THE ISRAEL ELECTRIC CORPORATION LTD. · PDF fileName Of Item / Project Full rewinding of...
Transcript of THE ISRAEL ELECTRIC CORPORATION LTD. · PDF fileName Of Item / Project Full rewinding of...
THE ISRAEL ELECTRIC CORPORATION LTD.
GENERATION DIVISION
SPECIFICATION GD1/16
POWER STATION HIGH-VOLTAGE MOTOR REWINDING
INDUCED DRAFT FAN MOTOR RUTENBERG 3-4
Prepared by:
Checked by: Relu ILIE
Approved by: Igor GOBENKO
December 2016
6SPECIFICATION GD1/1 THE ISRAEL ELECTRIC CORPORATION LTD
GENERATION DIVISION
2
1. Purchaser
The Israel Electric Corporation Ltd. (IECo) - Israel.
2. Name Of Item / Project Full rewinding of induced draft fan motor Rutenberg 3-4.
3. Location Of Item / Project
The motor covered by this specification is located in Purchaser’s power station or
storage.
4. Scope The scope of work covered by this specification is full rewinding of induced draft
fan motor stator, located in Rutenberg 3-4 power station.
Based on results of tests from Item 11.1 and motor history, the scope of work shall
be in details defined between Purchaser and Contractor.
4.1. Project Description
N/A
4.2. Scope Of Supply The motor name plate rated data for the specific motor to be repaired are as
following. The single line diagram is attached to this specification. IECo will
decide if the motor to be repaired is originally made either by KONČAR
Croatia, respectively by ABB Switzerland as detailed below.
4.2.1. Phases: 3
4.2.2. Frequency: 50 Hz
4.2.3. Rated voltage: 13200 V
4.2.4. Rated speed: 746 rpm
4.2.5. Insulation Class: F
4.2.6. Rating: 6125 kW
4.2.7. Rated current: 314 A
4.2.8. Power factor: 0.88
4.2.9. Connection of stator winding: star
4.2.10. Original manufacturer: KONČAR Croatia, respectively ABB
Switzerland
4.2.11. Type: 6AJZ0a 900L1-8, respectively ONG 900 fa 8
4.2.12. Serial number: 23358, respectively HM 1005511
4.2.13. Protection: IP 55, respectively W24.
The scope of work shall include at least the following (but not only):
4.2.14. Stator core flux test (including thermographic test), after removing the
old coils and after installing the new coils.
4.2.15. Full rewinding, which shall include dedicated turn insulation (in
addition to strand insulation)
4.2.16. End-winding support hardware repair or replacement (if necessary)
4.2.17. Replacement of motor heaters
6SPECIFICATION GD1/1 THE ISRAEL ELECTRIC CORPORATION LTD
GENERATION DIVISION
3
4.2.18. Renovation or replacement of motor main terminals. It shall include
suitable protection for overvoltage originated by vacuum circuit
breakers (surge arresters and capacitors)
4.2.19. The neutral point of stator windings shall be externally accessible and
shall allow dismantling in order to permit each phase separate
insulation testing.
4.2.20. Replacement of support isolators
4.2.21. Cleaning and painting the motor and motor leads box (first layer
epoxy and second layer polyurethane RAL 1023).
4.2.22. Replacement of the bearings (IECo will supply the bearings)
4.2.23. Replacement of the RTD's
4.2.24. Rotor check and repair (if necessary)
4.2.25. Rotor balance, if repaired
4.2.26. Check, test and adjustment of accessories (e.g. cable entries, earthing
bolts, terminal boxes, terminal marking, enclosure, nameplate labels,
lubrication, fans, thermal monitors, coolers etc.).
5. Terminal Points &Terminal Connections N/A
6. Cyber & Information Security N/A
7. Quality Assurance & Quality Control
7.1. General Quality Requirements
To be checked by Purchaser's Quality Control representative.
The manufacturing and all components shall confirm to quality requirements
and shall ensure high reliability. The Bidder shall submit with his proposal
copies of quality assurance and quality control procedures. The Bidder shall
provide a full I&T plan with references to his shop specifications, standards
used, and acceptance criteria.
The acceptance tests (paragraph 11.2) shall be performed in the factory, in
presence of Purchaser’s Quality Control representative. The purchaser reserves
the right to send a representative to attend part or all of the acceptance tests.
The contractor shall include in its technical offer a test plan (appendix A),
which will include at least all of the tests according to this specification
(paragraph 11.2 - acceptance test), including tentative time schedule.
