The International Linear Collider (ILC) – Status and Dubna Siting Grigori Shirkov

72
The International Linear Collider (ILC) – Status and Dubna Siting Grigori Shirkov Dubna, July 26, 2006 Международный Линейный Коллайдер

description

The International Linear Collider (ILC) – Status and Dubna Siting Grigori Shirkov Dubna, July 26, 2006. Международный Линейный Коллайдер. Linear Collider – two main challenges. Energy – need to reach at least 500 GeV CM as a start Luminosity – need to reach 10^34 level. - PowerPoint PPT Presentation

Transcript of The International Linear Collider (ILC) – Status and Dubna Siting Grigori Shirkov

Page 1: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

TheInternational

Linear Collider(ILC) – Status

and Dubna Siting

Grigori ShirkovDubna, July 26, 2006

МеждународныйЛинейныйКоллайдер

Page 2: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov
Page 3: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

• Energy – need to reach at least 500 GeV CM as a start

• Luminosity – need to reach 10^34 level

Linear Collider – two main challenges

Page 4: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Luminosity & Beam Size

• frep * nb tends to be low in a linear collider

• The beam-beam tune shift limit is much looser in a linear collider than a storage rings achieve luminosity with spot size and bunch charge– Small spots mean small emittances and small betas:

x = sqrt (x x)

Dyx

repb HfNn

L

2

2

L frep [Hz] nb N [1010] x [mm] y [mm]

ILC 2x1034 5 3000 2 0.5 0.005

SLC 2x1030 120 1 4 1.5 0.5

LEP2 5x1031 10,000 8 30 240 4

PEP-II 1x1034 140,000 1700 6 155 4

Page 5: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Beam Parameters

• Requirements:– High luminosity – set by physics needs– Low backgrounds (small IP effects)– Forced to high beam power and small vertical spots

• Details of technology determine other limitations– Rf cavities and power sources 10 mA beam current– Damping rings beam emittances and number of bunches– Bunch compressors IP bunch length– Cryogenic systems duty cycle– Extensive cost optimization is required to balance systems

• Linear collider will push many technological and beam-physics limits – Need to have operational flexibility to overcome unexpected

problems

Page 6: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

ILC Parameters

Parameter range established to allow for operational optimization

Page 7: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Schematic of the ILCe-(e+) source and delivery system

Damping Ring(s)

Ring(s) To Main Linac (RTML system)

Main Linac (ML)

Beam Delivery System (BDS)

Beam Dump (BD)

Page 8: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

2nd stage ILC : 1 TeV

- extension of main linac

- moving of SR and BC

1st stage ILC : 500 GeV

Page 9: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

room-temperature accelerating sect.

diagnostics section

standard ILC SCRF modules

Guns

sub-harmonic bunchers + solenoids

laser

Laser requirements:pulse energy: > 5 uJpulse length: ~ 2 ns# pulses/train: 2820Intensity jitter: < 5 % (rms)pulse spacing: 337 nsrep. rate: 5 Hzwavelength: 750-850 nm

DC gun:120 keV HV

Room temperature linac:Allows external focusing by solenoidsSame as e+ capture linac

Photocathodes:GaAs/GaAsP strained super-lattice

ILC Gun Schematic View

Page 10: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

ParameterPulse length 0.9ms

Pulse reputation 5Hz

# of electrons in a micro bunch 2.00E+10# of micro bunches in a pulse 2800(5600)

Bunch separation 308(154)ns

Bunch charge 3.2(1.6)nC

Micro bunch length at source 0.5-2ns

Peak current 12.8A(0.5ns)Electron Polarization 80%

ILC Gun Beam Specifications

• Polarized electrons are produced by injecting circularly polarized photons(sz=±1) on NEA GaAs cathode.

