The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68...

14
The History of Load Participation in ERCOT DOE Workshop—Washington, DC Mark Patterson ERCOT Manager of Demand Integration October 25, 2011

Transcript of The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68...

Page 1: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

The History of Load

Participation in ERCOT

DOE Workshop—Washington, DC

Mark Patterson

ERCOT Manager of Demand Integration

October 25, 2011

Page 2: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

In the Beginning….

2002

– Texas Energy Markets are opened to competition

– Legacy interruptible programs are eliminated

– Large Industrial customers want to participate in Ancillary Service

Markets

– Market Rules (Protocols) changed to add new type of resource called

Loads acting as a Resource (LaaR)

– Instantaneous Interruptible customers transition to Responsive Reserve

Service (RRS)

– 10 minute and 30 minute customers initially consider providing Non-

Spinning Reserve Service but quickly transition to RRS

– Limits placed on maximum participation (25% of RRS capacity)

– Loads must meet similar requirements as generators

• Real Time Telemetry

• Dispatchable via a verbal dispatch instruction

• UFR for Frequency Response

2

10/25/2011

Page 3: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

2002 to 2004

• Deployments are done for System Capacity Insufficiency and

Management of Zonal and Local Congestion

• Loads must have a relatively flat load profile in order to provide RRS

(batch process loads are not allowed to provide service)

• Loads must pass a qualification test to provide service

• 25% limit is raised to 33%

• Protocols are changed to create a new type of Resource called a

CLR but system changes are extensive and not implemented

• Numerous deployments for Zonal and Local Congestion

3 10/25/2011

Page 4: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

2005 – 2006

• Protocols are changed to remove zonal deployments

• 33% limit is changed to 50%

• Firm Load Shed in April 2006 and first system wide deployment of

LaaRs

• Some Performance Issues Identified

– 20 minute initial response times

– Real time telemetry issues

– Qualification tests allow simulated testing

4 10/25/2011

Page 5: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

• Protocol changes implemented to correct issues

– Simulated testing no longer acceptable – qualification tests

must include an actual deployment

– Tightened telemetry standards

– Provisions added to suspend LaaRs that fail to perform

• Response times go from 20 minute timeframe to 7-8 minutes

• Tests run to demonstrate viability of CLR

• Zonal market ends in December 2010

2007 – 2010

10/25/2011

5

Page 6: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

2011

• Nodal Market Implementation

– Deployments now include XML message prior to the verbal

dispatch instruction

– Split deployment stack created

– Full implementation of CLR

6 10/25/2011

Page 7: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

7 10/25/2011

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

2400

Apr-02 Apr-03 Mar-04 Mar-05 Mar-06 Mar-07 Mar-08 Mar-09 Mar-10 Mar-11

MW

sLoad Resources Registered and Qualified for

ERCOT AS Market

Page 8: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

Impact of Load Resources on AS Markets

10/25/2011

8

ERCOT Load Resources Participating in Responsive Reserve Market

Summary

2006 2007 2008 2009 2010 2011***

Number of Participants 130 130 143 160 181 189

Registered Load (MW) 1966 2069 2153 2063 2382 2391

Load Resource RRS Awards ($ millions) * 48.4 53.2 115.8 41.6 54.1 108.3

Estimate for Total Load Resource Contribution

($ millions) ** 130.0 125.7 267.9 95.5 89.5 182.9

Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27

* Represents only portion that was awarded through ERCOT AS Market Auction

** Estimate for Total Load Resource Contribution uses the weighted average price for RRS as a proxy price for self provided Load Resources

*** Results thru 9/30/2011

Page 9: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

Load Resource Response on 2/2/2011

10/25/2011

59.5

59.6

59.7

59.8

59.9

60

60.1

60.2

0.00

200.00

400.00

600.00

800.00

1000.00

1200.00

1400.00

5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00

Load

Res

ou

rces

Dep

loye

d (M

W)

Time (hr:mm)

ERCOT Load Resource RRS Deployment 2/2/2011

Load Resources Deployed (MW) Frequency

9

Page 10: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

Load Resource Response on 8/4/2011

10/25/2011

10

59.8

59.9

60

60.1

60.2

0.00

200.00

400.00

600.00

800.00

1000.00

1200.00

14:00 14:15 14:30 14:45 15:00 15:15 15:30 15:45 16:00 16:15 16:30 16:45 17:00 17:15 17:30 17:45 18:00 18:15 18:30 18:45

Load

Res

ou

rces

Dep

loye

d (M

W)

Time (hr:mm)

ERCOT Load Resource RRS Deployment 8/4/2011

Load Resources Deployed (MW) Frequency

Page 11: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

Emergency Interruptible Load Service (EILS)

11 10/25/2011

• Service provided by end use customers willing to interrupt during an

electric grid emergency

• An additional tool for ERCOT Operations, deployed ONLY in the late

stages of a grid emergency

• Requirements:

– Can be individual loads or aggregations

– 15-minute interval metering or statistically valid sample approved by

ERCOT

– Capability of interrupting at least 1 MW of load on 10 minutes notice at

any time during the committed hours

– No telemetry required, and not modeled in the Network Operations

Model

– 3 Contract Periods per year, each has 4 time periods

– Performance based on both availability and deployment metrics

– Dispatching and financial performance is between ERCOT and a QSE

Page 12: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

12 10/25/2011

0

100

200

300

400

500

600

FebMay08 Oct08Jan09 JunSept09 FebMay10 Oct10Jan11 AprMay11 Oct11Jan12

BH1 BH2 BH3 NBH

Nu

mb

er

of

MW

Pro

cu

red

Page 13: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

0

200

400

600

800

1000

1200

14000:

15

0:45

1:15

1:45

2:15

2:45

3:15

3:45

4:15

4:45

5:15

5:45

6:15

6:45

7:15

7:45

8:15

8:45

9:15

9:45

10:1

5

10:4

5

11:1

5

11:4

5

12:1

5

12:4

5

13:1

5

13:4

5

14:1

5

14:4

5

15:1

5

15:4

5

16:1

5

16:4

5

17:1

5

17:4

5

18:1

5

18:4

5

19:1

5

19:4

5

20:1

5

20:4

5

21:1

5

21:4

5

22:1

5

22:4

5

23:1

5

23:4

5

MW

EILS Load Reduction 08/04/2011

Actual MW Baseline MW Obligation Load Reduction

Page 14: The History of Load Participation in ERCOT · Weighted Average Price for RRS ($) 12.93 12.61 28.68 10.17 9.03 25.27 * Represents only portion that was awarded through ERCOT AS Market

Questions?

ON