The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20...

71
The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011

Transcript of The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20...

Page 1: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

The new balancing regime – Workshop with UsersNew features in SRG and STG systems

Workshop20 September 2011

Page 2: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

2

Agenda

Welcome

New flows and functionalities for the User Access to the Balancing Service Transportation programs and Balancing Billing

Next steps Blank Tests Systems Tests

Works closing

Page 3: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

3

Agenda

Welcome

New flows and functionalities for the User Access to the Balancing Service Transportation programs and Balancing Billing

Next steps Blank Tests System Tests

Works closing

Page 4: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

4

Access to the new balancing system(1 of 2)

The “Enabled User” is the User of storage and transportation services that

owns flexibility resources for balancing purposes and shall be required to

contribute, using its own resources, to the balancing of the system; the

access requirements are as follows:

Holder of a valid and effective transport contract;

Holder of a storage contract for the modulation service, the hydrocarbon

service or Legislative Decree 130/10 service (not required for

balancing users);

To be authorised for access to the Virtual Trading Point;

Holder of ratings and/or guarantees in compliance with the provisions of

the Network Code.

Page 5: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

5

SRG checks the requirements for access to the balancing system in order to

prepare the list of Users which shall contribute (holders of storage contracts) and

the list of the balancing Users (all network Users); to this end:

It determines the System's potential exposure of each user (EPSu);

It determines the maximum potential exposure in relation to the

guarantees given by the User (MEPSu);

It manages the system of guarantees to cover the System's exposure of the

User;

It compares the EPSu and MEPSu of each User;

It takes the necessary measures if the System is overexposed to the User.

Access to the new balancing system(2 of 2)

Page 6: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

6

The EPSu or potential exposure of the System to the User is the potential debt, calculated on a daily basis, of the User with reference to the balancing service.

The EPSu is the sum of the following components:

Pfatt: due amounts billed and still not paid by the User;

Pdet: provisional due amounts calculated and still not billed to the User;

Patt: potential due amounts that may arise for the User in the three months following the valuation.

EPSu [PFATT+PDET+PATT]

PFATT

Bills receivable (GME - Electricity Market Operator - items)

Bills receivable (Imbalances)

Credit notes receivable (Imbalances)

Bills payable (GME items and/or imbalances)

Credit notes payable (Imbalances)

PDET

Provisional due amounts receivable (GME items)

Provisional due amounts receivable (Imbalances)

Provisional due amounts payable (GME items)

Provisional due amounts payable (Imbalances)

PATT

Potential due amounts receivable (Expected Withdrawal)

Potential due amounts receivable (PSV - Virtual Trading Point - Transactions)

Calculation of the system's potential exposure to the User (EPSu)(1 of 5)

Page 7: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

7

Pfatt is composed of bills and credit notes, receivable and payable, relating to the economic items calculated on the PB-Gas platform and to imbalances of Users of the balancing service.

These economic items are a result of the calculation of the EPSu once they have been paid or reached maturity.

Pdet is the sum of economic items still not billed, determined on the basis of the most up-to-date transport balance; they are a sum of the following components:

Economic amounts receivable and payable relating to transactions completed on the PB-Gas platform by the User authorised by SRG and valued at the remuneration price;Economic amounts receivable and payable relating to imbalances of the balancing User and valued at the imbalance price.

Pfatt is composed of bills and credit notes, receivable and payable, relating to the economic items calculated on the PB-Gas platform and to imbalances of Users of the balancing service.

These economic items are a result of the calculation of the EPSu once they have been paid or reached maturity.

Pdet is the sum of economic items still not billed, determined on the basis of the most up-to-date transport balance; they are a sum of the following components:

Economic amounts receivable and payable relating to transactions completed on the PB-Gas platform by the User authorised by SRG and valued at the remuneration price;Economic amounts receivable and payable relating to imbalances of the balancing User and valued at the imbalance price.

Calculation of the system's potential exposure to the User (EPSu)(2 of 5)

Page 8: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

8

Patt is the potential due amount calculated as sum of the following components:

Transactions recorded at the Virtual Trading Point;

The cumulated imbalance the User may reach in the three months

following the valuation, calculated using an expected withdrawal estimate.

The aforementioned terms are assessed in the assumption of input by the User equal to zero and are valued at the estimated imbalance price.

In order to estimate the expected withdrawal of the User, the calculation criteria will take into consideration the capacities assigned to both the entry and redelivery points appropriately re-proportioned on the basis of the average load factors of such capacities.

Patt is the potential due amount calculated as sum of the following components:

Transactions recorded at the Virtual Trading Point;

The cumulated imbalance the User may reach in the three months

following the valuation, calculated using an expected withdrawal estimate.

The aforementioned terms are assessed in the assumption of input by the User equal to zero and are valued at the estimated imbalance price.

