The Relationship of Scheduling to Costs
![Page 2: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/2.jpg)
Introduction• Robert Madison – Manager, Scheduling &
Analysis
• Ken Halliday – Senior Scheduler
![Page 3: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/3.jpg)
Scheduling Process• Transit Scheduling Definition (verb) - the
act of designing a relationship between time and space – creating a plan for when a vehicle will pass by a specific geographic location.
• Because of the geographic aspect, efficient scheduling is not a “stand alone” activity, it has to be related to the route design.
![Page 4: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/4.jpg)
Scheduling process (overview)1. Understand the challenges and
opportunities
2. Understand the constraints
3. Collect information
4. Collect basic running time data
5. Refine running times
6. Determine cycle time
![Page 5: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/5.jpg)
Scheduling process (overview)7. Build trip schedule
8. Block trips
9. Runcut blocks
10.Finalization and wrap-up
![Page 6: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/6.jpg)
Scheduling process (approaches)
• Network/route design and scheduling go hand-in-hand
• Various approaches‣ Hub and spoke
»Often with timed transfers
‣ Loops»High coverage vs. inconvenient routings/timings
‣ Grid»Often offers best headway opportunities
![Page 7: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/7.jpg)
Hub and Spoke network• Schedules are designed so several buses arrive
at one location at specific times to facilitate transfers.
• Also known astimed-transfer, orpulse network
![Page 8: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/8.jpg)
Hub and Spoke network (pros)• Maximize transfer
opportunities‣ Often with timed
transfers/scheduled meets
• Most passengers can get to main hub on one-seat ride
![Page 9: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/9.jpg)
Hub and Spoke network (cons)• Very little flexibility with
route length‣ Bus has to be able to get
back to hub to meet with other buses
• Delays cause significant disruption‣ One late bus can make
every bus late
• Not convenient for travel between outer ends of adjacent spokes
![Page 10: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/10.jpg)
Loop networks (pros)• Maximize coverage
area with fewer vehicles
• Really, seriously, not much else.
![Page 11: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/11.jpg)
Loop networks (cons)• Indirect routings• One-way loops offer no
easy return trip options• Hard for passengers to
understand• Not always a clear start
and end point‣ Interlining can be difficult
if the bus is expected to continue on its loop routing
![Page 12: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/12.jpg)
Loop networks
![Page 13: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/13.jpg)
Grid• Buses are scheduled to run frequently so
wait times for transfers are minimized.
![Page 14: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/14.jpg)
Grid networks (pros)• Allows for best headway /
frequent transit
• Convenient for transferring anywhere in system
• Straightforward, logical
• Allows for less service duplication
![Page 15: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/15.jpg)
Grid networks (cons)• Not easy to do timed
transfers‣ Each route can have
different headways‣ Too many transfer
possibilities to try and make individual ones work
• Local street network must work for grids
![Page 16: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/16.jpg)
Short turns & branches• Useful where demand on one portion of a
route is significantly higher than demand on another portion
• Multiple outlying areas need service to a single dense corridor
![Page 17: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/17.jpg)
Short turns & branches• Short turns should actually save money in
order to be logical
• Branches necessarily must have a headway that is a multiple of the trunk headway.
![Page 18: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/18.jpg)
Route Design/Structure• Efficient, lower cost systems ideally run
buses through dense population areas
• Take passengers to/from popular destinations ‣ Employment centres‣ Shopping and entertainment centres‣ Schools
![Page 19: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/19.jpg)
Service Standards and Policies• Define your transit system’s “reason for
being”.
![Page 20: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/20.jpg)
Service Standards and Policies• Policies and standards used in service
development
• Balance between cost efficiency and provision of adequate service to the public
![Page 21: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/21.jpg)
Cycle time• The amount of time it takes for a bus
operate a round-trip (i.e. both directions, or one loop), including layover/recovery.
