THE RAYMOND GROUP STATEMENT OF QUALIFICATIONS EXTERIOR SYSTEMS

Transcript of THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the...

Page 1: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

THE RAYMOND GROUPSTATEMENT OF QUALIFICATIONS

EXTERIOR SYSTEMS

Page 2: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

TRUST | Conducting ourselves in a manner that will earn the respect of our employees, clients and vendors

INTEGRITY | Operating with the highest moral standards

QUALITY | Achieving excellence in all that we do

SAFETY | Protecting the well-being of our employees

RESPECT | Recognizing and appreciating people’s contributions

CONTINUOUS IMPROVEMENT | Committing to move from good to great

WORK/LIFE HARMONY | Balancing a passion for work and a zest for life

TEAMWORK | Maximizing the collective talents of our people to accomplish our goals

OUR VALUES

Page 3: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

PRIMARY MARKETSECTORS

CASINO/GAMING

EDUCATION

ENTERTAINMENT/ATTRACTION

HEALTHCARE

HOSPITALITY

INSTITUTIONAL/CIVIC

OFFICE/CORE AND SHELL

PARKING STRUCTURES

RESIDENTIAL/MULTI-FAMILY HOUSING

RETAIL

TENANT IMPROVEMENT

TRANSPORTATION

SELF PERFORMEDCAPABILITIES

STRUCTURAL FRAMING | LIGHT GAUGE STEEL STUD FRAMING

SPRAY APPLIED AND INTUMESCENT FIREPROOFING

EXTERIOR SHEATHING

EXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)

EXTERIOR PREFABRICATED PANEL SYSTEMS

RAIN SCREEN SYSTEMS | AIR AND WATER BARRIERS

INSULATION | SPRAY INSULATION AND SOUNDPROOFING

DRYWALL

LATH & PLASTER

VENETIAN PLASTER | VENEER PLASTER LE DECOR LIME PLASTER SYSTEMS

CAST MOLDING AND ORNAMENTS (FRP, GFC, GFRG)

THEMED FINISHESCARVED PLASTER | MILLWORK AND

CASEWORK | CUSTOM DOORS AND

WINDOWS | TILE | BRICK | STONE AND

ROCK WORK | DECORATIVE METAL

AND GLASSWORK | SPECIALTY FINISH

SYSTEMS | WALL COVERING | PAINTING |

SCENIC AGING | FAUX FINISHING

Page 4: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

520 West Walnut AvenueOrange, California 92868714.771.7670 p714.633.1558 fCA License #243645

TABLE OF CONTENTS

6435 Valley View Boulevard, Suite HLas Vegas, Nevada 89118702.891.8875 p 702.891.8876 fNV License #35448

CORPORATE PROFILE & SAFETY

PANEL PREFABRICATION

• STO PANEL TECHNOLOGY

• FRAMECAD SYSTEMS

PROJECT EXPERIENCE

• METAL PANEL SYSTEMS

• LOAD BEARING FRAMING SYSTEMS

• EIFS

• RAIN SCREEN SYSTEMS

• FIBERGLASS REINFORCED PANELS

BUILDING INFORMATION MODELING

QUALITY

4589 Pacheco Blvd.Martinez, California 94553925.680.8300 p925.827.1436 fCA License #307786

9560 Chesapeake DriveSan Diego, California 92123858.292.4499 p858.292.9144 fCA License #877824

THE RAYMOND GROUP

Page 5: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

CORPORATE PROFILE

raymondgroup.com

+ 83 years in Operation+ 800 Employees+ Highly Skilled Craftsmen and Artisans+ Theming Experts+ Early Adopter of 3D Modeling+ Transparent Cost Plus Documentation+ Members of National Fireproofing Contractors Association (NFCA)

+ Members of U.S. Green Building Council (USGBC)+ Members of Air Barrier Association of America (ABAA)+ EIFSmart Contractor+ LEED Accredited Professionals+ Excellent Bonding Capacity+ Excellent Safety Record+ Strong Balance Sheet and Financial Resources

WHY RAYMOND

For 83 years, Raymond has upheld the status as an award-winning union subcontractor. We have the expertise, innovation and capability of producing quality projects with unsurpassed safety. Holding both B and C Classification licenses, we can be a sole source for the general contractor. We offer a complete range of services, from conceptual budgeting to value engineering and engineering design assistance.