Page 11: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

ILC Gun Multi Bunch Laser

Output pulse train Output pulse train of the OPCPAof the OPCPA

► OPCPA (Optical Parmetric Chirped Pulse OPCPA (Optical Parmetric Chirped Pulse Amplification) system generates trains with a Amplification) system generates trains with a wide range of pulse length, 150 fs .. 20 ps wide range of pulse length, 150 fs .. 20 ps (FWHM)(FWHM)

► Pulse energy: EPulse energy: Emicromicro = 50 ~ 100 uJ = 50 ~ 100 uJ E Etraintrain = up to 80 mJ = up to 80 mJ

► Available wavelength: = 790 ~ 830 nmAvailable wavelength: = 790 ~ 830 nm

► Pulse train: up to 0.9msPulse train: up to 0.9ms

up to 900 us

= 12 ps(FWHM)

= 523 nm

synchronizedNd:YLF Burst-Mode laser

pumping the OPA

= 150 fs (FWHM)Emicro = 50...100 mJ

@ f= 1 MHz

picosecond-pulseoutput channel:

pulse trains, 800 ms long

= 15 ps 100 fs

G > 5 000primary

synchronization loop

master clockf = 1.3 GHz

mixer1.3 GHz

photodiode

Piezo

three-crystalOPA

outputpulse trains800 ms long, = 790 ...

830 nm

gratingcompressorgrating stretcherTi:Sa oscillator

G ~ 20

I. Will, H. Redlin, MBI Berlin

Page 12: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Damping Rings• Damping rings have more accelerator physics than the rest of the collider• Required to:

1. Damp beam emittances and incoming transients

2. Provide a stable platform for downstream systems

3. Have excellent availability ~99% (best of 3rd generation SRS)

• Mixed experience with SLC damping rings:– Referred to as the “The source of all Evil”– Collective instabilities; Dynamic aperture; Stability

• Damping ring designs based on KEK ATF, 3rd generation SRS, and high luminosity factories– Experimental results provide confidence in design

Page 13: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Issues in the Damping Rings• Emittance tuning and error correction

– Orbit correction and component stabilization• Injection/extraction of individual bunches

– Kicker rise/fall time – very large rings to store 3000 bunches• Dynamic aperture

– Long wigglers needed if the ring is too big• Single-bunch intensity

– Tune shift by self-Coulomb force (space charge)• Instabilities (mainly average current)

– Electron cloud instability– Fast ion instability– Classical collective instabilities

• Rings operate in a new regime with fast damping and very small beam emittances

Page 14: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

An aside: the damping wiggler• The damping time in a storage ring depends on the rate of energy

loss of the particles through synchrotron radiation. In the damping rings, the rate of energy loss can be enhanced by insertion of a long wiggler, consisting of short (~ 10 cm) sections of dipole field with alternating polarity.

y

xz

By = Bw sin(kzz)

The magnetic field in thewiggler can be approximated by:

Page 15: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Main Linac Design• Baseline Configuration Document (BCD) distilled from

Snowmass Working Group recommendations in August

2005.

• Major differences from 2001 Tesla TDR 500 GeV Design.

– Higher gradient (31.5 MV/m instead of 23.4 MV/m) for cost

savings.

– Two tunnels (service and beam) instead of one for improved

availability.

• The Linac Area Group of the Global Design Effort (GDE)

is continuing to evolve design.

Page 16: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Superconducting RF Acceleration technology

- Nano-meter size beam handling technology

Laser wire system

Technical Challenges at the ILC

Page 17: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

電場

( 陽 ) 電子

Acceleration

Electric Field

Electron (positron)

Page 18: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

OriginalCornellN = 5

High Gradient

N =7

LowLossN =7

TESLA

N=9

SNSß=0.61

N=6

SNSß=0.81

N=6

RIAß=0.47

N=6

RHIC

N=5

year 1982 2001 2002 1992 2000 2000 2003 2003

aff 1489 2592 3288 4091 3883 2924 5040 850

● Field flatness vs. N

Multi-cell Structures and Weakly Coupled Structures Cavities

cc

2

ff k

Na

i

i

cc

2

i

iff

i

i

f

f

k

N

f

fa

A

A

Field flatness factor

For the TESLA cavities: field flatness is better than 95 %

Page 19: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

‣ Made with solid, pure niobium – it has the highest Critical

Temperature (Tc = 9.2 K) and Thermodynamic Critical Field

(Bc ~ 1800 Gauss) of all metals.

‣ Nb sheets are deep-drawn to make cups, which are e-beam

welded to form cavities.

‣ Cavity limited to ~ 9 cells (~ 1 m Long) to reduce trapped

modes, input coupler power and sensitivity to frequency

errors.