B
A
![Page 22: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/22.jpg)
Cycle time• Good route design takes into account
cycle time• For “clock-face” headways (frequencies),
design routes that have a cycle time that can be divided by your headway (15/30/60 minutes)
![Page 23: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/23.jpg)
Cycle time• Cycle time drives the number of buses
required to operate service
![Page 24: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/24.jpg)
Cycle time / interlining• How do you maintain efficiency if you can’t
design routes with even cycle times?‣ That’s where you employ interlining
• Example‣ Route 100: 37 minute cycle‣ Route 200: 40 minute cycle‣ Route 300: 38 minute cycle‣ 30 minute frequency
![Page 25: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/25.jpg)
Interlining• Example:
![Page 26: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/26.jpg)
Interlining• Same trips, interlined
![Page 27: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/27.jpg)
Interlining• Without interlining
‣ 6 buses‣ Long layovers
• With interlining‣ 115-minute total cycle‣ 4 buses‣ Less excess recovery time
![Page 28: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/28.jpg)
Interlining
No interlining With interlining
In-service time 42h55 42h55
Pull in/out trips 9h00 6h00
Layover 29h31 6h45
Buses used 6 4
Total time 81h26 55h40
![Page 29: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/29.jpg)
Interlining (pros vs. cons)• Pros
‣ More efficient use of vehicle/driver time‣ Reduce excess recovery‣ Can offer additional direct service
• Cons‣ Delays on one route may impact others‣ Only works if vehicle types compatible on all
trips/routes
![Page 30: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/30.jpg)
Small schedule tweaks
5 Min
![Page 31: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/31.jpg)
Small schedule tweaks
![Page 32: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/32.jpg)
Peak vs. Off-peak service• Typical weekday “vehicles in service” graph
![Page 33: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/33.jpg)
Peak vs. Off-peak service• Typically, “base” service (midday service)
cheapest to add
• Peak service typically most expensive‣ Assuming service span is fixed. Adding new service
day or extending service day can have lots of overhead costs.
• “Shoulder” peak usually more expensive than base‣ Just before AM peak‣ Just after PM peak
![Page 34: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/34.jpg)
Runcutting• Often overlooked in overall system design
• Can be a key driver of efficiency, particularly for larger systems
• Impacted by collective agreement work rules‣ Or even generic work rules if no CA
![Page 35: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/35.jpg)
Overtime vs. adding drivers?• Consider cost of having extra drivers vs.
cost from overtime
• Often, fixed costs for employees (benefits, vacation, training, etc.) exceed overtime
• Must balance with driver quality of life, fatigue from longer hours, etc.
![Page 36: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/36.jpg)
OT vs. adding drivers example• Total of 240 hours per weekday• Driver pay = $25 / hour• Overtime (1.5x pay) after 8 hours• 250 weekdays per year• Each run costs $30,000/year in fixed costs
‣ Vacation benefits for driver‣ Health benefits for driver‣ Training and other administrative costs‣ Extra board
![Page 37: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/37.jpg)
OT vs. adding drivers example# of daily shifts 30 29 28
Average shift length 8 hours 8.28 hours 8.57 hours
Straight time pay per run/day $200 $206.90 $214.29
Overtime premium $0 $3.45 $7.14
Total daily pay per run $200.00 $210.35 $221.43
Annual pay total $1,500,000 $1,525,000 $1,550,000
Fixed run cost (total) $900,000 $870,000 $840,000
Total annual cost $2,400,000 $2,395,000 $2,390,000
• Paying ½ hour overtime to fewer drivers saves $10,000/year
![Page 38: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/38.jpg)
Drawbacks of high overtime• Increased driver stress may lead to more sick
time
• Longer hours, particularly at night, can increase fatigue (i.e. higher accident risk)
• Not all drivers want to work longer hours
• Some contracts may specify limits on work time
![Page 39: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/39.jpg)
Spread premium and limitations• Spread: The time from the earliest report to the latest
sign-off for a driver’s work day‣ Piece 1:
» Report 6:00» Pull out 6:15» Pull in 9:30» Sign off: 9:40
‣ Piece 2:» Report 14:00» Pull out 14:15» Pull in 17:45» Sign off: 17:55
‣ Spread: 6:00 – 17:55, 11h55
![Page 40: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/40.jpg)
Spread premium and limitations• Most transit collective agreements have
spread premium‣ E.g. 10% bonus pay for spread beyond 10
