The Project Management of the Knockharley Landfill by ...€¢ Provisional Items open to variation...
-
Upload
phungthien -
Category
Documents
-
view
251 -
download
0
Transcript of The Project Management of the Knockharley Landfill by ...€¢ Provisional Items open to variation...
The Project Management of the Knockharley Landfill
by
Kevin Cullen B.Sc.,M.Sc.,P.Geo., Gabriel Dennison BE MEngSc PhD &
Margaret Heavey BA BAI
WexfordWaterford
Cork
Killarney
Portlaoise
Kilkenny
Wicklow
Galway
Sligo
Leitrim
Athlone
Mullingar
Dundalk
Belfast
Derry
Limerick
Dublin
Kildare
Tralee
Nenagh
Donegal
Navan
Location & Regional Drainage
KnockharleySite
LOUTH
MEATH
Ardee
DroghedaDrogheda
NavanNavan
TrimTrim
Dunshaughlin Ashbourne
SkerriesSkerries
SwordsSwords
MalahideMalahide
BalbrigganBalbriggan
DublinAirport
Slane
Duleek
NobberDunleer
FINGAL
IrishSea
N
Item Period
Construction February 2004 - December 2004
Contract Negotiations November 2003 - January 2004
High Court Hearings & Settlement April 2003 - November 2003
Regulatory Process January 2001 – March 2003
EIS & Waste Licence Compilation August 2000 – December 2001
Greenstar Project Concept 1st Half 2000
Project Programme
• greenstar (formerly Celtic Waste)
• KTK Landfill in Co. Kildare
• Waste Management In Ireland
- Waste Management Act (’96)- Waste Permitting (’97)- Changing Our Ways (’98)……………rationalisation of MSW landfills- Landfill Directive (’99)……………….site selection criteria- Waste Data Base (’98 & ‘00)……….....increasing waste production
• Meath Co. Co. Waste Plan (’97)………………identifies Knockharley
• North East Waste Region Waste Plan (’99)….identifies Knockharley
• Draft Meath Co. Co. Development Plan (’00)..identifies Knockharley
Project Concept
2005
2004
2003
2002
2001
2000PLANNING
EIS & Waste Licence Application Compilation
LICENSING
01/08/00
11/01/01 Planning & Waste Licence Applications Submitted
12/07/01 - Permission Granted07/08/01 - Appeal Lodged
09/04/02 - 11/04/02 APP Oral Hearing
26/08/01 - APP Decision Granted
2003
2002
High Court - Papers Served 20/05/03
High Court Action Settled by Agreement 12/11/03Contracts Signed 2004
Construction Starts 01/02/04
First Loads Pass Over Weigh Bridge 24/12/042005
19/03/03 Waste Licence Issues
10/09/02 - 04/10/02 EPA Oral Hearing17/10/02 - 18/10/02
28/03/02 Draft Waste Licence
2000
PLANNING LICENSING
(Meath Co. Co. applies for Waste Licence 16/07/99)
(Licence issued to Meath Co. Co. 15/02/01)
• Assemble Management Team & Specialist Contributors
• Agree Interim Benchmarks & Final Delivery Date
• Agree Project Description & Budget
• Complete Fatal Flaw Review
• Complete All Site Studies & Consultations
• Compile Specialist Reports
• Finalise Engineering Drawings
• Review Draft EIS
• Produce Required No. of EIS Copies
• Finalise Waste Licence Application
• Finalise Planning Application Documents
Compilation of EIS & Waste Licence Application
Main Contributors to Environmental Impact Statement
Project Supervision greenstar
EIS Management & Compilation White Young Green
Engineering Fehily Timony & Co.
Planning Kieran O’Malley & Co. Ltd.
Landscape and Visual Impact Brady Shipman Martin
Roads & Traffic Denis Wilson Partnership (now Trafficwise)
EIS Section Contributor
Cultural Heritage CRDS Ltd.
Agricultural Impact Phillip Farrelly & Co. Ltd.
Freshwater Ecology EcoServe.
Terrestrial Fauna Ecological Solutions
Birds Biosphere Environmental Services
Water Analyses Enterprise Ireland
Drilling Glover Site Investigations Ltd.
Arial Photography / Topographic Contours BKS Surveys Ltd.
