THE HANDLING AND TRANSPORT OF CHEMICALS FROM THE PORT OF WALVIS BAY UPDATED ENVIRONMENTAL MANAGEMENT PLAN Assessed by: Assessed for: November 2020

Transcript of THE HANDLING AND TRANSPORT OF CHEMICALS FROM THE …

THE HANDLING AND TRANSPORT OF CHEMICALS FROM

THE PORT OF WALVIS BAY

UPDATED ENVIRONMENTAL MANAGEMENT PLAN

Assessed by: Assessed for:

November 2020

Project: UPDATED ENVIRONMENTAL MANAGEMENT PLAN FOR THE

HANDLING AND TRANSPORT OF CHEMICALS FROM THE PORT

OF WALVIS BAY

Report

Version/Date

Version 2

November 2020

Prepared for: Logistics Support Services (Pty) Ltd

PO Box 4407

Walvis Bay

Namibia

Lead Consultant Geo Pollution Technologies (Pty) Ltd

PO Box 11073

Windhoek

Namibia

Main Project

Team

André Faul (Leader)

(B.Sc. Zoology, Biochemistry); (B.Sc. (Hons) Zoology); (M.Sc. Conservation

Ecology); (Ph.D. Medical Bioscience)

Pierre Botha

(B.Sc. Geology/Geography); (B.Sc. (Hons) Hydrology/Hydrogeology)

Wikus Coetzer

(B.Sc. Environmental and Biological Sciences); (B.Sc (Hons) Environmental

Sciences)

Cite this

document as:

Faul A, Botha P, Coetzer W. 2020. Updated Environmental Management

Plan for the Handling and Transport of Chemicals from the Port Of

Walvis Bay

Copyright Copyright on this document is reserved. No part of this document may be

utilised without the written permission of Geo Pollution Technologies (Pty)

Ltd.

Report

Approval

André Faul

Environmental Assessment Practitioner

Table of Contents

1 OBJECTIVES OF THE ENVIRONMENTAL MANAGEMENT PLAN ............................................... 1

2 THE ENVIRONMENTAL MANAGEMENT PLAN ............................................................................... 1

2.1 OPERATIONS – IDENTIFIED IMPACTS ................................................................................................................ 1 2.2 OPERATIONS – MITIGATING MEASURES ........................................................................................................... 2

3 THE IMPLEMENTATION OF THE ENVIRONMENTAL MANAGEMENT PLAN ......................... 2

3.1 DECOMMISSIONING AND REHABILITATION..................................................................................................... 11

4 CONCLUSIONS ......................................................................................................................................... 11

5 REFERENCES ........................................................................................................................................... 11

List of Tables TABLE 1. PLANNING FOR OPERATIONS OF THE PROJECT ..................................................................... 3 TABLE 2. THE OPERATIONAL PHASE .................................................................................................... 5

1 OBJECTIVES OF THE ENVIRONMENTAL MANAGEMENT PLAN Logistics Support Services (Pty) Ltd requested Geo Pollution Technologies (Pty) Ltd to update their

existing environmental management plan (EMP) in order to renew their existing environmental

clearance certificate (ECC) that was issued on 20 September 2017. The renewed ECC is required for

the continued handling and transport of chemicals from the Port of Walvis Bay. The EMP provides

management options to ensure impacts related to the handling and transport of chemicals are

minimised. An EMP is a tool used to take pro-active action by addressing potential problems before

they occur. This should limit the corrective measures needed, although additional mitigation measures

might be included if necessary. The EMP acts as a stand-alone document, which can be used during

the various phases of any proposed activity or development.

As an international freight forwarding company, Logistics Support Services has a diverse array of

tasks related to the administrative aspects of shipping goods from international markets to local

clients. The clients being mostly in, but not limited to, the mining sector of Namibia, as well as other

southern African countries. Logistics Support Services does not own and operate cargo handling and

transport equipment (trucks, cranes, etc.), but rather arrange and administrate the entire process of

importing, handling, transporting and delivery of goods, including any incidental matters thereto,

otherwise referred to as supply chain management. However, all contractors and sub-contractors

taking part in the project should be made aware of the contents of the EMP, so as to plan the relevant

activities accordingly in an environmentally sound manner.

The objectives of the EMP are:

to include all components of the various activities;

to prescribe the best practicable control methods to lessen the environmental impacts associated

with the project;

to monitor and audit the performance of operational personnel in applying such controls; and

to ensure that appropriate environmental training is provided to responsible operational personnel.

Logistics Support Services may choose to implement an environmental management system. At the

heart of an environmental management system is the concept of continual improvement of

environmental performance with resulting increases in operational efficiency, financial savings and

reduction in environmental, health and safety risks. An effective environmental management system

would need to include the following elements:

A stated environmental policy which sets the desired level of environmental performance;

An environmental legal register;

An institutional structure which sets out the responsibility, authority, lines of communication and

resources needed to implement the environmental management system;

Identification of environmental, safety and health training needs;

An environmental program(s) stipulating environmental objectives and targets to be met, and work

instructions and controls to be applied in order to achieve compliance with the environmental

policy; and

Periodic (internal and external) audits and reviews of environmental performance and the

effectiveness of the environmental management system.

The EMP.

2 THE ENVIRONMENTAL MANAGEMENT PLAN The following general guidance for the EMP is based on the findings of the initial EIA and risk

assessment carried out by Geo Pollution Technologies (Faul & Botha, 2017).

2.1 Operations – Identified Impacts The following is the summary of the identified impacts:

The possibility of environmental pollution as a result of windblown chemical dust or spillage

is possible.

A risk to human health is possible due to the hazardous nature of some chemicals.

