The Roads Ahead Leroy D. Alloway, Director Community Development.
Transcript of The Roads Ahead Leroy D. Alloway, Director Community Development.
![Page 1: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/1.jpg)
The Roads Ahead Leroy D. Alloway, Director Community Development
![Page 2: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/2.jpg)
2
![Page 3: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/3.jpg)
3
![Page 4: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/4.jpg)
Photo from San Antonio Express-News – John Davenport
4
![Page 5: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/5.jpg)
5
![Page 6: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/6.jpg)
How is the Super Street working?
6
![Page 7: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/7.jpg)
Are more trips being made on the 281 Super Street?
Location 2010 Count 2011 Count % Increase
South of Evans Road
74,000 vehicles per day
81,526 vehicles per day
10.17% increase in traffic
North of Evans Road
60,100 vehicles per day
63,552 vehicles per day
5.74% increase in traffic
7
![Page 8: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/8.jpg)
8
US 281 / Loop 1604 Interchange Project
281 North to Loop 1604 West
Est. 2013 Traffic - 13500 Vehicles Per Day
281 North to Loop 1604 East
Est. 2013Traffic - 11250 Vehicles Per Day
Loop 1604 West to 281 South
Est. 2013 Traffic - 12500 Vehicles Per Day
Loop 1604 East to 281 South
Est. 2013 Traffic – 12550 Vehicles Per Day
![Page 9: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/9.jpg)
9
![Page 10: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/10.jpg)
Why undertake environmental studies?
Answer the environmental questions once and for all – what impact could improvements have on the environment
Examine both non-toll and toll project alternatives through the Draft Environmental Impact Statement
Two estimated cost for the 2 Environmental Impact Statements is approximately $17 Million
10
![Page 11: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/11.jpg)
US 281 Environmental Impact Statement
Want more information? Visit the official US 281 EIS Pages online at www.411on281.com/US281EIS
11
![Page 12: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/12.jpg)
12
Overpass/ Expansion Alternative
Limited access highway…
• means less construction cost
• less need for additional right-of-way
• less impervious cover
But with limited access roads… new driveways and intersections could occur costs, right-of-way and impervious cover would
increase if some access roads are provided access rights for some properties may have to be
acquired the highway would be more congested and operate
at lower speeds
![Page 13: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/13.jpg)
13
Expressway Alternative
But with main lanes and continuous one-way frontage roads…
construction costs are higher additional right-of-way is needed more impervious cover is required
Main lanes with continuous one-way frontage roads…
• provide safe access for driveways and side streets
• separate local traffic from through (main lane) traffic
• allow the main lanes to be less congested and provide higher speeds
• reduce high speed conflict points and lower crash rates
![Page 14: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/14.jpg)
14
Elevated Expressway Alternative
But main lanes on continuous bridges… mean higher construction cost fewer on- and off-ramps for the elevated main lanes
Main lanes on continuous bridges…
• mean less additional right-of-way and impervious cover
• allow most of the existing pavement to remain as access roads
• separate local traffic from through (main lane) traffic
• allow the main lanes to be less congested and operate at higher speeds
• reduce high speed conflict points and lower crash rates
![Page 15: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/15.jpg)
Loop 1604 Environmental Impact Statement
Want more information? Visit the official Loop 1604 EIS Pages online at www.MoreFor1604.com
15
![Page 16: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/16.jpg)
16
![Page 17: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/17.jpg)
Loop 1604 Potential Alternatives – No Build
17
![Page 18: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/18.jpg)
Loop 1604 Potential Alternatives – Expand lanes to the center
18
![Page 19: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/19.jpg)
Loop 1604 Potential Alternatives – Add Managed Lanes to the Center
19
![Page 20: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/20.jpg)
Loop 1604 Potential Alternatives – Add Elevated Managed Lanes
20
![Page 21: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/21.jpg)
Funding - Where is it going to come from?
21
Tolls
Gas Tax
Property Tax
Sales
Tax
BONDSEnd Diversions?
Vehicle Registration Fee
![Page 22: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/22.jpg)
Stay Informed, Stay Involved!
Want to see more of the animation files? Want to stay up to date on the proposed projects? - Follow us online!
www.AlamoRMA.org
www.411on281.com
www.MoreFor1604.com
22
![Page 23: The Roads Ahead Leroy D. Alloway, Director Community Development.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649e455503460f94b39c03/html5/thumbnails/23.jpg)
www.AlamoRMA.org