OF ADVANCE FOR BENEFICIARIES AS A GENERAL PRONCIPLE) – SPECIFIC CONTROL REQUIREMENTS

IMPROVING QUALITY OF EMIR DATA NEW PROJECT: DEVELOPMENT OF MANAGEMENT

VERIFICITAION CAPACITY IN IBS • IMPROVE RISK ASSESSMENT METHODOLOGIES

AND QUALITY OF ON-SITE VISITS (SHIFT OF FOCUS)

• TRAINING, CONSULTANCY AND COORDINATION STRUCTURES