Client: nazareth living center Location: 2 nazareth lane saint louis, missouri 63129 program: 50 living units parking garage library, card room, meditation room, fitness, exercise, doctors office, salon, kitchen, dining, family party room context: residential neighborhood senior living complex: assited living, skilled nursing brief: I have been involved with this project since may 2011. in august 2012, I was given project architect responsibili- ties as a result of an associate’s ma- ternity leave during the construc- tion administration phase. i attended meetings with the owner and other members of the design team. construction observation samantha auer health + wellness internship saint louis, missouri 2012 6'-4" 6'-4" 105 RECYCL'G TRASH/ S1-1 STAIR NORTH S2-1 STAIR SOUTH 133 CLOSET TECH 132 JANITOR 102 CORRIDOR A101 UNIT A103 UNIT A105 UNIT E-1 ELEV 137 ELEC 121 LOUNGE 122 CORRIDOR 123 CORRIDOR 130 CORRIDOR 131 ELEC MECH/ 134 CORRIDOR ROOF BELOW ROOF BELOW A111 UNIT ADA A117 UNIT A119 UNIT A118 UNIT A112 UNIT ADA C116 UNIT C114 UNIT C115 UNIT C113 UNIT S1-1A S2-1 105A 130 135 131 132 133 135 RECYCL'G TRASH/ 101 LOBBY ELEV 137 138 ROOM CARD 138 A123 UNIT A121 UNIT 136 CORRIDOR 129 ROOM MEDIA 127 STORE GENERAL 128 STORAGE 120 CONFERENCE FAMILY PARTY/ 125 JANITOR 124 RESTRM. PUBLIC 126 RESTRM. PUBLIC 106 BAR 107 DINING ROOM 108 BEVERAGE 109 COOK 111 PREP 119 FREEZER 118 COOLER 117 HALL 116 RESTRM. STAFF 115 LINENS 114 JANITOR 113 OFFICE 112 STORAGE DRY 110 ROOM DISH S1-1B 104 102 109 113 114 116 117 120A 122 123 124 126 125 127 128 129A 4'-6" HIGH WALL 107A 1 A5.02 44 seats UP DN UP DN 120B ROOF BELOW 129B 107B 9a A5.01 117A 117A MECH. 72" 48" 48" 1 A5.03 105B 2 A7.03 2 A7.02 1 A7.04 3 A5.02 6'-0" TYP. 8'-11 1/2" 12'-11 1/4" 15'-0 7/8" 15'-0 7/8" 15'-0 7/8" 13'-1 7/8" 13'-1 7/8" 14'-2 5/8" 16'-1 3/4" 27'-10 1/4" 18'-11 7/8" 3'-2 1/8" 3'-2" 4'-7 5/8" 18'-10 1/2" 13'-5 7/8" 3'-0 5/8" 12'-2 1/2" 14'-10 7/8" 13'-1 7/8" 35'-2" 12'-8 1/4" 10'-9 1/8" 12'-4 5/8" 13'-1 7/8" 15'-0 7/8" 15'-0 7/8" 13'-6 1/4" 6'-6" 18'-1 1/4" 15'-6" 6 3/4" 10'-0 3/4" 13'-1 7/8" 2'-4" 23'-1 3/4" 12'-8 1/4" 35'-2" 13'-1 7/8" 18'-8 5/8" 9'-0 3/4" 3'-3 1/4" 21'-10 3/4" 20'-10 3/4" 82'-2 1/2" 4" 6'-6" 4" 25'-9 1/4" 8'-1 1/8" 15'-6 3/4" 5'-0 5/8" 15'-0 7/8" 15'-0 7/8" 13'-5 3/4" SIM. 104 CORRIDOR 6'-5 1/4" 6'-0" TYP. 8'-3 1/4" 1'-1 5/8" 3'-7 1/2" 4'-7 3/4" 3'-3 5/8" 7'-1 5/8" 11'-1 7/8" 4'-3 5/8" 6'-0 3/4" 1'-8 3/8" 2'-0 3/8" 4'-9" 3'-5 1/8" 24'-0" 2 A7.01 D1 D1s D1 D1 D1 D1 D2 D2 D2s D2 W2s ALIGN D1s D1s D1s D2s W4 W3 D2 D1 D1 D1 D2 D2 SIM. SIM. 7'-7 3/4" 11'-0 3/8" 21'-3 3/8" 8'-7 5/8" 21'-5 1/4" 31'-10 3/4" 150° 150° 120° 120° D2s D2 D4s D2s SIM. 4'-0" 4'-0" D4s D2s D2s D2s D4s D2 D2 D2s D2s D2 D2 D2 W4 D2 D1 D1 S1 TYP. S1 TYP. 8'-11 1/4" D2 D2 D2s D2s D2 D4 D2 7'-5 7/8" 7'-5 7/8" D4s D2 TYP. 9'-2 1/2" 15'-10 3/8" 6'-0" TYP. 10 1/2" TYP. 6'-0" TYP. 28'-5 3/8" TYP. 28'-5 3/8" TYP. 28'-5 3/8" TYP. 28'-5 3/8" TYP. 10'-8" 6'-0" TYP. 13'-10 1/8" 11'-0" 19'-8 1/2" 6'-0" TYP. 5'-7 5/8" 7'-0 7/8" 2'-1 7/8" 9'-0 7/8" 12'-3" 5'-0" TYP. 112.82° 1'-3" 6'-6" 2'-11 5/8" 5'-0" 42'-5 1/8" 5'-0" R64'-0" CENTER OF RADIUS AT PATIO PATIO 33'-0 1/4" 9 7/8" 3'-2" 3'-0 3/4" 14'-0 1/8" 6'-6" 12'-7 3/8" 8'-2" 1'-5 3/4" -7-1/2" +0" 21 22 19 20 A5.02 east elevation first floor DESIGN DEVELOPMENT CORRESPONDENCE CONSTRUCTION ADMIN. PROJECT MANAGMENT drafting marketing product data consultant coordination site analysis programming code requirements owner meetings construction meetings sub-contractor meetings product selection client coordination marketing rfi’s rfp/pr co cp pay app asi’s submittals transmittals shop drawings review clarifications deliverables consultant coordination owner reviews documentation project objectives

description

Presentation of internship work.

