The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20...
-
Upload
kennedi-knee -
Category
Documents
-
view
216 -
download
0
Transcript of The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20...
![Page 1: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/1.jpg)
The new balancing regime – Workshop with UsersNew features in SRG and STG systems
Workshop20 September 2011
![Page 2: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/2.jpg)
2
Agenda
Welcome
New flows and functionalities for the User Access to the Balancing Service Transportation programs and Balancing Billing
Next steps Blank Tests Systems Tests
Works closing
![Page 3: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/3.jpg)
3
Agenda
Welcome
New flows and functionalities for the User Access to the Balancing Service Transportation programs and Balancing Billing
Next steps Blank Tests System Tests
Works closing
![Page 4: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/4.jpg)
4
Access to the new balancing system(1 of 2)
The “Enabled User” is the User of storage and transportation services that
owns flexibility resources for balancing purposes and shall be required to
contribute, using its own resources, to the balancing of the system; the
access requirements are as follows:
Holder of a valid and effective transport contract;
Holder of a storage contract for the modulation service, the hydrocarbon
service or Legislative Decree 130/10 service (not required for
balancing users);
To be authorised for access to the Virtual Trading Point;
Holder of ratings and/or guarantees in compliance with the provisions of
the Network Code.
![Page 5: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/5.jpg)
5
SRG checks the requirements for access to the balancing system in order to
prepare the list of Users which shall contribute (holders of storage contracts) and
the list of the balancing Users (all network Users); to this end:
It determines the System's potential exposure of each user (EPSu);
It determines the maximum potential exposure in relation to the
guarantees given by the User (MEPSu);
It manages the system of guarantees to cover the System's exposure of the
User;
It compares the EPSu and MEPSu of each User;
It takes the necessary measures if the System is overexposed to the User.
Access to the new balancing system(2 of 2)
![Page 6: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/6.jpg)
6
The EPSu or potential exposure of the System to the User is the potential debt, calculated on a daily basis, of the User with reference to the balancing service.
The EPSu is the sum of the following components:
Pfatt: due amounts billed and still not paid by the User;
Pdet: provisional due amounts calculated and still not billed to the User;
Patt: potential due amounts that may arise for the User in the three months following the valuation.
EPSu [PFATT+PDET+PATT]
PFATT
Bills receivable (GME - Electricity Market Operator - items)
Bills receivable (Imbalances)
Credit notes receivable (Imbalances)
Bills payable (GME items and/or imbalances)
Credit notes payable (Imbalances)
PDET
Provisional due amounts receivable (GME items)
Provisional due amounts receivable (Imbalances)
Provisional due amounts payable (GME items)
Provisional due amounts payable (Imbalances)
PATT
Potential due amounts receivable (Expected Withdrawal)
Potential due amounts receivable (PSV - Virtual Trading Point - Transactions)
Calculation of the system's potential exposure to the User (EPSu)(1 of 5)
![Page 7: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/7.jpg)
7
Pfatt is composed of bills and credit notes, receivable and payable, relating to the economic items calculated on the PB-Gas platform and to imbalances of Users of the balancing service.
These economic items are a result of the calculation of the EPSu once they have been paid or reached maturity.
Pdet is the sum of economic items still not billed, determined on the basis of the most up-to-date transport balance; they are a sum of the following components:
Economic amounts receivable and payable relating to transactions completed on the PB-Gas platform by the User authorised by SRG and valued at the remuneration price;Economic amounts receivable and payable relating to imbalances of the balancing User and valued at the imbalance price.
Pfatt is composed of bills and credit notes, receivable and payable, relating to the economic items calculated on the PB-Gas platform and to imbalances of Users of the balancing service.
These economic items are a result of the calculation of the EPSu once they have been paid or reached maturity.
Pdet is the sum of economic items still not billed, determined on the basis of the most up-to-date transport balance; they are a sum of the following components:
Economic amounts receivable and payable relating to transactions completed on the PB-Gas platform by the User authorised by SRG and valued at the remuneration price;Economic amounts receivable and payable relating to imbalances of the balancing User and valued at the imbalance price.
Calculation of the system's potential exposure to the User (EPSu)(2 of 5)
![Page 8: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/8.jpg)
8
Patt is the potential due amount calculated as sum of the following components:
Transactions recorded at the Virtual Trading Point;
The cumulated imbalance the User may reach in the three months
following the valuation, calculated using an expected withdrawal estimate.
The aforementioned terms are assessed in the assumption of input by the User equal to zero and are valued at the estimated imbalance price.
In order to estimate the expected withdrawal of the User, the calculation criteria will take into consideration the capacities assigned to both the entry and redelivery points appropriately re-proportioned on the basis of the average load factors of such capacities.
Patt is the potential due amount calculated as sum of the following components:
Transactions recorded at the Virtual Trading Point;
The cumulated imbalance the User may reach in the three months
following the valuation, calculated using an expected withdrawal estimate.
The aforementioned terms are assessed in the assumption of input by the User equal to zero and are valued at the estimated imbalance price.
