The LIVING SHIP Initiative - WordPress.com › 2014 › 01 › living-ship-initiative.pdfPettit...
Transcript of The LIVING SHIP Initiative - WordPress.com › 2014 › 01 › living-ship-initiative.pdfPettit...
The LIVING SHIP Initiative How Adventuress engages sustainability & the Maritime Industry
.
CENTENNIAL RESTORATION PROJECT 2009 - 2014
Phase I Reframe Port Bow
Stem Replacement, Rebuild Foc’sle Interior
Phase II Reframe Starboard Bow
Replace Foremast, Chain Plate and Strap
Phase III Counter Stern
Rudder Replacement, Horn Timber and Transom
Phase III.b Counter Stern
Shafting, Floor Timber
Phase IV Port Lower Framing
Garboard to Sheer
FINAL Phase V Starboard Lower Framing
Garboard to Sheer
Underway with our Community
• Over 3000 Participants Annually
• Formal Env. Ed Youth Programs
• Sustainable Leadership Programs
• Workforce Development Programs
• Family and Corporate Memberships
• Over 80 Volunteers, 8000+ Hours
Current Practices
Support and Enroll in Blue Flag Program
Environmental products: Cleaning, Brightwork, Lubricants
Support Local, Sustainable Agriculture and Food Systems
100% discharge at Municipal Waste Stations
Limited energy needs
Eco Bottom Paint
Recycling and Composting
Reduce Paper Usage
FSC Certified Wood Products
Local Manufacturers and Suppliers
Environmental and Sustainability Education
What technology is available?
A Collaborative Approach to a Sustainable Industry?
Where is it being done?
Where can I find information? Who Supports this?
Vigor Marine Argosy Cruises Living Futures Institute Port of Seattle WA State Ferries Fisheries Supply Glosten Associates Elliot Bay Design Group Art Anderson Associates Port of Port Townsend Puget Sound Clean Air CSR Marine
NWIFC Puget Soundkeeper Alliance NWMTA PVA Corvus Battery WA Sea Grant Schmidt Ocean Institute Pettit Paint King County Emerald Harbor Marine MER Equipment Puget Sound Partnership
Foster-Willis General Biodiesel H2Out NW Maritime Center US Sailing Haven Boatworks Jefferson Cnty Health Env. Protection Agency Phillips Media Co. Ridolfi Group Oars NW Foss Maritime PT Marine Trades
Our Course • WA Sea Grant funds Admin
and Facilitation
• Research Green Building Councils as a Model
• Convene Task Force for Actionable Goals/Outcomes
• Build Model and Pilot Programs
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
Calling for a Paradigm Shift in the Built Environment
Rewarding Early Adopters
Creating Models for the Future
Stirring the Pot
Pulling the Market Forward
Infusing Inspiration and Beauty
The Living Ship Design Team
With support and involvement from regional leaders in the maritime industry, Sound Experience expects that the Living Ship project will be a powerful demonstration model for a more sustainable built environment, whether land or sea.
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
The Highest Standards of Green Building Applied to the schooner ADVENTURESS
7 Performance Areas: (Petals)
Site – Surrounding Environment
Water – Net Zero
Energy – Net Zero
Health – Air, Sound and other Living Conditions
Materials – No Red List + Exceptions
Equity – Access and Education
Beauty – Got it Covered!
Standards - Philosophy - Advocacy
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
Objectives for a Sustainability Model
and Learning Platform
• Whole System, Technical Design for Retrofit
• Demonstration Projects
• Sustainability Education
• Marine Trades Workforce Development
Technical Design
Objective 1: Research and develop a “whole system” technical Living Ship plan for the schooner Adventuress with an expert Design Team that is a thorough, fundable and replicable platform modeling sustainability for, and in partnership with, the maritime and green building industry.
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
The Living Ship Design Team
With support and involvement from regional leaders in the maritime industry, Sound Experience expects that the Living Ship project will be a powerful demonstration model for a more sustainable built environment, whether land or sea.
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
Valve Descriptions
1 Raw water thru hull 11 DC pump discharge valve
2 Waste manifold seawater select valve 12 DC pump intake valve
3 Generator fire pump intake valve 13 Gray water pumpout select
4 Fore deck fire station 14 Raw water/bilge select valve
5 Bowling alley fire station 15 Main cabin bilge select valve
6 Generator fire pump discharge valve 16 Engine room bilge select valve
7 On deck discharge select valve 17 Fo’c’sle bilge select valve
8 Overboard discharge select valve 18 ME PTO pump discharge valve
9 Bilge overboard discharge thru hull 19 ME PTO pump intake valve
10 Aft deck fire station 20 Manual deck pump intake valve
ME PTO
Pump
5
2
1
3
4
12
To waste pumpout
manifold
6
DC Pump
Generator
Fire Pump
8 7
Manual Deck
Pump
9
11
14 15 16
17
18
19
20
To bilge overboard
discharge thru hull
10
Adventuress Bilge and Fire System
13
Ball Valve
Globe Valve
Bilge Pickup
Check Valve
Gray
Water
Holding
Tank
Shore
Power Generator
Genset Start Main
Engine
Start
McCarron
Console 120
Volt
Bank
Console VHF
Reefer
12 Volt Bank
12V DC
120
Volts AC
Adventuress Electrical Systems Overview
Lights: Cabin,
Anchor, X-Tree
· Main cabin stove fan
· Galley stove fan
· Galley H2O pump
· Galley fan
· Bilge alarms
· Galley stove high heat alarm
· Lights: deckhouse corners,
deckhouse and galley LEDs
· Aquarium pump
· Fuel pumps
Console Nav
Suite
· Radar
· GPS
· Depth sounder
· Deckhouse VHF
Inverted Outlets
· Bilge blowers
· AC outlets
· Waste pump
· DC Compressor
· DC Bilge pump
120V DC
Trace
Inverted
120V AC
Main
Engine
Lewco
Galley
Corner
(Prep) Sink
Galley
Starboard
Dish Faucet
Galley Port
Dish Faucet
Galley Fruit
&Vegetable
Sink
Starboard
Water
Tank
Total
Capacity:
180
gallons
Port
Water
Tank
Capacity:
160
gallons
Hot Water
Tank
Capacity: ?