A DAILY COMMITMENT TO SAFETY

Raymond recognizes that safety is a shared responsibility. These responsibilities can be met only by working continuously to promote safe work practices among all employees and to maintain property and equipment in safe operating condition. By working together we can maintain a safe working environment for all employees.

+ Thirteen full-time employees dedicated to safety+ Formal Return-To-Work Program+ Pre-employment and post accident drug testing+ Safety Incentive Program

2015 2016 2017 2018 2019

CA Compensation Experience Modification Rate: .57% .70% .72% .65% .67%

NV Compensation Experience Modification Rate: .64% .61% .60% .66% .67%

Page 6: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

STO PANEL TECHNOLOGYSto Panel Technology combines the latest technology and proven products to deliver the most energy efficient, architecturally versatile exteriors in the construction industry today, employing a process that saves time, adds value and improves quality.

SPEED. Greatly reduce the time of building envelope installation and make the most of your construction calendar.

• Fast-Track, Systemized Panel Manufacturing • Efficiencies Compress the Construction Schedule • Site Prep and Panel Construction Can Occur Simultaneously • Reduced Multi-Trade Vendor Coordination • Faster Installation Due to Prefab Panelization

VALUE. Reduce the cost of your project by eliminating scaffolding and other complications of working at high elevations.

• Lightweight Panels Lower Structural Requirements • Smaller Footings / Foundations • Reduced Jobsite Labor & Crew Sizes • No Jobsite Scaffolding Required • Decreased Volume of Project Concrete • Reduced Drywall Furring, Boxing and Strapping

QUALITY. Sto panels are produced in temperature-controlled factories, in full compliance with codes for testing, building and energy efficiency.

• Sto Prefab Panels Have ISO-Engineered Components • Sto Q/A Programs Ensure Quality-Controlled Workmanship • Strict Adherence to Manufacturers’ Temp/Humidity Guidelines • Extensive Architectural and Finish Options • Superior Fire, Acoustical and Thermal Performance • Superior Long Term Durability with Industry-Leading Warranty

Page 7: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

PROJECT OVERVIEWThe project was a remodel and addition to an old (circa 1977) hotel and casino in Las Vegas. The exterior scope consisted of in-place replacement and renovation of the existing structure and approximately 40,000 SF of StoPanel on the new structure.

The project required a non-drainage insulated exterior system, and StoPanel Classic was chosen as the most cost effective solution. Over 300 single-floor panels were developed. A combination of tower cranes and hydro cranes were used for the nighttime erection.

For years, insulated finish systems have been the go-to exterior enclosure for most projects along the Las Vegas strip due to their low cost and schedule effectiveness. Given the committed turnover date for this project and late steel, panelizing was the only and best solution.

raymondgroup.com

STO FEATURED PROJECT

THE CROMWELLLAS VEGAS, NEVADA

Owner Caesars Entertainment CorporationGeneral Contractor W.A. RichardsonArchitect Leo A. DalyEngineer LochsaProgram (Building Type) Replace Exterior Skin Onsite Assembly Date Spring 2014Panel Type Classic ci

Page 8: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

STO FEATURED PROJECT

WYNN RETAIL PLAZALAS VEGAS, NEVADA

Owner Wynn Las VegasGeneral Contractor The PENTA Building GroupArchitect Butler AshworthEngineer LochsaProgram (Building Type) Expansion, New ConstructionOnsite Assembly Date Spring 2016Panel Type Backup Panels

PROJECT OVERVIEWThe Wynn Retail Plaza project was a 70,000 square foot expansion to the existing Wynn Resort. The new high end space consists of two levels of retail shops, cafes, and restaurants. Raymond’s scope of work on the project included framing, drywall, EIFS, GFRC, GFRG, FRP, paint, wallcovering, insulation, and fire-stopping.

