Transcript of The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of...
![Page 1: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/1.jpg)
The Microgeneration Certification Scheme (MCS)
Richard PhillipsBRE Global
![Page 2: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/2.jpg)
Benefits of Microgeneration Systems
• Provide a useful proportion of a building’s energy demand
• Help reduce CO2 emissions• Help achieve higher sustainability ratings
(e.g. for BREEAM and CSH)• Help satisfy planners’ and home owners’
expectations for sustainability • Be good value for clients’ and taxpayers’
money• Enhance the reputation of the industry
– Encourage uptake
When correctly designed, manufactured and installed micro renewable systems can:
![Page 3: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/3.jpg)
Why MCS?
• Replacement needed for Clear Skies and PV schemes– More robust
• Protect reputation of the industry
• UKAS accreditation– Independent
• Protect consumers by providing robust criteria for:– Quality of products– Quality of installations
• Mitigate Risks
![Page 4: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/4.jpg)
Risks• Things can go wrong!• Little knowledge amongst homeowners • Poor performance can
– Increase running costs– Cause discomfort– Reduce, or even reverse, emissions
savings• Poor design and installation can:
– Be unsafe– Reduce system performance – Damage the building envelope
• Any of the above could turn a positive vision into a negative image
![Page 5: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/5.jpg)
The Microgeneration Certification Scheme
MCS Mark:
• MCS mark owned by Secretary of State (DECC)• Mark licensed to Gemserv (MCS administrator)• Sub licensed to Certification bodies• Certification bodies issue mark to certificated
companies
![Page 6: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/6.jpg)
The Microgeneration Certification Scheme
Gemserv
Certification bodies
Certificated companies
MCS Steering Group
Technical Working groups etc
DECC
UKAS
Scheme documents & standards etc
Stakeholders:Industry
Trade assoc.s
Consumer groups
Grant bodies
DECC
UCAS
Etc. etc.
![Page 7: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/7.jpg)
The MCS Installer Scheme• Certification of companies not individuals• Scope
– Design, supply, installation, set to work, commissioning and handover of microgeneration systems
• Assessments conducted in two parts:• Office Assessment
– MCS 001– Quality control– Membership of an OFT approved consumer code of
conduct (e.g. REAL)• On-site Installation Assessment
– Technology specific installation standard (MIS 300X)– Estimate of annual energy performance
• Certification is maintained through surveillance assessments (usually annually)
![Page 8: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/8.jpg)
MCS Simply Explained
• Say what you do,…– Have written procedures
• …do what you say,…– Follow your procedures
• …prove it.– Get MCS certification
![Page 9: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/9.jpg)
Office Assessment
• Quality manual appropriate to the business– Don’t be intimidated! A small business
probably doesn’t need a complex quality manual (but a large one might)
– Feedback suggests a good quality manual improves the business
– Needs to be a controlled document• Formal approval & sign-off = ‘ownership’• Issue number and date• ‘Singing from the same hymn sheet’
![Page 10: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/10.jpg)
Office Assessment
• Assesses procedures for a number of activities including:– Who is responsible for each activity– Document control
• e.g. keeping up with changes in regulations and standards
– Customer contracts• Very important
– Equipment and calibration– Training and competence
• Written procedures ensure quality and consistency
• Full requirements are detailed in MCS001– Annex A, Table 1
![Page 11: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/11.jpg)
On-site Assessment
• Technology specific installation standards
• Assessment of competence to install, not the installation itself
• Proof of knowledge and competence
• Needs to be a recent installation completed by the installer
![Page 12: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/12.jpg)
The MCS Product Scheme
• Scheme covers:– Solar Collectors (MCS 004)– Solar Photovoltaic Modules (MCS 005)– Micro and Small Wind Turbines (MCS 006)– Heat Pumps (MCS 007)– Biomass (MCS 008)– Heat-led Micro-cogeneration Packages
(MCS 014)– Fuel Cells and Micro Hydro are in
preparation• Scope
– Not exceeding 50kW for electricity generators
– Not exceeding 45kW for heat
![Page 13: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/13.jpg)
The MCS Product Scheme
• Product approval is generally in two parts:
• Technical evaluation– Review of test reports– Checks on the validity & completeness– Establish build status of product(s)
• Factory production control– Quality management system– Consistency of manufacture of certificated
products– Annual surveillance– Change control
![Page 14: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/14.jpg)
Product Testing
• Acceptance criteria for test reports described in MCS 011
• UKAS or equivalent test laboratories– Testing must be in scope of accreditation
• Unaccredited independent test laboratories or manufacturers own testing facilities:– Assessment of laboratory by certification body
• Confirmation of correct equipment, procedures & competence etc. at the time of testing
• Witness testing
![Page 15: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/15.jpg)
Certification• Contractors and products that meet
the relevant requirements will be MCS certificated– Listing on websites e.g.