In order to estimate the expected withdrawal of the User, the calculation criteria will take into consideration the capacities assigned to both the entry and redelivery points appropriately re-proportioned on the basis of the average load factors of such capacities.
Calculation of the system's potential exposure to the User (EPSu)(3 of 5)
![Page 9: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/9.jpg)
9
Users of the Capacity Portal will have the opportunity to check the components of their EPSu in real time in more detail.
Users of the Capacity Portal will have the opportunity to check the components of their EPSu in real time in more detail.
Level 1 EPSu
Calculation of the system's potential exposure to the User (EPSu)(4 of 5)
![Page 10: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/10.jpg)
10
Level 2 EPSu
Calculation of the system's potential exposure to the User (EPSu)(5 of 5)
![Page 11: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/11.jpg)
11
The MEPSu or maximum potential exposure of the System to the User corresponds to the maximum acceptable EPSu value, calculated on the basis of the following components:
Gmin is the guarantee the User is required to present in order to access the balancing
service;
G are the guarantees actually presented in the form of security deposits, bank guarantees, rating certifications and guarantees in gas held in storage;
C are the expired invoices and not paid yet relating to the balancing service.
MEPSu
GMIN
(guarantee required)
Expected Withdrawal
No. of days
Estimated Imbalance Price
G
(Guarantees presented)
Security deposits
Bank guarantees
Rating
Gas guarantee - Edison T&S
Gas guarantee - Stogit
C
(Expired bills - not paid)
Bills receivable (GME - Electricity Market Operator - items)
Bills receivable (Imbalances)
Calculation of the maximum potential exposure of the system to the User (MEPSu) (1 of 6)
![Page 12: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/12.jpg)
12
The following types of guarantee may be presented:
Security deposit: the associated amount may be used to fully cover the guarantee the User is required to present;
Bank guarantee: the associated amount may be used to fully cover the guarantee the User is required to present;
Parent Company letter of guarantee: the associated amount may be used to fully cover the guarantee the User is required to present;
Credit rating: possession of a minimum credit rating required by the Network Code covers X% of the value of the guarantee the User is required to present;
Gas in stock at one or more Storage Companies.
Calculation of the maximum potential exposure of the system to the User (MEPSu) (2 of 6)
![Page 13: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/13.jpg)
13
Day X of month M -1
M-1 M+1M
Last day of month M -1
Determination of the Guarantee to be
presented
End of last adjustment of guarantee G
30 September(End of Gas Year) 31 March of
next Gas Year
Guarantee G validity term
The adjustment of the amount of the guarantee given must be
carried out on the basis of the following timescales:
Calculation of the maximum potential exposure of the system to the User (MEPSu) (3 of 6)
![Page 14: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/14.jpg)
14
Users of the Capacity Portal will have the opportunity to check the components of their MEPSu in real time in more detail.
Users of the Capacity Portal will have the opportunity to check the components of their MEPSu in real time in more detail.
Calculation of the maximum potential exposure of the system to the User (MEPSu) (4 of 6)
Level 1 MEPSu
![Page 15: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/15.jpg)
15
Calculation of the maximum potential exposure of the system to the User (MEPSu) (5 of 6)
Level 2 MEPSu
![Page 16: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/16.jpg)
16
Calculation of the maximum potential exposure of the system to the User (MEPS) (6 of 6)
Warning and Blocking Messages
![Page 17: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/17.jpg)
17
In order to limit the risks related to the potential exposure of the System to the Users, on each gas day the conditions which compare the EPSu and the MEPSu must be observed;
In order to limit the risks related to the potential exposure of the System to the Users, on each gas day the conditions which compare the EPSu and the MEPSu must be observed;
SRG, as Balancing Operator, calculates and communicates to GME on a daily basis the economic limit of the purchase offers that the User can formulate on the PB-Gas platform.
SRG, as Balancing Operator, calculates and communicates to GME on a daily basis the economic limit of the purchase offers that the User can formulate on the PB-Gas platform.
Balancing Operator Actions in the event of the system's overexposure to the User (1 of 2)
![Page 18: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/18.jpg)
18
The Balancing Operator monitors the relative operational economic margins for each balancing user on a daily basis.
Based on the level of potential exposure EPSu with respect to the maximum potential exposure MEPSu:
The Capacity Portal displays to the User a warning/blocking message;
SRG sends a written notification to the User (and also to GME and Storage Companies);
SRG blocks, with immediate effect, the operations of the User in relation to capacity bookings and selling transactions on the Virtual Trading Point.
The Balancing Operator monitors the relative operational economic margins for each balancing user on a daily basis.
Based on the level of potential exposure EPSu with respect to the maximum potential exposure MEPSu:
The Capacity Portal displays to the User a warning/blocking message;
SRG sends a written notification to the User (and also to GME and Storage Companies);
SRG blocks, with immediate effect, the operations of the User in relation to capacity bookings and selling transactions on the Virtual Trading Point.