Galley
Stove
Forward
Head Sink Aft Head
Sink
Middle
Head Sink On Deck H2O Fill
Adventuress Fresh Water System
Water use meter
Ball valve
Check valve
Globe valve
Pump
Filter
Gravity fed & foot pump water lines
Cold pressurized water line
Hot pressurized water line
Valve Descriptions
1 Graywater containment valve 2 Graywater pumpout select
Graywater Holding
Tank
Hot H2O
Holding
Tank
To pumpout manifold
Hot H2O Pressure Release Lines
To Bilge
To Graywater
Tank
Adventuress Graywater System
2
Gal
ley
Sin
ks
Galley Prep Sink
Forward Head Sink Middle Head Sink Aft (pee) Head Sink
Break in plumbing to
prevent graywater
backup
Fruits and Vegetables Sink
1
AC
Waste
Pump
Blackwater Holding Tank
Capacity: 131? 142? gallons
Yellow Water
Holding Tank
Total Capacity:
160 gallons
Aft
Head
Middle
Head
Forward
Head
Yellow Water Holding
Tank
On deck pumpout
fitting
1
3
4
5
6
7
8
9 10
11
12
13 14
16
Adventuress Waste and Pumpout System
Yellow water
vent to deck
Blackwater vent
to deck
2 15
Valve Descriptions
1 Blackwater holding tank isolation 9 Sea water to pumpout isolation
valve
2 Tank select valve 10 Sea water to pumpout select
3 Yellow water holding tank to pumpout
isolation
11 Blackwater to pumpout select
4 Middle head discharge to holding tank 12 Yellow water to pumpout select
5 Middle head sea water flush 13 Overboard waste discharge thru
hull
6 Forward head discharge to holding tank 14 Overboard waste discharge select
7 Forward head sea water flush 15 Blackwater holding tank to AC
pump shutoff
8 Thru hull raw water supply to heads,
bilges, fire pump
16 AC waste pump priming valve
Ball Valve
Check Valve
Sea strainer
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
Living Ship Design Matrix – Data Compilation
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
Alternative Propulsion – Data Compilation
Demonstration Projects Objective 2: Implement small scale, sustainable/green systems demonstration projects that will complement the overall Living Ship plan.
Examples: • Rainwater reclamation • Copper-free bottom paint • Non-zinc sacrificial anodes • Disassemble 120VDC system • Battery system redesign • Convert to LED lights • Redesign efficient refrigeration
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
Bottom Paint & Sacrificial Anodes Partner with Pettit • Side by side comparison • Epoxy copper underlayer • Ultima Eco Water Based • Joint Media Release
Zinc vs Aluminum Anodes • Studies on Effectiveness • Positive Results
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
Refer Project Custom Build • Two Boxes • Re-used Materials
Insulation – R-50 in 1.25” • VIP Panels • Aerogel Blanket
Components – Frigaboat • Two Compressors • Keel Cooled • Smart Thermostats
Energy Reduction • Expect 40% reduction in daily
amp hour usage
Manufacturer Support
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
Manufacturer Support and USCG Approval Dow - Corning • VIP Panels • Aerogel Blanket
Hueson Wire • PVC free cable/wire
Blue Sea Systems
• 120VAC Panel
Local Suppliers • Go2Marine • Fisheries Supply
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
Sustainability Education
Objective 3: Initial exploration of shipboard sustainability education programming in alignment with the LBC’s seven performance areas, and state and national education standards that address real world applications of sustainability principles through hands on exploration, technological experimentation, youth and community development.
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
Sustainable Marine Trades
Objective 4: Design and develop Sustainable Maritime Workforce Training programs providing a foundation for people working in the trades to develop relevant and needed skills that support a more sustainable industry at large.
The LIVING SHIP Initiative A Project of Sound Experience aboard the schooner Adventuress
Our Course • Monthly Design Team meetings
• Pilot Program: Winter ’13 – ‘14
• Winter ‘13-’14: Install New
Refer, 120vDC, LED
• Conferences
• Convene Advisory Group
• System Design – June 2014
Engage What role does the Sail Training Industry
play to help inspire Environmental Marine Protection?
Are we not the ideal platform to engage and inspire the Maritime Industry and
our future Maritime Leaders?
STI Working Group to ensure the Blue Flag Scheme is working for operators and ports to invigorate the program.
Thank You
Contact: Capt. Joshua Berger
Sound Experience aboard Adventuress
PO Box 1390
Port Townsend, WA 98368
United States
Email: [email protected]
Mobile: 001-360-531-0251