Transcript of The Lawrence Group Poster

Page 1: The Lawrence Group Poster

nazareth living centerindependent senior living

Client: nazareth living centerLocation: 2 nazareth lane saint louis, missouri 63129

program: 50 living units parking garagelibrary, card room, meditation room, fi tness, exercise, doctors offi ce, salon, kitchen, dining, family party room

context: residential neighborhood senior living complex: assited living, skilled nursing

brief: I have been involved with this project since may 2011. in august 2012, I was given project architect responsibili-ties as a result of an associate’s ma-ternity leave during the construc-tion administration phase. i attended meetings with the owner and other members of the design team.

c o n s t r u c t i o n o b s e r v a t i o n

s a m a n t h a a u e r health + wellness internship saint louis, missouri 2012

6'-4"

6'-4"

105R

EC

YC

L'GTR

AS

H/

S1-1

STA

IRN

OR

TH

S2-1

STA

IRS

OU

TH

133C

LOS

ET

TEC

H

132JA

NITO

R

102C

OR

RID

OR

A101

UN

IT

A103

UN

IT

A105

UN

IT

E-1

ELE

V137

ELE

C

121LO

UN

GE

122C

OR

RID

OR

123C

OR

RID

OR

130C

OR

RID

OR

131E

LEC

ME

CH

/

134C

OR

RID

OR

RO

OF

BE

LOW

RO

OF

BE

LOW

A111

UN

ITA

DA

A117

UN

IT

A119

UN

IT

A118

UN

IT

A112

UN

ITA

DA

C116

UN

IT

C114

UN

IT

C115

UN

IT

C113

UN

IT

S1-1A

S2-1

105A

130

135

131

132

133

135R

EC

YC

L'GTR

AS

H/

101LO

BB

YE

LEV

137

138R

OO

MC

AR

D138

A123

UN

ITA

121U

NIT

136C

OR

RID

OR

129R

OO

MM

ED

IA

127S

TOR

EG

EN

ER

AL

128S

TOR

AG

E

120C

ON

FER

EN

CE

FAM

ILY P

AR

TY/

125JA

NITO

R

124R

ES

TRM

.P

UB

LIC

126R

ES

TRM

.P

UB

LIC

106B

AR

107D

ININ

G R

OO

M

108B

EV

ER

AG

E

109C

OO

K

111P

RE

P

119FR

EE

ZER

118C

OO

LER

117H

ALL

116R

ES

TRM

.S

TAFF

115LIN

EN

S

114JA

NITO

R

113O

FFICE

112S

TOR

AG

ED

RY

110R

OO

MD

ISH

S1-1B

104102

109 113

114

116

117

120A

122

123

124126

125

127

128

129A

4'-6" HIG

H W

ALL

107A

1A

5.02

44 seats

UP

DN

UPD

N

120B

RO

OF

BE

LOW

129B

107B

9a

A5.01

117A

117AM

EC

H.

72"

48"

48"

1A

5.03

105B

2A

7.03

2A

7.02

1A

7.04

3A

5.02

6'-0"

TYP

.

8'-11 1/2"12'-11 1/4"15'-0 7/8"15'-0 7/8"15'-0 7/8"13'-1 7/8"13'-1 7/8"14'-2 5/8"16'-1 3/4"27'-10 1/4"

18'-11 7/8"

3'-2 1/8"

3'-2"4'-7 5/8"

18'-10 1/2"

13'-5 7/8"3'-0 5/8"

12'-2 1/2"

14'-10 7/8"13'-1 7/8"35'-2"12'-8 1/4"10'-9 1/8" 12'-4 5/8"13'-1 7/8"15'-0 7/8"15'-0 7/8"13'-6 1/4"

6'-6"

18'-1 1/4" 15'-6"

6 3/4"

10'-0 3/4" 13'-1 7/8"

2'-4"

23'-1 3/4" 12'-8 1/4" 35'-2" 13'-1 7/8" 18'-8 5/8"

9'-0 3/4"

3'-3 1/4" 21'-10 3/4"

20'-10 3/4"

82'-2 1/2"

℄℄

℄℄

4"

℄6'-6"

4"

℄ ℄

25'-9 1/4"

8'-1 1/8"

15'-6 3/4"5'-0 5/8"℄

15'-0 7/8"15'-0 7/8"

13'-5 3/4"

SIM

.

104C

OR

RID

OR

6'-5 1/4"

6'-0"

TYP.

8'-3 1/4"

1'-1 5/8"

3'-7 1/2"

4'-7 3/4"

℄℄

3'-3 5/8" 7'-1 5/8"

11'-1 7/8"

4'-3 5/8"

6'-0 3/4"

1'-8 3/8"

2'-0 3/8"

4'-9"℄

3'-5 1/8" 24'-0"

2A

7.01

D1

D1s

D1

D1

D1

D1

D2

D2

D2s

D2

W2s

ALIG

N

D1s

D1s

D1s

D2s

W4

W3

D2

D1

D1

D1

D2

D2

SIM

.

SIM

.

7'-7 3/4"

℄11'-0 3/8"

21'-3 3/8"

8'-7 5/8"

21'-5 1/4"

31'-10 3/4"

150°

150°

120°

120°

D2s

D2D

4s

D2s

SIM

.

4'-0"4'-0"

D4s

D2s

D2s

D2s

D4s

D2D

2

D2sD

2s

D2D

2

D2

W4

D2

D1

D1

S1 TY

P.

S1

TYP

.

8'-11 1/4"

D2D

2

D2sD

2s

D2

D4 D

2

7'-5 7/8"7'-5 7/8"

D4s

D2

TYP

.

9'-2 1/2"15'-10 3/8"

6'-0"

TYP

.

10 1/2"TYP.

6'-0"

TYP

.

28'-5 3/8" TYP

.28'-5 3/8" TY

P.

28'-5 3/8" TYP

.28'-5 3/8" TY

P.

10'-8"

6'-0"TY

P.

13'-10 1/8"

11'-0"

19'-8 1/2"

6'-0"

TYP.

5'-7 5/8"7'-0 7/8"2'-1 7/8"9'-0 7/8"

12'-3"

5'-0"

TYP

.

112.82°

1'-3"

6'-6"

2'-11 5/8" 5'-0" 42'-5 1/8"

5'-0"

R64'-0"

CE

NTE

R O

FR

AD

IUS

AT P

ATIO

PA

TIO

33'-0 1/4"

9 7/8"

3'-2"3'-0 3/4"

14'-0 1/8"

6'-6"12'-7 3/8"

8'-2"

1'-5 3/4"

-7-1/2"

+0"

21

22

19

20A

5.02

1st Floor Phase 1

Design Development

10145.002

Northstar Nazareth Living Center

5' 10' 20'0

October 18, 2012

east elevation

fi rst fl oor

DESIGN DEVELOPMENT

CORRESPONDENCE

CONSTRUCTION ADMIN.

PROJECT MANAGMENT

draftingmarketingproduct dataconsultant coordinationsite analysisprogrammingcode requirements

owner meetingsconstruction meetingssub-contractor meetingsproduct selectionclient coordinationmarketing

rfi ’s rfp/prcocppay appasi’s

submittalstransmittalsshop drawings review clarifi cationsdeliverables

consultant coordinationowner reviews documentationproject objectives

Page 2: The Lawrence Group Poster

ST. PIUS V ADAPTIVE REUSE

CLOSET

CLOSET

DSDS

PLAS. CLG @13'-2" A.F.F.

WOOD FLR'G

OFFICE

2x2 APC @7'-11 1/2" A.F.F.

CARPET

CLOSETWOOD FLR'G

12x12 VCT CLOSETVCT FLR'G

CLASSROOM12x12 VCT FLR'G

PLAS. CLG @12'-4 1/2" A.F.F.