Page 1 of 11

Geo Pollution Technologies (Pty) LtdLogistics Support Services - Updated EMP - Nov 2020

During operations traffic impacts are expected.

The risk of groundwater and soil pollution is present.

The risk of fire and/or explosions exist.

2.2 Operations – Mitigating Measures The following is a summary of the proposed management plan, which will aid in mitigating /

preventing possible risk related to the operations and relevant activities. The measures provided

have taken into consideration all the risk perceptions raised by all stakeholders during the initial

EIA:

Environmental pollution must be prevented by preventing windblown chemical dust from

entering the environment and by appointing reputable and reliable contractors for transport.

All material safety data sheet instructions and IMDG (International Maritime Dangerous

Goods) Codes must be followed. Any spills must be cleaned immediately. All Namport

operation procedures as well as the EMP for the Port of Walvis Bay must be considered and

adhered to where applicable.

All relevant personal protective equipment should be a compulsory requirement.

Noise and traffic management must be conducted when required.

Fire prevention and firefighting plans must be in place. All products to be handled and stored

according to material safety data sheets and IMDG Codes.

3 THE IMPLEMENTATION OF THE ENVIRONMENTAL

MANAGEMENT PLAN Table 1 and Table 2 outline the management of the environmental elements that may be affected by

the different activities, grouped in each phase of development. These groups are as follows:

Planning Phase

Operational Phase

Note that since Logistics Support Services performs a supply chain management function, no

construction phase is included and decommissioning is mainly administrative as infrastructure used is

usually the property of Namport and/or the contractors.

The EMP is a living document that must be prepared in detail, and regularly updated, by the proponent

as the project progress and evolve. The tables below act as a guideline for the EMP to be established

by the proponent. Impacts addressed and mitigation measures proposed are seen as minimum

requirements which have to be elaborated on. Delegation of mitigation and reporting activities should

be determined by the proponent and included in the EMP.

All monitoring results must be reported on as indicated. These are important for any future renewals of

the environmental clearance certificate and must be submitted to the Ministry of Environment,

Forestry and Tourism on a bi-annual basis. This is a requirement by the Ministry.

Page 2 of 11

Geo Pollution Technologies (Pty) LtdLogistics Support Services - Updated EMP - Nov 2020

Tab

le 1

.

Pla

nn

ing f

or

Op

erati

on

s of

the

Pro

ject

A

ctiv

ity

Ob

ject

ive

Act

ion

T

imin

g

Pro

of

of

Co

mp

lia

nce

R

esp

on

sib

le B

od

y

Co

mp

lia

nce

T

o

com

ply

w

ith

all

leg

al

req

uir

em

ents

fo

r th

e p

roje

ct i

n

Nam

ibia

.

Ap

ply

fo

r th

e

nec

essa

ry

per

mit

s fr

om

th

e

var

ious

min

istr

ies,

lo

cal

auth

ori

ties

and

an

y

oth

er

bo

die

s th

at

go

ver

ns

the

pro

po

sed

acti

vit

y.

Fin

alis

e nego

tiat

ions

and

re

solv

e an

y

outs

tand

ing

issu

es,

if

an

y,

over

th

e

allo

cati

on o

f u

ser

righ

ts w

ith

in t

he

Po

rt o

f

Wal

vis

Bay.

Pri

or

to

com

mence

ment

and

duri

ng t

he

cours

e o

f

op

erat

ions

All

co

ntr

acts

, p

erm

its,

cert

ific

ates

and

o

ther

le

gal

do

cum

ents

on f

ile.

Pro

po

nen

t

Ap

po

intm

en

ts

To

appo

int

rep

uta

ble

contr

acto

rs

and

o

per

atio

nal

per

sonnel

an

d

esta

bli

sh

the

EM

P,

a le

gal

re

quir

em

ent

that

form

s p

art

of

the

contr

act

wit

h

the

contr

acto

r an

d e

mp

loyee

s.

Ap

po

int

con

trac

tors

an

d

emp

loyee

s and

ente

r in

to a

n a

gre

em

ent

wh

ich i

ncl

ud

es t

he

EM

P.

Ensu

re

that

th

e co

nte

nts

o

f th

e E

MP

ar

e

und

erst

oo

d

by

the

con

trac

tor,

su

b-

contr

acto

rs,

em

plo

yee

s and

al

l p

erso

nnel

wh

o w

ill

be

pre

sent

on s

ite.

Pri

or

to

com

mence

ment

and

duri

ng t

he

cours

e o

f

op

erat

ions

Co

ntr

acts

on f

ile

Pro

po

nen

t; C

ontr

acto

r

Ma

na

gem

en

t E

stab

lish

a m

anagem

ent

syst

em

to

imp

lem

ent

and

m

onit

or

hea

lth,

safe

ty a

nd

en

vir

on

ment

(HS

E).

Mak

e p

rovis

ion

s to

have

a heal

th,

safe

ty a

nd

env

iro

nm

enta

l co

ord

inat

or

to i

mp

lem

ent

the

EM

P an

d o

ver

see

occ

up

atio

nal

hea

lth and

safe

ty

as

well

as

gen

eral

en

vir

on

menta

l

rela

ted

co

mp

liance

duri

ng o

per

atio

ns.

Hav

e th

e fo

llo

win

g

em

ergen

cy

pla

ns,

equip

ment

and

p

erso

nnel

in

p

lace

to

dea

l

wit

h

all

em

ergen

cies:

E

MP

, ri

sk

manag

em

ent

pla

ns,

em

ergency

resp

onse

pla

ns

and

HS

E m

anuals

Ad

equat

e

pro

tect

ion

and

in

dem

nit

y

insu

rance

co

ver

fo

r in

cid

ents

;

Co

mp

ly w

ith t

he

pro

vis

ions

of

all

rele

van

t

safe

ty s

tand

ard

s;

Pro

ced

ure

s,

equip

men

t and

m

ater

ials

req

uir

ed f

or

emer

gen

cie

s.