In order to estimate the expected withdrawal of the User, the calculation criteria will take into consideration the capacities assigned to both the entry and redelivery points appropriately re-proportioned on the basis of the average load factors of such capacities.

Calculation of the system's potential exposure to the User (EPSu)(3 of 5)

Page 9: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

9

Users of the Capacity Portal will have the opportunity to check the components of their EPSu in real time in more detail.

Users of the Capacity Portal will have the opportunity to check the components of their EPSu in real time in more detail.

Level 1 EPSu

Calculation of the system's potential exposure to the User (EPSu)(4 of 5)

Page 10: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

10

Level 2 EPSu

Calculation of the system's potential exposure to the User (EPSu)(5 of 5)

Page 11: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

11

The MEPSu or maximum potential exposure of the System to the User corresponds to the maximum acceptable EPSu value, calculated on the basis of the following components:

Gmin is the guarantee the User is required to present in order to access the balancing

service;

G are the guarantees actually presented in the form of security deposits, bank guarantees, rating certifications and guarantees in gas held in storage;

C are the expired invoices and not paid yet relating to the balancing service.

MEPSu

GMIN

(guarantee required)

Expected Withdrawal

No. of days

Estimated Imbalance Price

G

(Guarantees presented)

Security deposits

Bank guarantees

Rating

Gas guarantee - Edison T&S

Gas guarantee - Stogit

C

(Expired bills - not paid)

Bills receivable (GME - Electricity Market Operator - items)

Bills receivable (Imbalances)

Calculation of the maximum potential exposure of the system to the User (MEPSu) (1 of 6)

Page 12: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

12

The following types of guarantee may be presented:

Security deposit: the associated amount may be used to fully cover the guarantee the User is required to present;

Bank guarantee: the associated amount may be used to fully cover the guarantee the User is required to present;

Parent Company letter of guarantee: the associated amount may be used to fully cover the guarantee the User is required to present;

Credit rating: possession of a minimum credit rating required by the Network Code covers X% of the value of the guarantee the User is required to present;

Gas in stock at one or more Storage Companies.

Calculation of the maximum potential exposure of the system to the User (MEPSu) (2 of 6)

Page 13: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

13

Day X of month M -1

M-1 M+1M

Last day of month M -1

Determination of the Guarantee to be

presented

End of last adjustment of guarantee G

30 September(End of Gas Year) 31 March of

next Gas Year

Guarantee G validity term

The adjustment of the amount of the guarantee given must be

carried out on the basis of the following timescales:

Calculation of the maximum potential exposure of the system to the User (MEPSu) (3 of 6)

Page 14: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

14

Users of the Capacity Portal will have the opportunity to check the components of their MEPSu in real time in more detail.

Users of the Capacity Portal will have the opportunity to check the components of their MEPSu in real time in more detail.

Calculation of the maximum potential exposure of the system to the User (MEPSu) (4 of 6)

Level 1 MEPSu

Page 15: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

15

Calculation of the maximum potential exposure of the system to the User (MEPSu) (5 of 6)

Level 2 MEPSu

Page 16: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

16

Calculation of the maximum potential exposure of the system to the User (MEPS) (6 of 6)

Warning and Blocking Messages

Page 17: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

17

In order to limit the risks related to the potential exposure of the System to the Users, on each gas day the conditions which compare the EPSu and the MEPSu must be observed;

In order to limit the risks related to the potential exposure of the System to the Users, on each gas day the conditions which compare the EPSu and the MEPSu must be observed;

SRG, as Balancing Operator, calculates and communicates to GME on a daily basis the economic limit of the purchase offers that the User can formulate on the PB-Gas platform.

SRG, as Balancing Operator, calculates and communicates to GME on a daily basis the economic limit of the purchase offers that the User can formulate on the PB-Gas platform.

Balancing Operator Actions in the event of the system's overexposure to the User (1 of 2)

Page 18: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

18

The Balancing Operator monitors the relative operational economic margins for each balancing user on a daily basis.

Based on the level of potential exposure EPSu with respect to the maximum potential exposure MEPSu:

The Capacity Portal displays to the User a warning/blocking message;

SRG sends a written notification to the User (and also to GME and Storage Companies);

SRG blocks, with immediate effect, the operations of the User in relation to capacity bookings and selling transactions on the Virtual Trading Point.

The Balancing Operator monitors the relative operational economic margins for each balancing user on a daily basis.

Based on the level of potential exposure EPSu with respect to the maximum potential exposure MEPSu:

The Capacity Portal displays to the User a warning/blocking message;

SRG sends a written notification to the User (and also to GME and Storage Companies);

SRG blocks, with immediate effect, the operations of the User in relation to capacity bookings and selling transactions on the Virtual Trading Point.