Approximately 57,000 square feet of Sto Panel System was utilized.

With a compressed schedule due to material delays as well as site constraints, prefabricating panels offsite made it possible to complete the project on time and budget.

Page 9: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

The Raymond Group is one of 21 companies nationwide which has earned the distinction of being a Sto Panel Technology Affiliate.

The combination of Sto, The Raymond Group, and the network of Affiliates, spanning 50 offices coast-to-coast is part of the systemized approach to prefabricated wall panels. The Sto Panel Technology Network of Affiliates was started in 2012, to ensure that consistent standards and methodologies are shared by all panel manufacturers across the nation.

CHILDREN’S HOSPITAL OF PHILADELPHIAPhiladelphia, Pennsylvania

HYATT HOUSE - HYATT PLACEDenver, Colorado

THE PENTHOUSES AT ROWAN UNIVERSITYGlassboro, New Jersey

SILVER SLIPPER CASINO HOTELBay St. Louis, Mississippi

INSPIRA MEDICAL CENTERVineland, New Jersey

HI LINE APARTMENTSDallas, Texas

CAPITAL HEALTH MEDICAL CENTERPennington, New Jersey

HILTON GARDEN INNMankato, Minnesota

HARRAH’S CONVENTION CENTERAtlantic City, New Jersey

HILTON HOME 2 SUITESPhiladelphia, Pennsylvania

LANDMARK MEDICAL CENTERDenver, Colorado

MCCAMEY COUNTY HOSPITALMcCamey, Texas

This allows Sto to confidently compete with other cladding options, fully taking advantage of the better costs that can be offered to the building owners and architects.

As an Affiliate, Raymond has immediate access to a larger national experience and knowledge base. Affiliates regularly share resources along with design and process enhancements to ensure that every Sto Panel installed is the best available in the market.

raymondgroup.com

STO AFFILIATES

+ Tested designs and details backed by Affiliates and Sto.+ Technological product support and warranties from Sto, one of the world’s largest and most recognized manufacturers.+ Pre-determined and carefully controlled fabrication and installation time (superior quality).+ Wall components customized by climate and design considerations.+ True Performance Mock-Ups + Critical Waterproofing Details – waterproofing details are highly repeatable and easily inspected.

FEATURED AFFILIATE EXPERIENCE

Page 10: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

FRAMECAD MANUFACTURING SYSTEMS

FRAMECAD is an advanced, end-to-end design and build system. The technology and advanced manufacturing solutions available through FRAMECAD produce cost-effective, lightweight steel framing components quickly and efficiently.

The FRAMECAD System is a modern method of rapid, quality construction using light-gauge steel framing.

The FRAMECAD System is designed to suit a wide range of projects that demand the rapid delivery of quality buildings. To achieve this, FRAMECAD has established a reputation as a global innovator in building design, software programming, detailing, engineering, manufacturing and delivery.

By using the FRAMECAD system, Raymond is able to complete projects more quickly, while minimizing waste and clutter that accumulates on most projects.

Framecad Systems F325iT and TF550OH for a fast, cost effective framing solution.

+ HIGHLY VERSATILE

+ INCREASED PRODUCTION SPEED

+ GREATER FLEXIBILITY

+ INCREASED RELIABILITY

+ HEAVY DUTY MANUFACTURING

+ HIGH VOLUME PRODUCTION

Page 11: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

PROJECT EXPERIENCE

CHASE CENTER TOWERSPrefabricated FRAMECAD Panels

San Francisco, CaliforniaMortenson Clark, A Joint Venture

CORNISH SCHOOL OF THE ARTS STUDENT HOUSING

Prefabricated Aluminum Painted PanelsLas Vegas, Nevada

Howard S. Wright

COSMOPOLITAN WEST REMODELFRAMECAD

Las Vegas, NevadaNevada Property LLC

RESORTS WORLD - IN PROGRESSPrefabricated FRAMECAD Panels

Las Vegas, NevadaW.A Richardson Builders

THOMAS JEFFERSON SCHOOL OF LAWCorrugated Metal Panels

San Diego, CaliforniaBovis Lend Lease, Inc.

