The Louisville – Southern Indiana Ohio River Bridges Project
“The Art of the Possible”Michael W. Hancock, PE &
Ken Sperry, PEHMB Professional Engineers, Inc.
National ASHE Conference – May 10, 2019
![Page 2: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/2.jpg)
Louisville Bridges Project Map
![Page 3: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/3.jpg)
The Louisville and Southern Indiana Ohio River Bridges ProjectAlmost 50 years in the Making
Kentucky Issues:
• Mobility: Complete outer beltway on east side of Louisville
• Safety: “Spaghetti Junction” daily congestion at the intersection of Interstates 64, 65, and 71 in the heart of downtown Louisville
• Aging Infrastructure built in 1940s and 50s
• Extreme Public Opposition to East End Ohio River Crossing
• Other Public Sentiment that an East End Bridge would solve the downtown traffic problem
Indiana Issues:
• Mobility: Complete outer beltway on east side of Louisville metro area
• Accessibility: Huge potential economic development sites on Indiana side of East End crossing
• Safety: Traffic congestion on the I-65 Kennedy Bridge and the 80-year old Second Street Bridge into Louisville
• Large volume of commuter traffic from southern Indiana to work in Louisville
![Page 4: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/4.jpg)
CROSS RIVER MOBILITY
Louisville Bridges Project PURPOSE
![Page 5: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/5.jpg)
Recommended Interchange
Two Bridges, One Project | The Downtown Bridge
![Page 6: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/6.jpg)
The Louisville and Southern Indiana Ohio River Bridges Project; Late 2009 Status:
• Planning and Environmental documentation had virtually stopped due to cost of downtown and east end bridges being linked as one project.
• The cost of this “Two Bridges, One Project” approach was $4.1 billion.
• MPO fiscal constraint issues prevented the inclusion of the project in the Long Range Plan for the area.
• KYTC and INDOT both knew that tolls would have to be part of any funding scenario for the project.
• The old I-65 Kennedy Bridge and the outdated “Spaghetti Junction” had to be addressed.
• Freight traffic in the Nashville to Indianapolis Corridor was increasing.
![Page 7: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/7.jpg)
What changed for the project??• Catalyst #1 in 2009: The two
Governors, Beshear (D) and Daniels (R), said “Reduce costs and get it done!”
• Catalyst # 2 in 2011: DISASTER—The I-64 Sherman Minton Bridge at Louisville’s western edge had to be closed for 4 months and all traffic rerouted to I-65
![Page 8: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/8.jpg)
The I-64 Bridge closure in 2011 led the public to demand that the Bridges project move forward, regardless of need for tolling!!
FHWA Front Office Prioritized the LSIORB:• Development of Initial Financial Plan
(IFP) including tolls
• Development of the Project Management Plan (PMP)
• Formalizing the Record of Decision (ROD)
• Mitigation follow-thru for multimodal commitments to transit
• EJ Mitigation follow-thru
• DBE and EEO commitments and minority training program
State-to-state Complexities were enormous:• Total project cost was reduced from
$4.1 to $2.6 billion.• Downtown and East End projects cost
roughly the same• States would split tolls 50/50• KY would lead Downtown Project and
IN would lead the East End work.• KY would do Design/Build procurement
for Downtown Bridge• IN would do P3 procurement for EE• Joint completion scheduled with tolls
to commence by January 1, 2017• O/M by KYTC and INDOT downtown• O/M by the P3 contractor and KYTC on
the East End
![Page 9: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/9.jpg)
Cost Reductions and Supplemental FEIS
Costs were reduced by:
• Shifting Kennedy Interchange back into its existing footprint and reducing number of lanes
• Shortening tie-ins to existing I-64, I-65, and I-71
• Eliminating bike/pedaccommodation from the new bridge
• Reducing East End from 6 lanes to 4 lanes
Supplemental FEIS:
• Necessary to revise design and include tolling
• SFEIS started in 2012 and completed in 18 months in June, 2013
• SFEIS activities received highest priority from KYTC, INDOT, and USDOT/FHWA
![Page 10: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/10.jpg)
State Governance Issues:
Bi-State Cooperation
• Legal framework thru Bi-State Development Agreement
• Technical interaction thru Bi-State Management Team
• Financial framework established thru KPTIA and IFA interaction
• Creation of a Joint Board to authorize bi-state actions for the project
• Creation of a Tolling Body to draft and implement tolling requirements
• Governors would serve as ultimate dispute mediators
Joint Board and Tolling Body Membership• 4 members of the Joint Board
• KYTC Secretary• INDOT Commissioner• Indiana Finance Authority (IFA)
Chair• KPTIA Chair
• 6 members of the Tolling Body• All 4 Joint Board Members plus• An additional IFA Member• An additional KPTIA Member
![Page 11: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/11.jpg)
How to pay for “2 Bridges, 1 Project”?