Pri

or

to

com

mence

ment

and

duri

ng t

he

cours

e o

f

op

erat

ions

Do

cum

enta

tio

n o

n f

ile

Per

sonal

p

rote

ctiv

e

equip

ment

(PP

E)

avai

lab

le

Sig

nage

rela

ted

to

rest

rict

ed

area

s, d

anger

ou

s ar

eas,

and

PP

E r

equir

ements

on s

ite

Em

ergency

resp

on

se

mat

eria

l o

n s

ite

Pro

po

nen

t; C

ontr

acto

r

Page 3 of 11

Geo Pollution Technologies (Pty) LtdLogistics Support Services - Updated EMP - Nov 2020

Act

ivit

y

Ob

ject

ive

Act

ion

T

imin

g

Pro

of

of

Co

mp

lia

nce

R

esp

on

sib

le B

od

y

Res

tora

tio

n

Fu

nd

/In

sura

nce

To

es

tab

lish

a

fund

/insu

ran

ce

for

futu

re

env

iro

nm

enta

l

rest

ora

tio

n

or

po

lluti

on

rem

edia

tio

n i

f ev

er r

equir

ed.

To e

stab

lish

a f

und

fo

r ec

olo

gic

al r

esto

rati

on

sho

uld

en

vir

on

menta

l d

am

ag

e

resu

lt

fro

m

pro

ject

act

ivit

ies.

Pri

or

to

com

mence

ment

and

duri

ng t

he

cours

e o

f

op

erat

ions

Fin

anci

al

stat

em

ents

o

f

rest

ora

tio

n

fund

/pro

of

of

insu

rance

Pro

po

nen

t;

Ind

epen

den

t S

pec

iali

st

Co

nsu

ltant

Rep

ort

ing

T

o e

stab

lish

a r

epo

rtin

g s

yst

em

to

rep

ort

o

n

mo

nit

ori

ng

and

com

pli

ance

asp

ects

o

f

op

erat

ions

as

outl

ined

in

th

e

EM

P.

Est

abli

sh

a re

po

rtin

g

syst

em

to

re

po

rt

on

asp

ects

o

per

atio

ns

as

outl

ined

in

th

e

env

iro

nm

enta

l m

anag

em

ent

pla

n.

Kee

p

mo

nit

ori

ng

rep

ort

s o

n

file

fo

r b

i-

ann

ual

su

bm

issi

on

to

the

Min

istr

y

of

Envir

on

ment,

F

ore

stry

and

T

ouri

sm

in

sup

po

rt o

f E

CC

renew

al a

pp

lica

tio

ns.

This

is

a re

quir

em

ent

by t

he

Min

istr

y.

Duri

ng o

per

atio

ns

Bi-

ann

ual

m

onit

ori

ng

rep

ort

s

Pro

po

nen

t; C

ontr

acto

r

En

vir

on

men

tal

Cle

ara

nce

Ren

ewa

l

To r

enew

the

EC

C e

ver

y t

hre

e

yea

rs.

Ap

po

int

a sp

ecia

list

en

vir

on

menta

l

consu

ltan

t to

up

dat

e th

e en

vir

on

menta

l

imp

act

ass

ess

men

t (i

f re

quir

ed)

and

E

MP

and

ap

ply

fo

r re

new

al o

f th

e E

CC

.

Pri

or

to

exp

iry

of

EC

C

Ren

ew

ed E

CC

P

rop

onen

t;

Ind

epen

den

t S

pec

iali

st

Co

nsu

ltant

Page 4 of 11

Geo Pollution Technologies (Pty) LtdLogistics Support Services - Updated EMP - Nov 2020

Tab

le 2

. T

he

Op

era

tio

nal

Ph

ase

C

rite

ria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

En

ha

nce

d

skil

ls

tra

nsf

er

an

d

tech

no

log

y

tra

nsf

er

to

Wa

lvis

B

ay

a

nd

sub

seq

uen

t

pro

mo

tio

n

of

eco

no

mic

dev

elo

pm

en

t

Peo

ple

need

sk

ills

to

perf

orm

th

eir

job

s.

The

tech

no

log

y t

o d

o s

om

eth

ing i

s o

ften

no

t fo

un

d

loca

lly.

Develo

pm

ent

of

peo

ple

an

d

tech

no

log

y

are

key

to

eco

no

mic

dev

elo

pm

en

t.

Tra

inin

g

mu

st

be

pro

vid

ed

to

Nam

ibia

ns

to

ult

imat

ely

em

plo

y a

pre

do

min

antl

y N

am

ibia

n w

ork

forc

e.

Co

pie

s o

f tr

ainin

g

cert

ific

atio

n

or

manager

ial

refe

rence

s o

n f

ile.

6 M

on

thly

su

mm

ary r

epo

rt

bas

ed o

n a

ctual

trai

nin

g a

nd

the

enhance

ment

of

skil

ls

and

tr

ansf

er

of

tech

no

log

y

sho

uld

be

com

pil

ed.

Pro

po

nen

t

Incr

ease

d

spre

ad

o

f H

IV/

AID

S;

Incr

ease

d i

nfl

ux

to

Wa

lvis

B

ay

;

Incr

ease

d

info

rm

al

sett

lem

en

t a

nd

ass

ocia

ted

pro

ble

ms;

Red

uce

d

pro

pert

y v

alu

es

New

and

ex

isti

ng d

evel

op

ments

at

trac

t

peo

ple

who

see

k w

ork

. T

his

in t

urn

can

incr

ease

th

e exte

nt

of

info

rmal

sett

lem

ents

and

its

ass

oci

ated

pro

ble

ms.

