AREA calculationThe following spaces need to be measured
and the area accurately calculated
Gross Building Area (for each addition)
Tape or electronic linear dimensions of all exterior building surfaces. Create AutoCadd footprint, check for closure and use area command for area. Exclude courtyards and remember to adjust for two story spaces.
Why does this seem to be so difficult?
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
AREA calculation
Corridors: Stairs, ramps and elevators shall be included in the Corridor area.
Stairs: Stair area shall be calculated as 100% on the ground floor and 5o% on elevated floors. Area shall be calculated based on the total area inside the stair enclosure walls.
Elevators: Elevators shall be calculated as 100% on the ground floor and o% on elevated floors.
Do not count overhangs as area.
When computing areas for existing or new buildings. The area shall be
calculated as follows:
(This is now in your Agreement under General Scope Guidelines)
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
OVERSIZE Space:
Existing area of certain common spaces of a
school building which are considered beyond DM
guidelines, and therefore is subtracted from the
gross area.
DEFINITIONS
OVERSIZE SPACE
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
There are 3 types of OVERSIZE space:
DEFINITIONS
RegularGymnasium
Corridors
Ag. Ed.
Media Center
Vocational
Dining
Kitchen
Non-DMAuditoriums
Natatoriums
Indoor Tracks
Adult Education
Board Offices
County or other
Agencies
UnusableTypically basement
space which no
longer is suitable
for classrooms or
other renovation.
OVERSIZE SPACE
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
Because some other scope will be required to be done in order to
protect the integrity of the space, a nearly complete assessment
will be necessary. All A-W items are to be included except:
General Finishes Security Systems Site Conditions
Loose Furnishings Technology
This scope will be a LFI, subject to review & negotiation with the District
and the Planner/RPC. (Determined during Master Plan development.)
Only “Life-Safety” related scope will be co-funded.
Assessing “Non-DM” oversize spaces.
OVERSIZE SPACE
ASSESS AS A SEPARATE ADDITION
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
Oversize space which is UNUSABLE is treated the same:
Typically basement space which is no longer suitable for
classrooms or other required areas of the program.
Only “Life-Safety” related scope will be co-funded.
Assessing “Unusable” oversize spaces.
OVERSIZE SPACE
ASSESS AS A SEPARATE ADDITION
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
UNUSABLE SPACE criteria:
• Not suitable space to fit a typical POR
• Can include very difficult areas to access such as a partial fourth floor or basement.
• Typical examples include old coal bins, very large basement mechanical rooms or fan rooms (catacombs).
• When in doubt, contact your RPC/Planner.
OVERSIZE SPACE
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
“Life Safety” related items in specific terms are…
Fire Protection
Fire Alarm System
Emergency Egress Lighting
Total Master Planning co-funded amount for this
scope is $7.15 / s.f. x Regional Cost Factor
OVERSIZE SPACE
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
•Are they Unusable Space?
•When does the area not get counted?
•If it does, what gets included?
•What criteria makes it count as area?
OK…But what about those pesky
utility tunnels?
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
EXCESS (or Underutilized) Space:
Existing area of a school building which,
after accounting for Oversize Space, is in excess
of the required area for the proposed student
population. Excess area is indicated as a
“negative” addition on the Master Plan.
DEFINITIONS
Partial Co-Funding Conditions(Oversize & Excess Area & resulting LFIs)
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
Existing buildings scheduled for renovation must house the maximum number of students based on the OSDM
sf/student formulas and oversize space considerations.
The maximum allowable excess area beyond that which is required to house shall be 1,000 sf of the gross area of the building. Area beyond the proposed enrollment is a
LFI.
The web tool automatically calculates this.
Excess space LFIs
Partial Co-Funding Conditions(Oversize & Excess Area & resulting LFIs)
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
The LFI is based on the average sf cost for
renovation of the entire building multiplied by the
excess area, minus “Life Safety” related scope at
$7.15 / sf.(Subject to Regional Cost Factor)
Excess space LFIs
Partial Co-Funding Conditions(Oversize & Excess Area & resulting LFIs)
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
1. Non-DM Oversize spaces.
2. Unusable Oversize spaces.Note: these spaces may require some “A-W” renovation (to
satisfy building integrity) as a LFI.
