nazareth living centerindependent senior living
Client: nazareth living centerLocation: 2 nazareth lane saint louis, missouri 63129
program: 50 living units parking garagelibrary, card room, meditation room, fi tness, exercise, doctors offi ce, salon, kitchen, dining, family party room
context: residential neighborhood senior living complex: assited living, skilled nursing
brief: I have been involved with this project since may 2011. in august 2012, I was given project architect responsibili-ties as a result of an associate’s ma-ternity leave during the construc-tion administration phase. i attended meetings with the owner and other members of the design team.
c o n s t r u c t i o n o b s e r v a t i o n
s a m a n t h a a u e r health + wellness internship saint louis, missouri 2012
6'-4"
6'-4"
105R
EC
YC
L'GTR
AS
H/
S1-1
STA
IRN
OR
TH
S2-1
STA
IRS
OU
TH
133C
LOS
ET
TEC
H
132JA
NITO
R
102C
OR
RID
OR
A101
UN
IT
A103
UN
IT
A105
UN
IT
E-1
ELE
V137
ELE
C
121LO
UN
GE
122C
OR
RID
OR
123C
OR
RID
OR
130C
OR
RID
OR
131E
LEC
ME
CH
/
134C
OR
RID
OR
RO
OF
BE
LOW
RO
OF
BE
LOW
A111
UN
ITA
DA
A117
UN
IT
A119
UN
IT
A118
UN
IT
A112
UN
ITA
DA
C116
UN
IT
C114
UN
IT
C115
UN
IT
C113
UN
IT
S1-1A
S2-1
105A
130
135
131
132
133
135R
EC
YC
L'GTR
AS
H/
101LO
BB
YE
LEV
137
138R
OO
MC
AR
D138
A123
UN
ITA
121U
NIT
136C
OR
RID
OR
129R
OO
MM
ED
IA
127S
TOR
EG
EN
ER
AL
128S
TOR
AG
E
120C
ON
FER
EN
CE
FAM
ILY P
AR
TY/
125JA
NITO
R
124R
ES
TRM
.P
UB
LIC
126R
ES
TRM
.P
UB
LIC
106B
AR
107D
ININ
G R
OO
M
108B
EV
ER
AG
E
109C
OO
K
111P
RE
P
119FR
EE
ZER
118C
OO
LER
117H
ALL
116R
ES
TRM
.S
TAFF
115LIN
EN
S
114JA
NITO
R
113O
FFICE
112S
TOR
AG
ED
RY
110R
OO
MD
ISH
S1-1B
104102
109 113
114
116
117
120A
122
123
124126
125
127
128
129A
4'-6" HIG
H W
ALL
107A
1A
5.02
44 seats
UP
DN
UPD
N
120B
RO
OF
BE
LOW
129B
107B
9a
A5.01
117A
117AM
EC
H.
72"
48"
48"
1A
5.03
105B
2A
7.03
2A
7.02
1A
7.04
3A
5.02
6'-0"
TYP
.
8'-11 1/2"12'-11 1/4"15'-0 7/8"15'-0 7/8"15'-0 7/8"13'-1 7/8"13'-1 7/8"14'-2 5/8"16'-1 3/4"27'-10 1/4"
18'-11 7/8"
3'-2 1/8"
3'-2"4'-7 5/8"
18'-10 1/2"
13'-5 7/8"3'-0 5/8"
12'-2 1/2"
14'-10 7/8"13'-1 7/8"35'-2"12'-8 1/4"10'-9 1/8" 12'-4 5/8"13'-1 7/8"15'-0 7/8"15'-0 7/8"13'-6 1/4"
6'-6"
18'-1 1/4" 15'-6"
6 3/4"
10'-0 3/4" 13'-1 7/8"
2'-4"
23'-1 3/4" 12'-8 1/4" 35'-2" 13'-1 7/8" 18'-8 5/8"
9'-0 3/4"
3'-3 1/4" 21'-10 3/4"
20'-10 3/4"
82'-2 1/2"
℄℄
℄
℄
℄℄
4"
℄6'-6"
℄
℄
4"
℄ ℄
25'-9 1/4"
8'-1 1/8"
℄
15'-6 3/4"5'-0 5/8"℄
15'-0 7/8"15'-0 7/8"
13'-5 3/4"
SIM
.
104C
OR
RID
OR
6'-5 1/4"
6'-0"
TYP.
8'-3 1/4"
1'-1 5/8"
3'-7 1/2"
4'-7 3/4"
℄
℄℄
3'-3 5/8" 7'-1 5/8"
11'-1 7/8"
4'-3 5/8"
℄
6'-0 3/4"
1'-8 3/8"
2'-0 3/8"
4'-9"℄
3'-5 1/8" 24'-0"
2A
7.01
D1
D1s
D1
D1
D1
D1
D2
D2
D2s
D2
W2s
ALIG
N
D1s
D1s
D1s
D2s
W4
W3
D2
D1
D1
D1
D2
D2
SIM
.
SIM
.
7'-7 3/4"
℄11'-0 3/8"
℄
21'-3 3/8"
8'-7 5/8"
21'-5 1/4"
31'-10 3/4"
150°
150°
120°
120°
D2s
D2D
4s
D2s
SIM
.
4'-0"4'-0"
D4s
D2s
D2s
D2s
D4s
D2D
2
D2sD
2s
D2D
2
D2
W4
D2
D1
D1
S1 TY
P.
S1
TYP
.
8'-11 1/4"
℄
D2D
2
D2sD
2s
D2
D4 D
2
7'-5 7/8"7'-5 7/8"
D4s
D2
TYP
.
9'-2 1/2"15'-10 3/8"
6'-0"
TYP
.
10 1/2"TYP.
6'-0"
TYP
.
28'-5 3/8" TYP
.28'-5 3/8" TY
P.
28'-5 3/8" TYP
.28'-5 3/8" TY
P.
10'-8"
6'-0"TY
P.
