The Review of the EIA system of South Africa
Structure of the presentation
• Elements of the presentation:– Setting the context for the EIA system– Introducing the 2006 EIA Regulations– Explaining the 5 point plan towards more efficient and
effective EIA– Report on progress with implementation of the 5 point
plan.
Factors influencing quality of life…
• Socio-economic standing• Employment• Education• Health• Access to services• Human dignity• Environmental Quality
Environmental quality
• Environmental quality is improved and protected via proactive and reactive measures:– Proactive
• Prevention of degradation and conservation • Tools – Strategic Planning, Environmental
Impact Assessment.
– Reactive • Rehabilitation of degraded areas, Reduction of
emissions and effluent, clean-up• Tools – NEMA sector Acts, Water legislation,
Compliance and Enforcement.
Environmental Impact Assessment
• Systematic process to identify potential positive and negative impacts on the environment (biophysical, socio-economic, cultural) associated with proposed activity.
• Examine alternatives / management measures to minimise negative and optimise positive consequences.
• Prevent substantial detrimental to the environment
Environmental Impact Assessment
• Advantages of EIA– To authorities:
• Informed decision making;• Improvement / protection of
environmental quality;• Management to sustainable utilisation
of resources;• Understanding demands on bulk
services, waste management services, urban forms, etc.
Environmental Impact Assessment
• Advantages of EIA (cont)– To interested and affected parties
• An opportunity to be heard;• Protecting environmental rights;• Utilisation of local and indigenous
knowledge;• Increased knowledge and
environmental awareness
Environmental Impact Assessment
• Advantages of EIA (cont)– To undertakers of identified activities
(developers):• Proactively asking the right questions
– Adequacy of natural resources
– Risks associated with environmental factors (geologic stability, hydrology regimes, fire, etc)
– Pollution potential and prevention thereof;
• Energy and water saving and associated financial savings
• Appropriateness of activity in terms of strategic planning for the area
Environmental Impact Assessment
• EIA in its design is aimed at informing project planning and design – unfortunately, mostly use to justify what is already planned instead.
South Africa’s EIA System
EIA in South Africa: September 1997 – July 2006
The “old” system
• EIA became law in 1997, before then, voluntary use of EIA.
• Concurrent function between national and provincial government.
• Survey conducted in April 2006 and updated in July 2006 to establish status quo of implementation of 1997 Regulations
EIA in South Africa: Provincial capacity
• Figures obtained from EIA authorities indicate:– Provinces’ capacity and resources vary
significantly– In some cases resources are commensurate with
EIA load, however in other provinces this is not the case
– Limited funding for developing information systems and other tools to assist both authorities and applicants is of particular concern.
EIA Applications – September 1997 to June 2006
1%14%
5%
30%
15%
6%
4%
7%
3%
15%DEAT
Eastern Cape
Free State
Gauteng
Kwa-Zulu Natal
Limpopo
Mpumalanga
North West
Northern Cape
Western Cape
• In the order of 44 000 applications received
• DEAT received the least (1% of total) and Gauteng the most (30% of total)
• At the end of June 2006 – these Regulations were
repealed
– 5 955 applications pending
Finalisation of EIA Applications (Central Tendency across all Provinces)
Measured from date of receipt of application to date of final decision
0
10
20
30
40
50
60
0.5 1 1.5 2 3 +3
Time (Years)
Ap
plic
atio
ns
(%)
EIA in South Africa: Processing times
• Whilst approximately 50% of applications are finalised within 6 months from the application date and an addition 33% within a year, it is of concern that approximately 9% is only finalised within a period of 2 years or more
• Although often related to complexity, controversy and pollution potential, delay in review and decision making processes also in cases due to severe capacity constraints within provincial authorities
Review of the 1997 EIA System
Review of the South Africa EIA system: The need for a review
• Lessons learnt through implementation of the 1997 EIA Regulations and evolution of Environmental Legislation since 1997 necessitated the review of the EIA System.