Balancing Operator Actions in the event of the system's overexposure to the User (2 of 2)

Page 19: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

19

Agenda

Welcome

New flows and functionalities for the User Access to the Balancing Service Transportation programs and Balancing Billing

Next steps Blank Tests System Tests

Works closing

Page 20: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

20

Transportation programs and BalancingIntroduction

In order to ensure the daily balancing of the system, Enabled Users are required to make their storage resources available to the Balancing Operator.

The process defining the transportation programs in the new system will be characterised by:

Publication of Estimates on gas day G to provide an overview of the system status; Renomination on gas day G to allow User to rebalance its input and withdrawal

quantities; Bids on gas day G aimed at making the storage resources available to the system.

During the Allocation and Balance phase, Enabled Users will be supplied with the outcomes of their balancing actions implemented during the transportation programs phase. The balancing process in the new system will be characterised by:

Bids Accepted, provided on gas day G+1, that has been selected to balance the system;

Position in Storage which is determined as final on gas day G+1; Value of Imbalances (whose coverage is no longer ensured through its storage

resources), provided as definitive in gas month M+1 and M+3 .

Page 21: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

21

12:00

Deadline for transactions

at Virtual Trading

Point

Deadline for gas

sales on the STS system

Nomination deadline

Nomination deadline

13:00

Nomination Confirmation

Nomination Confirmation

17:00

Re-nominations

19:00

12:00 13:00 17:00

User

Gas Day G-1Activity Deadline

Transmission system

Operator

Storage Company

Page 22: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

22

Gas Day G-1Flows and Operations

Transmission system

Operator

Storage Company

12:00 13:00 17:00

12:00 13:00 17:00 19:00

Transactions at Virtual Trading

Point

Gas transfers to Storage

Nomination Confirmation

Nomination Confirmation

Re-nominationsNomination Communication

Nomination Communication

User

Page 23: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

23

User

12:00 13:00 17:00 19:00

Transactions at Virtual Trading

Point

Gas transfers to Storage

Nomination Confirmation

Nomination Confirmation

Re-nominationNomination Communication

Nomination Communication

Gas Day G-1Variations with respect to AS-IS

Transmission system

Operator

Storage Company

12:00 13:00 17:00

Reservation for storage The reservation for storage will be assessed on the basis of:

•available capacities, including the interruptible capacities assigned, •treatment/compression consumptions, •available stocks/space at the time, •any strategic gas subject to prior authorisation by the MSE (Ministry of Economic Development), •any gas released by the user under guarantee to the Balancing Operator.

In the event the reservation exceeds the User's availability, Storage Companies will modify the reservation, assigning a value equal to maximum availability. .

Confirmed quantities will be checked again by the Storage Company on gas day G, as a result of the availability of stock data updated at the end of Gas Day G -1

Reservation for storage The reservation for storage will be assessed on the basis of:

•available capacities, including the interruptible capacities assigned, •treatment/compression consumptions, •available stocks/space at the time, •any strategic gas subject to prior authorisation by the MSE (Ministry of Economic Development), •any gas released by the user under guarantee to the Balancing Operator.

In the event the reservation exceeds the User's availability, Storage Companies will modify the reservation, assigning a value equal to maximum availability. .

Confirmed quantities will be checked again by the Storage Company on gas day G, as a result of the availability of stock data updated at the end of Gas Day G -1

Page 24: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

24

12:00 13:00 17:00 19:00

Transactions at Trading Exchange

Point

Gas transfers to Storage

Nomination Confirmation

Nomination Confirmation

Re-nominationsNomination Communication

Nomination Communication

Gas Day G-1Variations with respect to AS-IS

Transmission system

Operator

Storage Company

12:00 13:00 17:00

User

Transportation Reservation In the event of an inconsistency between the transportation programs at storage hubs and the programme sent to the Transporter by the Storage Company, the reservation at said points will be modified, incorporating the data of the storage company. In response to cuts/inconsistencies in the reservations, the Transporter will modify the transportation programs of the User Redelivery Points, reproportioning unbalanced quantities at said points.

Transportation Reservation In the event of an inconsistency between the transportation programs at storage hubs and the programme sent to the Transporter by the Storage Company, the reservation at said points will be modified, incorporating the data of the storage company. In response to cuts/inconsistencies in the reservations, the Transporter will modify the transportation programs of the User Redelivery Points, reproportioning unbalanced quantities at said points.