13'-10 1/8"
11'-0"
19'-8 1/2"
℄
6'-0"
TYP.
5'-7 5/8"7'-0 7/8"2'-1 7/8"9'-0 7/8"
12'-3"
5'-0"
TYP
.
112.82°
1'-3"
6'-6"
2'-11 5/8" 5'-0" 42'-5 1/8"
5'-0"
R64'-0"
CE
NTE
R O
FR
AD
IUS
AT P
ATIO
PA
TIO
33'-0 1/4"
9 7/8"
3'-2"3'-0 3/4"
14'-0 1/8"
6'-6"12'-7 3/8"
8'-2"
1'-5 3/4"
-7-1/2"
+0"
21
22
19
20A
5.02
1st Floor Phase 1
Design Development
10145.002
Northstar Nazareth Living Center
5' 10' 20'0
October 18, 2012
east elevation
fi rst fl oor
DESIGN DEVELOPMENT
CORRESPONDENCE
CONSTRUCTION ADMIN.
PROJECT MANAGMENT
draftingmarketingproduct dataconsultant coordinationsite analysisprogrammingcode requirements
owner meetingsconstruction meetingssub-contractor meetingsproduct selectionclient coordinationmarketing
rfi ’s rfp/prcocppay appasi’s
submittalstransmittalsshop drawings review clarifi cationsdeliverables
consultant coordinationowner reviews documentationproject objectives
ST. PIUS V ADAPTIVE REUSE
CLOSET
CLOSET
DSDS
PLAS. CLG @13'-2" A.F.F.
WOOD FLR'G
OFFICE
2x2 APC @7'-11 1/2" A.F.F.
CARPET
CLOSETWOOD FLR'G
12x12 VCT CLOSETVCT FLR'G
CLASSROOM12x12 VCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
PLAS. CLG @13'-2" A.F.F.
OFFICECARPET
PLAS. CLG @13'-2" A.F.F.
S
CLASSROOM12x12 VCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
12x12 VCT FLR'G
HALLWAYHISTORICAL
PLAS. CLG. @12'-5" A.F.F.
TERRAZZO FLR'G
CLASSROOM12x12 VCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
SD.F.
CLASSROOMVCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
CLASSROOMVCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
CLASSROOMVCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
CLOSETVCT FLR'G
TERRAZZO FLR'G
TERRAZZO FLR'G
TERRAZZO FLR'G
CLOSETCLOSET
QUARRY TILE FLR'G
CLOSETVCT FLR'G
F.S.
JAN.
CLOCK
UP
(13
)R@
7 7
/16"
-
DN
DN
DN
(13
)R.
@ 7
.5"+
UP
109'-9" F.F.
111'-10" F.F.
DSDS
DN
(8)
R.
@ 7
5/8
"U
P (
13)R
.@
7 3
/4"
BREAK RM
MULTIPURPOSEROOM
GRANTRECIPIENT
COPY
INTAKE
FAMILY CONF.
REFUGEE CENTER
HISTORICALHALLWAY
DIRECTOR
MECH. RM.
WS5
WS2
WS3
WS4
WS6
WS7
WS8
RECEPTION
WS5
WS1
WS2
WS3
WS4
WS6
WS7
WS8
ELEC./DATA
STAFF OFFICE
HEALTH &ASSISTANCE
CENTER
MECH.
STAFF WOMENS RR
STAFF MENS RR
3284
10'-6"11'-3"
5'-3 1/2" 15'-4 1/2"
2'-3 1/2"
2'-3
1/2
"1'
-8"
14'-1 1/8"7'-4"INSIDE SHAFT
6'-3
1/4
"IN
SID
E S
HA
FT9'
-9 1
/2"
19'-5
"
12'-3
1/4
"9'
-3 1
/8"
9'-5
1/4
"35
'-8"
ALIGN
ALIGN
16'-3" 4'-5"
5'-10" 4'-5"10'-5"
11'-0" 9'-8"
14'-1
1 3/
4"
11'-1
3/8
"
8'-6"
5'-9
1/2
"
ALIGN
UP
(13
)R@
7 7
/16"
-D
N(1
1)R
DN
(11)
R
LANDING ELEV. @120'-2 3/4" A.F.F.
STAFF RR
16'-2
1/2
"
LOBBY
HISTORICALCORR.
STAIR
PASSAGE
ELEVATOR
1'-6"
EXAM
DWREF
MICRO
OVEN/ COOKTOP & HOOD
3'-4
"
1
1
1 1
1
6 TYP. @ELEVATOR
1
2
1
1
1
1
1
7 7
1
1
DS
DS
1FEC
FEC
BOTT. BM. @11'-1 1/2" A.F.F.
PLAS. CLG. @12'-5" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
BOTT. BM. @11'-11 1/2" A.F.F.
PLAS. CLG @13'-2" A.F.F.
PLAS. CLG @13'-2" A.F.F.
BOTT. BM. @12'-6" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
BOTT. BM. @12'-6" A.F.F.
BOTT. BM. @11'-1 1/2" A.F.F.
BOTT. BM. @11'-1 3/4" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
APC-1 @9'-0" A.F.F.
APC-1 @9'-0" A.F.F.
The Professional Architect's seal affixed to this sheetapplies only to the material and items shown on thissheet. All drawings, instruments or other documents notexhibiting this seal shall not be considered prepared bythis architect, and this architect expressly disclaims anyand all responsibility for such plans, drawings ordocuments not exhibiting this seal.
This drawing and details on it are the sole property of thearchitect and may be used for this specific project only.It shall not be loaned, copied or reproduced, in whole orpart, or for any other purpose or project without thewritten consent of the architect.
12114.001
KPG
Issue Date
No. Description Date
3530
Uta
h S
tree
t, S
t. Lo
uis,
Mis
sour
i 63
118
St.