Review of the South Africa EIA system: The need for a review
• Inadequacies of 1997 Regulations include.– Wide interpretation of activities resulting in
inconsistent application by authorities– To many small scale / insignificant activities made
subject to EIA– Lengthy and inflexible process, with to many “authority
stops” / “decision points”– Inadequate provisions for public consultation– Not aligned with PAJA and PAIA– Not supported by strategic planning tools– Enforcement measures generally weak
• The Review commenced in 2000 and resulted in the promulgation of new Regulations in terms of the NEMA during April 2006
The NEMA EIA Regulations
What has been retained but improved? …
Aspect ECA EIA Regulations
NEMA EIA Regulations
Activities To wide a spectrum, unclear, crucial activities omitted
Narrowed the spectrum, more specific, include activities previously omitted
EIA Process One cumbersome process, resulted in innovative interventions
Differentiate between basic and thorough assessments
Aspect ECA EIA Regulations
NEMA EIA Regulations
Decision-making process
Allowed for comprehensive process only
• Allow for upfront decision making (e.g. fatal flaws, emergency circumstances, clearly no impact situations)• Prescribe time frames
Aspect ECA EIA Regulations
NEMA EIA Regulations
Roles & Responsibilities
Prescribed for authorities and applicant only – no real consequences for not abiding by the rules
Prescribed for ALL role players – consequences for non-compliance provided for.
Aspect ECA EIA Regulations
NEMA EIA Regulations
Public participation Included but poorly defined
Well defined and minimum requirements prescribed
Appeal process Appeal decision-making process not prescribed
Process well defined and aligned with PAJA
What is new …
New additions• Exclusions based on
– Policies and guidelines– Environmental Management Frameworks
• Compliance and enforcement strengthened
• Regulation 6 allowing for cooperation agreements between authorities
• Site Environmental Management Plans structured
• Class applications
Environmental Management Frameworks
Environmental Management Framework
• Regulations prescribe process for compiling EMF and set minimum requirements for content
• Strategic tool where a geographical area is assessed: – Status quo study in terms of inter alia
biophysical environment, built environment and “planned” environment
– Desired state of environment defined– Road map established to reach and
maintain desired SOE
• EMF consist of “environmental control zones”; environmental management plan and environmental management policy
• Certain pre-determined activities when aligned with control zones, EMP and EM Policy are then excluded from EIA requirements
• EMF also useful as environmental input into SDF’s, precinct plans, etc.
Sector guidelines
Sector guidelines• Regulations prescribe process for
compiling and publication of Sector guidelines
• Sector guidelines are given teeth – applicants have to take it into consideration
• Sector guidelines can also be used for exclusions
Class applications
Class applications• One application and process for
many different activities occurring in one geographical area
OR
• One application and process for the same activity type proposed to take place in different locations
The processes and time frames associated with it
Basic Assessment Process
• Activities contained in Listing Notice 1 are subject to a basic assessment process
• Smaller scale activities• Predicted impacts are generally known
and can be easily managed• Will be further limited through exclusions • Approximately 70% of all EIA applications
subject to this process• Total authority time = 55 calender days
Scoping and EIA process (thorough process)
Scoping and EIA (Thorough Assessment Process)
• Activities contained in Listing Notice 2 are subject to a thorough assessment process
• Activities that due to nature and/or extent is likely to have significant impacts
• Associated with high levels of pollution / waste / environmental degradation
• Impacts cannot easily be predicted• Higher risk activities• Total authority time: Scoping - 45 Days, EIA 105-
days
Implementation of the NEMA EIA Regulations
• NEMA EIA Regulations came into effect for all activities except for those related to mining permits, licenses and permission on 3 July 2006
• Mining related activities will come into effect at a later date due to– Required law reform– Development of cooperation structures and systems– System reform
• Transitional arrangements provided for transition between 1997 EIA System and NEMA EIA System
5 Point plan towards more efficient and effective EIA in
South Africa
Introduction• In April 2006 DEAT adopted a five
point plan to improve efficiency and effectiveness of the EIA system
• The implementation of this plan together with the new EIA system (2006 Regulations) subsequently improved EIA management significantly.