Page 25: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

25

Gas Day GActivity Deadline

14:00

2nd Publication of Estimates

Minimum and Maximum

Limits

16:00

Closing of Renomination

17:00

Re-nomination confirmation

19:00

Closing of Renomination

18:00Re-nomination confirmation

1st Publication of Estimates

Transactions at Virtual Trading

Point Deadline

16:30

End of Balancing

Session Offers

20:00

17:00 19:00

Balancing Operator

Transmission system

Operator

GME

Storage Company

User

Page 26: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

26

Gas Day G Flows and Operations

14:00

1stPublication of Estimates

16:00

17:00

Reformulation confirmation

19:00

17:00

2nd Publication of Estimates

Transactions in the Virtual

Exchange Point

16:30

19:0018:00

20:00

Balancing Operator

Transmission system

Operator

GME

Storage Company

1st Publication of Estimates Re-Nomination

Re-nomination confirmation

2nd Publication of Estimates

Transactions at Virtual Trading

Point

Re-Nomination Offer Minimum and Maximum Limits

Re-nomination confirmation

Balancing Session Offers

User

Page 27: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

27

14:00

1st Publication of Estimates

16:00

17:00

Reformulation confirmation

19:00

17:00

2nd Publication of Estimates

Transactions in the Virtual

Exchange Point

16:30

19:0018:00

20:00

Balancing Operator

Transmission system

Operator

GME

Storage Company

1st Publication of Estimates Re-Nomination

Re-nomination confirmation

2nd Publication of Estimates

Transactions at Virtual Trading

Point

Re-Nomination Offer Minimum and Maximum Limits

Re-nomination confirmation

Balancing Session Offers

Gas Day G Variations with respect to AS-IS

User

Publication Obligations The Balancing Operator will publish the information required by resolution 45/11 on its website at 14.00, and will then update it at 16.00

Publication Obligations The Balancing Operator will publish the information required by resolution 45/11 on its website at 14.00, and will then update it at 16.00

Page 28: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

28

User

14:00

1st Publication of Estimates

16:00

17:00

Reformulation confirmation

19:00

17:00

2nd Publication of Estimates

Transactions in the Virtual

Exchange Point

16:30

19:0018:00

20:00

Balancing Operator

Transmission system

Operator

GME

Storage Company

1st Publication of Estimates Re-Nomination

Re-Nomination confirmation

2nd Publication of Estimates

Transactions in the Virtual

Exchange Point

Re-Nomination Offer Minimum and Maximum Limits

Re-Nomination confirmation

Balancing Session Offers

Gas Day GVariations with respect to AS-IS

Reformulation of Transport ProgrammeThe reformulation of the transport programme can be performed by Users, limited to Storage hubs and Redelivery Points.

In the event of an inconsistency between the reformulation at storage hubs and the reformulation of the programme sent to the Transporter by the Storage Company, the reservation at said points will be modified, incorporating the data of the storage company.

If the reformulated programme, also as per the previous point, is not balanced, the Transporter amends the transportation programs of the User Redelivery Points, by reproportioning unbalanced quantities at said points.

Reformulation of Transport ProgrammeThe reformulation of the transport programme can be performed by Users, limited to Storage hubs and Redelivery Points.

In the event of an inconsistency between the reformulation at storage hubs and the reformulation of the programme sent to the Transporter by the Storage Company, the reservation at said points will be modified, incorporating the data of the storage company.

If the reformulated programme, also as per the previous point, is not balanced, the Transporter amends the transportation programs of the User Redelivery Points, by reproportioning unbalanced quantities at said points.

Page 29: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

29

User

14:00

1st Publication of Estimates

16:00

Reservation Reformulation

17:00

Reformulation confirmation

19:00

17:00

2nd Publication of Estimates

Transactions in the Virtual

Exchange Point

16:30

19:0018:00

20:00

Balancing Operator

Transmission system

Operator

GME

Storage Company

1st Publication of Estimates Re-Nomination

Re-Nomination confirmation

2nd Publication of Estimates

Transactions at Virtual Trading

Point

Re-Nomination Offer Minimum and Maximum Limits

Re-Nomination confirmation

Balancing Session Offers

Gas Day G Variations with respect to AS-IS

Reformulation of Storage Reservation

The reformulation of the storage reservation will be subject to the same restrictions described for the reservation on Gas Day G-1

Interruptible capacities subject to formulations/reformulations of storage reservations will be confirmed on Gas Day G.

Reformulation of Storage Reservation

The reformulation of the storage reservation will be subject to the same restrictions described for the reservation on Gas Day G-1

Interruptible capacities subject to formulations/reformulations of storage reservations will be confirmed on Gas Day G.

Page 30: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

30

User

14:00

1stPublication of Estimates

16:00

Reservation Reformulation

17:00

Reformulation confirmation

19:00

17:00

2nd Publication of Estimates

Transactions in the Virtual

Exchange Point

16:30

19:0018:00

20:00

Balancing Operator

Transmission system

Operator

GME

Storage Company

1st Publication of Estimates Re-Nomination

Re-Nomination confirmation

2nd Publication of Estimates

Transactions at Virtual Trading

Point

Re-Nomination Offer Minimum and Maximum Limits

Re-Nomination confirmation

Balancing Session Offers

Gas Day G Variations with respect to AS-IS

Offer Minimum and Maximum Limits

The calculation, for users, of the Minimum and Maximum Limits for the Balancing Market bids to be sent to GME, is performed on the basis of:

Capacity, space and available stocks after the (re)formulation of the reservation, Any gas released by the user under guarantee to the Balancing Operator Estimated treatment/compression consumption.