Piu
s V
Cat
holic
Cha
ritie
sA
rchd
ioce
se o
f Sai
nt L
ouis
AD
AP
TIV
E R
EU
SE
FO
R:
99% REVIEW SET
DECEMBER 28, 2012
2nd FLOOR PLANSDEMOLITIONNEW WORK
2nd FLOOR PLAN - DEMOLITIONSCALE: 1/8" = 1'-0"
1NORTHPLAN
2nd FLOOR PLAN - NEW WORKSCALE: 1/8" = 1'-0"
2NORTHPLAN
2nd CEILING PLAN PLAN - NEW WORKSCALE: 1/8" = 1'-0"
3NORTHPLAN
XDEMOLITION KEYED NOTES1 REMOVE PARTITION AND ASSOCIATED DOORS IN IT'S ENTIRETY AS INDICATED.
2
4
3REMOVE MISCELLANEOUS SHELVING, COAT RACKS ETC. AT EXISTINGCLOSETS AS REQUIRED FIELD VERIFY CONDITION.
REMOVE BUILT-IN WOOD STORAGE CABINET OR SHELVING UNIT..
SAW CUT AND REMOVE EXISTING CMU AS REQUIRED FOR NEW DOOR OPENING
2
1
11
3
3
3
33
3
3
4
1
(THIS PLAN ONLY)
1
1
1
4
4
4 4
4
4
5REMOVE EXISTING POWER PANEL- REFER TO M.E.P. DRAWINGS FOR MOREINFORMATION.
6REMOVE C.I. RADIATOR AND ASSOCIATED PIPING COMPLETELY- REFER TOM.E.P. DRAWINGS FOR MORE INFORMATION.
5
6 4
6
6
6
6
6
6
6
6
6
6
6
6
6
6 6
7 REMOVE EXISTING FINISH FLOOR MATERIAL AND UNDERLAYMENT ASINDICATED (HARDWOOD FLOORING TO REMAIN). SEE GENERAL NOTE 3
8EXISTING TERRAZZO FLOORING TO REMAIN, PROTECT DURING THEDEMOLITION AND CONSTRUCTION PROCESS.
7
8
8
9REMOVE WALL MOUNTED TRIM, CHALK BOARDS, MARKER BOARDS, ETC.(RETAIN HISTORIC CHALK BOARD WHERE NOTED)
7 7
4
9
7
9
7
9
7
9
7
97
9
10REMOVE WALL MOUNTED SINK, SINK AND BASE CABINET, AND OR DRINKINGFOUNTAIN, REFER TO M.E.P. DRAWINGS FOR MORE INFORMATION.
66
10
10
10
11 SAW CUT AND REMOVE AREA OF CONCRETE SLAB FOR NEW ELEVATOR,REFER TO STRUCTURAL DRAWINGS FOR MORE INFORMATION.
12REMOVE PIPING AND STACKS AS REQUIRED, REFER TO M.E.P. DRAWINGS FORMORE INFORMATION.
12
12
12
12
13REMOVE STEEL FLUE PIPE AND METAL SUPPORT BRACKETS, PATCH EXISTINGMASONRY AS REQUIRED AT REMOVED BRACKETS.
13
14
14 REMOVE EXISTING WINDOW AND WOOD TRIM.
1
15
15
TYP.
15
TYP.
15
TYP.
15
TYP.
15
TYP.
15
TYP.
XXX
XCONSTRUCTION PLAN KEYED NOTES (THIS PLAN ONLY)
1HISTORIC CLOCK TO REMAIN, REPLACE MISSING GLASS LENS ON SOUTHSIDE. PROTECT DURING DEMOLITION AND CONSTRUCTION PROCESS
2
16REMOVE WOOD DOOR AND RETAIN DOOR FOR POSSIBLE INSTALLATION AT NEWLOCATION. EXISTING DOOR FRAME AND TRANSOM TO REMAIN.
16
HISTORIC TERRAZZO FLOORING AND BASE, RESTORE ANY DAMAGED AREASIF ANY, SCRUB CLEAN, POLISH AND SEAL AS REQUIRED FOR LIKE NEWAPPEARANCE.
1
3HISTORIC CORRIDOR TO BE PRESERVED; REPAIR ANY DAMAGED PLASTERWALLS AND CEILINGS TO MATCH ADJACENT FINISHES.
PRESERVEHISTORICCHALK BD.
17
17TYP.
2
TYP.2
TYP.3
4HISTORIC STAIRS TO BE PRESERVED; REPAIR ANY DAMAGED PLASTER WALLSAND CEILINGS TO MATCH ADJACENT FINISHES. CLEAN REPAINT WINDOWFRAMES AT NORTH ELEVATION
4
5
5 HISTORIC CHALK BOARD TO BE PRESERVED, CLEAN/ SAND WOOD FRAME ASREQUIRED AND REPAINT. USE ELEMENTS FROM DEMO BOARDS IF REQ'D.
6 HISTORIC CORRIDOR DOOR TO BE PRESERVED; REPAIR DOOR AND FRAME ASREQUIRED. REFER TO DOOR SCHEDULE FOR MORE INFORMATION.
6
69
6
6
6
9 7
7 HISTORIC DOOR FRAME AND TRANSOM TO BE PRESERVED; REPAIR DOORFRAME AND TRANSOM IF REQUIRED. FILL HINGE POCKETS, LATCH HOLES,ETC. AND REFINISH FRAME TO MATCH EXISTING FINISH. SEE DOOR SCHED.
8
8EXISTING ENTRY AND STEPS, RESTORE TO HISTORIC CONDITION-SEE DETAILS 1 THRU 4 SHEET A3.2.
2
REMOVE LOOSE DELAMINATING OR DAMAGED PLASTER AT EXTERIOR WALLSAND PREP AS REQUIRED FOR NEW PLASTER FINISH (FEILD VERIFY CONDITIONS).
