![Page 1: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/1.jpg)
The Malaysian Electricity Supply Industry (MESI) – Stakeholders
CISB413 Malaysian Electricity & Power Landscape
Aznan Ezraie Ariffin
System Operation Dept
Transmission Div
![Page 2: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/2.jpg)
CONTENTS
1. Power System Review2. Malaysian Electricity Supply Industry3. Governance & Institutional Framework4. Smart Grid and New Technologies5. IPPs and PPAs
![Page 3: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/3.jpg)
Part 1:
Power System Review
![Page 4: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/4.jpg)
Electricity Characteristics
![Page 5: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/5.jpg)
Illustration of Power Delivery
![Page 6: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/6.jpg)
Illustration of Generation Sources
![Page 7: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/7.jpg)
Part 2:
Malaysian Electricity Supply Industry
![Page 8: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/8.jpg)
MALAYSIA ELECTRICITY SUPPLY INDUSTRY (M-ESI)MALAYSIA
MNC
‘WE’VE GOT THE POWER - to serve, to deliver, to excel’
19
![Page 9: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/9.jpg)
Evolution of the MESI
AC Unbundling/Preparation for IBR 2011
![Page 10: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/10.jpg)
Evolution of the MESI (cont)
![Page 11: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/11.jpg)
Introduction to Tenaga Nasional BerhadThree Major Utilities in Malaysia
PENINSULAR
MALAYSIA
SARAWAK
SABAH
Sabah Electricity Sdn Bhd(A 83% TNB Subsidiary)
Sarawak Electricity Board (SEB)
Tenaga Nasional Bhd(TNB)
SINGAPORE
BRUNEI21,060MW*
1,237MW
1,141MW*
695MW
11,506MW
* Includes IPPs
MD: 16,901MW
‘WE’VE GOT THE POWER - to serve, to deliver, to excel’
* Includes IPPs
FY’09 FY’10 FY’11 FY’12 1HFY’13
TNB -Peninsula
Installed Capacity (MW)11,530 11,530 11,530 11,462 11,462
Total units sold (GWh) 87,780 95,197 97,888 102,132 52,129
Total customers (million) 7.59 7.87 8.11 8.36 8.47
Total employees 29,149 30,535 31,935 33,568 34,353
Total assets (RM billion) 71.4 75.9 79.1 88.5 88.3
![Page 12: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/12.jpg)
Customer VS Sales
![Page 13: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/13.jpg)
Tariffs Comparison
![Page 14: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/14.jpg)
TYPICAL DAILY LOAD CURVE PATTERN
POWERING THE NATION
![Page 15: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/15.jpg)
TYPICAL DAILY LOAD CURVE PATTERN
POWERING THE NATION
![Page 16: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/16.jpg)
15,000
15,500
16,000
16,500
17,000
Maximum Demand (MW)
Monthly Peak Demand, MW
FY Highest Month (MW)
Growth (%)
09/10 15, 072 5.8
10/11 15, 476 2.7
11/12 15, 825 2.3
12/13 16, 562 4.7
13/14 16, 901 (YTD) -
MONTHLY MAXIMUM DEMAND (FY09/10 – FY13/14)
POWERING THE NATION
12,000
12,500
13,000
13,500
14,000
14,500
15,000
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
Maximum Demand (MW)
FY 08/09 FY 09/10 FY10/11 FY11/12 FY12/13 FY13/14
The apparent increase in FY09/10 might be due toThe apparent increase in FY09/10 might be due to El NiñoEl Niño
![Page 17: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/17.jpg)
THE POLICY DRIVES THE FUEL MIX EVOLUTION FROM OIL
DOMINANT TO GAS DOMINANT OVER A FEW DECADES
Malaysia has been highly dependent on fossil fuels:
Oil (1970s) � Natural Gas (1990s to 2000s) � Coal ??