• Kentucky’s Downtown Bridge and Approaches Used More Traditional Design/Build:
• Regular state and federal-aid funds from KYTC• GARVEE Bonds sold by KYTC• TIFIA Loan obtained by KPTIA ($452 million)• Non-Recourse Toll Revenue Bonds sold by KPTIA• KY’s 50% of toll revenues support TIFIA and Toll Bonds payback
• Indiana’s East End Bridge and Approaches Used P3:• Private Activity Bonds (PABs) sold by IFA• TIFIA Loan obtained by IFA ($162 million)• P3 Availability Payment structured by IFA and paid by INDOT• IN’s 50% of toll revenues support INDOT’s AP commitment
![Page 12: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/12.jpg)
Did the Plan Work? Yes it Did!!!
• 2010: Governors Beshear and Daniels joined together to move the LSIORB Project
• 2011: An I-64 bridge closure forced virtually all cross-river trips thru the I-65 corridor and changed the game
• 2012: Downtown and East End D/B and P3 Teams Selected• Mid-2013: Financing Plan and Supplemental FEIS completed• Late 2013: Construction Begins at both river crossings • December 2015: New Downtown Bridge opens to traffic and
all lanes shifted to the new bridge• Summer 2016: Refurbished Kennedy Bridge reopens to
traffic• December 2016: East End Bridge opens to traffic and tolling
begins at both locations
![Page 13: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/13.jpg)
Request for Qualifications (RFQ)
• 5 submittals received 4/2/12• Conducted interviews• Short listed to 3 5/1/12
• Ohio River Transportation Constuctors (ORTC)• Skanska Flatiron Dragados (SFD)• Walsh Construction Company
RFQ – RFP – ITC – Selection Process
• Schedule:• RFQ/RFP creation begins 1/2/12• SOQ due 4/2/12• Short-listed to 3 teams 5/1/12• Draft RFP provided 5/1/12• Accepted ITC (ATC) 5/1 – 7/16• Final RFP 8/3/12
![Page 14: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/14.jpg)
Request for Qualifications (RFQ)
• 5 submittals received 4/2/12• Conducted interviews• Short listed to 3 5/1/12
• Ohio River Transportation Constuctors (ORTC)• Skanska Flatiron Dragados (SFD)• Walsh Construction Company
RFQ – RFP – ITC – Selection Process• Schedule continued:
• Technical Proposals due 10/1/12• Interviews 11/8/12• Price Proposal due 11/15/12• Awards Meeting 11/15/12• Agreement Signed 12/28/12
![Page 15: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/15.jpg)
Request for Qualifications (RFQ)
• 5 submittals received 4/2/12• Conducted interviews• Short listed to 3 5/1/12
• Ohio River Transportation Constuctors (ORTC)• Skanska Flatiron Dragados (SFD)• Walsh Construction Company
Request for Proposals (RFP)• First Draft available 5/1/12• Had 5 draft revisions• Final RFP 8/3/12• Had 3 addenda’s
![Page 16: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/16.jpg)
Request for Qualifications (RFQ)
• 5 submittals received 4/2/12• Conducted interviews• Short listed to 3 5/1/12
• Ohio River Transportation Constuctors (ORTC)• Skanska Flatiron Dragados (SFD)• Walsh Construction Company
Met every 2 weeks with teamsKYTC Responses to ITC’s:
ApprovedApproved with conditionsNot approved in present formNot approvedNot an ITC
Innovative Technical Concepts (ITC’s)
![Page 17: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/17.jpg)
Request for Qualifications (RFQ)
• 5 submittals received 4/2/12• Conducted interviews• Short listed to 3 5/1/12
• Ohio River Transportation Constuctors (ORTC)• Skanska Flatiron Dragados (SFD)• Walsh Construction Company
Innovative Technical Concepts (ITC’s)
• ORTC 14 submittals 9 approved• SFD 41 submittals 26 approved• Walsh 33 submittals 15 approved
![Page 18: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/18.jpg)
Request for Qualifications (RFQ)
• 5 submittals received 4/2/12• Conducted interviews• Short listed to 3 5/1/12