8
9 HISTORIC DOOR WITH SWING REVERSED AS SHOWN, PREP EXISTING FRAMEFOR NEW SWING/ HARDWARE. REFER TO DOOR SCHEDULE.
1 PATCH AND REPAIR ALL EXISTING PLASTER CEILINGS ASREQUIRED TO MATCH EXISTING FINISH, PAINT AS SCHEDULED.
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
2 PATCH IN AND REPAIR EXISTING HISTORIC CEILING MOLDINGSAT EXTERIOR WALLS AND AT HISTORIC CORRIDOR ATDEMOLISHED PARTITIONS OR AS REQUIRED TO MATCH EXISTINGCLEAN AND PAINT.
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.1
TYP.1
TYP.2
XCEILING PLAN KEYED NOTES (THIS PLAN ONLY)
10HISTORIC WOOD BASE MOLDINGS AND WALL RAIL TRIM TO BE PRESERVED,TYPICAL AT EXTERIOR WALL AND CLASSROOM SIDE OF HISTORIC CORRIDOR.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
REVERSEDR. SWING
3
6
DEMOLISHED PARTITION/ CONSTRUCTION
EXISTING PARTITION/ CONSTRUCTION
NEW PARTITION
NEW OR EXISTING (1) HOUR RATED PARTITION
NEW OR EXISTING (2) HOUR RATED PARTITION
PLAN LEGEND 2x4 LAY-IN FLUORESCENT LIGHT FIXTURE
2x4 ACOUSTICAL PANEL CEILING SYSTEM (APC)
DIRECT/ INDIRECT FLUORESCENTLIGHT FIXTURE
SURFACE MOUNTED OR PENDENTTYPE LIGHT FIXTURE
COMPACT FLUORESCENT CAN LIGHT FIXTURE
1x4 SURFACE MOUNTED OR SUSPENDEDFLUORESCENT STRIP TYPE LIGHT FIXTURE
PARTITION WITH ACOUSTICAL BATTS
1. REFER TO GENERAL NOTES AND CUTTING AND PATCHING NOTESSHEET A2.1 FOR MORE INFORMATION.
2. ALL PLASTER WALLS AND CEILINGS TO REMAIN EXPOSED TO VIEW INNEW CONSTRUCTION ARE TO BE VISUALLY INSPECTED, REMOVESPALLED OR LOOSE PLASTER FINISHES AND REMOVE ANY PEELINGPAINT AND PREP WALLS AND CEILINGS AS REQUIRED FOR PLASTERREPAIR WORK.
3. HARDWOOD FLOORS; ANY AREAS FOUND TO BE UN-SOUND ORDAMAGED ARE TO BE PATCHED AS REQUIRE TO RECEIVE NEWUNDERLAYMENT / FINISHES FLOOR MATERIAL AS SCHEDULE.
1. ALL EXISTING INTERIOR AND EXTERIOR PLASTER WALLS EXPOSEDTO VIEW IN NEW CONSTRUCTION ARE TO BE PATCHED, REPAIREDAND RESTORED TO ORIGINAL WALL FINISH AND TEXTURE ASREQUIRED, FIELD VERIFY EXTENT OF WORK.
2. PROTECT ALL HISTORIC BUILDING ELEMENTS TO REMAIN DURINGTHE DEMOLITION AND CONSTRUCTION PROCESS, TYP.
3. ALL EXISTING WINDOWS AND WOOD WORK ARE TO BE INSPECTEDAND REPAIRED AS REQ'D. WOOD FRAMES, STOOLS AND TRIM ARETO BE PAINTED AS SCHEDULED. SEE TYP. DETAIL 2/A8.1
1
18 REMOVE EXIST'G DOOR AND FRAME
18
19 REMOVED WOOD CASED DOOR OPENINGS AT WALL TO REMAIN
19 19
18
REVERSEDR. SWING
20
20 REMOVED WOOD DOORS, FRAMES AND SIDELITES AT FRONT ENTRY,WOOD VERTICAL HISTORIC MULLIONS TO REMAIN- SEE DETAIL 3/A3.2
21 REMOVE EXIST'G INFILL CONSTRUCTION AT PREVIOUSLYDEMOLISHED WINDOWS FOR NEW MASONRY BEARING CONSTR.
21 21
22
REMOVE WINDOW AC. UNIT AND METAL COMPOSITE PANEL SET INEXIST'G ALUM. WINDOW SASH FRAME, FRAME TO REMAIN.
22 REMOVE EXIST'G INFILL CONSTRUCTION AT PREVIOUSLYDEMOLISHED WINDOW AS REQ'D FOR NEW ALUM. WINDOW.ORIGINAL WOOD WINDOW FRAME IS TO REMAIN.
23
22
REMOVEAC UNITAND WOODSHELVING
23
11NEW STEEL PIPE HANDRAILS, CORE DRILL POST INTO STONE STEPS ORCONCRETE, SET IN NONE SHRINK GROUT.
11
12EXISTING STONE STEPS, MUD-JACK AND SEAL JOINTS AS REQ'D-SEE DETAIL 4/A3.2
12
13PROVIDE NEW 8" CMU FILL WITH PLASTER FINISH TO MATCH ADJACENTWALLS AT EXISTING WINDOW OPENINGS
14
13
1. EXISTING PLASTER CEILINGS TO REMAIN EXPOSED TO VIEWARE TO BE RESTORED TO ORIGINAL FINSIH AND ANY LOOSEOF PEELING PAINT IS TO BE REMOVE AS REQUIRED FORPLASTER REPAIR AND NEW PAINT FINISH.
3
3
3
15 PROVIDE SOUND BATTS IN NEW PARTITIONS AT MECHANICAL ROOM
15
15
1
44
4REPAIR COVED PLASTER CEILING AND TRIM TO ORIGINAL CONDITIONAS REQUIRED AT DEMOLISHED PLUMBING - PAINT AS SCHED..