The

incr

ease

d t

ruckin

g a

nd

dis

trib

uti

on

of

go

od

s fr

om

W

alvis

B

ay

could

contr

ibute

to

the

spre

ad o

f H

IV /

AID

S.

It

is

po

ssib

le

that

th

ese

ca

n

aff

ect

pro

per

ty p

rice

s in

the a

rea

dep

end

ing

on

the

pro

xim

ity t

o a

res

iden

tial

sit

e.

Res

tric

ted

em

plo

ym

ent

for

loca

l p

eop

le

only

sh

ould

b

e

pra

ctic

ed.

Dev

iati

ons

fro

m t

his

pra

ctic

e s

ho

uld

be

just

ifie

d

appro

pri

atel

y.

Ed

uca

tio

nal

p

rogra

ms

on

H

IV/A

IDs.

C

ontr

acti

ng

of

tran

spo

rt c

om

panie

s w

ith e

du

cati

onal

pro

gra

mm

es

for

truck

dri

ver

s is

im

per

ativ

e.

6 M

on

thly

su

mm

ary r

epo

rt

bas

ed

on

educa

tio

nal

pro

gra

mm

es

and

tr

ainin

g

cond

uct

ed.

6

Mo

nth

ly

rep

ort

an

d

revie

w

of

em

plo

yee

dem

ogra

phic

s.

Pro

po

nen

t

Em

plo

ym

en

t T

he

pro

ject

w

ill

pro

vid

e em

plo

ym

ent

and

res

ult

in m

an

y i

nd

irec

t em

plo

ym

ent

op

port

unit

ies.

If

skil

ls

exis

t lo

call

y

Nam

ibia

ns

mu

st

be

em

plo

yed

.

Alt

ernat

ivel

y tr

ainin

g

mu

st

be

pro

vid

ed to

N

amib

ians

to

ult

imat

ely

em

plo

y

a p

red

om

inan

tly

Nam

ibia

n

wo

rkfo

rce.

Dev

iati

ons

fro

m

this

p

ract

ice

sho

uld

b

e ju

stif

ied

app

rop

riat

ely.

6 M

on

thly

su

mm

ary r

epo

rt

bas

ed o

n e

mp

loyee

rec

ord

s.

Pro

po

nen

t

Ch

em

ica

l

Su

pp

ly

an

d

Eco

no

mic

Inje

ctio

n

Rel

iab

le

sup

ply

o

f ch

em

icals

to

lo

cal

ind

ust

ries

such a

s m

ines

and

to

so

uth

ern

Afr

ica.

Eco

no

mic

inje

ctio

n i

nto

Wal

vis

Bay a

nd

Nam

ibia

as

a w

ho

le.

Use

lo

cal

Nam

ibia

n

contr

act

ors

. D

evia

tio

ns

fro

m

this

pra

ctis

e sh

ou

ld b

e ju

stif

ied

.

6 M

on

thly

su

mm

ary r

epo

rt

bas

ed

on

contr

acto

rs

reco

rds.

Pro

po

nen

t

Tra

ffic

In

crea

sed

tr

affi

c le

adin

g

to

traf

fic

conges

tio

n,

acci

dents

an

d

incr

ease

d

Ad

her

e to

al

l lo

cal,

re

gio

nal

an

d

nat

ional

reg

ula

tio

ns

per

tain

ing t

o t

he

truck

ing i

nd

ust

ry a

nd

ro

ad u

sage.

An

y

com

pla

ints

re

ceiv

ed

regar

din

g

traff

ic

issu

es

Pro

po

nen

t

Page 5 of 11

Geo Pollution Technologies (Pty) LtdLogistics Support Services - Updated EMP - Nov 2020

Cri

teria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

det

erio

rati

on o

f ro

ads.

P

rio

r to

th

e tr

ansp

ort

o

f hazar

do

us

or

exp

losi

ve

carg

o a

journ

ey p

lan m

ust

be

pre

par

ed w

hic

h i

ncl

ud

e ro

ute

s w

ith

min

imu

m

po

tenti

al

traf

fic

(and

o

ther

) im

pac

ts.

This

incl

ud

es t

he

use

of

the

C3

4 (

M0

04

4)

road

beh

ind

the

du

nes

bet

wee

n W

alvis

Bay a

nd

Sw

ako

pm

und

.

Tru

cks

may

no

t o

ver

load

ed

an

d

must

re

po

rt

at

the

wei

ghb

rid

ge

exce

pt

if

exem

pte

d

as

the

case

m

ay

be

for

exp

losi

ve

carg

os.

Tru

cks

sho

uld

no

t b

e all

ow

ed

to

par

k,

outs

ide

des

ignate

d

area

s o

uts

ide

po

rt

lim

its

for

exte

nd

ed

per

iod

s o

f ti

me,

nei

ther

sho

uld

they o

bst

ruct

nei

ghb

ouri

ng b

usi

ness

es.

sho

uld

b

e re

cord

ed

and

rem

edia

l ac

tio

n

imp

lem

ente

d.

A r

egis

ter

sho

uld

be

kep

t o

f

all

carg

o t

ransp

ort

ed.

A r

epo

rt s

ho

uld

be

com

pil

ed

ever

y

6

mo

nth

s o

f al

l

inci

den

ts

rep

ort

ed,

com

pla

ints

re

ceiv

ed,

rem

edia

l ac

tio

n

taken

and

carg

o t

ransp

ort

ed.

Fir

e

an

d

Ex

plo

sio

ns

So

me

pro

duct

s to

b

e hand

led

ar

e

flam

mab

le a

nd

/or

exp

losi

ve.

