HURRY UP AND WAIT—PUSH SYSTEM

Page 3: The hidden factory by JULIAN KALAC

3

PULL SYSTEM CONTINUOUS FLOW

Page 4: The hidden factory by JULIAN KALAC

4

BATCH & QUE PRODUCTIONPUSH

Page 5: The hidden factory by JULIAN KALAC

5

THE PERFECT FACTORYPULLCONTINUOUS FLOW

Page 6: The hidden factory by JULIAN KALAC

Hidden Factory

6

Shipped on time and customer happyWe Made $$$$

ProductionMaterialShip order CUSTOMER

• No Wasted Time• No Wasted Money• No Wasted Resources• No Wasted Material

? ?

99% Customer Quality

Page 7: The hidden factory by JULIAN KALAC

The truth

7

The Hidden Factory

$50000-material scrap costs

$350,000 transportation costs

Lost orderWrong order shipped

ProductionMaterial Ship order CUSTOMER

Hidden Factory

Page 8: The hidden factory by JULIAN KALAC

8

Hidden Factory

Page 9: The hidden factory by JULIAN KALAC

9

Hidden Factory

Page 10: The hidden factory by JULIAN KALAC

10

Hidden Factory

Page 11: The hidden factory by JULIAN KALAC

Where is the hidden factory?

Page 12: The hidden factory by JULIAN KALAC

12

Page 13: The hidden factory by JULIAN KALAC

13

Page 14: The hidden factory by JULIAN KALAC

14

Page 15: The hidden factory by JULIAN KALAC
Page 16: The hidden factory by JULIAN KALAC

16

Page 17: The hidden factory by JULIAN KALAC

Eliminating the WastesValue Added

Typically 95% of all lead time is non-value added

1. Overproduction2. Waiting3. Transportation4. Non-Value Added Processing5. Excess Inventory/Material6. Defects7. Excess Motion8. Underutilized People

Non-Value Added

5%

Page 18: The hidden factory by JULIAN KALAC

| | 18

The 8th WasteNot utilizing operators to their full potential

Lack of cross-functional trainingOver relying on a select few while others are Inadequately trained

Operators are unable to rotate and help each other out to balance the work-load

High overtime, increased pressure stress

Page 19: The hidden factory by JULIAN KALAC

ProcessValue Added

Adds value to the output and

customer is willing to pay

for.

Optimize

Non-Value Added

Does not add value to the output, and

customer isn’t willing to pay

for.

Eliminate

Business-Value Added

Does not add value to output, customer will not pay for, but

is necessary.(Legal, Safety, Etc.)

Minimize

LEAN VALUE ADD/NON VALUE ADD

Page 20: The hidden factory by JULIAN KALAC

Cycle Time is dictated by the slowest (bottleneck) operation in the cell.

40 min

20 min

25 min

15 min

30 min

1

54

3

2

•What operation controls the cycle?•How can you relieve the bottleneck?

Basic Lean Concepts

Page 21: The hidden factory by JULIAN KALAC

• Maintain buffer in front of bottleneck – (never starve the bottleneck !)

• Improve bottleneck operation• Cross train on bottleneck

–Creates a visual work place–Continuous Improvement–Cell Support–Balance activities / operations

21

Bottleneck Management:

Page 22: The hidden factory by JULIAN KALAC

Managing Bottlenecks

22