Balancing Operator Actions in the event of the system's overexposure to the User (2 of 2)
![Page 19: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/19.jpg)
19
Agenda
Welcome
New flows and functionalities for the User Access to the Balancing Service Transportation programs and Balancing Billing
Next steps Blank Tests System Tests
Works closing
![Page 20: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/20.jpg)
20
Transportation programs and BalancingIntroduction
In order to ensure the daily balancing of the system, Enabled Users are required to make their storage resources available to the Balancing Operator.
The process defining the transportation programs in the new system will be characterised by:
Publication of Estimates on gas day G to provide an overview of the system status; Renomination on gas day G to allow User to rebalance its input and withdrawal
quantities; Bids on gas day G aimed at making the storage resources available to the system.
During the Allocation and Balance phase, Enabled Users will be supplied with the outcomes of their balancing actions implemented during the transportation programs phase. The balancing process in the new system will be characterised by:
Bids Accepted, provided on gas day G+1, that has been selected to balance the system;
Position in Storage which is determined as final on gas day G+1; Value of Imbalances (whose coverage is no longer ensured through its storage
resources), provided as definitive in gas month M+1 and M+3 .
![Page 21: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/21.jpg)
21
12:00
Deadline for transactions
at Virtual Trading
Point
Deadline for gas
sales on the STS system
Nomination deadline
Nomination deadline
13:00
Nomination Confirmation
Nomination Confirmation
17:00
Re-nominations
19:00
12:00 13:00 17:00
User
Gas Day G-1Activity Deadline
Transmission system
Operator
Storage Company
![Page 22: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/22.jpg)
22
Gas Day G-1Flows and Operations
Transmission system
Operator
Storage Company
12:00 13:00 17:00
12:00 13:00 17:00 19:00
Transactions at Virtual Trading
Point
Gas transfers to Storage
Nomination Confirmation
Nomination Confirmation
Re-nominationsNomination Communication
Nomination Communication
User
![Page 23: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/23.jpg)
23
User
12:00 13:00 17:00 19:00
Transactions at Virtual Trading
Point
Gas transfers to Storage
Nomination Confirmation
Nomination Confirmation
Re-nominationNomination Communication
Nomination Communication
Gas Day G-1Variations with respect to AS-IS
Transmission system
Operator
Storage Company
12:00 13:00 17:00
Reservation for storage The reservation for storage will be assessed on the basis of:
•available capacities, including the interruptible capacities assigned, •treatment/compression consumptions, •available stocks/space at the time, •any strategic gas subject to prior authorisation by the MSE (Ministry of Economic Development), •any gas released by the user under guarantee to the Balancing Operator.
In the event the reservation exceeds the User's availability, Storage Companies will modify the reservation, assigning a value equal to maximum availability. .
Confirmed quantities will be checked again by the Storage Company on gas day G, as a result of the availability of stock data updated at the end of Gas Day G -1
Reservation for storage The reservation for storage will be assessed on the basis of:
•available capacities, including the interruptible capacities assigned, •treatment/compression consumptions, •available stocks/space at the time, •any strategic gas subject to prior authorisation by the MSE (Ministry of Economic Development), •any gas released by the user under guarantee to the Balancing Operator.
In the event the reservation exceeds the User's availability, Storage Companies will modify the reservation, assigning a value equal to maximum availability. .
Confirmed quantities will be checked again by the Storage Company on gas day G, as a result of the availability of stock data updated at the end of Gas Day G -1
![Page 24: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/24.jpg)
24
12:00 13:00 17:00 19:00
Transactions at Trading Exchange
Point
Gas transfers to Storage
Nomination Confirmation
Nomination Confirmation
Re-nominationsNomination Communication
Nomination Communication
Gas Day G-1Variations with respect to AS-IS
Transmission system
Operator
Storage Company
12:00 13:00 17:00
User
Transportation Reservation In the event of an inconsistency between the transportation programs at storage hubs and the programme sent to the Transporter by the Storage Company, the reservation at said points will be modified, incorporating the data of the storage company. In response to cuts/inconsistencies in the reservations, the Transporter will modify the transportation programs of the User Redelivery Points, reproportioning unbalanced quantities at said points.
Transportation Reservation In the event of an inconsistency between the transportation programs at storage hubs and the programme sent to the Transporter by the Storage Company, the reservation at said points will be modified, incorporating the data of the storage company. In response to cuts/inconsistencies in the reservations, the Transporter will modify the transportation programs of the User Redelivery Points, reproportioning unbalanced quantities at said points.