TRINITY PLACE PHASE 3FRAMECAD

San Francisco, CaliforniaSwinerton Builders

USO RELOCATIONMetal Panels

San Diego, CaliforniaKiewit-Sundt, A Joint Venture

VERITAS CAMPUS IIMetal Panels

Seattle, WashingtonHoward S. Wright

CORNISH STUDENT HOUSING

RESORTS WORLD

METAL PANEL SYSTEMS

Page 12: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

PROJECT EXPERIENCE

CSUSB STUDENT HOUSING & DININGPrefabricated Load Bearing Panel System

San Bernardino, CaliforniaC.W. Driver

CAMPBELL HALLNorth Hollywood, California

Matt Construction

CARLSBAD HIGH SCHOOLSan Diego, California

McCarthy Building Companies

DODGER STADIUM CONCESSIONSLos Angeles, California

Hunt Construction Group

RAYTHEONEl Segundo, CaliforniaPacific National Group

SAINT MARY’S COLLEGE RECREATION CENTER

Moraga, CaliforniaOveraa Construction

VARIEL SENIOR LIVING FACILITYWoodland Hills, California

W.E. O’Neil

VETERAN’S VILLAGE CRISIS CENTERLas Vegas, Nevada

Wynn Design & Development

CSUSB - RECENTLY COMPLETED

VARIEL - IN PROGRESS

LOAD BEARING PANEL SYSTEMS

Page 13: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

PROJECT EXPERIENCE

CAESARS PALACE SPA TOWEREIFS Panel System

Las Vegas, NevadaPerini Building Company

THE CROMWELLEIFS Panel System & STO Panel System

Las Vegas, NevadaW.A. Richardson Builders, LLC

HOLLYWOOD & HIGHLAND RENAISSANCE HOTEL

EIFS Panel SystemHollywood, California

Matt Construction

HUNTINGTON MEMORIAL HOSPITALEIFS

McCarthy Building Companies, Inc.Pasadena, California

MGM RESIDENCESEIFS Panel System

Las Vegas, NevadaMarnell Corrao Associates

T-MOBILE ARENAEIFS Panel System

Las Vegas, NevadaThe PENTA Building Group

WORLD MARKET CENTEREIFS Panel System

Las Vegas, NevadaThe PENTA Building Group

THE CROMWELL

T-MOBILE ARENA

EXTERIOR INSULATION AND FINISHING SYSTEMS

Page 14: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

PROJECT EXPERIENCE

1900 1ST AVENUE

CORESITE

RAIN SCREEN SYSTEMS

1900 1ST AVENUEPrefabricated Swisspearl Panels

Seattle, WashingtonTurner Construction

2121 PARK PLACESwisspearl

Santa Monica, CaliforniaPankow

BLAIR IB MAGNET MIDDLE SCHOOLSwisspearl

Pasadena, CaliforniaC.W. Driver

CALTRANS DISTRICT HEADQUARTERSSwisspearl

Los Angeles, CaliforniaClark Construction

CAMPBELL HALLMinerit

North Hollywood, CaliforniaMatt Construction

CATALINA MEDIAMinerit

Burbank, CaliforniaKrismar Construction

CHILDREN’S MUSEUM LOS ANGELESMinerit

Los Angeles, CaliforniaMatt Construction

CORESITETerracotta Rain Screen System

San Francisco, CaliforniaMatt Construction

Page 15: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

PROJECT EXPERIENCE

DISNEY GC3

LMU SCIENCE BUILDING

RAIN SCREEN SYSTEMS

DISNEY GC3Terracotta Rain Screen System

Glendale, CaliforniaHathaway Dinwiddie Construction

Company

FOOTHILL COLLEGE - PHYSICAL SCIENCES & ENGINEERING CENTER

Terracotta Rain Screen SystemLos Altos Hills, California

Hathaway Dinwiddie Construction Company

LAUSD #22Swisspearl

Los Angeles, CaliforniaHathaway Dinwiddie Construction

Company

LMU SCIENCE BUILDINGSwisspearl

Los Angeles, CaliforniaC.W. Driver

MISSION VIEJO MALLGreen Screen System

Mission Viejo, CaliforniaDebartolo Properties Management, Inc.