PLAS. CLG @13'-2" A.F.F.

OFFICECARPET

PLAS. CLG @13'-2" A.F.F.

S

CLASSROOM12x12 VCT FLR'G

PLAS. CLG @12'-4 1/2" A.F.F.

12x12 VCT FLR'G

HALLWAYHISTORICAL

PLAS. CLG. @12'-5" A.F.F.

TERRAZZO FLR'G

CLASSROOM12x12 VCT FLR'G

PLAS. CLG @12'-4 1/2" A.F.F.

SD.F.

CLASSROOMVCT FLR'G

PLAS. CLG @12'-4 1/2" A.F.F.

CLASSROOMVCT FLR'G

PLAS. CLG @12'-4 1/2" A.F.F.

CLASSROOMVCT FLR'G

PLAS. CLG @12'-4 1/2" A.F.F.

CLOSETVCT FLR'G

TERRAZZO FLR'G

TERRAZZO FLR'G

TERRAZZO FLR'G

CLOSETCLOSET

QUARRY TILE FLR'G

CLOSETVCT FLR'G

F.S.

JAN.

CLOCK

UP

(13

)R@

7 7

/16"

-

DN

DN

DN

(13

)R.

@ 7

.5"+

UP

109'-9" F.F.

111'-10" F.F.

DSDS

DN

(8)

R.

@ 7

5/8

"U

P (

13)R

.@

7 3

/4"

BREAK RM

MULTIPURPOSEROOM

GRANTRECIPIENT

COPY

INTAKE

FAMILY CONF.

REFUGEE CENTER

HISTORICALHALLWAY

DIRECTOR

MECH. RM.

WS5

WS2

WS3

WS4

WS6

WS7

WS8

RECEPTION

WS5

WS1

WS2

WS3

WS4

WS6

WS7

WS8

ELEC./DATA

STAFF OFFICE

HEALTH &ASSISTANCE

CENTER

MECH.

STAFF WOMENS RR

STAFF MENS RR

3284

10'-6"11'-3"

5'-3 1/2" 15'-4 1/2"

2'-3 1/2"

2'-3

1/2

"1'

-8"

14'-1 1/8"7'-4"INSIDE SHAFT

6'-3

1/4

"IN

SID

E S

HA

FT9'

-9 1

/2"

19'-5

"

12'-3

1/4

"9'

-3 1

/8"

9'-5

1/4

"35

'-8"

ALIGN

ALIGN

16'-3" 4'-5"

5'-10" 4'-5"10'-5"

11'-0" 9'-8"

14'-1

1 3/

4"

11'-1

3/8

"

8'-6"

5'-9

1/2

"

ALIGN

UP

(13

)R@

7 7

/16"

-D

N(1

1)R

DN

(11)

R

LANDING ELEV. @120'-2 3/4" A.F.F.

STAFF RR

16'-2

1/2

"

LOBBY

HISTORICALCORR.

STAIR

PASSAGE

ELEVATOR

1'-6"

EXAM

DWREF

MICRO

OVEN/ COOKTOP & HOOD

3'-4

"

1

1

1 1

1

6 TYP. @ELEVATOR

1

2

1

1

1

1

1

7 7

1

1

DS

DS

1FEC

FEC

BOTT. BM. @11'-1 1/2" A.F.F.

PLAS. CLG. @12'-5" A.F.F.

PLAS. CLG @12'-4 1/2" A.F.F.

PLAS. CLG @12'-4 1/2" A.F.F.

BOTT. BM. @11'-11 1/2" A.F.F.

PLAS. CLG @13'-2" A.F.F.

PLAS. CLG @13'-2" A.F.F.

BOTT. BM. @12'-6" A.F.F.

PLAS. CLG @12'-4 1/2" A.F.F.

BOTT. BM. @12'-6" A.F.F.

BOTT. BM. @11'-1 1/2" A.F.F.

BOTT. BM. @11'-1 3/4" A.F.F.

PLAS. CLG @12'-4 1/2" A.F.F.

APC-1 @9'-0" A.F.F.

APC-1 @9'-0" A.F.F.

The Professional Architect's seal affixed to this sheetapplies only to the material and items shown on thissheet. All drawings, instruments or other documents notexhibiting this seal shall not be considered prepared bythis architect, and this architect expressly disclaims anyand all responsibility for such plans, drawings ordocuments not exhibiting this seal.

This drawing and details on it are the sole property of thearchitect and may be used for this specific project only.It shall not be loaned, copied or reproduced, in whole orpart, or for any other purpose or project without thewritten consent of the architect.

12114.001

KPG

Issue Date

No. Description Date

3530

Uta

h S

tree

t, S

t. Lo

uis,

Mis

sour

i 63

118

St.

Piu

s V

Cat

holic

Cha

ritie

sA

rchd

ioce

se o

f Sai

nt L

ouis

AD

AP

TIV

E R

EU

SE

FO

R:

99% REVIEW SET

DECEMBER 28, 2012

2nd FLOOR PLANSDEMOLITIONNEW WORK

2nd FLOOR PLAN - DEMOLITIONSCALE: 1/8" = 1'-0"

1NORTHPLAN

2nd FLOOR PLAN - NEW WORKSCALE: 1/8" = 1'-0"

2NORTHPLAN

2nd CEILING PLAN PLAN - NEW WORKSCALE: 1/8" = 1'-0"

3NORTHPLAN

XDEMOLITION KEYED NOTES1 REMOVE PARTITION AND ASSOCIATED DOORS IN IT'S ENTIRETY AS INDICATED.

2

4

3REMOVE MISCELLANEOUS SHELVING, COAT RACKS ETC. AT EXISTINGCLOSETS AS REQUIRED FIELD VERIFY CONDITION.

REMOVE BUILT-IN WOOD STORAGE CABINET OR SHELVING UNIT..

SAW CUT AND REMOVE EXISTING CMU AS REQUIRED FOR NEW DOOR OPENING

2

1

11

3

3

3

33

3

3

4

1

(THIS PLAN ONLY)

1

1

1

4

4

4 4

4

4

5REMOVE EXISTING POWER PANEL- REFER TO M.E.P. DRAWINGS FOR MOREINFORMATION.

6REMOVE C.I. RADIATOR AND ASSOCIATED PIPING COMPLETELY- REFER TOM.E.P. DRAWINGS FOR MORE INFORMATION.

5

6 4

6

6

6

6

6

6

6

6

6

6

6

6

6

6 6

7 REMOVE EXISTING FINISH FLOOR MATERIAL AND UNDERLAYMENT ASINDICATED (HARDWOOD FLOORING TO REMAIN). SEE GENERAL NOTE 3

8EXISTING TERRAZZO FLOORING TO REMAIN, PROTECT DURING THEDEMOLITION AND CONSTRUCTION PROCESS.