![Page 25: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/25.jpg)
25
Gas Day GActivity Deadline
14:00
2nd Publication of Estimates
Minimum and Maximum
Limits
16:00
Closing of Renomination
17:00
Re-nomination confirmation
19:00
Closing of Renomination
18:00Re-nomination confirmation
1st Publication of Estimates
Transactions at Virtual Trading
Point Deadline
16:30
End of Balancing
Session Offers
20:00
17:00 19:00
Balancing Operator
Transmission system
Operator
GME
Storage Company
User
![Page 26: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/26.jpg)
26
Gas Day G Flows and Operations
14:00
1stPublication of Estimates
16:00
17:00
Reformulation confirmation
19:00
17:00
2nd Publication of Estimates
Transactions in the Virtual
Exchange Point
16:30
19:0018:00
20:00
Balancing Operator
Transmission system
Operator
GME
Storage Company
1st Publication of Estimates Re-Nomination
Re-nomination confirmation
2nd Publication of Estimates
Transactions at Virtual Trading
Point
Re-Nomination Offer Minimum and Maximum Limits
Re-nomination confirmation
Balancing Session Offers
User
![Page 27: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/27.jpg)
27
14:00
1st Publication of Estimates
16:00
17:00
Reformulation confirmation
19:00
17:00
2nd Publication of Estimates
Transactions in the Virtual
Exchange Point
16:30
19:0018:00
20:00
Balancing Operator
Transmission system
Operator
GME
Storage Company
1st Publication of Estimates Re-Nomination
Re-nomination confirmation
2nd Publication of Estimates
Transactions at Virtual Trading
Point
Re-Nomination Offer Minimum and Maximum Limits
Re-nomination confirmation
Balancing Session Offers
Gas Day G Variations with respect to AS-IS
User
Publication Obligations The Balancing Operator will publish the information required by resolution 45/11 on its website at 14.00, and will then update it at 16.00
Publication Obligations The Balancing Operator will publish the information required by resolution 45/11 on its website at 14.00, and will then update it at 16.00
![Page 28: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/28.jpg)
28
User
14:00
1st Publication of Estimates
16:00
17:00
Reformulation confirmation
19:00
17:00
2nd Publication of Estimates
Transactions in the Virtual
Exchange Point
16:30
19:0018:00
20:00
Balancing Operator
Transmission system
Operator
GME
Storage Company
1st Publication of Estimates Re-Nomination
Re-Nomination confirmation
2nd Publication of Estimates
Transactions in the Virtual
Exchange Point
Re-Nomination Offer Minimum and Maximum Limits
Re-Nomination confirmation
Balancing Session Offers
Gas Day GVariations with respect to AS-IS
Reformulation of Transport ProgrammeThe reformulation of the transport programme can be performed by Users, limited to Storage hubs and Redelivery Points.
In the event of an inconsistency between the reformulation at storage hubs and the reformulation of the programme sent to the Transporter by the Storage Company, the reservation at said points will be modified, incorporating the data of the storage company.
If the reformulated programme, also as per the previous point, is not balanced, the Transporter amends the transportation programs of the User Redelivery Points, by reproportioning unbalanced quantities at said points.
Reformulation of Transport ProgrammeThe reformulation of the transport programme can be performed by Users, limited to Storage hubs and Redelivery Points.
In the event of an inconsistency between the reformulation at storage hubs and the reformulation of the programme sent to the Transporter by the Storage Company, the reservation at said points will be modified, incorporating the data of the storage company.
If the reformulated programme, also as per the previous point, is not balanced, the Transporter amends the transportation programs of the User Redelivery Points, by reproportioning unbalanced quantities at said points.
![Page 29: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/29.jpg)
29
User
14:00
1st Publication of Estimates
16:00
Reservation Reformulation
17:00
Reformulation confirmation
19:00
17:00
2nd Publication of Estimates
Transactions in the Virtual
Exchange Point
16:30
19:0018:00
20:00
Balancing Operator
Transmission system
Operator
GME
Storage Company
1st Publication of Estimates Re-Nomination
Re-Nomination confirmation
2nd Publication of Estimates
Transactions at Virtual Trading
Point
Re-Nomination Offer Minimum and Maximum Limits
Re-Nomination confirmation
Balancing Session Offers
Gas Day G Variations with respect to AS-IS
Reformulation of Storage Reservation
The reformulation of the storage reservation will be subject to the same restrictions described for the reservation on Gas Day G-1
Interruptible capacities subject to formulations/reformulations of storage reservations will be confirmed on Gas Day G.
Reformulation of Storage Reservation
The reformulation of the storage reservation will be subject to the same restrictions described for the reservation on Gas Day G-1
Interruptible capacities subject to formulations/reformulations of storage reservations will be confirmed on Gas Day G.
![Page 30: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/30.jpg)
30
User
14:00
1stPublication of Estimates
16:00
Reservation Reformulation
17:00
Reformulation confirmation
19:00
17:00
2nd Publication of Estimates
Transactions in the Virtual
Exchange Point
16:30
19:0018:00
20:00
Balancing Operator
Transmission system
Operator
GME
Storage Company
1st Publication of Estimates Re-Nomination
Re-Nomination confirmation
2nd Publication of Estimates
Transactions at Virtual Trading
Point
Re-Nomination Offer Minimum and Maximum Limits
Re-Nomination confirmation
Balancing Session Offers
Gas Day G Variations with respect to AS-IS
Offer Minimum and Maximum Limits
The calculation, for users, of the Minimum and Maximum Limits for the Balancing Market bids to be sent to GME, is performed on the basis of:
Capacity, space and available stocks after the (re)formulation of the reservation, Any gas released by the user under guarantee to the Balancing Operator Estimated treatment/compression consumption.