‣ Iris radius (a) of 35 mm chosen in tradeoff for low surface

fields, low rf losses (~ a), large mode spacing (~ a3 ), small

wakes (~ a-3.5 ).

1.3 GHz TESLA

Cavities

Page 20: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Cryomodule with four 9 cell cavities

13 m

Page 21: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Cryomodule DesignRelative to the TTF cryomodules

– Continue with 8 cavities per cryomodule based on experience and minimal cost savings if number increased (12 in TDR).

– Move quad / corrector / bpm package to center (from end) to improve stability.

– Increase some of cryogenic pipe sizes (similar to that proposed for the XFEL).

– Decrease cavity separation from 344 mm to 283 mm as proposed in the TDR.

Page 22: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Niobium:Electron Beam Melting• High Purity Niobium(RRR>250) is made by multiple electron beam

melting steps under good vacuum, resulting in elimination of volatile impurities

• There are several companies, which can produce RRR niobium in larger quantities:

Wah Chang (USA), Cabot (USA), W.C.Heraeus (Germany), Tokyo Denkai(Japan), Ningxia (China), CBMM (Brasil)

CBMM deposit in Araxa, Brasil EBM furnace at Tokyo DenkaiEBM Ingots at CBMM

Page 23: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Fabrication(3)

Page 24: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Cavity Tests on Mono-cells

- dedicated nozzle system for cavity cleaning developed [L.Lilje, CARE Meeting Nov. 2004, DESY]

Page 25: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Fabrication• Hydro forming (W.Singer,DESY) Spinning

(V.Palmieri,INFN Legnaro)

Page 26: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Beam Delivery System challenges

• Focus the beam to size of about 500 * 5 nm at IP • Provide acceptable detector backgrounds

– collimate beam halo

• Monitor the luminosity spectrum and polarization– diagnostics both upstream and downstream of IP is desired

• Measure incoming beam properties to allow tuning of the machine

• Keep the beams in collision & maintain small beam sizes – fast intra-train and slow inter-train feedback

• Protect detector and beamline components against errant beams

• Extract disrupted beams and safely transport to beam dumps• Minimize cost & ensure Conventional Facilities constructability

Page 27: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

BDS

BDS: from end of linac to IP, to dumps

Page 28: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Beam Delivery System• Requirements:

– Focus beams down to very small spot sizes– Collect out-going disrupted beam and transport to the dump– Collimate the incoming beams to limit beam halo– Provide diagnostics and optimize the system and determine the

luminosity spectrum for the detector– Switch between IPs

Page 29: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

How to get Luminosity

• To increase probability of direct e+e- collisions (luminosity) and birth of new particles, beam sizes at IP must be very small

• E.g., ILC beam sizes just before collision (500GeV CM): 500 * 5 * 300000 nanometers (x y z)

Vertical size is smallest

Dyx

brep HNnf

L

2

4

5

300000500

Page 30: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Modulators (115 kV, 135 A, 1.5 ms, 5 Hz)

Pulse Transformer Style

(~ 2 m Long)

To generate pulse, an array of capacitors is slowly charged in parallel and then discharged in series using IGBT switches.

Will test full prototype in 2006

Page 31: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

KlystronsBaseline: 10 MW Multi-Beam Klystrons (MBKs) with ~ 65%

Efficiency: Being Developed by Three Tube Companies in Collaboration with DESY

Thales CPI Toshiba

Page 32: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Beam dump for 18MW beam• Water vortex

• Window, 1mm thin, ~30cm diameter hemisphere

• Raster beam with dipole coils to avoid water boiling

• Deal with H, O, catalytic recombination

• etc.