7

8

8

9REMOVE WALL MOUNTED TRIM, CHALK BOARDS, MARKER BOARDS, ETC.(RETAIN HISTORIC CHALK BOARD WHERE NOTED)

7 7

4

9

7

9

7

9

7

9

7

97

9

10REMOVE WALL MOUNTED SINK, SINK AND BASE CABINET, AND OR DRINKINGFOUNTAIN, REFER TO M.E.P. DRAWINGS FOR MORE INFORMATION.

66

10

10

10

11 SAW CUT AND REMOVE AREA OF CONCRETE SLAB FOR NEW ELEVATOR,REFER TO STRUCTURAL DRAWINGS FOR MORE INFORMATION.

12REMOVE PIPING AND STACKS AS REQUIRED, REFER TO M.E.P. DRAWINGS FORMORE INFORMATION.

12

12

12

12

13REMOVE STEEL FLUE PIPE AND METAL SUPPORT BRACKETS, PATCH EXISTINGMASONRY AS REQUIRED AT REMOVED BRACKETS.

13

14

14 REMOVE EXISTING WINDOW AND WOOD TRIM.

1

15

15

TYP.

15

TYP.

15

TYP.

15

TYP.

15

TYP.

15

TYP.

XXX

XCONSTRUCTION PLAN KEYED NOTES (THIS PLAN ONLY)

1HISTORIC CLOCK TO REMAIN, REPLACE MISSING GLASS LENS ON SOUTHSIDE. PROTECT DURING DEMOLITION AND CONSTRUCTION PROCESS

2

16REMOVE WOOD DOOR AND RETAIN DOOR FOR POSSIBLE INSTALLATION AT NEWLOCATION. EXISTING DOOR FRAME AND TRANSOM TO REMAIN.

16

HISTORIC TERRAZZO FLOORING AND BASE, RESTORE ANY DAMAGED AREASIF ANY, SCRUB CLEAN, POLISH AND SEAL AS REQUIRED FOR LIKE NEWAPPEARANCE.

1

3HISTORIC CORRIDOR TO BE PRESERVED; REPAIR ANY DAMAGED PLASTERWALLS AND CEILINGS TO MATCH ADJACENT FINISHES.

PRESERVEHISTORICCHALK BD.

17

17TYP.

2

TYP.2

TYP.3

4HISTORIC STAIRS TO BE PRESERVED; REPAIR ANY DAMAGED PLASTER WALLSAND CEILINGS TO MATCH ADJACENT FINISHES. CLEAN REPAINT WINDOWFRAMES AT NORTH ELEVATION

4

5

5 HISTORIC CHALK BOARD TO BE PRESERVED, CLEAN/ SAND WOOD FRAME ASREQUIRED AND REPAINT. USE ELEMENTS FROM DEMO BOARDS IF REQ'D.

6 HISTORIC CORRIDOR DOOR TO BE PRESERVED; REPAIR DOOR AND FRAME ASREQUIRED. REFER TO DOOR SCHEDULE FOR MORE INFORMATION.

6

69

6

6

6

9 7

7 HISTORIC DOOR FRAME AND TRANSOM TO BE PRESERVED; REPAIR DOORFRAME AND TRANSOM IF REQUIRED. FILL HINGE POCKETS, LATCH HOLES,ETC. AND REFINISH FRAME TO MATCH EXISTING FINISH. SEE DOOR SCHED.

8

8EXISTING ENTRY AND STEPS, RESTORE TO HISTORIC CONDITION-SEE DETAILS 1 THRU 4 SHEET A3.2.

2

REMOVE LOOSE DELAMINATING OR DAMAGED PLASTER AT EXTERIOR WALLSAND PREP AS REQUIRED FOR NEW PLASTER FINISH (FEILD VERIFY CONDITIONS).

8

9 HISTORIC DOOR WITH SWING REVERSED AS SHOWN, PREP EXISTING FRAMEFOR NEW SWING/ HARDWARE. REFER TO DOOR SCHEDULE.

1 PATCH AND REPAIR ALL EXISTING PLASTER CEILINGS ASREQUIRED TO MATCH EXISTING FINISH, PAINT AS SCHEDULED.

TYP.1

TYP.1

TYP.1

TYP.1

TYP.1

TYP.1

TYP.1

TYP.1

2 PATCH IN AND REPAIR EXISTING HISTORIC CEILING MOLDINGSAT EXTERIOR WALLS AND AT HISTORIC CORRIDOR ATDEMOLISHED PARTITIONS OR AS REQUIRED TO MATCH EXISTINGCLEAN AND PAINT.

TYP.2

TYP.2

TYP.2

TYP.2

TYP.2

TYP.2

TYP.2

TYP.2

TYP.2

TYP.2

TYP.1

TYP.1

TYP.2

XCEILING PLAN KEYED NOTES (THIS PLAN ONLY)

10HISTORIC WOOD BASE MOLDINGS AND WALL RAIL TRIM TO BE PRESERVED,TYPICAL AT EXTERIOR WALL AND CLASSROOM SIDE OF HISTORIC CORRIDOR.

10TYP.

10TYP.

10TYP.

10TYP.

10TYP.

10TYP.

10TYP.

10TYP.

10TYP.

REVERSEDR. SWING

3

6

DEMOLISHED PARTITION/ CONSTRUCTION

EXISTING PARTITION/ CONSTRUCTION

NEW PARTITION

NEW OR EXISTING (1) HOUR RATED PARTITION

NEW OR EXISTING (2) HOUR RATED PARTITION

PLAN LEGEND 2x4 LAY-IN FLUORESCENT LIGHT FIXTURE

2x4 ACOUSTICAL PANEL CEILING SYSTEM (APC)

DIRECT/ INDIRECT FLUORESCENTLIGHT FIXTURE

SURFACE MOUNTED OR PENDENTTYPE LIGHT FIXTURE

COMPACT FLUORESCENT CAN LIGHT FIXTURE

1x4 SURFACE MOUNTED OR SUSPENDEDFLUORESCENT STRIP TYPE LIGHT FIXTURE

PARTITION WITH ACOUSTICAL BATTS

1. REFER TO GENERAL NOTES AND CUTTING AND PATCHING NOTESSHEET A2.1 FOR MORE INFORMATION.

2. ALL PLASTER WALLS AND CEILINGS TO REMAIN EXPOSED TO VIEW INNEW CONSTRUCTION ARE TO BE VISUALLY INSPECTED, REMOVESPALLED OR LOOSE PLASTER FINISHES AND REMOVE ANY PEELINGPAINT AND PREP WALLS AND CEILINGS AS REQUIRED FOR PLASTERREPAIR WORK.

3. HARDWOOD FLOORS; ANY AREAS FOUND TO BE UN-SOUND ORDAMAGED ARE TO BE PATCHED AS REQUIRE TO RECEIVE NEWUNDERLAYMENT / FINISHES FLOOR MATERIAL AS SCHEDULE.