Specialist Contributors to Environmental Impact Statement
Housing Density
Residential DwellingHigher Housing Density
Curraghtown
Knockharley
Kentstown
Flemingstown
T uiterath
to Slane
Seneschalstown
Slanduf f
Brownstown
to Ashbourne
Cross Sections
Metres.OD
60
40
20
60
40
20
SiteBoundary
SiteBoundary
Stream TP2MW14s
TP6
North South
MW4sNorth South
A A’
B B’
80
MW9s
Metres.OD
SiteBoundary
StreamStream
SiteBoundary
Boulder ClayBedrockWater TableMonitoring W ell (Shallow)Trial Pit
MW4sTP2
PlanningTimetable2003
F
J
DN
O
S
AJ
J
M
A
M
F
J
DN
O
S
AJ
J
M
A
M
F
J
2002
2001
11/01/01 - Planning Application
07/03/01 - Further Information Request Received
17/05/01 - Further Information Submitted
03/07/01 - Unsolicited Further Information Lodged
12/07/01 - Planning Permission Granted07/08/01 - Planning Appeal Lodged07/09/01 - Response to 3rd Party Appeals Lodged
09/04/2002 - 11/04/2002 -ABP Oral Hearing
26/08/2002 -ABP Appeal Decision
Waste LicenceTimetable
17/10/2002 - 18/10/2002EPA Oral Hearing
19/03/03 Licence Issued
2003
F
J
DN
O
S
AJ
J
M
A
M
F
J
DN
O
S
AJ
J
M
A
M
F
J
2002
2001
30/09/2002 - 04/10/2002EPA Oral Hearing
28/03/2002 - Draft Licence Issued
21/08/01 - Article 14(2) Received
26/04/01 - Article 14 Submitted
21/03/01 - Article 12 & 13 Received
11/01/01 - Licence Application
Wastes (t/y) EPA Licences greenstar Planning PermissionDisposal Recovery MCC** greenstar Jan.’05 – Dec. ’07 Dec’07 –Hse. - 45,500 100,000 - -Commercial - 17,000 45,000 - -Industrial - - 30,000 - -
- C&D 13,500 25,000 - -----------------------------------------------------------------------------------------------------------------------Totals 76,000 200,000 132,000* 88,000*
*= Wastes arising from the North East Region** = Meath County Council
Current Permissions
High Court Hearings & Settlement
• 20th May, 2003 High Court Papers served • Gemma Mc Manus vs. EPA; eight notice parties including Meath Co Co, greenstar
and local individuals • Mainly ‘frivolous and vexatious’ grounds covered by previous High Court challenges
to the same site • Responding affidavits by greenstar and EPA refuting grounds • Urgency emphasised to the Court re National and Regional need for the project • 12th Nov Hearing – Applicant requested delay to facilitate settlement discussions • Out of Court settlement 12 Nov – no compensation paid to individuals
• N2 National Primary Route : 400 metre length of road strengthening and widening • Provision of new ghost island access junction designed to NRA DMRB standards • 5.35m high reinforced earth underpass of county road • 1.5km length of 7m wide private access road • 3.2 km palisade, post and wire, and timber post and rail fencing • 5.0 km surface-water drainage • 2 no 18m weighbridges, administration offices and reception area • 5000m3 capacity surface water pond • 1500m3 leachate pond, quarantine area and aviary • 4 no. HDPE and engineered clay-lined cells of approx 4 years capacity (28,000 m2) • Preliminary works to 2 further cells (14,000 m2) • Data collection and remote telemetry monitoring and control - SCADA • 112 acres amenity forestry
Contract Documents – Scope of Works
• Contractor - Logan Ascon • Fixed Price Lump Sum Contract • Measured works – Fixed Sum • Provisional Items open to variation and measurement – CESMM3 • Early finish bonus • IEI Conditions of Contract (6th Edition) • Fehiley Timoney & Co – ‘ The Engineer’. • Resident Engineers employed directly by greenstar
Contract Negotiations
• Restricted working hours in ABP Planning permission 8am – 6pm • High concentration of plant on site- peaking at 44 items of heavy plant • Cell excavation, embankments, drainage, roads, underpass construction – all simultaneously • Dust suppression – 3 tractors with water tankers • 100% environmental compliance during construction including dust, noise, surface water quality • Independent quality assurance – Metlab Ltd • Insitu clays with typical permeabilities lower than 1 X 10 -9 m/s• Engineered liner fully in compliance with EPA Landfill Design Manual • Contract finished ahead of schedule and below budget
Construction