Fo

r ex

plo

sive

chem

ical

s p

redet

erm

ined

ro

ute

s an

d t

imes

of

tran

spo

rt s

ho

uld

be

foll

ow

ed.

Sto

rage

and

han

dli

ng o

f fl

am

mab

le o

r ex

plo

sive

pro

duct

s

sho

uld

b

e ac

cord

ing

to

th

eir

mat

eria

l sa

fety

d

ata

shee

t

inst

ruct

ion

s w

hic

h i

nclu

des

th

e se

gre

gat

ion o

f in

com

pat

ible

pro

duct

s.

Fir

efig

hti

ng m

easu

res

as

per

the

mat

eria

l sa

fety

dat

a sh

eets

of

the

pro

duct

s sh

ould

be

adhere

d t

o.

In a

dd

itio

n t

o t

his

, al

l p

erso

nn

el h

ave

to b

e se

nsi

tise

d a

bo

ut

resp

onsi

ble

fir

e p

rote

ctio

n m

eas

ure

s an

d g

oo

d h

ou

sekee

pin

g

such

as

the

rem

oval

o

f fl

am

mab

le

mat

eria

ls

incl

ud

ing

rub

bis

h.

Reg

ula

r in

spec

tio

ns

sho

uld

be

carr

ied

out

to c

hec

k

for

thes

e m

ater

ials

at

the

site

.

A ho

list

ic

fire

p

rote

ctio

n an

d p

reven

tio

n p

lan is

nee

ded

.

This

p

lan

mu

st

incl

ud

e an

em

ergency

resp

onse

p

lan,

fire

fig

hti

ng p

lan a

nd

sp

ill

reco

ver

y p

lan.

Exp

erie

nce

has

sho

wn t

hat

the

bes

t ch

ance

to

rap

idly

pu

t

out

a m

ajo

r fi

re i

s in

the

firs

t 5

min

ute

s. I

t is

im

po

rtan

t to

reco

gnis

e th

at a

resp

onsi

ve

fire

p

reven

tio

n p

lan d

oes

no

t

sole

ly i

ncl

ud

e th

e avai

lab

ilit

y o

f fi

refi

ghti

ng e

quip

ment,

but

mo

re im

po

rtan

tly,

it in

vo

lves

pre

med

itat

ed m

easu

res

and

acti

vit

ies

to t

imeo

usl

y p

revent,

curb

and

avo

id c

ond

itio

ns

that

may r

esu

lt i

n f

ires

. A

n i

nte

gra

ted

fir

e p

reven

tio

n p

lan

A r

epo

rt s

ho

uld

be

com

pil

ed

ever

y

6

mo

nth

s o

f al

l

inci

den

ts

rep

ort

ed.

The

rep

ort

sh

ould

co

nta

in d

ates

wh

en

fire

d

rill

s w

ere

cond

uct

ed

and

w

hen

fire

fig

hti

ng

equip

ment

was

test

ed.

Pro

po

nen

t

Page 6 of 11

Geo Pollution Technologies (Pty) LtdLogistics Support Services - Updated EMP - Nov 2020

Cri

teria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

sho

uld

be

dra

fted

.

Hea

lth

, S

afe

ty

an

d S

ecu

rity

Ris

ks

incl

ud

e w

ork

re

late

d

inju

ries

o

r

exp

osu

res

to h

arm

ful

pro

duct

s, t

heft

and

sab

ota

ge.

Imp

lem

en

t an

d m

ain

tain

an

in

teg

rate

d h

ealt

h an

d sa

fety

man

ag

em

en

t sy

stem

, to

act

as a

mo

nit

ori

ng

an

d m

itig

ati

ng

too

l.

Co

mp

ly w

ith

all

healt

h a

nd

safe

ty s

tan

dard

s as

specif

ied

in

the L

ab

ou

r A

ct

an

d r

ela

ted

leg

isla

tio

n.

Cle

arl

y

lab

el

dan

gero

us

an

d

rest

ricte

d

are

as

as

well

as

dan

gero

us

eq

uip

men

t an

d p

rod

ucts

.

Lo

ck

aw

ay o

r st

ore

all

eq

uip

men

t an

d g

oo

ds

in a

man

ner

suit

ab

le t

o d

isco

ura

ge c

rim

inal

acti

vit

ies

(e.g

. th

eft

).

Pro

vid

e

all

em

plo

yees

wit

h

req

uir

ed

an

d

ad

eq

uate

pers

on

al

pro

tecti

ve e

qu

ipm

en

t (P

PE

) w

here

req

uir

ed.

En

sure

th

at

all

pers

on

nel

rece

ive a

deq

uate

tra

inin

g o

n t

he

op

erati

on

al

pro

ced

ure

s an

d

the

han

dli

ng

o

f h

azard

ous

sub

stan

ces.

Tra

in s

ele

cte

d p

ers

on

nel

in f

irst

aid

an

d e

nsu

re f

irst

aid

kit

s are

av

ail

ab

le.

Th

e

co

nta

ct

deta

ils

of

all

em

erg

en

cy

serv

ices

mu

st

be

read

ily a

vail

ab

le.

Ap

ply

an

d a

dh

ere

to

all

in

du

stry

sp

ecif

ic h

ealt

h a

nd

safe

ty

pro

ced

ure

s an

d r

eg

ula

tio

ns

ap

pli

cab

le t

o t

he h

an

dli

ng

of

hazard

ou

s su

bst

an

ces.

Tre

at

all

m

ino

r w

ork

re

late

d

inju

ries

imm

ed

iate

ly

an

d

ob

tain

pro

fess

ion

al

med

ical

treatm

en

t if

req

uir

ed

.