In the transitory period, SRG will provide an estimate of the accuracy of gas in stock to be used to calculate the Minimum and Maximum Limits.
Offer Minimum and Maximum Limits
The calculation, for users, of the Minimum and Maximum Limits for the Balancing Market bids to be sent to GME, is performed on the basis of:
Capacity, space and available stocks after the (re)formulation of the reservation, Any gas released by the user under guarantee to the Balancing Operator Estimated treatment/compression consumption.
In the transitory period, SRG will provide an estimate of the accuracy of gas in stock to be used to calculate the Minimum and Maximum Limits.
![Page 31: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/31.jpg)
31
Gas Day G New functionalities
14:00
1st Publication of Estimates
16:00
17:00
Reformulation confirmation
19:00
17:00
2nd Publication of Estimates
Transactions in the Virtual
Exchange Point
16:30
19:0018:00
20:00
Balancing Manager
GME
Storage Company
Re-Nomination
Re-Nomination confirmation
1stPublication of Estimates
2nd Publication of Estimates
Transactions at Virtual Trading
Point
Re-Nomination Offer Minimum and Maximum Limits
Re-Nomination confirmation
Balancing Session Offers
User
Transmission system
Operator
![Page 32: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/32.jpg)
32
EXPLANATORY
Gas Day G Publication of Estimates - SRG website
SRG will public the estimates set forth in articles 6.4 and 6.5 of resolution 132/09 on its website:
Home > Customers and Institutions > Gas Year 2010/2011 > Quantity of gas trasported
By clicking on the reference month, it will be possible to display the relevant estimates in the format
Pubblicazione Del 45/11
EXPLANATORY
![Page 33: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/33.jpg)
33
Gas Day G Programme Reformulation - Altra Web
§ The Reformulation of the Transport Programme may be carried out§ On Regional Networks both through Protocol X12 and using the ‘Nomination’
functionality of Altra Web § On the National Network through the new Renomination functionality of Altra Web
EXPLANATORY
![Page 34: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/34.jpg)
34
Gas Day GReformulation Display - Altra Web
§ The Reformulation of the Transport Programme may be displayed through a new report accessible from the new Altra Web menu item 'Display Renomination'
EXPLANATORY
![Page 35: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/35.jpg)
35
Gas Day GReformulation of the reservation - Sampei
§ The Reformulation of the Storage Reservation may be performed through the new Sampei menu item “Inserimento Rinomine”
![Page 36: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/36.jpg)
36
Gas Day GReformulation display - Sampei
§ The Reformulation of the Storage Reservation may be performed through the new Sampei menu item “Interrogazione Rinomine”
![Page 37: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/37.jpg)
37
Gas Day G+1Activity Deadline
Storage Company
10:30
Allocations to storage
Offers Accepted and Remuneration
Price Provisional Balance
11:30
11:30
GMEGME
User
Transmission system
Operator
![Page 38: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/38.jpg)
38
Gas Day G+1Flows and Activities
User
11:30
11:30
10:30
Storage Company
GMEGME
Offers Accepted and Remuneration Price
Allocations to Storage
Provisional Balance
Transmission system
Operator
![Page 39: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/39.jpg)
39
11:30
11:30
10:30
Storage Company
GMEGME
Offers Accepted and Remuneration Price
Allocations to Storage
Provisional Balance
Gas Day G+1Variations with respect to AS-IS
User
SRG calculates and sends to the GME the Overall
System Deviation(SCS)
SRG calculates and sends to the GME the Overall
System Deviation(SCS)
Transmission system
Operator
Provisional BalanceFollowing the communication of bids accepted in the Balancing Market to cover the imbalances of Balancing Users, SRG will calculate the Provisional Balance of the User using the following equation:
Ik + Sk + (TkPSV + Tk
GNL + TkM + Tk
PB) = Pk + GSk + DSk
where• Sk= represents the quantity of gas input to/withdrawn from storage, obtained as the sum of quantities of gas planned for storage SNk and quantities of storage gas SMk selected in the Balancing Market to cover the Overall System Imbalance (SCS).• Tk
PB= represents the net balance of gas transactions concluded between the User and the Balancing Operator in the Balancing Market.• DSk= represents the imbalance of the User and constitutes the result of the balancing equation.
Provisional BalanceFollowing the communication of bids accepted in the Balancing Market to cover the imbalances of Balancing Users, SRG will calculate the Provisional Balance of the User using the following equation:
Ik + Sk + (TkPSV + Tk
GNL + TkM + Tk
PB) = Pk + GSk + DSk
where• Sk= represents the quantity of gas input to/withdrawn from storage, obtained as the sum of quantities of gas planned for storage SNk and quantities of storage gas SMk selected in the Balancing Market to cover the Overall System Imbalance (SCS).• Tk
PB= represents the net balance of gas transactions concluded between the User and the Balancing Operator in the Balancing Market.• DSk= represents the imbalance of the User and constitutes the result of the balancing equation.