Coal
Hydro
70%
80%
90%
100%
Import Hydro Coal Natural Gas Distillate
28
Oil
Distillate
Natural Gas
0%
10%
20%
30%
40%
50%
60%
19
76
19
78
19
80
19
82
19
84
19
86
19
88
19
90
19
92
19
94
19
96
19
98
20
00
20
02
20
04
20
06
20
08
20
10
20
12
![Page 18: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/18.jpg)
DEMAND GROWTH FORECAST
2016
201718,880 MW
201819,492 MW3.18 %
3.24 %
3.27 %
3.31 %
POWERING THE NATION
Note: As Approved by the BOD on 29 Jan 2014
201417,152 MW
201517,697 MW
201618,282 MW
![Page 19: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/19.jpg)
Typical Generation-Demand Scenario
![Page 20: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/20.jpg)
Typical Generation-Demand Scenario
East
North
South
Central
![Page 21: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/21.jpg)
ASEAN Power Grid – Inception under the ASEAN Ministe r of Energy (AMEM) and implemented under HAPUA
Existing Interconnection
•Peninsular Malaysia –Singapore
(1986, 2 x 200 MW)
•Peninsular Malaysia – Thailand
•HVAC Bukit Ketri – Sadao (1981, 85
MW)
•HVDC Gurun – Khlong Ngae
(2001, 300 MW)
Potential Interconnection
32
MALAYSIAMNC
‘WE’VE GOT THE POWER - to serve, to deliver, to excel’
• Sarawak and Sumatera interconnections are viable op tions to increase energy security• The Singapore & Thailand Interconnections enhanced system security for all parties
Potential Interconnection
•Peninsular Malaysia – Sarawak (2022)
•Peninsular Malaysia – Sumatera (2018)
•Peninsular Malaysia – Thailand
(2015, 2nd 300MW HVDC)
•Rantau Panjang – Sg. Kolok (under
discussion)
Note: HAPUA – Head of ASEAN Power Utilities and Authorities
![Page 22: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/22.jpg)
Part 3:
Governance & Institutional Framework
![Page 23: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/23.jpg)
ESI Structure in Peninsular Malaysia
� Current ESI structure remains the same with TNB and IPPs as the key players in the generation sector
� However, the business activities of TNB is segmented into 5 business entities in anticipation of full implementation of Incentive Based Regulation (IBR) in 2015
TNB Generation- Thermal plants- Hydro planrs- Generation
SPV
IPPs
‘WE’VE GOT THE POWER - to serve, to deliver, to excel’
Regulation (IBR) in 2015
� The System Operator and Single Buyer are in the process to be ring-fenced to enhance transparency, independence and fair play in generation scheduling and dispatch
Source: • Energy Commission’s Peninsular
Malaysia Industry Outlook 2013
34
TNB Transmission (Grid Owner)
Grid System Operator Single Buyer
Franchised Retailers
TNB Distribution
Retail
![Page 24: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/24.jpg)
Industry Regulatory Framework
![Page 25: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/25.jpg)
Institutions in the Sector
![Page 26: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/26.jpg)
Key Energy Policies
![Page 27: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/27.jpg)
The Energy Commission:
Regulatory Process • To advise the Minister on all matters concerning the national
policy objectives for energy supply activities.• To implement and enforce the energy supply laws.• To regulate on safety matters relating to the electricity
supply industry and gas supply industry (reticulation stage).• To regulate on technical matters in order to promote • To regulate on technical matters in order to promote
efficiency in the electricity supply industry and gas supply industry (reticulation stage).
• To regulate on economic matters so as to promote and safeguard competition and fair and efficient market conduct or, in the absence of a competitive market, to prevent the misuse of monopoly or market power in the ESI and the GSI (reticulation stage)
• Sarawak is regulated separately
![Page 28: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/28.jpg)
Historical Development of MESI
Structure
![Page 29: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/29.jpg)
Part 4:
Use of Information Technology in
Power Utility
![Page 30: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/30.jpg)
Tesla vs Bell
41
![Page 31: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/31.jpg)
Disruptive Forces
![Page 32: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/32.jpg)
Intelligent Grid
43
![Page 33: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/33.jpg)
• "Smart Grid" is today used as a marketing term, rather than atechnical definition. For this reason there is no well definedand commonly accepted scope of what "smart" is and what itis not.
• The general understanding is that the Smart Grid is theconcept of modernizing the electric grid. The Smart Grid
What is Smart Grid
© 2014 TNBR. All rights reserved 44
concept of modernizing the electric grid. The Smart Gridcomprises everything related to the electric system inbetween any point of generation and any point ofconsumption. Through the addition of Smart Gridtechnologies the grid becomes more flexible, interactive andis able to provide real time feedback.
http://www.iec.ch/smartgrid/
![Page 34: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/34.jpg)
Smart Grid Drivers & Technology Options
© 2014 TNBR. All rights reserved 45
Source : Bloomberg New Energy Finance 2012
![Page 35: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/35.jpg)
Smart Grid Drivers & Technology Options
© 2014 TNBR. All rights reserved 46
Source : IEA Smart Grid Survey
![Page 36: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/36.jpg)
Issues & Challenges – Customer Acceptance
© 2014 TNBR. All rights reserved 47
![Page 37: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/37.jpg)
© 2014 TNBR. All rights reserved 48COTO – cut over to operation
![Page 38: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/38.jpg)
B
Community Briefings & Engagemen
tPre
Installation Letter
Bill Inserts
Video/Advert
Web & Mobile
Incentive Campaign
Phone & Post Survey
Post-installation
survey
▪ Continuous
customer
engagement
▪ Localised
events
▪ Community
engagements
▪ Voluntary
participation
▪ Customer
benefits
Pilot Smart Meter Deployment in Melaka - Customer Experience
B Advert
Door Hanger
Social Media
EngagementInstallation
Survey
Smart Meter Help
Desk
Smart Meter Web
Portal
Mobile Tools
▪ Improved
efficiency and
availability.