Page 33: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

The Big Picture: ILC Site Power ~ 330MW

Sub-Systems 60MW

Main Linacs 140MW

Cryogenics:

50MW

RF: 90MW

65%

78%

60%

Beam 22MW

Injectors

Damping rings

Auxiliaries

BDS

Page 34: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov
Page 35: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

DefinitionsICFA - International Committee for Future Accelerators

FALC - Funding Agencies for the Linear Collider

ILCSC - International Linear Collider Steering Committee

GDE - Global Design Effort

RDB - Research and Development Board

CCB - Change Control Board

DCB - Design Cost Board

CFS - Conventional Facilities and Siting

BCD - Baseline Configuration Document

RDR - Reference Design Report

TDR - Technical Design Report

WBS - Work Breakdown Structure

International OrganizationInternational Organization

Page 36: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Global Design EffortGlobal Design Effort

Page 37: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

International Linear Collider Timeline 2005 2006 2007 2008 2009 2010

Global Design Effort Project

Baseline configuration

Reference Design

ILC R&D Program

Technical Design

Expression of Interest to Host

International Mgmt

Page 38: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

THE 50 KM LINETHE 50 KM LINE

Page 39: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Longitudinal Section

EUROPEAN SAMPLE SITE - CERNEUROPEAN SAMPLE SITE - CERN

Page 40: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

EUROPEAN SAMPLE SITE - DESYEUROPEAN SAMPLE SITE - DESY

Longitudinal Section

Page 41: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

ASIAN SAMPLE SITEASIAN SAMPLE SITE

Longitudinal Section

Page 42: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

AMERICAS SAMPLE SITEAMERICAS SAMPLE SITE

Longitudinal Section

Page 43: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

For baseline, developing deep underground (~100 m) layout with 4-5 m diameter tunnels spaced by 5 m.

ILC Tunnel Layout

Page 44: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

MAIN LINAC BEAM TUNNEL VENTILATION

Normal airflow same as Service tunnel

Smoke airflow (TBD) Assume 2X = 38,000cfm

ODH airflow (TBD).

Construction Airflow (not included)

Thermal load Airflow (Not included). Minimal load to air

MAIN LINAC SERVICE TUNNEL VENTILATION

Normal airflow for 1 mile per hour speed= 19,000 cfm dry 100% outdoor air per tunnel = 0.3 airchange per hour at 5 meter diamater tunnel. Airflow increase per CO2 sensor.

Smoke airflow (TBD) Assume 2X = 38,000cfm (placeholder)

ODH airflow (NONE). Service tunnel to be separated from Cryo cavern

Construction Airflow (not included)

Thermal load Airflow (Not included). Heat load to air will be handled by separate chilled water fancoils (see sketch)

Page 45: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

OVERALL SCHEMATIC LAYOUTOVERALL SCHEMATIC LAYOUT

Page 46: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

EXTENT OF CONSTRUCTIONEXTENT OF CONSTRUCTION

• Main Accelerator Enclosures - 475,000 mMain Accelerator Enclosures - 475,000 m33

• Main Accelerator Support Enclosures - 475,000 mMain Accelerator Support Enclosures - 475,000 m33

• 2 Damping Ring Enclosures - 210,000 m2 Damping Ring Enclosures - 210,000 m33

• 12 Access Shafts - 70,000 m12 Access Shafts - 70,000 m33

• Beam Delivery Enclosures - 160,000 mBeam Delivery Enclosures - 160,000 m33

• 2 Interaction Halls - 800,000 m2 Interaction Halls - 800,000 m33

• Additional Support and Transport Enclosures - 300,000 mAdditional Support and Transport Enclosures - 300,000 m33

• Surface Facilities - 85,000 mSurface Facilities - 85,000 m22

Page 47: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Side View of ShieldedSide View of ShieldedTunnel Boring MachineTunnel Boring Machine-W. Bialowans-W. Bialowans

Page 48: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Cutting Face of ModernCutting Face of ModernTunnel Boring MachinesTunnel Boring Machines-W. Bialowans-W. Bialowans

Page 49: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Interaction Hall SchematicsInteraction Hall Schematics

Page 50: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Cryogenic PlantsCryogenic Plants

Water Processing PlantsWater Processing Plants

Page 51: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Electrical SubstationsElectrical Substations

Page 52: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

ILC siting and conventional facilities in Dubna region

Page 53: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Joint Institute for Nuclear Research

Dubna, RussiaInternational Intergovernmental Organization

18 member states; 4 associate members

Page 54: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

- The international intergovernmental organization Joint Institute for Nuclear Research -

prototype of ILC host institution;

- Experienced personal of JINR in accelerators, cryogenics, power supplies and etc.