In the transitory period, SRG will provide an estimate of the accuracy of gas in stock to be used to calculate the Minimum and Maximum Limits.

Offer Minimum and Maximum Limits

The calculation, for users, of the Minimum and Maximum Limits for the Balancing Market bids to be sent to GME, is performed on the basis of:

Capacity, space and available stocks after the (re)formulation of the reservation, Any gas released by the user under guarantee to the Balancing Operator Estimated treatment/compression consumption.

In the transitory period, SRG will provide an estimate of the accuracy of gas in stock to be used to calculate the Minimum and Maximum Limits.

Page 31: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

31

Gas Day G New functionalities

14:00

1st Publication of Estimates

16:00

17:00

Reformulation confirmation

19:00

17:00

2nd Publication of Estimates

Transactions in the Virtual

Exchange Point

16:30

19:0018:00

20:00

Balancing Manager

GME

Storage Company

Re-Nomination

Re-Nomination confirmation

1stPublication of Estimates

2nd Publication of Estimates

Transactions at Virtual Trading

Point

Re-Nomination Offer Minimum and Maximum Limits

Re-Nomination confirmation

Balancing Session Offers

User

Transmission system

Operator

Page 32: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

32

EXPLANATORY

Gas Day G Publication of Estimates - SRG website

SRG will public the estimates set forth in articles 6.4 and 6.5 of resolution 132/09 on its website:

Home > Customers and Institutions > Gas Year 2010/2011 > Quantity of gas trasported

By clicking on the reference month, it will be possible to display the relevant estimates in the format

Pubblicazione Del 45/11

EXPLANATORY

Page 33: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

33

Gas Day G Programme Reformulation - Altra Web

§ The Reformulation of the Transport Programme may be carried out§ On Regional Networks both through Protocol X12 and using the ‘Nomination’

functionality of Altra Web § On the National Network through the new Renomination functionality of Altra Web

EXPLANATORY

Page 34: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

34

Gas Day GReformulation Display - Altra Web

§ The Reformulation of the Transport Programme may be displayed through a new report accessible from the new Altra Web menu item 'Display Renomination'

EXPLANATORY

Page 35: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

35

Gas Day GReformulation of the reservation - Sampei

§ The Reformulation of the Storage Reservation may be performed through the new Sampei menu item “Inserimento Rinomine”

Page 36: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

36

Gas Day GReformulation display - Sampei

§ The Reformulation of the Storage Reservation may be performed through the new Sampei menu item “Interrogazione Rinomine”

Page 37: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

37

Gas Day G+1Activity Deadline

Storage Company

10:30

Allocations to storage

Offers Accepted and Remuneration

Price Provisional Balance

11:30

11:30

GMEGME

User

Transmission system

Operator

Page 38: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

38

Gas Day G+1Flows and Activities

User

11:30

11:30

10:30

Storage Company

GMEGME

Offers Accepted and Remuneration Price

Allocations to Storage

Provisional Balance

Transmission system

Operator

Page 39: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

39

11:30

11:30

10:30

Storage Company

GMEGME

Offers Accepted and Remuneration Price

Allocations to Storage

Provisional Balance

Gas Day G+1Variations with respect to AS-IS

User

SRG calculates and sends to the GME the Overall

System Deviation(SCS)

SRG calculates and sends to the GME the Overall

System Deviation(SCS)

Transmission system

Operator

Provisional BalanceFollowing the communication of bids accepted in the Balancing Market to cover the imbalances of Balancing Users, SRG will calculate the Provisional Balance of the User using the following equation:

Ik + Sk + (TkPSV + Tk

GNL + TkM + Tk

PB) = Pk + GSk + DSk

where• Sk= represents the quantity of gas input to/withdrawn from storage, obtained as the sum of quantities of gas planned for storage SNk and quantities of storage gas SMk selected in the Balancing Market to cover the Overall System Imbalance (SCS).• Tk

PB= represents the net balance of gas transactions concluded between the User and the Balancing Operator in the Balancing Market.• DSk= represents the imbalance of the User and constitutes the result of the balancing equation.

Provisional BalanceFollowing the communication of bids accepted in the Balancing Market to cover the imbalances of Balancing Users, SRG will calculate the Provisional Balance of the User using the following equation:

Ik + Sk + (TkPSV + Tk

GNL + TkM + Tk

PB) = Pk + GSk + DSk

where• Sk= represents the quantity of gas input to/withdrawn from storage, obtained as the sum of quantities of gas planned for storage SNk and quantities of storage gas SMk selected in the Balancing Market to cover the Overall System Imbalance (SCS).• Tk

PB= represents the net balance of gas transactions concluded between the User and the Balancing Operator in the Balancing Market.• DSk= represents the imbalance of the User and constitutes the result of the balancing equation.