EXISTING WINDOWS THIS AREA TO BE PROTECTED WITHWATER CURTAIN TO ACHIEVE (1) HOUR RATING .5
5
6
TRANSOM WOOD WORK STRIPPED, CLEANED AND REPAINTED6
16 BRICK VENEER INFILL TO MATCH EXIST'G OVER 5/8" DENSGLAS 3-5/8"METAL STUDS W/ INSULATION AND 5/8" GYP. BD. AT INTERIOR SIDE.PROVIDE SILL FLASHING AND WEEPS AS REQUIRED.
16
REMOVE WINDOW AC. UNIT AND METAL COMPOSITE PANEL SET INEXIST'G ALUM. WINDOW SASH FRAME, FRAME TO REMAIN.
PROVIDE & INSTALL NEW CLEAR INSULATED GLASS IN EXISTINGALUMINUM WINDOW SASH AS REQ'D TO MATCH EXISTING GLAZING.FIELD VERIFY SIZES AND EXIST'G CONDITIONS.
24
24
17
17 HISTORIC CORR; REMOVE ALL SURFACE MOUNTED ELECTRICAL CONDUITS,J-BOXES, LIGHT FIXTURES, ETC. REFER TO M.E.P. DWGS FOR MORE INFORMATION.PLASTER WALLS AND CEILINGS, TRIM, AND DOORS ARE TO BE PRESERVED U.N.O.
14PROVIDE NEW STEEL LINTELS AS REQUIRED AT NEW DOOR OPENINGREFER TO STRUCTURAL DWGS FOR MORE INFORMATION.
1725
REMOVE ALUM. SINGLE HUNG WINDOW, RETAIN FOR INSTALLATIONAT NEW LOCATION- REFER TO CONSTRUCTION PLAN.25
25
NEW MECHANICAL LOUVER IN EXISTING WOOD WINDOW FRAME.INSTALL WEATHER TIGHT .18
18
18
RELOCATED ALUM. SINGLE HUNG WINDOW IN EXISTING WOODWINDOW FRAME. PROVIDE BREAK METAL CLADDING AT EXTERIOR OFWOOD FRAME TO MATCH EXIST'G INSTALLED CONDITIONS, INSTALLWEATHER TIGHT .
19
1919
NEW SUSPENDED ACOUSTICAL PANEL CEILING SYSTEM. SEEDETAILS A, B, & C/A8.1
CLOSET
CLOSET
DSDS
PLAS. CLG @13'-2" A.F.F.
WOOD FLR'G
OFFICE
2x2 APC @7'-11 1/2" A.F.F.
CARPET
CLOSETWOOD FLR'G
12x12 VCT CLOSETVCT FLR'G
CLASSROOM12x12 VCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
PLAS. CLG @13'-2" A.F.F.
OFFICECARPET
PLAS. CLG @13'-2" A.F.F.
S
CLASSROOM12x12 VCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
12x12 VCT FLR'G
HALLWAYHISTORICAL
PLAS. CLG. @12'-5" A.F.F.
TERRAZZO FLR'G
CLASSROOM12x12 VCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
SD.F.
CLASSROOMVCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
CLASSROOMVCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
CLASSROOMVCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
CLOSETVCT FLR'G
TERRAZZO FLR'G
TERRAZZO FLR'G
TERRAZZO FLR'G
CLOSETCLOSET
QUARRY TILE FLR'G
CLOSETVCT FLR'G
F.S.
JAN.
CLOCK
UP
(13
)R@
7 7
/16"
-
DN
DN
DN
(13
)R.
@ 7
.5"+
UP
109'-9" F.F.
111'-10" F.F.
DSDS
DN
(8)
R.
@ 7
5/8
"U
P (
13)R
.@
7 3
/4"
BREAK RM
MULTIPURPOSEROOM
GRANTRECIPIENT
COPY
INTAKE
FAMILY CONF.
REFUGEE CENTER
HISTORICALHALLWAY
DIRECTOR
MECH. RM.
WS5
WS2
WS3
WS4
WS6
WS7
WS8
RECEPTION
WS5
WS1
WS2
WS3
WS4
WS6
WS7
WS8
ELEC./DATA
STAFF OFFICE
HEALTH &ASSISTANCE
CENTER
MECH.
STAFF WOMENS RR
STAFF MENS RR
3284
10'-6"11'-3"
5'-3 1/2" 15'-4 1/2"
2'-3 1/2"
2'-3
1/2
"1'
-8"
14'-1 1/8"7'-4"INSIDE SHAFT
6'-3
1/4
"IN
SID
E S
HA
FT9'
-9 1
/2"
19'-5
"
12'-3
1/4
"9'
-3 1
/8"
9'-5
1/4
"35
'-8"
ALIGN
ALIGN
16'-3" 4'-5"
5'-10" 4'-5"10'-5"
11'-0" 9'-8"
14'-1
1 3/
4"
11'-1
3/8
"
8'-6"
5'-9
1/2
"
ALIGN
UP
(13
)R@
7 7
/16"
-D
N(1
1)R
DN
(11)
R
LANDING ELEV. @120'-2 3/4" A.F.F.
STAFF RR
16'-2
1/2
"
LOBBY
HISTORICALCORR.
STAIR
PASSAGE
ELEVATOR
1'-6"
EXAM
DWREF
MICRO
OVEN/ COOKTOP & HOOD
3'-4
"
1
1
1 1
1
6 TYP. @ELEVATOR
1
2
1
1
1
1
1
7 7
1
1
DS
DS
1FEC
FEC
BOTT. BM. @11'-1 1/2" A.F.F.
PLAS. CLG. @12'-5" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
BOTT. BM. @11'-11 1/2" A.F.F.
PLAS. CLG @13'-2" A.F.F.
PLAS. CLG @13'-2" A.F.F.
BOTT. BM. @12'-6" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
BOTT. BM. @12'-6" A.F.F.
BOTT. BM. @11'-1 1/2" A.F.F.
BOTT. BM. @11'-1 3/4" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
APC-1 @9'-0" A.F.F.
APC-1 @9'-0" A.F.F.