Ass

ess

an

y

healt

h

an

d

safe

ty

pro

ble

ms

an

d

imp

lem

en

t

co

rrecti

ve a

cti

on

to

pre

ven

t fu

ture

occu

rren

ces.

A r

epo

rt s

ho

uld

be

com

pil

ed

ever

y

6

mo

nth

s o

f al

l

inci

den

ts

rep

ort

ed.

The

rep

ort

sh

ould

co

nta

in d

ates

wh

en

trai

nin

g

was

cond

uct

ed a

nd

w

hen s

afe

ty

equip

ment

wer

e in

spec

ted

and

mai

nta

ined

.

Pro

po

nen

t

Nois

e

No

ise

wil

l b

e p

rod

uce

d b

y h

eav

y m

oto

r

veh

icle

s an

d

the

use

o

f fo

rkli

fts

and

rela

ted

mac

hin

ery.

The

Wal

vis

B

ay

Mun

icip

alit

y

has

no

re

gula

tio

ns

wit

h

regar

d t

o n

ois

e le

vel

s. A

sig

nif

icant

po

rtio

n o

f o

per

atio

ns

is

situ

ate

d i

n a

n i

nd

ust

rial

are

a so

ther

e is

no

res

tric

tio

n o

n t

he

tim

es

of

op

erat

ion.

The

Wo

rld

H

ealt

h

Org

aniz

atio

n

guid

elin

e o

n

maxim

um

n

ois

e le

vel

s (G

uid

elin

es

for

Co

mm

unit

y N

ois

e, 1

99

9)

to p

reven

t hea

ring

im

pai

rment

for

An

y

com

pla

ints

re

ceiv

ed

regar

din

g

exce

ssiv

e no

ise

sho

uld

b

e re

cord

ed

wit

h

no

tes

on

re

med

ial

acti

on

taken

.

Pro

po

nen

t

Page 7 of 11

Geo Pollution Technologies (Pty) LtdLogistics Support Services - Updated EMP - Nov 2020

Cri

teria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

wo

rker

s o

n s

ite c

an b

e fo

llo

wed

. T

his

lim

its

no

ise

level

s to

an a

ver

age

of

70

dB

over

a 2

4 h

our

per

iod

wit

h m

axim

um

no

ise

level

s no

t ex

ceed

ing 1

10

dB

duri

ng t

he

per

iod

.

The

nuis

ance

cre

ated

by a

ud

ible

war

nin

g s

ignal

s o

n t

ruck

s

and

fo

rkli

fts

at n

igh

t ca

n b

e p

reven

ted

by s

wit

chin

g t

o a

flas

hin

g l

ight

or

‘bro

adb

and

wh

ite

no

ise’

syst

em

inst

ead

of

the

no

rmal

aud

ible

w

arnin

g

sig

nal

s.

Duri

ng

dayti

me

the

aud

ible

war

nin

gs

may b

e use

d.

All

tr

ucks

and

m

ach

iner

y

must

b

e re

gula

rly

serv

iced

to

ensu

re m

inim

al n

ois

e p

rod

uct

ion.

All

co

mp

lain

ts,

rem

edia

l

acti

on

taken

an

d

addit

ional

dat

a,

if

avai

lable

, to

be

com

pil

ed i

n a

rep

ort

ever

y 6

mo

nth

s.

Wa

ste

Prod

uct

ion

Wast

e

can

b

e

of

do

mest

ic

ori

gin

o

r

hazard

ou

s w

ast

e

that

inclu

de

co

nta

min

ate

d

mate

rials

su

ch

as

pack

ag

ing

mate

rials

.

Wast

e s

ho

uld

be d

isp

ose

d o

f re

gu

larl

y a

nd

at

ap

pro

pri

ate

dis

po

sal

facil

itie

s.

Pro

du

cts

th

at

can

be r

e-u

sed

or

re-c

ycle

d s

ho

uld

be k

ep

t

sep

ara

te a

nd

tre

ate

d a

s su

ch

.

Du

e t

o t

he n

atu

re o

f so

me h

azard

ou

s m

ate

rials

th

ey s

ho

uld

be

dis

po

sed

o

f ap

pro

pri

ate

ly

an

d

at

an

ap

pro

pri

ate

ly

cla

ssif

ied

wast

e d

isp

osa

l fa

cil

ity.

See t

he m

ate

rial

safe

ty

data

sh

eets

av

ail

ab

le f

rom

su

pp

lier

s if

th

e u

ser

is n

ot

sure

ho

w t

o d

isp

ose

of

the s

ub

stan

ce.

A

reg

iste

r o

f h

azar

do

us

wast

e d

isp

osa

l sh

ould

b

e

kep

t.

Th

is

sho

uld

in

clu

de

typ

e

of

wast

e,

vo

lum

e

as

well

as

dis

po

sal

meth

od

/fac

ilit

y.

An

y

com

pla

ints

re

ceiv

ed

regar

din

g

wast

e sh

ould

b

e

reco

rded

w

ith

no

tes

on

acti

on t

aken.

All

dat

a to

be

com

pil

ed i

n a

6 m

on

th r

eport

.

Pro

po

nen

t

Grou

nd

wa

ter,

Su

rfa

ce

Wa

ter

an

d

So

il

Con

tam

ina

tio

n

Sp

ille

d o

r w

ind

blo

wn

pro

du

cts

en

teri

ng

the

en

vir

on

men

t

Po

rou

s su

rface

su

bst

rate

ca

n

allo

w

un

wan

ted

haza

rdo

us

and

ec

olo

gic

ally

det

rim

enta

l su

bst

ance

s to

see

p d

ow

n t

o

the

wat

er t

able

.