- Infrastructure and workshops of JINR on the first stage of ILC project realization;

- The town Dubna provides with all the necessary means of transport to deliver all kinds of

the equipment of the accelerator itself and its technological systems: highways, railways,

waterways (through Volga river to Black sea, Baltic sea, Polar ocean);

- The international airport «Sheremetyevo» is situated at the distance of 100 km from

Dubna (1.5 hours by highway);

- Developed Internet and satellite communication;

- A Special Economic Zone (industrial+scientific) in the Dubna region (Edict of Russian

Government, Dec. 2005), provides unique conditions in taxes and custom regulations;

- A good position in the European region;

- A positive reaction received in preliminary discussions with the interested

governmental persons and organizations in Russia.

Advantages of Location

Page 55: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov
Page 56: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Russian Satellite Communications Center

Page 57: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

0 km

10 km

20 km

30 km

40 km

500 kV power line

Volga river

Dubna city

Page 58: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

The area is thinly populated, the path of the accelerator traverses 2 small

settlements and a railway with light traffic between Taldom and Kimry.

Possible “line” crosses only the railway to Savelovo (of low utilization) and

the River Hotcha with a very small flow rate.

The climate is temperate-continental. The mean temperature in January

is –10.7С. The mean temperature in July is +17.8С. The mean annual

rainfall is 783 mm. The mean wind speed is 3.2 m/s. Strong winds (15

m/s) blow only 8 days/year. According to the climatic parameters, the

territory of Dubna is considered to be comfortable.

Area and Climate

Page 59: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Power and energetics

The northern part of Moscow region and the neighboring regions have a developed system of objects of generation and transmission of electrical energy. There are first-rate generating stations: the Konakovo EPS (electric power station, ~30 km from Dubna) and the Udomlia APP (atomic power plant, ~100 km from Dubna).

Two trunk transmission lines with the voltage 220 kV and 500 kV pass through the territory of Dubna.

The investigation of possibilities of the power supply for the accelerator and its infrastructure with the total power up to 300 MW gives the following variant:Construction of the power line-220 kV, 35÷40 km long, directly from the center of generation – the Konakovo EPS to the Central Experimental Zone of the accelerator with a head step-down substations 220/110 kV.

It will require the investment in larger amount but the cost of power obtained directly from the centers of generation will be lower for 40÷50 % (from 0.05$ per 1kWh down to 0.02-0.03 $ per 1kWh in prices of 2006).

Page 60: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

The area of the proposed location of the accelerator is situated

within the Upper Volga lowland. The characteristic feature of this

territory is the uniformity, monolithic character of the surface. The

existing rises of the relief in the form of single hills and ridges have

smoothed shapes, soft outlines and small excesses. The territory of

the area is waterlogged. The absolute marks of the surface range

from 125 to 135 m with regard to the level of the Baltic Sea.

The difference of surface marks is in the range of 10 m only on

the base of 50 km.

Relief

Page 61: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

The area of the proposed location of the accelerator is situated within the Russian

plate – a part of the Eastern European ancient platform – a stable, steady structural

element of the earth’s crust.

The Russian plate, like all the other plates, has a well-defined double-tier

structure. The lower tier or structural floor is formed by the ancient – lower

Proterozoic and Archaean strata of metamorphic and abyssal rocks, which are more

than 1.7 billion of years old. All these strata are welded into a single tough body –

the foundation of the platform. The area of the ILC accelerator is located in the

southern part of a very gently sloping saucer-shaped structure – the Moscovian

syneclise.

Alluvial deposits i.e. fine water-saturated sands, 1-5 m of thickness. Below one

can find semisolid drift clay of the Moscovian glaciation with exception of detritus

and igneous rocks. The thickness of moraine deposits is 30-40 m.

Geology

Page 62: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

The ILC linear accelerator is proposed to be placed in the drift clay at the depth of 20 m (at the mark of 100.00 m) with the idea that below the tunnel there should be impermeable soil preventing from the underlying groundwater inrush. It is possible to construct tunnels of the accelerating complex using tunnel shields with a simultaneous wall timbering by tubing or falsework concreting.

Standard tunnel shields in the drift clay provide for daily speed of the drilling progress specified by the Project of the accelerator (it is needed for tunnel approximately 2.5 y’s).