![Page 40: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/40.jpg)
40
11:30
11:30
10:30
Storage Company
GMEGME
Offers Accepted and Remuneration Price
Allocations to Storage
Provisional Balance
Gas Day G+1Variations with respect to AS-IS
Storage Allocation
The gas allocated to storage and stock of each User are calculated definitively in the report prepared on Gas Day G+1
Storage Allocation
The gas allocated to storage and stock of each User are calculated definitively in the report prepared on Gas Day G+1
User
Transmission system
Operator
![Page 41: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/41.jpg)
41
11:30
11:30
10:30
Storage Company
GMEGME
Offers Accepted and Remuneration Price
Allocations to Storage
Provisional Balance
Gas Day G+1New Functionalities
User
Transmission system
Operator
![Page 42: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/42.jpg)
42
Gas Day G+1 Provisional Balance - Altra Web
In order to display the Provisional Balance, a specific report will be made available on Altra Web, which can be accessed by selecting the 'Provisional Balance' item in the 'Reporting' section.
EXPLANATORY
EXPLANATORY
![Page 43: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/43.jpg)
43
Gas Month M+1Activity Deadline
Within the 15th working day M+1
Publication of Definitive Balance
Storage Company
User
Transmission system
Operator
![Page 44: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/44.jpg)
44
Gas Month M+1Flows and Operations
Storage Company
Within the 15th working day M+1
Definitive Balance
User
Transmission system
Operator
![Page 45: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/45.jpg)
45
Gas Month M+1Variations with respect to AS-IS
Storage Company
Within the 15th working day M+1
Definitive Balance
Definitive Balance•In the definitive balance, for each Balancing User, the imbalance that will determine the economic amount to be billed will be calculated
Definitive Balance•In the definitive balance, for each Balancing User, the imbalance that will determine the economic amount to be billed will be calculated
User
Transmission system
Operator
![Page 46: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/46.jpg)
46
Gas Month M+1New Functionalities
Storage Company
Within the 15th working day M+1
Definitive Balance
User
Transmission system
Operator
![Page 47: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/47.jpg)
47
Gas Month M+1 Definitive Balance - Altra Web
In order to display the Definitive Balance, a specific report will be made available on Altra Web, which can be accessed by selecting the 'Definitive Balance' item in the 'Reporting' section.
EXPLANATORYEXPLANATORY
![Page 48: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/48.jpg)
48
Gas Month M+3 Flows and operations
M+3
Adjustment Balance
User
Storage Company
Transmission system
Operator
![Page 49: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/49.jpg)
49
Storage Company
M+3
Adjustment Balance
Gas Month M+3 Variations with respect to AS-IS
Reconciliation BalanceIn the reconciliation balance, for each Balancing User, the term of definitive imbalance that may determine an economic amount to be adjusted will be calculated
Reconciliation BalanceIn the reconciliation balance, for each Balancing User, the term of definitive imbalance that may determine an economic amount to be adjusted will be calculated
User
Transmission system
Operator
![Page 50: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/50.jpg)
50
Agenda
Welcome
New flows and functionalities for the User Access to the Balancing Service transportation programs and Balancing Billing
Next steps Blank Tests System Tests
Works closing
![Page 51: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/51.jpg)
51
BillingIntroduction
The quantities of gas exchanged on the Balancing Platform to cover the Network Imbalance and the Imbalances of individual Users are subject to Billing.
Snam Rete Gas, as Balancing Operator (RdB):
procures balancing resources on the market and manages the settlement of bids selected on the Balancing Platform;
performs the settlement of gas items that are considered to have been exchanged with the Balancing User for the coverage of his imbalance.
The Balancing User must issue bills payable by the Balancing Operator in the following cases:
Sale of quantities of Gas on the Balancing Platform; Positive imbalance.
![Page 52: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/52.jpg)
52
Gas Month M+1Activity Deadline
Within the 15th working day M+1
Publication of Definitive Balance
UserUser
Storage Company
Following availability of the Definitive Balance of
Month M
Issue of Balancing
Service billing
Transmission system
Operator
![Page 53: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/53.jpg)
53
Bill Receivable
Bill Payable
Gas Month M+1Flows and operations
Use
r
Within the 15th working day M+1
Definitive Balance
Availability of the Definitive Balance of Month M
Transmission system
Operator
The Bills Receivable issued by the Balancing Operator to the User will contain two separate items, relating to the aforementioned economic amounts: economic amounts relating to transactions on the Balancing Platform and economic amounts for the coverage of the imbalance.
The price at which the transactions on the Balancing Platform are valued is the remuneration price equal to the price of the last accepted offer.
The imbalance price at which the quantities of gas are valued relating to the imbalance always coincides with the remuneration price, except where the overall system imbalance is less than 6000 GJ. In this case, the imbalance price will be the average price of the last 30 days with the exception of emergency days due to gas excess and deficiency.
The Bills Receivable issued by the Balancing Operator to the User will contain two separate items, relating to the aforementioned economic amounts: economic amounts relating to transactions on the Balancing Platform and economic amounts for the coverage of the imbalance.
The price at which the transactions on the Balancing Platform are valued is the remuneration price equal to the price of the last accepted offer.