Em

ergency r

esp

onse

pla

ns

and

sp

ill

conti

ngency p

lans

mu

st

be

in p

lace

and

inclu

de

all

ch

em

icals

bei

ng h

and

led

. T

hes

e

sho

uld

b

e up

dat

ed as

new

chem

icals

ar

e ad

ded

to

th

ose

bei

ng h

and

led

.

The

ente

rin

g o

f chem

icals

in

to th

e e

nv

iro

nm

en

t m

ust

be

pre

ven

ted

at

all

co

sts.

If s

pil

ls o

ccu

r cle

an

-up

sho

uld

be

init

iate

d i

mm

ed

iate

ly.

Use

of

rep

uta

ble

and

well

tra

ined

co

ntr

acto

rs a

re e

ssenti

al.

Off

load

ing

bu

lk

car

go

d

uri

ng

stro

ng

win

ds

mu

st

be

pre

ven

ted

.

A r

epo

rt s

ho

uld

be

com

pil

ed

ever

y 6

mo

nth

s o

f al

l sp

ills

or

leak

ages

rep

ort

ed.

The

rep

ort

sh

ould

co

nta

in

the

foll

ow

ing i

nfo

rmat

ion

:

dat

e an

d

dura

tio

n

of

spil

l

pro

duct

sp

ille

d

vo

lum

e o

f sp

ill

rem

edia

l ac

tio

n t

aken

cop

y o

f d

ocu

menta

tio

n

in

wh

ich

spil

l w

as

Pro

po

nen

t

Page 8 of 11

Geo Pollution Technologies (Pty) LtdLogistics Support Services - Updated EMP - Nov 2020

Cri

teria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

Use

o

f sp

ill

con

tro

l m

easu

res

wh

ere

ap

pro

pri

ate

(e

.g.

pla

stic

shee

tin

g)

Reg

ula

r in

spec

tio

n a

nd

main

ten

ance

of

all

eq

uip

men

t.

To

pre

vent

the

tear

ing o

f b

reak

bulk

bag

s a

lim

it s

ho

uld

be

pla

ced

o

n

stackin

g

hei

gh

t d

uri

ng

tran

spo

rt

and

st

ora

ge.

Only

sup

erio

r q

ual

ity b

ags

sho

uld

be

use

d.

rep

ort

ed

Eco

logic

al

Imp

act

The

imp

act

on

the

eco

logic

al

envir

on

ment.

The

ente

ring o

f ch

em

ical

s in

to th

e envir

on

ment

mu

st b

e

pre

ven

ted

at

all

cost

s.

Fo

r an

y

off

sho

re

po

lluti

on

the

up

dat

ed

Nat

ional

M

arin

e

Po

lluti

on C

on

tin

gency P

lan

must

be

consu

lted

.

Em

ergency r

esp

onse

pla

ns

and

sp

ill

conti

ngency p

lans

mu

st

be

in p

lace

and

incl

ud

e al

l ch

em

ical

s b

ein

g h

and

led

. T

hes

e

sho

uld

b

e up

dat

ed as

new

chem

ical

s ar

e ad

ded

to

th

ose

bei

ng h

and

led

.

If s

pil

ls o

ccur

clea

n-u

p s

ho

uld

be

init

iate

d i

mm

edia

tely

.

Use

of

rep

uta

ble

and

wel

l tr

ained

co

ntr

acto

rs a

re e

ssen

tial

.

Off

load

ing b

reak

bulk

ca

rgo

d

uri

ng st

ron

g w

ind

s m

ust

b

e

avo

ided

.

Use

of

spil

l co

ntr

ol

mea

sure

s w

her

e ap

pro

pri

ate

(e.g

. p

last

ic

shee

tin

g)

Reg

ula

r in

spec

tio

n a

nd

mai

nte

nan

ce o

f al

l eq

uip

men

t.

To

pre

ven

t th

e te

arin

g o

f b

reak

bulk

bag

s a

lim

it s

ho

uld

be

pla

ced

on s

tack

ing h

eig

ht

duri

ng t

ransp

ort

and

sto

rage.

Only

sup

erio

r q

ual

ity b

ags

sho

uld

be

use

d.

A r

eco

rd s

ho

uld

be k

ept

of

any

extr

aord

inar

y

fau

na

sig

hti

ngs

or

enco

unte

rs

on

site

.

All

dat

a to

be

com

pil

ed i

n a

6 m

on

thly

rep

ort

.

Pro

po

nen

t

Du

st/A

ir

Qu

ali

ty

Ch

em

ical

du

st b

ein

g b

low

n i

n t

he w

ind

O

fflo

ad

ing

b

ulk

carg

o

du

rin

g

stro

ng

w

ind

s m

ust

b

e

av

oid

ed

.

If s

pil

ls o

ccu

r cle

an

-up

sh

ou

ld b

e in

itia

ted

im

med

iate

ly.

Use

of

rep

uta

ble

an

d w

ell

tra

ined

co

ntr

acto

rs a

re e

ssen

tial.

Air

qu

ali

ty m

on

ito

rin

g i

f re

gu

lar

com

pla

ints

are

receiv

ed

.

If

air

qual

ity

rela

ted

com

pla

ints

ar

e re

ceiv

ed

then

ai

r q

uali

ty m

onit

ori

ng

sho

uld

b

e im

ple

mente

d

foll

ow

ing c

onsu

ltat

ion w

ith

a sp

ecia

list

in t

his

fie

ld.

A r

epo

rt s

ho

uld

be

com

pil

ed

Pro

po

nen

t

Page 9 of 11

Geo Pollution Technologies (Pty) LtdLogistics Support Services - Updated EMP - Nov 2020

Cri

teria

N

atu

re

Mit

igati

on

M

on

itori

ng

R

esp

on

sib

le B

od

y

ever

y

6

mo

nth

s o

f al

l

com

pla

ints

re

po

rted

an

d

mo

nit

ori

ng p

erfo

rmed

.