Page 63: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

BCD document (Conventional Facilities part)

Documentation and Cost Estimation

Site Assessment MatrixFirst official document from Russian State Project Institute with estimations on: Conventional facilities cost Siting (tunnel, land acquisition) cost and time schedule Energetics and power cost operational cost Labor cost

JINR prepared and filled the followingDocuments for the possible hosting ILC:

The overall value on consolidated estimated calculations in the prices of year 2006 for civil engineering work, underground and surface objects of the main construction gives the sum in order of 2,3 B$, including 1 B$ of costs of the tunnels construction for linear accelerator, all its technological systems and mines.

Cost of power supply objects which will provide electric power directly from generator sources with special (favorable) cost of energy (tariff) is of order of 170 M$.

Page 64: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

Structure

JINR participation in ILC

Accelerator physics & techniques

Detectors Particle PhysicsDetector concepts

R&DExperiments &Tests

Program for new physics

& experiments

R&DTest facilitiesInfrastructure

SitingSafety

Scientific Council of JINR (20.01.2006):• encourages JINR to be involved in the ILC design effort and to invest appropriate resources in scientific and technological developments to support its ability to play a leading role in the ILC project;• supports the intention of JINR to participate actively in the ILC project and the possible interest of JINR to host the ILC

JINR Committee of Plenipotentiaries approved this recommendation on 25.03.2006The Committee of Plenipotentiary Representatives of the Governments of the Member States is the supreme body governing the Institute.

Page 65: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

JINR at ILC

Plans on opening of new themeJINR participation in design, construction and testing of prototype elements of the ILC accelerator complex (2007-2009).

Studying problem and main goal of researches:Development and creation of accelerator complex elements, study of the beam dynamics in linear colliders.

Participating countries and international organizationsBelarus, Germany, Italy, Russia, USA, Japan, CERN

Page 66: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

1. Creation of the ILC injection complex prototype. Development and study of electron sources on the base of photocathode and control laser system. Creation and launching of the electron injector prototype with RF or DC gun.

2. Development and creation of the test facility on base of the electron linear accelerator LINAK-800 for testing with high-energy electron beam of accelerating RF resonators, beam parameter diagnostics and transportation channels prototypes for ILC. Creation of the free electron laser on the base of photo-injector and linac LINAK-800. Development and testing of RF system elements of the linear accelerator.

3. Researches on possible creation of high-precise metrological laser complex with extended coordinate length up to 20 km.

4. Development and creation of cryogenic modules for the acceleration system of linac. Participation in creation of design documentation (work drawings) in ANSYS standard for manufacturing at ZANON (Milano) plant the first cryostat prototypes for ILC.

Page 67: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

5. Preparation of design documentation on creation of hardware-software complex and facility for study of cryomodules, with the goal of further transition to production of documentation for mass cryostats fabrication and/or their element with refering to technologies and standard group of of the work performers.

6. Theoretical study of electron beam dynamics in transportation channels using software packages, calculation of electric and magnetic fields in accelerating structures, transportation systems and systems of e-/e+ beam formation.

7. Preparation of the project of hardware-software complex for studies of radiation stability of superconductive materials using powerful , e, n beams

8. Engineering studies and design works with purpose of the study and preparing the possible hosting of ILC in the region near Dubna.

9. Development of the magnetic systems of ILC. Calculation on choosing parameters of electromagnetic elements for Damping Rings (DR). Development and creation of the magnetic systems on base of superconducting and warm electromagnets, also for constant magnet variant.

Page 68: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

LHE groundMachinery Hall # 2:

Possible place for location of the Test Bench for experiments on superconducting RF cavities.Adv: Large hall, Power supply,Water supply, very close to systems for liquid Helium and other cryogenics

Page 69: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

LNP ground Building 118Location of constructed LINAC-800.Test of RF accelerator sections and cryo modulesLINAC with super-conducting RF cavity(power,water, ...

LINAC-800 – first electron beam on 27.04.2006

Page 70: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov

LNP ground

Building 108 (LEPTA project)2 experimental Halls(water, power, …)

Test Bench forPhoto Injector

Page 71: The International Linear Collider (ILC) – Status  and Dubna Siting Grigori Shirkov