The imbalance price at which the quantities of gas are valued relating to the imbalance always coincides with the remuneration price, except where the overall system imbalance is less than 6000 GJ. In this case, the imbalance price will be the average price of the last 30 days with the exception of emergency days due to gas excess and deficiency.
![Page 54: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/54.jpg)
54
Gas Month M+1 Billing- Transactions at zero
The remuneration price calculated on the Balancing Platform is equal to € 0 (zero) in the event in which the quantities subject to the selected bids of enabled users are less than the quantity of gas (overall system imbalance) bid for sale by the Balancing Operator.
As regards said gas movements, against a tax base of zero, VAT should, in any case, be calculated in the bill (10%).
SRG will issue a specific bill to manage this particular case.
The price to value said transactions (for the purposes of calculation of VAT) is equal to the latest available value of the wholesale marketing price (CCI).
![Page 55: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/55.jpg)
55
Gas Month M+1 Billing Receivable – Billing Portal
Balancing Users will be able to view in detail the amounts of receivable bills that Snam Rete Gas, as Balancing Operator, has issued them.
In the Billing Portal, receivable bills can be selected through a dedicated and easily identifiable item.
More specifically, in the Billing Portal, two compressed files can be viewed (one for bills at a price higher than zero and the other for any bills at zero price, each containing the bill and the associated detailed attachment):
•PDF bill attachment - price >0•CSV support bill attachment - price >0•PDF bill attachment - price = 0•CSV support bill attachment - price =0
The CSV file will show cases when Imbalance Price is different from the Remuneration Price.
![Page 56: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/56.jpg)
56
Gas Month M+1 Billing Receivable - Billing Portal
§ By selecting 'Accedi', the User can download two csv files containing the details of Receivable Bills for transactions at a price above zero and for any transactions at zero price.
EXPLANATORY
![Page 57: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/57.jpg)
57
Gas Month M+1 Billing Receivable - Billing Portal
Example of Bill for transactions at a price other than zero
EXPLANATORY
![Page 58: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/58.jpg)
58
Gas Month M+1 Billing Receivable - Billing Portal
Example of CSV File for transactions at a price other than zero
EXPLANATORY
![Page 59: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/59.jpg)
59
Gas Month M+1Billing Payable - Billing Portal
In order to facilitate User operations during bills invoicing to the Balancing Operator (for gas sold to the system), details will be made available, on a daily basis, in a dedicated area on the Billing Portal, about the quantities of gas and the associated prices, and the total bill amount.
The User will be notified via e-mail on availability of said figures on the Billing Portal.
EXPLANATORY
![Page 60: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/60.jpg)
60
Gas Month M+4 Flows and operations
M+4
Adjustment of Bill
Receivable
M+3
Adjustment Balance
Adjustment of Bill Payable
Reconciliation billing will relate solely to the quantities linked to the imbalance. The quantities of gas subject to a reconciliation bill will be obtained as the difference between the imbalance determined with the reconciliation balance and the imbalance calculated with the Definitive Balance.
Reconciliation billing will relate solely to the quantities linked to the imbalance. The quantities of gas subject to a reconciliation bill will be obtained as the difference between the imbalance determined with the reconciliation balance and the imbalance calculated with the Definitive Balance.
Storage Company
UserUser
Transmission system
Operator
![Page 61: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/61.jpg)
61
Agenda
Welcome
New flows and functionalities for the User Access to the Balancing Service transportation programs and Balancing Billing
Next steps Blank Tests Systems Tests
Works closing
![Page 62: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/62.jpg)
62
Blank Tests
While awaiting the availability of the definitive solution, in order to allow Balancing Users to familiarise themselves with the changes introduced by Resolution 45/11, Snam Rete Gas is preparing an application solution which will implement a subset of new functionalities
The application solution will be made available to all active Transport Users for the new 2011-2012 Gas Year
The date set for the start of Blank Tests is 3 October
The duration is expected to be roughly 15 days
The new functionalities will be accessible with the same users existing on the systems already used today (SRG website, Altra Web and Capacity Portal)
Snam Rete Gas will provide a help desk Service to support Users
Snam Rete Gas will shortly send a communication to notify the start of tests and provide operational details
![Page 63: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/63.jpg)
63
Gas Day G Blank Tests
Storage Company
17:00 18:00Key:Grey - functionalities not available Red - functionalities available
Key:Grey - functionalities not available Red - functionalities available
14:00
1stPublication of Estimates
16:00
17:00
Reformulation confirmation
19:00
2nd Publication of Estimates
Transactions in the Virtual
Exchange Point
16:30
19:00
20:00
Balancing Operator
GME
1st Publication of Estimates Re-Nomination
Re-Nomination confirmation
2nd Publication of Estimates
Transactions at Virtual Trading
Point
Re-Nomination Offer Minimum and Maximum Limits
Re-Nomination confirmation
Balancing Session Offers
User
Transmission system
Operator
![Page 64: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/64.jpg)
64
Gas Day G Blank Tests
Storage Company
Key:Grey - functionalities not available Red - functionalities available
Key:Grey - functionalities not available Red - functionalities available
14:00
1stPublication of Estimates
16:00
17:00
Reformulation confirmation
19:00
2nd Publication of Estimates
Transactions in the Virtual
Exchange Point
16:30
19:00
20:00
Balancing Operator
GME
1st Publication of Estimates Re-Nomination
Re-Nomination confirmation
2nd Publication of Estimates
Transactions at Virtual Trading
Point
Re-Nomination Offer Minimum and Maximum Limits
Re-Nomination confirmation
Balancing Session Offers
Publication Obligations • SRG will publish the information identified by resolution n. 45/11, on its website at 14.00 and then update it at 16.00.