Cu

mu

lati

ve

Imp

act

Th

ese

are

im

pacts

w

hic

h

resu

lt

fro

m

the

incre

men

tal

imp

act

of

the

acti

on

wh

en

ad

ded

to

oth

er

past

, p

rese

nt,

an

d

fore

seeab

le f

utu

re a

cti

on

s re

gard

less

of

wh

o

un

dert

ak

es

such

acti

on

s.

It

can

resu

lt

fro

m

ind

ivid

uall

y

min

or,

b

ut

co

llecti

vely

si

gn

ific

an

t acti

on

s ta

kin

g

pla

ce o

ver

a p

erio

d o

f ti

me.

In r

ela

tio

n

to a

n a

cti

vit

y,

it m

ean

s th

e i

mp

act

of

an

acti

vit

y

that

in

itse

lf

may

n

ot

be

sig

nif

ican

t,

may

b

eco

me

sig

nif

ican

t

wh

en

ad

ded

to

ex

isti

ng

an

d

po

ten

tial

imp

acts

re

sult

ing

fr

om

si

mil

ar

or

div

ers

e a

cti

vit

ies

or

un

dert

akin

gs

in t

he

are

a.

Po

ssib

le c

um

ula

tiv

e i

mp

acts

ass

ocia

ted

wit

h

the

op

era

tio

nal

ph

ase

in

clu

de

incre

ase

in

tr

aff

ic fr

eq

uen

tin

g th

e si

te

an

d a

lon

g t

he s

ecti

on

s o

f ro

ads

use

d f

or

tran

spo

rt.

An

in

cre

ase

in

em

issi

on

s

fro

m t

hese

veh

icle

s w

ill

decre

asi

ng

th

e

air

q

uali

ty

aro

un

d

the

facil

ity.

Wear

an

d

tear

on

th

e

road

s an

d

incre

ase

d

risk

s o

f ro

ad

tr

aff

ic

incid

ences

co

uld

incre

ase

. A

dd

itio

nal

traf

fic

an

d

op

erati

on

al

no

ise

wo

uld

fu

rth

er

incre

ase

n

ois

e

imp

acts

in

th

e

are

a.

Cu

mu

lati

ve e

nv

iro

nm

en

tal

imp

acts

are

po

ssib

le

form

a

vari

ety

o

f so

urc

es

in

the P

ort

of

Walv

is B

ay.

Th

is i

nclu

des

ship

re

pair

acti

vit

ies,

sp

ills

an

d

po

llu

tan

ts f

orm

sh

ips,

etc

.

Ad

dre

ssin

g e

ach o

f th

e in

div

idual

im

pac

ts a

s d

iscuss

ed a

nd

reco

mm

end

ed

in

the

envir

on

menta

l m

anagem

ent

pla

n

wo

uld

red

uce

the

cum

ula

tive

imp

act.

Rev

iew

ing b

ian

nual

and

an

nu

al r

epo

rts

for

any n

ew

or

re-

occ

urr

ing

im

pac

ts

or

pro

ble

ms

wo

uld

aid

in

id

enti

fyin

g

cum

ula

tive

imp

acts

and

hel

p

in

pla

nnin

g

if

the

exis

tin

g

mit

igat

ions

are

insu

ffic

ient.

.

6 m

on

thly

su

mm

ary re

port

bas

ed

on

all

oth

er

imp

acts

mu

st b

e cr

eate

d t

o g

ive

an

over

all

asse

ssm

ent

of

the

imp

act

of

the

Op

erat

ional

Phas

e.

Pro

po

nen

t

Page 10 of 11

Geo Pollution Technologies (Pty) LtdLogistics Support Services - Updated EMP - Nov 2020

3.1 Decommissioning and Rehabilitation Decommissioning is not foreseen during the validity of the ECC. Decommissioning was however

assessed as some activities may include modification and decommissioning. Decommissioning

will mainly be administrative and will require consultation with relevant stakeholder regarding

the termination of all business contracts and termination of employee contracts in line with labour

law requirements. Decommissioning may further require the rehabilitation of impacted areas, if

any. Any infrastructure including buildings and underground infrastructure forming part of the

operations should be removed of handed over to relevant parties. Any pollution caused by the

operations must be remediated. The impacts associated with this phase is mainly expected to be

of social nature, however may include noise and waste production if any structures of

infrastructure requires removal dismantled. Noise must be kept within WHO standards and waste

should be contained and disposed of at an appropriately classified and approved waste facility and

not dumped in the surrounding areas. Future land use after decommissioning should be assessed

prior to decommissioning and rehabilitation initiated if the land would not be used for future

purposes. The EMP for the facility may have to be reviewed at the time of decommissioning to

cater for changes made to the site and implement guidelines and mitigation measures.

4 CONCLUSIONS The above EMP, if properly implemented will continue to help minimise adverse impacts on the

environment. Where impacts occur, immediate action must be taken to reduce the escalation of effects

associated with these impacts. To ensure the relevance of this document to the specific stage of

project, it needs to be reviewed throughout all phases.

The EMP should continue to be used as an on-site reference document during all phases of the project,

and auditing should take place in order to determine compliance with the EMP for the operations.

Parties responsible for transgression of the EMP should be held responsible for any rehabilitation that

may need to be undertaken as a result thereof.

Monitoring reports must be submitted to the Ministry of Environment, Forestry and Tourism every six

months to allow for the future renewal of the ECC.

5 REFERENCES Faul A, Botha P. 2017. Environmental Impact Scoping Assessment for the Handling and Transport of

Chemicals from the Port of Walvis Bay