PLAYA VISTA BSwisspearl

Los Angeles, CaliforniaMorley Builders

THE RESERVESwisspearl & Parklex Facades

Los Angeles, CaliforniaKrismar Construction

Page 16: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

PROJECT EXPERIENCE

SADDLEBACK COLLEGE

WALLIS ANNENBERG PERFORMING ARTS

RAIN SCREEN SYSTEMS

ROWLEY HILTON EXTENDED STAY Prefabricated Swisspearl Panels

Seattle, WashingtonGLY

SADDLEBACK COLLEGE Hardie Nuon Exterior Rain Screen System

Irvine, CaliforniaC.W. Driver

SAN YSIDRO LAND PORT BRIDGESwisspearl

San Diego, CaliforniaClark Construction

SANTA MONICA PLACETerracotta Rain Screen System

Santa Monica, CaliforniaWhiting-Turner Contracting Company

SFJAZZ CENTERSwisspearl

San Francisco, CaliforniaHathaway Dinwiddie Construction

Company

USC BRAIN & CREATIVITY INSTITUTESwisspearl

Los Angeles, CaliforniaHathaway Dinwiddie Construction

Company

WALLIS ANNENBERG PERFORMING ARTSSwisspearl

Los Angeles, CaliforniaMatt Construction

Page 17: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

PROJECT EXPERIENCE

DISNEY’S LITTLE MERMAID

ROUTE 66 PEDESTRIAN BRIDGE

FIBERGLASS REINFORCEDEXTERIOR PANELS

DISNEY’S LITTLE MERMAID Ride Entry Wall Protection Panels

Anaheim, CaliforniaWalt Disney Imagineering

DISNEY’S PARADISE PIER Prefabricated Columns & Trellises

Anaheim, CaliforniaWalt Disney Imagineering

ROUTE 66 PEDESTRIAN BRIDGE Prefabricated Decorative Fencing Panels

Rancho Cucamonga, CaliforniaPenwal Industries, Inc.

UCI HEWITT HALL LABORATORY Prefabricated Wall & Ceiling Panels

Irvine, CaliforniaHensel Phelps

VERIZON PADRE GOLDS TOWER ROOFTOP SATELLITE DISH

Renewal-Cell Solutions Panel SystemSan Diego, California

Burge Corporation

WESTMINSTER POLICE DEPARTMENT PARKING STRUCTURE ROOFTOP

SATELLITE DISH Renewal-Cell Solutions Panel System

Westminster, CaliforniaMcCarthy Building Companies, Inc.

Page 18: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

VIRTUAL DESIGN AND CONSTRUCTION (VDC)

Projects are completed easier and quicker when everyone is working with the same vision and using the same information. Raymond achieves this collaboration with the support of our Virtual Design and Construction (VDC) team. Raymond and our VDC team members are experts at facilitating projects through value engineering, providing complex Building Information Modeling (BIM) and proposing less expensive and more constructible alternatives.

The Raymond VDC team thrives on keeping the construction process as smart and simple as possible. By using building information modeling, different stakeholders on a project collaborate by adding, modifying, or updating information in a shared model, resulting in a digital representation of the physical and functional characteristics of the project. This digital representation then becomes a resource that is leveraged to make decisions, even after the building has been completed and occupied.