Page 40: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

40

11:30

11:30

10:30

Storage Company

GMEGME

Offers Accepted and Remuneration Price

Allocations to Storage

Provisional Balance

Gas Day G+1Variations with respect to AS-IS

Storage Allocation

The gas allocated to storage and stock of each User are calculated definitively in the report prepared on Gas Day G+1

Storage Allocation

The gas allocated to storage and stock of each User are calculated definitively in the report prepared on Gas Day G+1

User

Transmission system

Operator

Page 41: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

41

11:30

11:30

10:30

Storage Company

GMEGME

Offers Accepted and Remuneration Price

Allocations to Storage

Provisional Balance

Gas Day G+1New Functionalities

User

Transmission system

Operator

Page 42: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

42

Gas Day G+1 Provisional Balance - Altra Web

In order to display the Provisional Balance, a specific report will be made available on Altra Web, which can be accessed by selecting the 'Provisional Balance' item in the 'Reporting' section.

EXPLANATORY

EXPLANATORY

Page 43: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

43

Gas Month M+1Activity Deadline

Within the 15th working day M+1

Publication of Definitive Balance

Storage Company

User

Transmission system

Operator

Page 44: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

44

Gas Month M+1Flows and Operations

Storage Company

Within the 15th working day M+1

Definitive Balance

User

Transmission system

Operator

Page 45: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

45

Gas Month M+1Variations with respect to AS-IS

Storage Company

Within the 15th working day M+1

Definitive Balance

Definitive Balance•In the definitive balance, for each Balancing User, the imbalance that will determine the economic amount to be billed will be calculated

Definitive Balance•In the definitive balance, for each Balancing User, the imbalance that will determine the economic amount to be billed will be calculated

User

Transmission system

Operator

Page 46: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

46

Gas Month M+1New Functionalities

Storage Company

Within the 15th working day M+1

Definitive Balance

User

Transmission system

Operator

Page 47: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

47

Gas Month M+1 Definitive Balance - Altra Web

In order to display the Definitive Balance, a specific report will be made available on Altra Web, which can be accessed by selecting the 'Definitive Balance' item in the 'Reporting' section.

EXPLANATORYEXPLANATORY

Page 48: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

48

Gas Month M+3 Flows and operations

M+3

Adjustment Balance

User

Storage Company

Transmission system

Operator

Page 49: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

49

Storage Company

M+3

Adjustment Balance

Gas Month M+3 Variations with respect to AS-IS

Reconciliation BalanceIn the reconciliation balance, for each Balancing User, the term of definitive imbalance that may determine an economic amount to be adjusted will be calculated

Reconciliation BalanceIn the reconciliation balance, for each Balancing User, the term of definitive imbalance that may determine an economic amount to be adjusted will be calculated

User

Transmission system

Operator

Page 50: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

50

Agenda

Welcome

New flows and functionalities for the User Access to the Balancing Service transportation programs and Balancing Billing

Next steps Blank Tests System Tests

Works closing

Page 51: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

51

BillingIntroduction

The quantities of gas exchanged on the Balancing Platform to cover the Network Imbalance and the Imbalances of individual Users are subject to Billing.

Snam Rete Gas, as Balancing Operator (RdB):

procures balancing resources on the market and manages the settlement of bids selected on the Balancing Platform;

performs the settlement of gas items that are considered to have been exchanged with the Balancing User for the coverage of his imbalance.

The Balancing User must issue bills payable by the Balancing Operator in the following cases:

Sale of quantities of Gas on the Balancing Platform; Positive imbalance.

Page 52: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

52

Gas Month M+1Activity Deadline

Within the 15th working day M+1

Publication of Definitive Balance

UserUser

Storage Company

Following availability of the Definitive Balance of

Month M

Issue of Balancing

Service billing

Transmission system

Operator

Page 53: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

53

Bill Receivable

Bill Payable

Gas Month M+1Flows and operations

Use

r

Within the 15th working day M+1

Definitive Balance

Availability of the Definitive Balance of Month M

Transmission system

Operator

The Bills Receivable issued by the Balancing Operator to the User will contain two separate items, relating to the aforementioned economic amounts: economic amounts relating to transactions on the Balancing Platform and economic amounts for the coverage of the imbalance.

The price at which the transactions on the Balancing Platform are valued is the remuneration price equal to the price of the last accepted offer.

The imbalance price at which the quantities of gas are valued relating to the imbalance always coincides with the remuneration price, except where the overall system imbalance is less than 6000 GJ. In this case, the imbalance price will be the average price of the last 30 days with the exception of emergency days due to gas excess and deficiency.

The Bills Receivable issued by the Balancing Operator to the User will contain two separate items, relating to the aforementioned economic amounts: economic amounts relating to transactions on the Balancing Platform and economic amounts for the coverage of the imbalance.