www.greenbooklive.comwww.microgenerationcertification.org
– Eligibility for FITs etc.– Use of MCS and Certification
Body marks• Differentiation
![Page 16: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/16.jpg)
BRE Global Certification Scheme
• Scheme operating for: – Solar Thermal– Solar PV– Micro-wind– Heat pumps – Biomass – Micro-CHP– Other standards under development
• Full UKAS accreditation achieved• 410+ installers Certificated by BRE Global
– Business improvements• 500+ products approved• Further information:
www.greenbooklive.com/microgen
Current status:
![Page 17: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/17.jpg)
Summary• MCS in place to underpin and enhance
confidence in the industry by setting minimum requirements for:– Standard of installations– Product performance
• Installer and product schemes established– Annual energy calculations– Consumer code of conduct– Minimum performance requirements
• Initial assessment followed by surveillance• A number of certification bodies now
operating MCS– Robustness of the schemes needs to be
maintained
![Page 19: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/19.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Mark Group Project
Case Studies
![Page 20: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/20.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Solar Hot Water
![Page 21: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/21.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Outline Brief
• 10 Nursing Homes• All in need of refurbishment• High hot water & heating requirement• Concern about rising energy costs• Mixed fuel types – Gas & Electric• Vulnerable customers / priority groups• Budget constraints
![Page 22: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/22.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Initial Scope
Mark Group met the client to agree –
• Aims of the project• To identify key problem areas• Order of priority• Budget
– More added to scope because of LCBP potential funding
• Project risks/ Feasibility• Communication to the Residents
![Page 23: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/23.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy AdviceAppropriate Roof/s for Panels ?
Site Assessment
![Page 24: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/24.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy AdviceAccess ?
![Page 25: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/25.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Space in Plant Room
for Water Storage ?
![Page 26: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/26.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy AdviceSpace in Loft for Pumps and Pipes ?
![Page 27: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/27.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Safe Loft Access ?
![Page 28: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/28.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Solution Design
![Page 29: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/29.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
?
Solution Design
HeatingNeeds
Budget /Funding
HotWaterNeeds
Timescale ExistingSystems
SolarWater
Heating
![Page 30: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/30.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Pre-Installation
Communication with
• Council• Site Manager/s• Residents
![Page 31: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/31.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Installation
Installation of:
• Pumps• Cylinders• Pipework• Panels
![Page 32: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/32.jpg)
During
After
Before
![Page 33: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/33.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Results – Post Install
• Funding from LCBP programme– received in accordance with the offer
• Happy users– who were involved all the way
• Happy client– fuel usage reduction of ~30%
• Further 4 installs ordered and planned– further LCBP funding offers approved
• Other properties at survey stage
![Page 34: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/34.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Summary
Mark Group provided client with:–
• The best technology solution to meet their needs• A full service from inception to completion• Assistance with funding application• A positive outcome
![Page 35: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/35.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Solar Electricity
![Page 36: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/36.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Outline Brief
• Modern Secondary School• High electric usage and costs• Concern about rising energy costs• Budget constraints• Educational opportunity
![Page 37: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/37.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Initial Scope
Mark Group met the Headmaster to agree –
• Aims of the project• To identify key risk areas• Budget
LCBP funding / Feed-in TariffPower Purchase Agreement
• Project plan• Communication to the Pupils and Staff
![Page 38: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/38.jpg)
Appropriate Roof/s for Panels ?
Site Assessment
![Page 39: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/39.jpg)
Access ?
![Page 40: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/40.jpg)
Plant Room Access ?
![Page 41: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/41.jpg)
Solution Design
![Page 42: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/42.jpg)
?
Solution Design
ElectricalNeeds
Budget /Funding
EducationNeeds
Timescale ExistingSystems
SolarPhotovoltaic
System
![Page 43: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/43.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Pre-Installation
Communication with
• Headmaster• Staff• Pupils
![Page 44: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/44.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Installation
Installation of:
• Brackets• Framework• Panels
![Page 45: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/45.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Installation of:
• Inverters• Isolators• Meters
![Page 46: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/46.jpg)
Before
![Page 47: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/47.jpg)
During
![Page 48: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/48.jpg)
After
![Page 49: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/49.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Results – Post Install
• Funding from LCBP/FIT– received in accordance with the offer
• Happy Headmaster– green electric supply of 35,000 kWh’s
• Educated pupils / staff– integrated lesson plans
• Other schools at survey / planning stages
![Page 50: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/50.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Summary
Mark Group provided client with:–
• The best technology solution to meet their needs• A full service from inception to completion• Assistance with funding application• A positive outcome
![Page 51: The Microgeneration Certification Scheme (MCS) · The MCS Installer Scheme • Certification of companies not individuals • Scope – Design, supply, installation, set to work,](https://reader031.fdocuments.us/reader031/viewer/2022011801/5af82edb7f8b9ad2208c3a22/html5/thumbnails/51.jpg)
Home Insulation • Wind Power • Solar Energy • Heat Harvesting • Energy Advice
Thank YouQuestions and Answers