The contractor shall announce the updated time schedule, immediately after
receiving the order and shall update it if necessary.
The Contractor shall notify IECo by a non-conformance report in any case or
process a problem occurs, for any component which is out of specification, for
any component testing if a failure occurs.
7.2. Interchangeability
6SPECIFICATION GD1/1 THE ISRAEL ELECTRIC CORPORATION LTD
GENERATION DIVISION
4
The repaired motor shall provide the same or better parameters, characteristics
and performance, from all points of view, as the motor before repairing.
8. Standards & Codes In principle, the required tests procedure shall conform to IEC relevant standards
(mainly IEC 60034 series).
For tests not covered by IEC standards, ANSI, IEEE, NEMA, VDE standards shall
be applied, or the normal Purchaser internal practice.
9. Technical Documentation
9.1. General N/A
9.2. Technical Documentation Attached to Proposal
The Bidder shall supply to Purchaser the guarantee values of motor relevant
data that will be achieved after the repair.
The tolerances for guarantee values shall be according to IEC 60034-1.
9.3. Technical Documentation to Deliver after Award Notification The Contractor shall provide with the repaired or overhauled motor all data and
drawings showing the details of the work performed (i.e. active core
dimensions, slot details, insulation material type, cross section of coils, rated
power if changed, losses if influenced by repair, etc.).
If applicable, these data shall be presented comparatively with the condition
before repair.
In addition, the Contractor shall supply type and routine test reports and
operation and maintenance manual (if relevant).
10. Technical Requirements
10.1. Environmental Considerations & Service Conditions
• The altitude of the power station does not exceed 1000 m above the sea
level.
• The motor shall be outdoor mounted.
• The expected ambient air temperatures are:
- Maximum momentary................. .........................+45°C
- Minimum momentary.................. .........................-10°C
- Monthly average of the hottest month. .................+30°C
- Yearly average........................... .......... ..............+20°C
• The motor is expected to be exposed to long dry periods without rain,
sometimes with very fine sand dust, changing suddenly to periods of high
humidity and rain.
• The motor might also be exposed to a moderate combination of conductive
or abrasive dust (such as coal dust, fly ash, etc.), sulfur smokes ,moisture,
etc., as encountered in usual power plant applications.
• The motor at seashore location is expected to be additionally exposed to
coastal conditions with salt laden spray and storms.
6SPECIFICATION GD1/1 THE ISRAEL ELECTRIC CORPORATION LTD
GENERATION DIVISION
5
• The motor might be exposed during summer days to very intensive solar
radiation.
10.2. Reliability, Availability, Maintainability (RAM)
The repair performed shall be intended to improve the reliability and
availability of the motor.
10.3. Functional Requirements
10.3.1. The stator winding insulation shall be of Class F or Class H, but the
temperature rise shall correspond to Class B conditions.
10.3.2. The insulation system of stator winding shall be Vacuum Pressure
Impregnated (VPI). If approved by IECo, resin rich insulation system
can be used, assuring a similar winding quality, reliability and
operation life as VPI.
10.3.3. The Contractor shall use wires with at least the same cross section as
the existing one in the motor.
10.3.4. If applicable for repairing work, the rotor squirrel cage shall be made
of copper or copper-alloy bars.
10.3.5. The minimum monitoring devices (RTD's, thermocouples, etc.) shall
be of the same type and quantity as in the motor before the repair /
overhaul.
11. Tests & Inspections
11.1. Motor Test Before Repair
11.1.1. The motor shall be dismantled and tested in presence of Purchaser's
representative. The Contractor shall send to the Purchaser an initial
detail report of the condition of the motor.
11.1.2. At least the following tests shall be performed:
11.1.2.1. Visual inspection of stator and rotor.
11.1.2.2. Air gap clearance measurement.
11.1.2.3. Measurement of insulation resistance of stator winding, at 5000
V DC.
11.1.2.4. Measurement of stator winding resistance.
11.2. Acceptance Tests
6SPECIFICATION GD1/1 THE ISRAEL ELECTRIC CORPORATION LTD
GENERATION DIVISION
6
11.2.1. The Purchaser has the right to witness any process or tests performed
in the Contractor's facilities without any additional price. The
witnessing will be performed in such way to avoid any impact on the
contractual repair or overhaul schedule/delivery time.
11.2.2. The tests and acceptance conditions detailed in the items below shall
be completed. Additional tests and additional/changed acceptance
values can be agreed between Purchaser and Contractor.