• Ohio River Transportation Constuctors (ORTC)• Skanska Flatiron Dragados (SFD)• Walsh Construction Company
Best Value Selection ProcessSB = 100 [0.25 (TB/TH) + 0.70 (PL/PB) + 0.05(DB/DH]Where
PB = DBT’s Price ProposalPL = Lowest Price Proposal (all DBTs)SB = DBT’s Overall Score (Technical Proposal and Price Proposal)TB = DBT’s Technical Proposal ScoreTH = Highest Technical Proposal Score (all DBTs)DB = DBT’s DBE ScoreDH = Highest DBE Score (all DBTs)
![Page 19: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/19.jpg)
Request for Qualifications (RFQ)
• 5 submittals received 4/2/12• Conducted interviews• Short listed to 3 5/1/12
• Ohio River Transportation Constuctors (ORTC)• Skanska Flatiron Dragados (SFD)• Walsh Construction Company
Price Proposal• Received after scoring technical proposals• DBT could change scheduled completion date• DBT’s Price Proposal= PB = A + (B x C) + D where:
A = DBT Contract Bid amount in dollarsB = Calendar days to substantially complete the Project C = Daily value = $80,000 per Calendar Day D = John F. Kennedy Bridge Structural Steel Repairs = $1,000,000.00
![Page 20: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/20.jpg)
Request for Qualifications (RFQ)
• 5 submittals received 4/2/12• Conducted interviews• Short listed to 3 5/1/12
• Ohio River Transportation Constuctors (ORTC)• Skanska Flatiron Dragados (SFD)• Walsh Construction Company
Results
![Page 21: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/21.jpg)
New Kennedy Interchange
![Page 22: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/22.jpg)
Abraham Lincoln Bridge
3 Twin Tower Cable-Stayed Bridge
Six lanes of NB I-65 traffic99 Feet wide2,114 feet long with 3 towers71 feet above water Kennedy becomes 6 lanes SB
![Page 23: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/23.jpg)
Opening Day – Dec. 5, 2015
![Page 24: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/24.jpg)
John F. Kennedy Bridge Rehabilitation
![Page 25: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/25.jpg)
East End - I71 to Ohio River
![Page 26: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/26.jpg)
East End Tunnel
![Page 27: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/27.jpg)
East End Ohio River BridgeTwin Diamond Towers
![Page 28: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/28.jpg)
IN 265 at IN 62 and Port Road Salem Rd. Interchange
![Page 29: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/29.jpg)
Transforming Our Region• Projected economic impact of
$87 billion over the next 30 years• Anticipated 15,000 new jobs• Improving economic
competiveness• Uniting the region• Designated by Congress as one
of 13 projects of national importance
• Project was not possible without tolling
![Page 30: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/30.jpg)
For the Louisville Bridges Project, this is what success looks like…
![Page 31: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/31.jpg)
Separately from the LSIORB Project, KYTC and INDOT funded the adjacent, previously abandoned Big Four railroad bridge for cross-river bike/ped connectivity in the Downtown area…
![Page 32: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/32.jpg)
The “Art of the Possible” is worth the journey!!
![Page 33: The Louisville – Southern Indiana Ohio River Bridges Project2019conference.ashe.pro/Presentations/SessionC/6C... · The Louisville and Southern Indiana Ohio River Bridges Project;](https://reader033.fdocuments.us/reader033/viewer/2022060207/5f03d0287e708231d40ae5b4/html5/thumbnails/33.jpg)
Thank you!!!Louisville Bridges Project Website:
www.kyinbridges.com
Contact Information:
Michael W. Hancock, [email protected]
Ken Sperry, [email protected]