Raymond’s VDC department is made up of experienced team members with an average of 15 years of practical BIM experience. Raymond has an in-house structural engineer who closes the gap between intelligent and true detailing for modeling and clash detection. Our VDC department uses this in-house structural advice for quick and accurate solutions for complicated framing methods, helping to save time and money.

√ VISUALIZE ADVANCED WALL AND CEILING ASSEMBLIES

√ COORDINATE TRADES WITH MINIMAL INTERFERENCE

√ INTEGRATE PREFABRICATED WALL ASSEMBLIES WITH MEP COMPONENTS

Page 19: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

VIRTUAL DESIGN AND CONSTRUCTION (VDC)

raymondgroup.com

BIM SERVICES

• Shop Drawing Preparation• Material Quantity Extraction• Integration of prefabricated wall assemblies with Mechanical, Electrical, and Plumbing components• Visualization of advanced wall and ceiling assemblies• Trade Coordination• Time Scheduling with 4D BIM• Cost Estimations with 5D BIM• In house structural engineering advice for quick and accurate solutions for complicated framing methods

BIM TECHNOLOGY

• Revit Architecture• Rhino• Autocad Architecture• Navisworks Manage• BIM 360 Glue• Collaboration for Revit• BIM 360 Team• Blue Beam• Plan Grid• Autodesk Point Layout• Robotic QML Layout

BIM PROCESS GOALS

• Understand Client defined needs• Clearly communicate project objectives• Develop project specific processes to fulfill objectives• Select the best people for roles/ responsibilities/fit• Establish ownership and team commitment to goals• Cradle to grave approach to design assist: field, management, design• Project Design Captain supports ongoing project operations• Best Practice for Model transition to field staff

Page 20: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

raymondgroup.com

VIRTUAL DESIGN AND CONSTRUCTION (VDC)

CEDARS SINAI MEDICAL CENTER - AHSP Los Angeles, California

Hathaway Dinwiddie Construction Company

CHASE CENTER OFFICE TOWERSSan Francisco, California

Clark Construction

CITY CENTER - SOBELLA RETAIL INTERIOR Las Vegas, Nevada

Perini Building Company

DISNEY’S LITTLE MERMAID ATTRACTIONAnaheim, California

Walt Disney Imagineering

UCSD JACOBS TOWER MEDICAL CENTER La Jolla, California

Kitchell Construction

JW MARRIOTTAnaheim, California

W.E. O’Neil

NORTH LAS VEGAS CITY HALL North Las Vegas, Nevada

Whiting-Turner Contracting Company

PALMDALE MEDICAL CENTER Palmdale, CaliforniaTurner Construction

UCSF MINNESOTA ST. HOUSINGSan Francisco, California

Skanska

WILSHIRE GRAND CENTERLos Angeles, California

Tuner Construction

JACOBS TOWER MEDICAL CENTER

WILSHIRE GRAND CENTER

BIM 3D, 4D & 5DPROJECT EXPERIENCE

Page 21: THE RAYMOND GROUP · operating procedures. Our processes are standardized throughout the organization. Our processes are standardized throughout the organization. Each member of Raymond’s

QUALITY ASSURANCE MANAGEMENT

raymondgroup.com

Raymond has incorporated Quality Assurance as an integrated system of management. Our Quality Assurance Management is one of our core competencies that separate Raymond from our competitors. Raymond’s extensive training programs and best practice measures have guaranteed our clients the quality assurance as well as the highest-level of service that is consciously maintained and managed throughout our organization. Our shared vision of quality extends beyond the highest quality of product installation to a culture of providing quality in all aspects of our business.

The objectives of Raymond’s quality control program are managed at each level of our organization and are ultimately controlled with the implementation of project specific quality assurance plans. Our approach to quality begins at the estimating stage and is followed through at each operational step with adherence to Raymond’s standard operating procedures. Our processes are standardized throughout the organization.

Each member of Raymond’s team is responsible for ensuring that Raymond’s legendary reputation for quality is carried forward on every project. At Raymond, Quality is one of our Core values: ACHIEVING EXCELLENCE IN ALL THAT WE DO.