11.2.3. Factory tests shall be performed for each coil before install, e.g.:
• Strand – strand isolation check
• Insulation resistance & PI
• DC Ramp
• Dissipation Factor and Tip-Up
• Partial Discharge
• Final Hi-Pot
These tests shall all have acceptance criteria spelled out in advance
and reports shall be supplied for each coil.
11.2.4. The following tests shall be performed on 2 sample coils:
• Voltage Endurance
• Surge test (IEC 60034-15)
• Hi-Pot to Breakdown
• Dissection
A full report on these tests shall be provided.
11.2.5. The following tests shall be performed on the repaired motor in the
factory, in presence of Purchaser’s representative:
11.2.5.1. Measurement of stator winding resistance, each phase
separately (the winding neutral point is accessible by 4.2.16).
For acceptance, each measurement shall not differ from each
other by more than 2%.
11.2.5.2. Measurement of stator insulation resistance and polarization
index, each phase separately (the winding neutral point is
accessible by 4.2.16), at 5000 V DC.
The minimum acceptance value of insulation resistance at 40°C
shall be 300 MΩ.
The minimum acceptance value of polarization index shall be
2.0.
11.2.5.3. Measurement of insulation resistance of heaters, thermometers,
thermocouples, thermistors, thermostats, etc. used for windings,
bearings or cooling circuits at 500V DC, 1 min.
11.2.5.4. Measurement of no-load current (including current symmetry)
and losses at rated voltage and frequency.
6SPECIFICATION GD1/1 THE ISRAEL ELECTRIC CORPORATION LTD
GENERATION DIVISION
7
The no-load running shall be performed for about 1÷3 hours,
until thermal equilibrium is achieved.
The no-load currents unbalance shall not exceed 20%.
11.2.5.5. Check of direction of rotation versus phase sequence and mark
it on the wires and the motor. The phase sequence in the
connection box shall be kept as it was before starting the work.
11.2.5.6. Measurement of mechanical vibrations for housing and
attachments, performance of noise assessment. Maximum
acceptable values according to ISO 10816-3: r.m.s. velocity 2.3
mm/s, radial and axial direction, at bearing housing.
11.2.5.7. Behavior of bearings (lubricant level, temperature, noise,
vibrations).
11.2.5.8. On motors supplied with insulation bearings, measurement of
bearing insulation resistance at 500V DC, 1 min. and
measurement of shaft voltage.
11.2.5.9. Measurement of locked-rotor torque and current (including
current symmetry) at rated current times service factor, rated
frequency and reduced voltage. The short-circuit currents
unbalance shall not exceed 5%.
11.2.5.10. Performing of moisture withstand test for sealed stator winding
(water immersion or spray test) according to NEMA MG1. The
Contractor shall announce to the purchaser at which method he
will perform the test (either submerge or spraying), in the
technical stage.
11.2.5.11. Measurement of dielectric dissipation factor (tgδ) with different
applied voltages, up to rated voltage, each phase separately.
The maximum acceptance value of tgδ shall be 2% (at 20°C÷
30°C). The maximum acceptance change in tgδ value from
20% of rated voltage to rated voltage shall be 50%.
11.2.5.12. Partial discharge measurements of stator with voltages up to
rated voltage, each phase separately.
11.2.5.13. Power frequency withstand test of the stator winding with
voltage (2UN + 1) kV for 1 min, each phase separately.
11.2.5.14. Impulse withstand test of main insulation of 2 individual
sample coils with peak voltage of 4UN + 5 kV (1.2/50µs).
6SPECIFICATION GD1/1 THE ISRAEL ELECTRIC CORPORATION LTD
GENERATION DIVISION
8
11.2.5.15. Impulse test (inter-turn insulation) withstand test of 2 sample
coils with peak voltage of 0.65 x (4UN + 5) kV having a front
time of 0.2 µs.
11.2.5.16. Air gap clearance measurement. As acceptance condition, the
difference between the measurements at diametrical opposite
air gap points shall be less than 5% from air gap average
clearance.
11.2.5.17. Rotor tests – analyses of stator current harmonics by Motor
Monitoring or similar method (if applicable for repairing
work).
11.2.5.18. Over-speed test for rotor if repaired, at 120% rated speed. In
addition, rotor dynamic balancing test, if repaired.