The price at which the transactions on the Balancing Platform are valued is the remuneration price equal to the price of the last accepted offer.

The imbalance price at which the quantities of gas are valued relating to the imbalance always coincides with the remuneration price, except where the overall system imbalance is less than 6000 GJ. In this case, the imbalance price will be the average price of the last 30 days with the exception of emergency days due to gas excess and deficiency.

Page 54: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

54

Gas Month M+1 Billing- Transactions at zero

The remuneration price calculated on the Balancing Platform is equal to € 0 (zero) in the event in which the quantities subject to the selected bids of enabled users are less than the quantity of gas (overall system imbalance) bid for sale by the Balancing Operator.

As regards said gas movements, against a tax base of zero, VAT should, in any case, be calculated in the bill (10%).

SRG will issue a specific bill to manage this particular case.

The price to value said transactions (for the purposes of calculation of VAT) is equal to the latest available value of the wholesale marketing price (CCI).

Page 55: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

55

Gas Month M+1 Billing Receivable – Billing Portal

Balancing Users will be able to view in detail the amounts of receivable bills that Snam Rete Gas, as Balancing Operator, has issued them.

In the Billing Portal, receivable bills can be selected through a dedicated and easily identifiable item.

More specifically, in the Billing Portal, two compressed files can be viewed (one for bills at a price higher than zero and the other for any bills at zero price, each containing the bill and the associated detailed attachment):

•PDF bill attachment - price >0•CSV support bill attachment - price >0•PDF bill attachment - price = 0•CSV support bill attachment - price =0

The CSV file will show cases when Imbalance Price is different from the Remuneration Price.

Page 56: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

56

Gas Month M+1 Billing Receivable - Billing Portal

§ By selecting 'Accedi', the User can download two csv files containing the details of Receivable Bills for transactions at a price above zero and for any transactions at zero price.

EXPLANATORY

Page 57: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

57

Gas Month M+1 Billing Receivable - Billing Portal

Example of Bill for transactions at a price other than zero

EXPLANATORY

Page 58: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

58

Gas Month M+1 Billing Receivable - Billing Portal

Example of CSV File for transactions at a price other than zero

EXPLANATORY

Page 59: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

59

Gas Month M+1Billing Payable - Billing Portal

In order to facilitate User operations during bills invoicing to the Balancing Operator (for gas sold to the system), details will be made available, on a daily basis, in a dedicated area on the Billing Portal, about the quantities of gas and the associated prices, and the total bill amount.

The User will be notified via e-mail on availability of said figures on the Billing Portal.

EXPLANATORY

Page 60: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

60

Gas Month M+4 Flows and operations

M+4

Adjustment of Bill

Receivable

M+3

Adjustment Balance

Adjustment of Bill Payable

Reconciliation billing will relate solely to the quantities linked to the imbalance. The quantities of gas subject to a reconciliation bill will be obtained as the difference between the imbalance determined with the reconciliation balance and the imbalance calculated with the Definitive Balance.

Reconciliation billing will relate solely to the quantities linked to the imbalance. The quantities of gas subject to a reconciliation bill will be obtained as the difference between the imbalance determined with the reconciliation balance and the imbalance calculated with the Definitive Balance.

Storage Company

UserUser

Transmission system

Operator

Page 61: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

61

Agenda

Welcome

New flows and functionalities for the User Access to the Balancing Service transportation programs and Balancing Billing

Next steps Blank Tests Systems Tests

Works closing

Page 62: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

62

Blank Tests

While awaiting the availability of the definitive solution, in order to allow Balancing Users to familiarise themselves with the changes introduced by Resolution 45/11, Snam Rete Gas is preparing an application solution which will implement a subset of new functionalities

The application solution will be made available to all active Transport Users for the new 2011-2012 Gas Year

The date set for the start of Blank Tests is 3 October

The duration is expected to be roughly 15 days

The new functionalities will be accessible with the same users existing on the systems already used today (SRG website, Altra Web and Capacity Portal)

Snam Rete Gas will provide a help desk Service to support Users

Snam Rete Gas will shortly send a communication to notify the start of tests and provide operational details

Page 63: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

63

Gas Day G Blank Tests

Storage Company

17:00 18:00Key:Grey - functionalities not available Red - functionalities available