Publication Obligations • SRG will publish the information identified by resolution n. 45/11, on its website at 14.00 and then update it at 16.00.
User
Transmission system
Operator
![Page 65: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/65.jpg)
65
Gas Day G Blank Tests
17:00 19:00
Refo
rmul
ation
co
nfirm
ation
18:00
Storage Company
Key:Grey - functionalities not available Red - functionalities available
Key:Grey - functionalities not available Red - functionalities available
14:00
1Publication of Estimates
16:00
17:00
Reformulation confirmation
19:00
2nd Publication of Estimates
Transactions in the Virtual
Exchange Point
16:30
19:00
20:00
Balancing Operator
GME
1st Publication of Estimates
Re-Nomination
Re-Nomination confirmation
2nd Publication of Estimates
Transactions at Virtual Trading
Point
Re-Nomination Reformulation
Offer Minimum and Maximum Limits
Re-Nomination confirmation
Balancing Session Offers
User
Transmission system
Operator
Bids - Balancing Session • Users can insert their purchase and sale Bids on the Balancing Platform• The Bids will be verified on the basis of Minimum and Maximum Limits (GJ) and the Operating Margin (€)
Bids - Balancing Session • Users can insert their purchase and sale Bids on the Balancing Platform• The Bids will be verified on the basis of Minimum and Maximum Limits (GJ) and the Operating Margin (€)
![Page 66: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/66.jpg)
66
11:30
11:30
10:30
Gas Day G+1 Blank Tests - Flows and Activities
Storage Company
GMEGME
Offers Accepted and Remuneration Price
Provisional Balance
Key:Grey - functionalities not available Red - functionalities available
Key:Grey - functionalities not available Red - functionalities available
Allocations to Storage
User
Transmission system
Operator
![Page 67: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/67.jpg)
67
11:30
11:30
10:30
Gas Day G+1 Blank Tests - Flows and Activities
Storage Company
GMEGME
Offers Accepted and Remuneration Price
Provisional Balance
Key:Grey - functionalities not available Red - functionalities available
Key:Grey - functionalities not available Red - functionalities available
Allocations to Storage
Bids accepted on the Balancing PlatformPublication of the selected bids, on the basis of the Overall System Imbalance (calculated as the difference between the Actual Measurements at the Stogit storage hub and reservations received on G-1) and the remuneration price.
Bids accepted on the Balancing PlatformPublication of the selected bids, on the basis of the Overall System Imbalance (calculated as the difference between the Actual Measurements at the Stogit storage hub and reservations received on G-1) and the remuneration price.
User
The Balancing Operator calculates and sends to the
GME the Overall System Deviation
(SCS)
The Balancing Operator calculates and sends to the
GME the Overall System Deviation
(SCS)
Transmission system
Operator
![Page 68: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/68.jpg)
68
11:30
11:30
10:30
Gas Day G+1Blank Tests - Flows and Activities
Storage Company
GMEGME
Offers Accepted and Remuneration Price
Provisional Balance
Key:Grey - functionalities not available Red - functionalities available
Key:Grey - functionalities not available Red - functionalities available
Allocations to Storage
Publication of Provisional Balance
A report containing the Provisional User Balance determined using the new equation is made available to Balancing Users.
Publication of Provisional Balance
A report containing the Provisional User Balance determined using the new equation is made available to Balancing Users.
User
Transmission system
Operator
![Page 69: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/69.jpg)
69
Gas Day G+1Blank Tests – Provisional Balance Report
The User can display his Provisional Balance calculated according to the new Balance Equation, through a new functionality which will be made available on Altra Web
![Page 70: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/70.jpg)
70
Agenda
Welcome
New flows and functionalities for the User Access to the Balancing Service transportation programs and Balancing Billing
Next steps Blank Tests Systems Tests
Works closing
![Page 71: The new balancing regime – Workshop with Users New features in SRG and STG systems Workshop 20 September 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062407/56649cc15503460f94989565/html5/thumbnails/71.jpg)
71
Systems Tests
In compliance with resolution 81/11, the Balancing Operator, in coordination with GME and the storage companies, will organise a Systems Test to evaluate the new balancing system in which Users will operate
The date set for the start of Systems Tests is 16/11/2011
The expected duration of said Tests is 10 days.
Snam Rete Gas will provide a help desk Service to support Users
Snam Rete Gas will send a communication to notify the start of the Tests, supported by the necessary operational details