The Professional Architect's seal affixed to this sheetapplies only to the material and items shown on thissheet. All drawings, instruments or other documents notexhibiting this seal shall not be considered prepared bythis architect, and this architect expressly disclaims anyand all responsibility for such plans, drawings ordocuments not exhibiting this seal.
This drawing and details on it are the sole property of thearchitect and may be used for this specific project only.It shall not be loaned, copied or reproduced, in whole orpart, or for any other purpose or project without thewritten consent of the architect.
12114.001
KPG
Issue Date
No. Description Date
3530
Uta
h S
tree
t, S
t. Lo
uis,
Mis
sour
i 63
118
St.
Piu
s V
Cat
holic
Cha
ritie
sA
rchd
ioce
se o
f Sai
nt L
ouis
AD
AP
TIV
E R
EU
SE
FO
R:
99% REVIEW SET
DECEMBER 28, 2012
2nd FLOOR PLANSDEMOLITIONNEW WORK
2nd FLOOR PLAN - DEMOLITIONSCALE: 1/8" = 1'-0"
1NORTHPLAN
2nd FLOOR PLAN - NEW WORKSCALE: 1/8" = 1'-0"
2NORTHPLAN
2nd CEILING PLAN PLAN - NEW WORKSCALE: 1/8" = 1'-0"
3NORTHPLAN
XDEMOLITION KEYED NOTES1 REMOVE PARTITION AND ASSOCIATED DOORS IN IT'S ENTIRETY AS INDICATED.
2
4
3REMOVE MISCELLANEOUS SHELVING, COAT RACKS ETC. AT EXISTINGCLOSETS AS REQUIRED FIELD VERIFY CONDITION.
REMOVE BUILT-IN WOOD STORAGE CABINET OR SHELVING UNIT..
SAW CUT AND REMOVE EXISTING CMU AS REQUIRED FOR NEW DOOR OPENING
2
1
11
3
3
3
33
3
3
4
1
(THIS PLAN ONLY)
1
1
1
4
4
4 4
4
4
5REMOVE EXISTING POWER PANEL- REFER TO M.E.P. DRAWINGS FOR MOREINFORMATION.
6REMOVE C.I. RADIATOR AND ASSOCIATED PIPING COMPLETELY- REFER TOM.E.P. DRAWINGS FOR MORE INFORMATION.
5
6 4
6
6
6
6
6
6
6
6
6
6
6
6
6
6 6
7 REMOVE EXISTING FINISH FLOOR MATERIAL AND UNDERLAYMENT ASINDICATED (HARDWOOD FLOORING TO REMAIN). SEE GENERAL NOTE 3
8EXISTING TERRAZZO FLOORING TO REMAIN, PROTECT DURING THEDEMOLITION AND CONSTRUCTION PROCESS.
7
8
8
9REMOVE WALL MOUNTED TRIM, CHALK BOARDS, MARKER BOARDS, ETC.(RETAIN HISTORIC CHALK BOARD WHERE NOTED)
7 7
4
9
7
9
7
9
7
9
7
97
9
10REMOVE WALL MOUNTED SINK, SINK AND BASE CABINET, AND OR DRINKINGFOUNTAIN, REFER TO M.E.P. DRAWINGS FOR MORE INFORMATION.
66
10
10
10
11 SAW CUT AND REMOVE AREA OF CONCRETE SLAB FOR NEW ELEVATOR,REFER TO STRUCTURAL DRAWINGS FOR MORE INFORMATION.
12REMOVE PIPING AND STACKS AS REQUIRED, REFER TO M.E.P. DRAWINGS FORMORE INFORMATION.
12
12
12
12
13REMOVE STEEL FLUE PIPE AND METAL SUPPORT BRACKETS, PATCH EXISTINGMASONRY AS REQUIRED AT REMOVED BRACKETS.
13
14
14 REMOVE EXISTING WINDOW AND WOOD TRIM.
1
15
15
TYP.
15
TYP.
15
TYP.
15
TYP.
15
TYP.
15
TYP.
XXX
XCONSTRUCTION PLAN KEYED NOTES (THIS PLAN ONLY)
1HISTORIC CLOCK TO REMAIN, REPLACE MISSING GLASS LENS ON SOUTHSIDE. PROTECT DURING DEMOLITION AND CONSTRUCTION PROCESS
2
16REMOVE WOOD DOOR AND RETAIN DOOR FOR POSSIBLE INSTALLATION AT NEWLOCATION. EXISTING DOOR FRAME AND TRANSOM TO REMAIN.
16
HISTORIC TERRAZZO FLOORING AND BASE, RESTORE ANY DAMAGED AREASIF ANY, SCRUB CLEAN, POLISH AND SEAL AS REQUIRED FOR LIKE NEWAPPEARANCE.
1
3HISTORIC CORRIDOR TO BE PRESERVED; REPAIR ANY DAMAGED PLASTERWALLS AND CEILINGS TO MATCH ADJACENT FINISHES.
PRESERVEHISTORICCHALK BD.
17
17TYP.
2
TYP.2
TYP.3
4HISTORIC STAIRS TO BE PRESERVED; REPAIR ANY DAMAGED PLASTER WALLSAND CEILINGS TO MATCH ADJACENT FINISHES. CLEAN REPAINT WINDOWFRAMES AT NORTH ELEVATION
4
5
5 HISTORIC CHALK BOARD TO BE PRESERVED, CLEAN/ SAND WOOD FRAME ASREQUIRED AND REPAINT. USE ELEMENTS FROM DEMO BOARDS IF REQ'D.
6 HISTORIC CORRIDOR DOOR TO BE PRESERVED; REPAIR DOOR AND FRAME ASREQUIRED. REFER TO DOOR SCHEDULE FOR MORE INFORMATION.
6
69
6
6
6
9 7
7 HISTORIC DOOR FRAME AND TRANSOM TO BE PRESERVED; REPAIR DOORFRAME AND TRANSOM IF REQUIRED. FILL HINGE POCKETS, LATCH HOLES,ETC. AND REFINISH FRAME TO MATCH EXISTING FINISH. SEE DOOR SCHED.