1. ALL EXISTING INTERIOR AND EXTERIOR PLASTER WALLS EXPOSEDTO VIEW IN NEW CONSTRUCTION ARE TO BE PATCHED, REPAIREDAND RESTORED TO ORIGINAL WALL FINISH AND TEXTURE ASREQUIRED, FIELD VERIFY EXTENT OF WORK.

2. PROTECT ALL HISTORIC BUILDING ELEMENTS TO REMAIN DURINGTHE DEMOLITION AND CONSTRUCTION PROCESS, TYP.

3. ALL EXISTING WINDOWS AND WOOD WORK ARE TO BE INSPECTEDAND REPAIRED AS REQ'D. WOOD FRAMES, STOOLS AND TRIM ARETO BE PAINTED AS SCHEDULED. SEE TYP. DETAIL 2/A8.1

1

18 REMOVE EXIST'G DOOR AND FRAME

18

19 REMOVED WOOD CASED DOOR OPENINGS AT WALL TO REMAIN

19 19

18

REVERSEDR. SWING

20

20 REMOVED WOOD DOORS, FRAMES AND SIDELITES AT FRONT ENTRY,WOOD VERTICAL HISTORIC MULLIONS TO REMAIN- SEE DETAIL 3/A3.2

21 REMOVE EXIST'G INFILL CONSTRUCTION AT PREVIOUSLYDEMOLISHED WINDOWS FOR NEW MASONRY BEARING CONSTR.

21 21

22

REMOVE WINDOW AC. UNIT AND METAL COMPOSITE PANEL SET INEXIST'G ALUM. WINDOW SASH FRAME, FRAME TO REMAIN.

22 REMOVE EXIST'G INFILL CONSTRUCTION AT PREVIOUSLYDEMOLISHED WINDOW AS REQ'D FOR NEW ALUM. WINDOW.ORIGINAL WOOD WINDOW FRAME IS TO REMAIN.

23

22

REMOVEAC UNITAND WOODSHELVING

23

11NEW STEEL PIPE HANDRAILS, CORE DRILL POST INTO STONE STEPS ORCONCRETE, SET IN NONE SHRINK GROUT.

11

12EXISTING STONE STEPS, MUD-JACK AND SEAL JOINTS AS REQ'D-SEE DETAIL 4/A3.2

12

13PROVIDE NEW 8" CMU FILL WITH PLASTER FINISH TO MATCH ADJACENTWALLS AT EXISTING WINDOW OPENINGS

14

13

1. EXISTING PLASTER CEILINGS TO REMAIN EXPOSED TO VIEWARE TO BE RESTORED TO ORIGINAL FINSIH AND ANY LOOSEOF PEELING PAINT IS TO BE REMOVE AS REQUIRED FORPLASTER REPAIR AND NEW PAINT FINISH.

3

3

3

15 PROVIDE SOUND BATTS IN NEW PARTITIONS AT MECHANICAL ROOM

15

15

1

44

4REPAIR COVED PLASTER CEILING AND TRIM TO ORIGINAL CONDITIONAS REQUIRED AT DEMOLISHED PLUMBING - PAINT AS SCHED..

EXISTING WINDOWS THIS AREA TO BE PROTECTED WITHWATER CURTAIN TO ACHIEVE (1) HOUR RATING .5

5

6

TRANSOM WOOD WORK STRIPPED, CLEANED AND REPAINTED6

16 BRICK VENEER INFILL TO MATCH EXIST'G OVER 5/8" DENSGLAS 3-5/8"METAL STUDS W/ INSULATION AND 5/8" GYP. BD. AT INTERIOR SIDE.PROVIDE SILL FLASHING AND WEEPS AS REQUIRED.

16

REMOVE WINDOW AC. UNIT AND METAL COMPOSITE PANEL SET INEXIST'G ALUM. WINDOW SASH FRAME, FRAME TO REMAIN.

PROVIDE & INSTALL NEW CLEAR INSULATED GLASS IN EXISTINGALUMINUM WINDOW SASH AS REQ'D TO MATCH EXISTING GLAZING.FIELD VERIFY SIZES AND EXIST'G CONDITIONS.

24

24

17

17 HISTORIC CORR; REMOVE ALL SURFACE MOUNTED ELECTRICAL CONDUITS,J-BOXES, LIGHT FIXTURES, ETC. REFER TO M.E.P. DWGS FOR MORE INFORMATION.PLASTER WALLS AND CEILINGS, TRIM, AND DOORS ARE TO BE PRESERVED U.N.O.

14PROVIDE NEW STEEL LINTELS AS REQUIRED AT NEW DOOR OPENINGREFER TO STRUCTURAL DWGS FOR MORE INFORMATION.

1725

REMOVE ALUM. SINGLE HUNG WINDOW, RETAIN FOR INSTALLATIONAT NEW LOCATION- REFER TO CONSTRUCTION PLAN.25

25

NEW MECHANICAL LOUVER IN EXISTING WOOD WINDOW FRAME.INSTALL WEATHER TIGHT .18

18

18

RELOCATED ALUM. SINGLE HUNG WINDOW IN EXISTING WOODWINDOW FRAME. PROVIDE BREAK METAL CLADDING AT EXTERIOR OFWOOD FRAME TO MATCH EXIST'G INSTALLED CONDITIONS, INSTALLWEATHER TIGHT .

19

1919

NEW SUSPENDED ACOUSTICAL PANEL CEILING SYSTEM. SEEDETAILS A, B, & C/A8.1

CLOSET

CLOSET

DSDS

PLAS. CLG @13'-2" A.F.F.

WOOD FLR'G

OFFICE

2x2 APC @7'-11 1/2" A.F.F.

CARPET

CLOSETWOOD FLR'G

12x12 VCT CLOSETVCT FLR'G

CLASSROOM12x12 VCT FLR'G

PLAS. CLG @12'-4 1/2" A.F.F.

PLAS. CLG @13'-2" A.F.F.

OFFICECARPET

PLAS. CLG @13'-2" A.F.F.

S

CLASSROOM12x12 VCT FLR'G

PLAS. CLG @12'-4 1/2" A.F.F.

12x12 VCT FLR'G

HALLWAYHISTORICAL

PLAS. CLG. @12'-5" A.F.F.

TERRAZZO FLR'G

CLASSROOM12x12 VCT FLR'G

PLAS. CLG @12'-4 1/2" A.F.F.

SD.F.

CLASSROOMVCT FLR'G

PLAS. CLG @12'-4 1/2" A.F.F.

CLASSROOMVCT FLR'G

PLAS. CLG @12'-4 1/2" A.F.F.

CLASSROOMVCT FLR'G

PLAS. CLG @12'-4 1/2" A.F.F.

CLOSETVCT FLR'G

TERRAZZO FLR'G

TERRAZZO FLR'G

TERRAZZO FLR'G

CLOSETCLOSET

QUARRY TILE FLR'G

CLOSETVCT FLR'G

F.S.

JAN.

CLOCK

UP

(13

)R@

7 7

/16"

-

DN

DN

DN

(13

)R.

@ 7

.5"+

UP

109'-9" F.F.

111'-10" F.F.