Key:Grey - functionalities not available Red - functionalities available

14:00

1stPublication of Estimates

16:00

17:00

Reformulation confirmation

19:00

2nd Publication of Estimates

Transactions in the Virtual

Exchange Point

16:30

19:00

20:00

Balancing Operator

GME

1st Publication of Estimates Re-Nomination

Re-Nomination confirmation

2nd Publication of Estimates

Transactions at Virtual Trading

Point

Re-Nomination Offer Minimum and Maximum Limits

Re-Nomination confirmation

Balancing Session Offers

User

Transmission system

Operator

Page 64: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

64

Gas Day G Blank Tests

Storage Company

Key:Grey - functionalities not available Red - functionalities available

Key:Grey - functionalities not available Red - functionalities available

14:00

1stPublication of Estimates

16:00

17:00

Reformulation confirmation

19:00

2nd Publication of Estimates

Transactions in the Virtual

Exchange Point

16:30

19:00

20:00

Balancing Operator

GME

1st Publication of Estimates Re-Nomination

Re-Nomination confirmation

2nd Publication of Estimates

Transactions at Virtual Trading

Point

Re-Nomination Offer Minimum and Maximum Limits

Re-Nomination confirmation

Balancing Session Offers

Publication Obligations • SRG will publish the information identified by resolution n. 45/11, on its website at 14.00 and then update it at 16.00.

Publication Obligations • SRG will publish the information identified by resolution n. 45/11, on its website at 14.00 and then update it at 16.00.

User

Transmission system

Operator

Page 65: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

65

Gas Day G Blank Tests

17:00 19:00

Refo

rmul

ation

co

nfirm

ation

18:00

Storage Company

Key:Grey - functionalities not available Red - functionalities available

Key:Grey - functionalities not available Red - functionalities available

14:00

1Publication of Estimates

16:00

17:00

Reformulation confirmation

19:00

2nd Publication of Estimates

Transactions in the Virtual

Exchange Point

16:30

19:00

20:00

Balancing Operator

GME

1st Publication of Estimates

Re-Nomination

Re-Nomination confirmation

2nd Publication of Estimates

Transactions at Virtual Trading

Point

Re-Nomination Reformulation

Offer Minimum and Maximum Limits

Re-Nomination confirmation

Balancing Session Offers

User

Transmission system

Operator

Bids - Balancing Session • Users can insert their purchase and sale Bids on the Balancing Platform• The Bids will be verified on the basis of Minimum and Maximum Limits (GJ) and the Operating Margin (€)

Bids - Balancing Session • Users can insert their purchase and sale Bids on the Balancing Platform• The Bids will be verified on the basis of Minimum and Maximum Limits (GJ) and the Operating Margin (€)

Page 66: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

66

11:30

11:30

10:30

Gas Day G+1 Blank Tests - Flows and Activities

Storage Company

GMEGME

Offers Accepted and Remuneration Price

Provisional Balance

Key:Grey - functionalities not available Red - functionalities available

Key:Grey - functionalities not available Red - functionalities available

Allocations to Storage

User

Transmission system

Operator

Page 67: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

67

11:30

11:30

10:30

Gas Day G+1 Blank Tests - Flows and Activities

Storage Company

GMEGME

Offers Accepted and Remuneration Price

Provisional Balance

Key:Grey - functionalities not available Red - functionalities available

Key:Grey - functionalities not available Red - functionalities available

Allocations to Storage

Bids accepted on the Balancing PlatformPublication of the selected bids, on the basis of the Overall System Imbalance (calculated as the difference between the Actual Measurements at the Stogit storage hub and reservations received on G-1) and the remuneration price.

Bids accepted on the Balancing PlatformPublication of the selected bids, on the basis of the Overall System Imbalance (calculated as the difference between the Actual Measurements at the Stogit storage hub and reservations received on G-1) and the remuneration price.

User

The Balancing Operator calculates and sends to the

GME the Overall System Deviation

(SCS)

The Balancing Operator calculates and sends to the

GME the Overall System Deviation

(SCS)

Transmission system

Operator

Page 68: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

68

11:30

11:30

10:30

Gas Day G+1Blank Tests - Flows and Activities

Storage Company

GMEGME

Offers Accepted and Remuneration Price

Provisional Balance

Key:Grey - functionalities not available Red - functionalities available

Key:Grey - functionalities not available Red - functionalities available

Allocations to Storage

Publication of Provisional Balance

A report containing the Provisional User Balance determined using the new equation is made available to Balancing Users.

Publication of Provisional Balance

A report containing the Provisional User Balance determined using the new equation is made available to Balancing Users.

User

Transmission system

Operator

Page 69: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

69

Gas Day G+1Blank Tests – Provisional Balance Report

The User can display his Provisional Balance calculated according to the new Balance Equation, through a new functionality which will be made available on Altra Web

Page 70: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

70

Agenda

Welcome

New flows and functionalities for the User Access to the Balancing Service transportation programs and Balancing Billing

Next steps Blank Tests Systems Tests

Works closing

Page 71: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.

71

Systems Tests

In compliance with resolution 81/11, the Balancing Operator, in coordination with GME and the storage companies, will organise a Systems Test to evaluate the new balancing system in which Users will operate

The date set for the start of Systems Tests is 16/11/2011

The expected duration of said Tests is 10 days.

Snam Rete Gas will provide a help desk Service to support Users

Snam Rete Gas will send a communication to notify the start of the Tests, supported by the necessary operational details