8
8EXISTING ENTRY AND STEPS, RESTORE TO HISTORIC CONDITION-SEE DETAILS 1 THRU 4 SHEET A3.2.
2
REMOVE LOOSE DELAMINATING OR DAMAGED PLASTER AT EXTERIOR WALLSAND PREP AS REQUIRED FOR NEW PLASTER FINISH (FEILD VERIFY CONDITIONS).
8
9 HISTORIC DOOR WITH SWING REVERSED AS SHOWN, PREP EXISTING FRAMEFOR NEW SWING/ HARDWARE. REFER TO DOOR SCHEDULE.
1 PATCH AND REPAIR ALL EXISTING PLASTER CEILINGS ASREQUIRED TO MATCH EXISTING FINISH, PAINT AS SCHEDULED.
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
2 PATCH IN AND REPAIR EXISTING HISTORIC CEILING MOLDINGSAT EXTERIOR WALLS AND AT HISTORIC CORRIDOR ATDEMOLISHED PARTITIONS OR AS REQUIRED TO MATCH EXISTINGCLEAN AND PAINT.
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.1
TYP.1
TYP.2
XCEILING PLAN KEYED NOTES (THIS PLAN ONLY)
10HISTORIC WOOD BASE MOLDINGS AND WALL RAIL TRIM TO BE PRESERVED,TYPICAL AT EXTERIOR WALL AND CLASSROOM SIDE OF HISTORIC CORRIDOR.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
REVERSEDR. SWING
3
6
DEMOLISHED PARTITION/ CONSTRUCTION
EXISTING PARTITION/ CONSTRUCTION
NEW PARTITION
NEW OR EXISTING (1) HOUR RATED PARTITION
NEW OR EXISTING (2) HOUR RATED PARTITION
PLAN LEGEND 2x4 LAY-IN FLUORESCENT LIGHT FIXTURE
2x4 ACOUSTICAL PANEL CEILING SYSTEM (APC)
DIRECT/ INDIRECT FLUORESCENTLIGHT FIXTURE
SURFACE MOUNTED OR PENDENTTYPE LIGHT FIXTURE
COMPACT FLUORESCENT CAN LIGHT FIXTURE
1x4 SURFACE MOUNTED OR SUSPENDEDFLUORESCENT STRIP TYPE LIGHT FIXTURE
PARTITION WITH ACOUSTICAL BATTS
1. REFER TO GENERAL NOTES AND CUTTING AND PATCHING NOTESSHEET A2.1 FOR MORE INFORMATION.
2. ALL PLASTER WALLS AND CEILINGS TO REMAIN EXPOSED TO VIEW INNEW CONSTRUCTION ARE TO BE VISUALLY INSPECTED, REMOVESPALLED OR LOOSE PLASTER FINISHES AND REMOVE ANY PEELINGPAINT AND PREP WALLS AND CEILINGS AS REQUIRED FOR PLASTERREPAIR WORK.
3. HARDWOOD FLOORS; ANY AREAS FOUND TO BE UN-SOUND ORDAMAGED ARE TO BE PATCHED AS REQUIRE TO RECEIVE NEWUNDERLAYMENT / FINISHES FLOOR MATERIAL AS SCHEDULE.
1. ALL EXISTING INTERIOR AND EXTERIOR PLASTER WALLS EXPOSEDTO VIEW IN NEW CONSTRUCTION ARE TO BE PATCHED, REPAIREDAND RESTORED TO ORIGINAL WALL FINISH AND TEXTURE ASREQUIRED, FIELD VERIFY EXTENT OF WORK.
2. PROTECT ALL HISTORIC BUILDING ELEMENTS TO REMAIN DURINGTHE DEMOLITION AND CONSTRUCTION PROCESS, TYP.
3. ALL EXISTING WINDOWS AND WOOD WORK ARE TO BE INSPECTEDAND REPAIRED AS REQ'D. WOOD FRAMES, STOOLS AND TRIM ARETO BE PAINTED AS SCHEDULED. SEE TYP. DETAIL 2/A8.1
1
18 REMOVE EXIST'G DOOR AND FRAME
18
19 REMOVED WOOD CASED DOOR OPENINGS AT WALL TO REMAIN
19 19
18
REVERSEDR. SWING
20
20 REMOVED WOOD DOORS, FRAMES AND SIDELITES AT FRONT ENTRY,WOOD VERTICAL HISTORIC MULLIONS TO REMAIN- SEE DETAIL 3/A3.2
21 REMOVE EXIST'G INFILL CONSTRUCTION AT PREVIOUSLYDEMOLISHED WINDOWS FOR NEW MASONRY BEARING CONSTR.
21 21
22
REMOVE WINDOW AC. UNIT AND METAL COMPOSITE PANEL SET INEXIST'G ALUM. WINDOW SASH FRAME, FRAME TO REMAIN.
22 REMOVE EXIST'G INFILL CONSTRUCTION AT PREVIOUSLYDEMOLISHED WINDOW AS REQ'D FOR NEW ALUM. WINDOW.ORIGINAL WOOD WINDOW FRAME IS TO REMAIN.
23
22
REMOVEAC UNITAND WOODSHELVING
23
11NEW STEEL PIPE HANDRAILS, CORE DRILL POST INTO STONE STEPS ORCONCRETE, SET IN NONE SHRINK GROUT.
11
12EXISTING STONE STEPS, MUD-JACK AND SEAL JOINTS AS REQ'D-SEE DETAIL 4/A3.2
12
13PROVIDE NEW 8" CMU FILL WITH PLASTER FINISH TO MATCH ADJACENTWALLS AT EXISTING WINDOW OPENINGS
14
13
1. EXISTING PLASTER CEILINGS TO REMAIN EXPOSED TO VIEWARE TO BE RESTORED TO ORIGINAL FINSIH AND ANY LOOSEOF PEELING PAINT IS TO BE REMOVE AS REQUIRED FORPLASTER REPAIR AND NEW PAINT FINISH.