▪ TNB
SmartLiving
enabled
programs
▪ Online
community
engagement
▪ Personalized
engagement
![Page 39: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/39.jpg)
Challenges & Critical Enabler - Interoperability
• As information technology (IT) and operations technology (OT)converge in the smarter grid of the future, network interoperability willbe the starting point and precondition for all.
• Interoperability in multiple network technology must support end-to-end data quality and security, network system performance andapplication service provisioning and management.
© 2014 TNBR. All rights reserved 50
Mission : To accelerate the implementation of interoperable Smart Grid devices and systems
![Page 40: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/40.jpg)
© 2014 TNBR. All rights reserved 51
![Page 41: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/41.jpg)
Challenges & Enabler – Infrastructure Development
• Shared vision for the smart electricity among stake holders
• Widespread deployment of Intelligent Electronic Devices (IED)– Retrofitting of existing components are required to make them
“smarter” as well as keeping the cost lower
• Infrastructure for integrated communications need to be fullydeveloped
© 2014 TNBR. All rights reserved 52
developed
South Korea Smart Grid Test-bed with budget allocation of $200 million has been made ($68 mil public funds, $170 mil private investment)
![Page 42: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/42.jpg)
Host of New Technologies
53
![Page 43: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/43.jpg)
Part 5:
IPPs and PPAs
![Page 44: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/44.jpg)
IPP’s Beginning
� Beginning 1993, IPP license was awarded to a total of 15 IPPs tobuild and operate generating plants in Peninsular Malaysia.
1993• YTL• GSP• SEV• PDP• PTEK
1998 - 1999• TNB
Janamanjung• TTPC• NUR• Pahlawan
2001 - 2003• Prai Power• GB3 Sdn Bhd• Panglima• Kapar Energy
2003 – 2005• Tanjung Bin• TNB
Janamanjung• Jimah Energy
First Generation IPPs
Third Generation IPPs
Second Generation IPPs
Strictly Private & Confidential 55
![Page 45: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/45.jpg)
Independent Power Producers
IPP Capacity (MW)
Type of Plant
Fuel Owner
First Generation IPPs
YTL Power Sdn Bhd 1,170 CCGT Gas YTL
SEV Energy Ventures Sdn Bhd 1,303 CCGT Gas Malakoff
Genting Sanyen Power Sdn Bhd 762 CCGT Gas Genting Group
Powertek Bhd 434 OCGT Gas Tanjong
PD Power Sdn Bhd 436.4 OCGT Gas Sime Darby
Second Pahlawan Power Sdn Bhd 322 CCGT Gas TanjongSecond Generation IPPs
Pahlawan Power Sdn Bhd 322 CCGT Gas Tanjong
Kapar Energy Ventures Sdn Bhd 2,420 CSP,OCGT
Coal, MFO, Gas
60% TNB/40% Malakoff
Panglima Power Sdn Bhd 720 CCGT Gas Tanjong
GB3 Sdn Bhd 640 CCGT Gas Malakoff
Prai Power Sdn Bhd 350 CCGT Gas Malakoff
Teknologi Tenaga Perlis Consortium Sdn Bhd (TTPC)
650 CCGT Gas JatiCakerawala
Third Generation IPPs
TNB Janamanjung Sdn Bhd 2,070 CSP Coal TNB
Tanjung Bin Power Sdn Bhd 2,100 CSP Coal Malakoff
Jimah Energy Ventures Sdn Bhd 1,400 CSP Coal Jimah TeknikNote: CCGT (Combined-Cycle Gas Turbine), OCGT (Open Cycle Gas Turbine), CSP (Conventional Steam Plant)
![Page 46: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/46.jpg)
PPA :Product & Payment
Capacity & Energy
Capacity & EnergyMinimum Take or Pay (Energy)
(YTL only)
Product
Product
Product
Payment
Energy Payment Only (YTL only)
Capacity & Energy Payment
1st Generation
1998 2002PPA Signed
Capacity & Energy
Capacity & Energy Payment
2nd Generation
Capacity, Utilisation &Energy Payment
3rd Generation
Payment
Payment
![Page 47: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/47.jpg)
PPA: Product and Payment (2)
� Capacity Payment
Payment made to IPPs
Capacity Payment (for being available)
Energy Payment(for energy generated)
Daily Utilisation Payment
� Capacity Payment� for availability & performance of the plant� Payment is based on availability regardless of whether the plant is
despatched or not. � Daily Utilisation Payment (for Jimah & Tanjung Bin only)
� introduced to encourage IPP to share demand risks and to reduce fixed capacity payment when plant is not utilised.
� Energy payment� Payment for energy despatched from the plant� covers fuel & variable operating costs
![Page 48: The Malaysian Electricity Supply Industry (MESI) · PDF fileThe Malaysian Electricity Supply Industry (MESI) –Stakeholders CISB413 Malaysian Electricity & Power Landscape Aznan Ezraie](https://reader034.fdocuments.us/reader034/viewer/2022042515/5a9e1bec7f8b9a29228db3de/html5/thumbnails/48.jpg)
TUTORIAL SESSIONANY QUESTIONS?ANY QUESTIONS?