DSDS

DN

(8)

R.

@ 7

5/8

"U

P (

13)R

.@

7 3

/4"

BREAK RM

MULTIPURPOSEROOM

GRANTRECIPIENT

COPY

INTAKE

FAMILY CONF.

REFUGEE CENTER

HISTORICALHALLWAY

DIRECTOR

MECH. RM.

WS5

WS2

WS3

WS4

WS6

WS7

WS8

RECEPTION

WS5

WS1

WS2

WS3

WS4

WS6

WS7

WS8

ELEC./DATA

STAFF OFFICE

HEALTH &ASSISTANCE

CENTER

MECH.

STAFF WOMENS RR

STAFF MENS RR

3284

10'-6"11'-3"

5'-3 1/2" 15'-4 1/2"

2'-3 1/2"

2'-3

1/2

"1'

-8"

14'-1 1/8"7'-4"INSIDE SHAFT

6'-3

1/4

"IN

SID

E S

HA

FT9'

-9 1

/2"

19'-5

"

12'-3

1/4

"9'

-3 1

/8"

9'-5

1/4

"35

'-8"

ALIGN

ALIGN

16'-3" 4'-5"

5'-10" 4'-5"10'-5"

11'-0" 9'-8"

14'-1

1 3/

4"

11'-1

3/8

"

8'-6"

5'-9

1/2

"

ALIGN

UP

(13

)R@

7 7

/16"

-D

N(1

1)R

DN

(11)

R

LANDING ELEV. @120'-2 3/4" A.F.F.

STAFF RR

16'-2

1/2

"

LOBBY

HISTORICALCORR.

STAIR

PASSAGE

ELEVATOR

1'-6"

EXAM

DWREF

MICRO

OVEN/ COOKTOP & HOOD

3'-4

"

1

1

1 1

1

6 TYP. @ELEVATOR

1

2

1

1

1

1

1

7 7

1

1

DS

DS

1FEC

FEC

BOTT. BM. @11'-1 1/2" A.F.F.

PLAS. CLG. @12'-5" A.F.F.

PLAS. CLG @12'-4 1/2" A.F.F.

PLAS. CLG @12'-4 1/2" A.F.F.

BOTT. BM. @11'-11 1/2" A.F.F.

PLAS. CLG @13'-2" A.F.F.

PLAS. CLG @13'-2" A.F.F.

BOTT. BM. @12'-6" A.F.F.

PLAS. CLG @12'-4 1/2" A.F.F.

BOTT. BM. @12'-6" A.F.F.

BOTT. BM. @11'-1 1/2" A.F.F.

BOTT. BM. @11'-1 3/4" A.F.F.

PLAS. CLG @12'-4 1/2" A.F.F.

APC-1 @9'-0" A.F.F.

APC-1 @9'-0" A.F.F.

The Professional Architect's seal affixed to this sheetapplies only to the material and items shown on thissheet. All drawings, instruments or other documents notexhibiting this seal shall not be considered prepared bythis architect, and this architect expressly disclaims anyand all responsibility for such plans, drawings ordocuments not exhibiting this seal.

This drawing and details on it are the sole property of thearchitect and may be used for this specific project only.It shall not be loaned, copied or reproduced, in whole orpart, or for any other purpose or project without thewritten consent of the architect.

12114.001

KPG

Issue Date

No. Description Date

3530

Uta

h S

tree

t, S

t. Lo

uis,

Mis

sour

i 63

118

St.

Piu

s V

Cat

holic

Cha

ritie

sA

rchd

ioce

se o

f Sai

nt L

ouis

AD

AP

TIV

E R

EU

SE

FO

R:

99% REVIEW SET

DECEMBER 28, 2012

2nd FLOOR PLANSDEMOLITIONNEW WORK

2nd FLOOR PLAN - DEMOLITIONSCALE: 1/8" = 1'-0"

1NORTHPLAN

2nd FLOOR PLAN - NEW WORKSCALE: 1/8" = 1'-0"

2NORTHPLAN

2nd CEILING PLAN PLAN - NEW WORKSCALE: 1/8" = 1'-0"

3NORTHPLAN

XDEMOLITION KEYED NOTES1 REMOVE PARTITION AND ASSOCIATED DOORS IN IT'S ENTIRETY AS INDICATED.

2

4

3REMOVE MISCELLANEOUS SHELVING, COAT RACKS ETC. AT EXISTINGCLOSETS AS REQUIRED FIELD VERIFY CONDITION.

REMOVE BUILT-IN WOOD STORAGE CABINET OR SHELVING UNIT..

SAW CUT AND REMOVE EXISTING CMU AS REQUIRED FOR NEW DOOR OPENING

2

1

11

3

3

3

33

3

3

4

1

(THIS PLAN ONLY)

1

1

1

4

4

4 4

4

4

5REMOVE EXISTING POWER PANEL- REFER TO M.E.P. DRAWINGS FOR MOREINFORMATION.

6REMOVE C.I. RADIATOR AND ASSOCIATED PIPING COMPLETELY- REFER TOM.E.P. DRAWINGS FOR MORE INFORMATION.

5

6 4

6

6

6

6

6

6

6

6

6

6

6

6

6

6 6

7 REMOVE EXISTING FINISH FLOOR MATERIAL AND UNDERLAYMENT ASINDICATED (HARDWOOD FLOORING TO REMAIN). SEE GENERAL NOTE 3

8EXISTING TERRAZZO FLOORING TO REMAIN, PROTECT DURING THEDEMOLITION AND CONSTRUCTION PROCESS.

7

8

8

9REMOVE WALL MOUNTED TRIM, CHALK BOARDS, MARKER BOARDS, ETC.(RETAIN HISTORIC CHALK BOARD WHERE NOTED)

7 7

4

9

7

9

7

9

7

9

7

97

9

10REMOVE WALL MOUNTED SINK, SINK AND BASE CABINET, AND OR DRINKINGFOUNTAIN, REFER TO M.E.P. DRAWINGS FOR MORE INFORMATION.

66

10

10

10

11 SAW CUT AND REMOVE AREA OF CONCRETE SLAB FOR NEW ELEVATOR,REFER TO STRUCTURAL DRAWINGS FOR MORE INFORMATION.

12REMOVE PIPING AND STACKS AS REQUIRED, REFER TO M.E.P. DRAWINGS FORMORE INFORMATION.

12

12

12

12

13REMOVE STEEL FLUE PIPE AND METAL SUPPORT BRACKETS, PATCH EXISTINGMASONRY AS REQUIRED AT REMOVED BRACKETS.

13

14

14 REMOVE EXISTING WINDOW AND WOOD TRIM.

1

15

15

TYP.

15

TYP.

15

TYP.

15

TYP.

15

TYP.

15

TYP.