3
3
3
15 PROVIDE SOUND BATTS IN NEW PARTITIONS AT MECHANICAL ROOM
15
15
1
44
4REPAIR COVED PLASTER CEILING AND TRIM TO ORIGINAL CONDITIONAS REQUIRED AT DEMOLISHED PLUMBING - PAINT AS SCHED..
EXISTING WINDOWS THIS AREA TO BE PROTECTED WITHWATER CURTAIN TO ACHIEVE (1) HOUR RATING .5
5
6
TRANSOM WOOD WORK STRIPPED, CLEANED AND REPAINTED6
16 BRICK VENEER INFILL TO MATCH EXIST'G OVER 5/8" DENSGLAS 3-5/8"METAL STUDS W/ INSULATION AND 5/8" GYP. BD. AT INTERIOR SIDE.PROVIDE SILL FLASHING AND WEEPS AS REQUIRED.
16
REMOVE WINDOW AC. UNIT AND METAL COMPOSITE PANEL SET INEXIST'G ALUM. WINDOW SASH FRAME, FRAME TO REMAIN.
PROVIDE & INSTALL NEW CLEAR INSULATED GLASS IN EXISTINGALUMINUM WINDOW SASH AS REQ'D TO MATCH EXISTING GLAZING.FIELD VERIFY SIZES AND EXIST'G CONDITIONS.
24
24
17
17 HISTORIC CORR; REMOVE ALL SURFACE MOUNTED ELECTRICAL CONDUITS,J-BOXES, LIGHT FIXTURES, ETC. REFER TO M.E.P. DWGS FOR MORE INFORMATION.PLASTER WALLS AND CEILINGS, TRIM, AND DOORS ARE TO BE PRESERVED U.N.O.
14PROVIDE NEW STEEL LINTELS AS REQUIRED AT NEW DOOR OPENINGREFER TO STRUCTURAL DWGS FOR MORE INFORMATION.
1725
REMOVE ALUM. SINGLE HUNG WINDOW, RETAIN FOR INSTALLATIONAT NEW LOCATION- REFER TO CONSTRUCTION PLAN.25
25
NEW MECHANICAL LOUVER IN EXISTING WOOD WINDOW FRAME.INSTALL WEATHER TIGHT .18
18
18
RELOCATED ALUM. SINGLE HUNG WINDOW IN EXISTING WOODWINDOW FRAME. PROVIDE BREAK METAL CLADDING AT EXTERIOR OFWOOD FRAME TO MATCH EXIST'G INSTALLED CONDITIONS, INSTALLWEATHER TIGHT .
19
1919
NEW SUSPENDED ACOUSTICAL PANEL CEILING SYSTEM. SEEDETAILS A, B, & C/A8.1
STUDENT HOUSING
ACADEMIC PROGRAMS
EXISTING BUILDINGS
south east missouri state UNIVERSITY-RIVER CAMPUS MIXED USE
UNIT A4 BEDROOM/ 4 BATH
BEDROOM
BEDROOM
BATH BATH
W/D
BATH BATH
BEDROOM
BEDROOM KIT
CH
EN
ETT
E
R
8'-6
"
14'-3"
8'-6
"
14'-3"
14'-3"
8'-6
"
8'-6
"
14'-3"
6'-6
"
6'-6
"
32'-0
"
DWELLING
13'-0"
DINING
Sketch/Page No.
refer to sheet A3.0
A01Unit A
612.127
Southeast Missouri State River Campus Residence Hall & Academic Program
07.05.12
Scale: 3/16" = 1'-0"
0 5'-4"2'-8"1'-4"
UNIT B4 BEDROOM/ 4 BATH
BATH
BEDROOMBEDROOM
BATH
KIT
CH
EN
ETT
E
RW/D
13'-0"
8'-6"
6'-6"
8'-6"
14'-3
"3'
-6"
14'-3
"
32'-0
"
BATH
BEDROOM BEDROOM
BATH
8'-6"
6'-6"
8'-6"
14'-3
"3'
-6"
14'-3
"
DWELLING
DINING
Sketch/Page No.
refer to sheet A3.0
A01612.127
Southeast Missouri State River Campus Residence Hall & Academic Program
Scale: 3/16" = 1'-0"
0 5'-4"2'-8"1'-4"
Unit B
07.05.12
UNIT HYBRID4 BEDROOM/ 4 BATH
BATH
BEDROOMBEDROOM
BATH
KIT
CH
EN
ETT
E
RW/D
13'-0"
8'-6"
6'-6"
8'-6"
14'-3
"3'
-6"
14'-3
"
32'-0
"
DWELLING
DINING
BATH BATH
BEDROOM
BEDROOM
8'-6
"
14'-3"
8'-6
"
14'-3"
Sketch/Page No.
refer to sheet A3.0
A01612.127
Southeast Missouri State River Campus Residence Hall & Academic Program
Scale: 3/16" = 1'-0"
0 5'-4"2'-8"1'-4"
Unit C (Hybrid)07.05.12
UNIT TYPES STUDY
Client: south-east missouri state universityLocation: 518 S Fountain St Cape Girardeau, MO 63702
program: student housing art studios
context: river campus
brief:
schematic design programming adjacency studiesspace allocation diagramscontext studiesprecedent studies 3-d modeling siting optionseffi cient fl oor plan options
Client: archdiocese of st. louis Location: 3310 S Grand Blvd Saint Louis, Missouri 63116program: catholic charities offi ces:
catholic family servies refugee centersouthside centerlamphousing resource centerchildcare center
shared multi-purpose spaces
context: st. louis city
brief:
abandoned school buildingProgramming Adjacency studiesField Verifying existing conditions consultant coordinationAdaptive ReuseHistoric Preservationintegrating new systems multiple clients and programs