11.2.5.19. Check, test and adjustment of accessories (e.g. cable entries,
earthing bolts, terminal boxes, terminal marking, enclosure,
nameplate labels, lubrication, fans, thermal monitors, coolers
etc.).
11.2.5.20. Direct rated voltage starting test, including measurement of
starting currents and starting time and successive starts test
according to motor design.
This test can be performed also in Contractor or Purchaser’s
facilities under Contractor responsibility. Acceptable locked
rotor current is until +20% of rated value.
11.3. Field Tests
11.3.1. The Purchaser shall have the right to perform all or a part of the
following field tests, on motor mounted in power station, before the
first operation following the repair:
11.3.1.1. Check of direction of rotation versus phase sequence.
11.3.1.2. Measurement of no-load current and losses (with the load
uncoupled).
11.3.1.3. Measurement of mechanical vibration.
11.3.1.4. Measurement of insulation resistance and polarization index at
the same DC voltage as in Items 11.2.5.2, 11.2.5.3.
11.3.1.5. Measurement of partial discharge with voltage up to nominal
voltage.
6SPECIFICATION GD1/1 THE ISRAEL ELECTRIC CORPORATION LTD
GENERATION DIVISION
9
11.3.1.6. Power frequency withstand test of stator winding at 0.80 x (2UN
+1) kV
11.3.1.7. Tgδ measurement according to item 11.2.5.11.
11.3.1.8. Measurement of bearing insulation resistance on motors
supplied with insulated bearings.
11.3.1.9. Rotor tests – analyses of stator current harmonics by Motor
Monitoring according to item 11.2.5.177.
11.3.1.10. Check of the accessories.
11.3.1.11. Direct rated voltage starting test, including measurement of
starting currents and starting time according to item 11.2.5.20.
12. Packaging & Delivery
12.1. The repair or overhaul shall be performed in Contractor’s factory.
The transportation to and from the Contractor’s factory, including the
insurance, shall be the Contractor’s responsibility (as an integral part of the
contractual repair or overhaul schedule/delivery time) unless otherwise agree.
13. Storage & Handling The Contractor shall submit instructions for long term motor storage.
14. Nameplate & Marking
The contractor shall renew the nameplate, include IECo motor number.
The contractor shall mark the motor phases.
15. Notes
Within this specification, the word "shall" indicates mandatory requirements, from
which no deviation is permitted. The word "should" indicates a preferred or
recommended possibility.
IECo keeps its rights to qualify or disqualify any Bidder following the fulfilling of
any specification requirement.
All deviations from this specification shall be separately listed. In the absence of
such list, it will be presumed that the provision of the specification are complied with
by the Bidder.
(See also non-conformance reporting requirement in item 7.1 above).
16. Special Requirements
16.1. Warranty The warranty period of the repaired motor shall be at least 12 months from first
operation.
16.2. Repair Duration
6SPECIFICATION GD1/1 THE ISRAEL ELECTRIC CORPORATION LTD
GENERATION DIVISION
10
The works detailed above (scope of work and tests) shall be performed in the
Contractor facilities during 60 calendar days or less.
16.3. Threshold Conditions 16.3.1. The Contractor shall provide with the proposal a reference list
showing his proven experience performing rewinding of similar
motors (rated power, voltage) - at least 2 similar motors in the last
five years.
16.3.2. The Bidder shall include in his technical proposal ISO-9001
qualification certificate or similar.
16.4. Others 16.4.1. The repair or overhaul shall be performed in Contractor’s factory.
16.4.2. The Contractor shall issue a Root Cause Analysis of the original failed
motor.
16.4.3. The Contractor shall issue an acceptance test report, before shipment.
16.4.4. The Contractor shall issue a final report, within 30 days after
completion of the scope of work.
16.4.5. All documentation shall be issued in English or Hebrew.
6SPECIFICATION GD1/1 THE ISRAEL ELECTRIC CORPORATION LTD
GENERATION DIVISION
11
Appendix A
TEST PLAN
CONTRACTOR`S: NAME, I&T PLAN TITLE, THE PRODUCT INSPECTED/TESTED,
AND DOCUMENT IDENTITY & APPROVAL.
PURCHASER`S : NAME AND PROJECT`S NAME AND LOCATION
REMARKS
TIME SCHEDULE
INSPECTED/TESTED BY :
WP/HP OR
OTHER
APPLICABLE
DOCUMENTS
THE INSPECTI
ON OR TEST
NO.
OTHER PURCH-
ASER CONTR- ACTOR
SUB-CONT./
SUPPLYER