hours
• Most also have a maximum spread time‣ Generally 12 or 13 hours, depending on run
type
![Page 41: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/41.jpg)
Spread premium and limitations• Spread limitations can cause difficulty for
runcutting in certain cases‣ Service operates far from downtown (has to start
early/finish late)‣ Service levels drop off later in PM rush/early
evening‣ Limited opportunities to mix with other services
• Because of spread premium, can make adding service more expensive at certain times of day
![Page 42: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/42.jpg)
Spread premium and limitations• Filling in midday is often cheaper than adding to
the outer edge of the peaks
More $ More $Cheaper
![Page 43: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/43.jpg)
Vehicle blocking and runcutting• Vehicle blocking can drive runcutting costs
‣ Short blocks may have to pay guarantee‣ Blocking can affect efficiency in scheduling
straights and splits
• Most efficient vehicle schedule isn’t necessarily most efficient crew schedule
![Page 44: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/44.jpg)
Vehicle blocking and runcutting• Scenario:
‣ Route operates 5:00-21:00‣ 45-minute cycle‣ 15-minute headway (3 buses) 7:00-9:15,
15:15-18:00‣ 45-minute headway (1 bus) all other times
![Page 45: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/45.jpg)
Vehicle blocking and runcutting• Blocking option 1:
• Total 26h15 vehicle time per day
![Page 46: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/46.jpg)
Vehicle blocking and runcutting• Blocking option 2:
• Total 27h15 vehicle time per day
![Page 47: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/47.jpg)
Vehicle blocking and runcutting• Blocking option 1:
![Page 48: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/48.jpg)
Vehicle blocking and runcutting• Blocking option 2:
![Page 49: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/49.jpg)
Vehicle blocking and runcutting
Option 1 Option 2
Vehicle time 26h15 27h15
Straight runs 1 2
Split runs 1 2
Trippers 3 0
Paid time 34h53 30h15
![Page 50: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/50.jpg)
Pitfalls to avoid• “We can’t afford to schedule accurate
running times”‣ You are paying for it one way or the other‣ Schedule accurate run times to better control
overtime costs/service reliability‣ Increase headway if cost increase can’t be
accommodated in budget
![Page 51: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/51.jpg)
Pitfalls to avoid• Time-consuming diversions to serve few
passengers‣ Mass transit should serve the masses‣ Increase in running time will increase costs
without a commensurate benefit to ridership‣ Passengers on board inconvenienced by
longer trip
![Page 52: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/52.jpg)
Pitfalls to avoid• Trying to guarantee everyone an 8 am
arrival‣ If every route has to have a bus at the same
time, you need a separate bus for every route» Particularly expensive for smaller systems
‣ Reduces ability to gain efficiency through interlining
‣ If possible, try to work with schools, major employers to stagger start/end times
![Page 53: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/53.jpg)
Pitfalls to avoid• Building a bus garage in the middle of
nowhere because the land is cheap
15 K
m
![Page 54: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/54.jpg)
Tools to help improve schedules• Automated data collection technology to
help calibrate service levels, cycle times‣ AVL, APC systems generate large amounts of
data for planners and schedulers to use‣ BC Transit currently working on a program to
improve our APC technology‣ Smart Bus program to consider AVL options
![Page 55: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/55.jpg)
Tools to help improve schedules• HASTUS-ATP
‣ Run-time analysis tool offered by GIRO»On wish list for near-term purchase
‣ Uses data from AVL/APC software‣ Calibrates run times and cycle times based on
user-specified criteria for on-time performance
![Page 56: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/56.jpg)
Tools to help improve schedules• MinBus
‣ Vehicle blocking optimizer‣ Finds efficiency in vehicle blocking, reducing
peak vehicle requirements based on parameters set by scheduler
‣ Best for larger systems (multiple garages, multiple vehicle types)
![Page 57: The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.](https://reader035.fdocuments.us/reader035/viewer/2022070415/5697bf8d1a28abf838c8c7fe/html5/thumbnails/57.jpg)
Tools to help improve schedules• CrewOpt
‣ Crew schedule optimizer‣ Finds efficiency in crew scheduling, reducing
overall schedule cost based on parameters set by scheduler
‣ Uses rules based on collective agreement, plus other preferences