XXX

XCONSTRUCTION PLAN KEYED NOTES (THIS PLAN ONLY)

1HISTORIC CLOCK TO REMAIN, REPLACE MISSING GLASS LENS ON SOUTHSIDE. PROTECT DURING DEMOLITION AND CONSTRUCTION PROCESS

2

16REMOVE WOOD DOOR AND RETAIN DOOR FOR POSSIBLE INSTALLATION AT NEWLOCATION. EXISTING DOOR FRAME AND TRANSOM TO REMAIN.

16

HISTORIC TERRAZZO FLOORING AND BASE, RESTORE ANY DAMAGED AREASIF ANY, SCRUB CLEAN, POLISH AND SEAL AS REQUIRED FOR LIKE NEWAPPEARANCE.

1

3HISTORIC CORRIDOR TO BE PRESERVED; REPAIR ANY DAMAGED PLASTERWALLS AND CEILINGS TO MATCH ADJACENT FINISHES.

PRESERVEHISTORICCHALK BD.

17

17TYP.

2

TYP.2

TYP.3

4HISTORIC STAIRS TO BE PRESERVED; REPAIR ANY DAMAGED PLASTER WALLSAND CEILINGS TO MATCH ADJACENT FINISHES. CLEAN REPAINT WINDOWFRAMES AT NORTH ELEVATION

4

5

5 HISTORIC CHALK BOARD TO BE PRESERVED, CLEAN/ SAND WOOD FRAME ASREQUIRED AND REPAINT. USE ELEMENTS FROM DEMO BOARDS IF REQ'D.

6 HISTORIC CORRIDOR DOOR TO BE PRESERVED; REPAIR DOOR AND FRAME ASREQUIRED. REFER TO DOOR SCHEDULE FOR MORE INFORMATION.

6

69

6

6

6

9 7

7 HISTORIC DOOR FRAME AND TRANSOM TO BE PRESERVED; REPAIR DOORFRAME AND TRANSOM IF REQUIRED. FILL HINGE POCKETS, LATCH HOLES,ETC. AND REFINISH FRAME TO MATCH EXISTING FINISH. SEE DOOR SCHED.

8

8EXISTING ENTRY AND STEPS, RESTORE TO HISTORIC CONDITION-SEE DETAILS 1 THRU 4 SHEET A3.2.

2

REMOVE LOOSE DELAMINATING OR DAMAGED PLASTER AT EXTERIOR WALLSAND PREP AS REQUIRED FOR NEW PLASTER FINISH (FEILD VERIFY CONDITIONS).

8

9 HISTORIC DOOR WITH SWING REVERSED AS SHOWN, PREP EXISTING FRAMEFOR NEW SWING/ HARDWARE. REFER TO DOOR SCHEDULE.

1 PATCH AND REPAIR ALL EXISTING PLASTER CEILINGS ASREQUIRED TO MATCH EXISTING FINISH, PAINT AS SCHEDULED.

TYP.1

TYP.1

TYP.1

TYP.1

TYP.1

TYP.1

TYP.1

TYP.1

2 PATCH IN AND REPAIR EXISTING HISTORIC CEILING MOLDINGSAT EXTERIOR WALLS AND AT HISTORIC CORRIDOR ATDEMOLISHED PARTITIONS OR AS REQUIRED TO MATCH EXISTINGCLEAN AND PAINT.

TYP.2

TYP.2

TYP.2

TYP.2

TYP.2

TYP.2

TYP.2

TYP.2

TYP.2

TYP.2

TYP.1

TYP.1

TYP.2

XCEILING PLAN KEYED NOTES (THIS PLAN ONLY)

10HISTORIC WOOD BASE MOLDINGS AND WALL RAIL TRIM TO BE PRESERVED,TYPICAL AT EXTERIOR WALL AND CLASSROOM SIDE OF HISTORIC CORRIDOR.

10TYP.

10TYP.

10TYP.

10TYP.

10TYP.

10TYP.

10TYP.

10TYP.

10TYP.

REVERSEDR. SWING

3

6

DEMOLISHED PARTITION/ CONSTRUCTION

EXISTING PARTITION/ CONSTRUCTION

NEW PARTITION

NEW OR EXISTING (1) HOUR RATED PARTITION

NEW OR EXISTING (2) HOUR RATED PARTITION

PLAN LEGEND 2x4 LAY-IN FLUORESCENT LIGHT FIXTURE

2x4 ACOUSTICAL PANEL CEILING SYSTEM (APC)

DIRECT/ INDIRECT FLUORESCENTLIGHT FIXTURE

SURFACE MOUNTED OR PENDENTTYPE LIGHT FIXTURE

COMPACT FLUORESCENT CAN LIGHT FIXTURE

1x4 SURFACE MOUNTED OR SUSPENDEDFLUORESCENT STRIP TYPE LIGHT FIXTURE

PARTITION WITH ACOUSTICAL BATTS

1. REFER TO GENERAL NOTES AND CUTTING AND PATCHING NOTESSHEET A2.1 FOR MORE INFORMATION.

2. ALL PLASTER WALLS AND CEILINGS TO REMAIN EXPOSED TO VIEW INNEW CONSTRUCTION ARE TO BE VISUALLY INSPECTED, REMOVESPALLED OR LOOSE PLASTER FINISHES AND REMOVE ANY PEELINGPAINT AND PREP WALLS AND CEILINGS AS REQUIRED FOR PLASTERREPAIR WORK.

3. HARDWOOD FLOORS; ANY AREAS FOUND TO BE UN-SOUND ORDAMAGED ARE TO BE PATCHED AS REQUIRE TO RECEIVE NEWUNDERLAYMENT / FINISHES FLOOR MATERIAL AS SCHEDULE.

1. ALL EXISTING INTERIOR AND EXTERIOR PLASTER WALLS EXPOSEDTO VIEW IN NEW CONSTRUCTION ARE TO BE PATCHED, REPAIREDAND RESTORED TO ORIGINAL WALL FINISH AND TEXTURE ASREQUIRED, FIELD VERIFY EXTENT OF WORK.

2. PROTECT ALL HISTORIC BUILDING ELEMENTS TO REMAIN DURINGTHE DEMOLITION AND CONSTRUCTION PROCESS, TYP.

3. ALL EXISTING WINDOWS AND WOOD WORK ARE TO BE INSPECTEDAND REPAIRED AS REQ'D. WOOD FRAMES, STOOLS AND TRIM ARETO BE PAINTED AS SCHEDULED. SEE TYP. DETAIL 2/A8.1

1

18 REMOVE EXIST'G DOOR AND FRAME

18

19 REMOVED WOOD CASED DOOR OPENINGS AT WALL TO REMAIN

19 19

18

REVERSEDR. SWING

20

20 REMOVED WOOD DOORS, FRAMES AND SIDELITES AT FRONT ENTRY,WOOD VERTICAL HISTORIC MULLIONS TO REMAIN- SEE DETAIL 3/A3.2

21 REMOVE EXIST'G INFILL CONSTRUCTION AT PREVIOUSLYDEMOLISHED WINDOWS FOR NEW MASONRY BEARING CONSTR.

21 21

22

REMOVE WINDOW AC. UNIT AND METAL COMPOSITE PANEL SET INEXIST'G ALUM. WINDOW SASH FRAME, FRAME TO REMAIN.