FOR RENOVATIONS: All “Excess Area” is required to be DM compliant (requires complete “A-W” renovation) except:
Partial Co-Funding Conditions(Oversize & Excess Area & resulting LFIs)
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
1. Detached buildings that do not contain required
program space.
2. Non-DM spaces that do not contain required
program space.Note: “required program space” is space that satisfies the Master Plan
program space.
FOR NEW CONSTRUCTION: All LFI spaces are required to be DM compliant except:
Partial Co-Funding Conditions(Oversize & Excess Area & resulting LFIs)
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
ASSESSMENTCOST
GUIDELINES
2008 EDITION
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
Increase changes in Unit Prices
Assessment Cost Guidelines
• HVAC System Replacement
• Convert to Ducted System
• Roof replacement
• A/C Replacement
• Electrical System Replacement
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
Increase changes in Unit Prices
Assessment Cost Guidelines
• Complete Finish Replacement
• Kitchen Equipment Replacement
• Asphalt Paving
• Concrete Curbs and Sidewalks
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
New Items with Unit Prices
Assessment Cost Guidelines
• Roof accessory replacement
• Roof Insulation (including resolving ponding)
• Ventilation / Exhaust additional items
• Item I: Structure: Floors and Roofs: Repair for damaged soffits and concrete slabs.
• Finishes: remove demountables & replace with GWB partition
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
New Items with Unit Prices
Assessment Cost Guidelines
• ADA: Shower and accessory replacement
• Site: Playground surface; concrete stairs; catch basins & dumpster pad.
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
ASSESSMENTCOST
GUIDELINES
LESSONS LEARNED
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
A. HEATING SYSTEM
Don’t forget “Convert to Ducted System” if current system does not primarily utilize ductwork.
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
B. ROOFING
Don’t forget about Gutters and Downspouts.
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
D. ELECTRICAL SYSTEMS
If a complete replacement is not selected, add a new generator.
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
E. PLUMBING & FIXTURES
In old buildings (say 50 yrs or more) consider replacing Sanitary Waste system.
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
F. WINDOWS
Area take-offs are often incorrect.
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
G. STRUCTURE
Pipe tunnels?
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
H. STRUCTURE: WALLS
Masonry Cleaning & Sealing should almost be a given. Also, don’t underestimate area for Tuckpointing.
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
I. STRUCTURE: FLOORS, ROOFS
Don’t confuse a wood finish floor with a wood structural floor system. Finish wood can stay.
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
J. GENERAL FINISHES
“Complete Finish Replacement” includes only:Paint; Ceiling; Floors; MB/TBs and Lockers
It does not include Interior Doors
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
J. GENERAL FINISHES (cont.)
Be sure to assess Interior Doors. If most are original, replace. Make sure new ADA hardware in “O” doesn’t
duplicate with new doors or hardware.
Don’t forget Toilet Accessories Replacement.If building does not have Casework per the OSDM, or falls significantly short, be sure to include “Complete
Replacement of Casework”.(assuming you don’t already have it in Finishes)
Kitchen Equipment gets replaced if older than 1985. That’s probably most schools!
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
K. INTERIOR LIGHTING
Very seldom ever not replaced.
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
L. SECURITY SYSTEM
Boring…
M. EMERGENCY LIGHTING
N. FIRE ALARM
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
O. HANICAPP ACCESS (ADA)
Coordinate better with Plumbing & Finishes so you don’t duplicate fixtures, partitions, hardware, etc.
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
P. SITE CONDITION
Use Site Contingency Allowance unless you get special permission not to by your Planner.
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
Q. SEWAGE SYSTEM
Boring…
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
R. WATER SUPPLY
Watch out for Arsenic!
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
S. EXTERIOR DOORS
Straight forward…
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
T. HAZ MAT
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
U. LIFE SAFETY
If you can obtain water pressure/flow form the Owner/AE team, do it. This way we can plan for
adding a pump and/or tank if necessary.
A new generator is included in a “Complete Electrical Replacement”. If you’re not doing this,
choose the new Generator.
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
V. LOOSE FURNISHINGS
The OHIO SCHOOL FACILITIES COMMISSION Assessor & RPC Summit; July 1, 2008
W. TECHNOLOGY
Notice our change on this. Also note that there is no partial, only a full replacement.