The plan• The plan focuses on the following areas:
– Expedite the processing of pending applications submitted in terms of the 1997 Regulations (the 5 955);
– Develop and implement strategic spatial systems to compliment EIA;
– Build and maintain adequate EIA administration capacity;
– Develop and implement decision support tools; and
– Develop and implement capacity and support strategies
Implementation of the new EIA Regulations
Progress with implementation of the 2006 EIA Regulations
• Figures obtained from the January 2008 Quarterly reports from EIA authorities, indicate:– XXXX new applications were received– 95% of these applications are being processed within
prescribed time frames (or faster).
• Number of applications per quarter less than in 1997 Regs (succeeded in reduction of number of applications)
• Problems have however been identified and DEAT commenced with an amendment process that will be concluded in July 2008 (dependent on NEMA process)
Progress with implementation of the 5 point plan
1. Expedite processing of the 5,955
• Contracts to the amount of R11,3M have been awarded to service providers to assist provinces with processing of these applications
• Between 1 July 2006 and 31 December 2007 pending applications were reduced to XXXX(from 5,859)
2. Strategic Spatial Tools to compliment EIA
• Environmental Management Frameworks:– DEAT is providing financial and technical assistance in the
development of 7 Environmental Management Frameworks for municipal areas under development pressure
– Gauteng and the Western Cape have also embarked on the development of EMFs.
– At the end of 2008-2009 a total of 15 EMFs will be in place.• Identification of sensitive area:
– DEAT has commenced with the process to identify and map all sensitive areas of national importance
– Gauteng, the Western Cape and Mpumalanga have also embarked on processes to identify and map sensitive areas of provincial importance
– All these processes to be concluded in 2008-2009
3. Build and maintain human resource capacity
• Tender awarded for project to conduct capacity audit and needs analysis – project to be finalised at the end of March 2008
• Draft guideline for optimum structure will be work-shopped with provincial authorities in May 2008. It will then be submitted to the DPSA for further processing.
• 14 Training sessions on the new EIA Regulations conducted
• The development and roll-out of accredited training on EIA administration is on track. Training will be rolled out before end of April 2008.
4. Develop and implement decision-support tools and systems
• Procedural Guidelines:– 4 Guidelines have been developed by DEAT and are available on the DEAT
website– “The Companion” to the 2007 EIA Regulations (“dummy” guide) has been
finalised– Publication delayed due to the amendment process
• Sector Guidelines:– DEAT appointed a service provider to assist with the development of
identified sector guidelines and work is progressing according to plan. • Templates, forms and pro-forma letters
– Have been developed, distributed to all EIA authorities and are being implemented
• National Environmental Authorisation System (NEAS)– This web-based system to record and track all EIA applications have been
developed and is currently being tested by provincial and national authorities
– It will be fully implemented by the end of April 2008– Applicants and I&APs will be able to access information from this system
via the DEAT website by March 2009
5. Develop and implement province specific and generic capacity &
support interventions• Capacity audit and needs analysis will inform
this work in future• Quarterly implementation workshops
conducted to assist provinces with interpretation and application of the new Regulations
• DEAT provide written response on all interpretation queries
• Strategy for stakeholder capacitation initiated
Future of EIA and IEM
Environmental Impact Management Strategy
• In 2008-2009 DEAT together with provincial partners will embark on development of comprehensive EIM strategy and action plan
• Objectives of the strategy will be to:– Further rationalise the use of EIA– Promote of self-regulation– Integration of EIM in other legislative processes– Management through norms and standard– Where appropriate, replacement of EIA with more
appropriate tools such as risk assessment (RA); cost benefit analysis (CBA); sustainability assessments (SA); etc.