22 REMOVE EXIST'G INFILL CONSTRUCTION AT PREVIOUSLYDEMOLISHED WINDOW AS REQ'D FOR NEW ALUM. WINDOW.ORIGINAL WOOD WINDOW FRAME IS TO REMAIN.

23

22

REMOVEAC UNITAND WOODSHELVING

23

11NEW STEEL PIPE HANDRAILS, CORE DRILL POST INTO STONE STEPS ORCONCRETE, SET IN NONE SHRINK GROUT.

11

12EXISTING STONE STEPS, MUD-JACK AND SEAL JOINTS AS REQ'D-SEE DETAIL 4/A3.2

12

13PROVIDE NEW 8" CMU FILL WITH PLASTER FINISH TO MATCH ADJACENTWALLS AT EXISTING WINDOW OPENINGS

14

13

1. EXISTING PLASTER CEILINGS TO REMAIN EXPOSED TO VIEWARE TO BE RESTORED TO ORIGINAL FINSIH AND ANY LOOSEOF PEELING PAINT IS TO BE REMOVE AS REQUIRED FORPLASTER REPAIR AND NEW PAINT FINISH.

3

3

3

15 PROVIDE SOUND BATTS IN NEW PARTITIONS AT MECHANICAL ROOM

15

15

1

44

4REPAIR COVED PLASTER CEILING AND TRIM TO ORIGINAL CONDITIONAS REQUIRED AT DEMOLISHED PLUMBING - PAINT AS SCHED..

EXISTING WINDOWS THIS AREA TO BE PROTECTED WITHWATER CURTAIN TO ACHIEVE (1) HOUR RATING .5

5

6

TRANSOM WOOD WORK STRIPPED, CLEANED AND REPAINTED6

16 BRICK VENEER INFILL TO MATCH EXIST'G OVER 5/8" DENSGLAS 3-5/8"METAL STUDS W/ INSULATION AND 5/8" GYP. BD. AT INTERIOR SIDE.PROVIDE SILL FLASHING AND WEEPS AS REQUIRED.

16

REMOVE WINDOW AC. UNIT AND METAL COMPOSITE PANEL SET INEXIST'G ALUM. WINDOW SASH FRAME, FRAME TO REMAIN.

PROVIDE & INSTALL NEW CLEAR INSULATED GLASS IN EXISTINGALUMINUM WINDOW SASH AS REQ'D TO MATCH EXISTING GLAZING.FIELD VERIFY SIZES AND EXIST'G CONDITIONS.

24

24

17

17 HISTORIC CORR; REMOVE ALL SURFACE MOUNTED ELECTRICAL CONDUITS,J-BOXES, LIGHT FIXTURES, ETC. REFER TO M.E.P. DWGS FOR MORE INFORMATION.PLASTER WALLS AND CEILINGS, TRIM, AND DOORS ARE TO BE PRESERVED U.N.O.

14PROVIDE NEW STEEL LINTELS AS REQUIRED AT NEW DOOR OPENINGREFER TO STRUCTURAL DWGS FOR MORE INFORMATION.

1725

REMOVE ALUM. SINGLE HUNG WINDOW, RETAIN FOR INSTALLATIONAT NEW LOCATION- REFER TO CONSTRUCTION PLAN.25

25

NEW MECHANICAL LOUVER IN EXISTING WOOD WINDOW FRAME.INSTALL WEATHER TIGHT .18

18

18

RELOCATED ALUM. SINGLE HUNG WINDOW IN EXISTING WOODWINDOW FRAME. PROVIDE BREAK METAL CLADDING AT EXTERIOR OFWOOD FRAME TO MATCH EXIST'G INSTALLED CONDITIONS, INSTALLWEATHER TIGHT .

19

1919

NEW SUSPENDED ACOUSTICAL PANEL CEILING SYSTEM. SEEDETAILS A, B, & C/A8.1

STUDENT HOUSING

ACADEMIC PROGRAMS

EXISTING BUILDINGS

south east missouri state UNIVERSITY-RIVER CAMPUS MIXED USE

UNIT A4 BEDROOM/ 4 BATH

BEDROOM

BEDROOM

BATH BATH

W/D

BATH BATH

BEDROOM

BEDROOM KIT

CH

EN

ETT

E

R

8'-6

"

14'-3"

8'-6

"

14'-3"

14'-3"

8'-6

"

8'-6

"

14'-3"

6'-6

"

6'-6

"

32'-0

"

DWELLING

13'-0"

DINING

Sketch/Page No.

refer to sheet A3.0

A01Unit A

612.127

Southeast Missouri State River Campus Residence Hall & Academic Program

07.05.12

Scale: 3/16" = 1'-0"

0 5'-4"2'-8"1'-4"

UNIT B4 BEDROOM/ 4 BATH

BATH

BEDROOMBEDROOM

BATH

KIT

CH

EN

ETT

E

RW/D

13'-0"

8'-6"

6'-6"

8'-6"

14'-3

"3'

-6"

14'-3

"

32'-0

"

BATH

BEDROOM BEDROOM

BATH

8'-6"

6'-6"

8'-6"

14'-3

"3'

-6"

14'-3

"

DWELLING

DINING

Sketch/Page No.

refer to sheet A3.0

A01612.127

Southeast Missouri State River Campus Residence Hall & Academic Program

Scale: 3/16" = 1'-0"

0 5'-4"2'-8"1'-4"

Unit B

07.05.12

UNIT HYBRID4 BEDROOM/ 4 BATH

BATH

BEDROOMBEDROOM

BATH

KIT

CH

EN

ETT

E

RW/D

13'-0"

8'-6"

6'-6"

8'-6"

14'-3

"3'

-6"

14'-3

"

32'-0

"

DWELLING

DINING

BATH BATH

BEDROOM

BEDROOM

8'-6

"

14'-3"

8'-6

"

14'-3"

Sketch/Page No.

refer to sheet A3.0

A01612.127

Southeast Missouri State River Campus Residence Hall & Academic Program

Scale: 3/16" = 1'-0"

0 5'-4"2'-8"1'-4"

Unit C (Hybrid)07.05.12

UNIT TYPES STUDY

Client: south-east missouri state universityLocation: 518 S Fountain St Cape Girardeau, MO 63702

program: student housing art studios

context: river campus

brief:

schematic design programming adjacency studiesspace allocation diagramscontext studiesprecedent studies 3-d modeling siting optionseffi cient fl oor plan options

Client: archdiocese of st. louis Location: 3310 S Grand Blvd Saint Louis, Missouri 63116program: catholic charities offi ces:

catholic family servies refugee centersouthside centerlamphousing resource centerchildcare center

shared multi-purpose spaces

context: st. louis city

brief:

abandoned school buildingProgramming Adjacency studiesField Verifying existing conditions consultant coordinationAdaptive ReuseHistoric Preservationintegrating new systems multiple clients and programs