The Green Project

33
Green Project VISIONING DOCUMENT A Project Of AEDS Ammar Eloueini A Collaboration With THE TULANE CITY CENTER And THE GREEN PROJECT

description

 

Transcript of The Green Project

Page 1: The Green Project

Green ProjectVISIONING DOCUMENT

A Project Of

AEDS Ammar Eloueini

A Collaboration With

THE TULANE CITY CENTER

And

THE GREEN PROJECT

Page 2: The Green Project
Page 3: The Green Project

5

TABLE OF CONTENTS

Program

Existing Conditions

Design Concept

Proposed Views

1st and 2nd Floors

Public Program

Components

Outdoor Program

Acknowledgments

6

8

14

16

20

24

26

30

32

Page 4: The Green Project

6

PROGRAM

Page 5: The Green Project

7

The Green Project

Loyola Streetcar Stop(Future)

St. Claude Avenue

St. Ferdinand Street

PROJECT The Green Project provides salvaged building materials are accessible to the general public. It is part of a sustainable system of recycling, repairing and repurposing of older and discarded building materials to help reduce landfi ll and other waste problems.

The project offers classroom spaces to educate and provide information to the community on how to recycle and repurpose various materials. Entertainment space is included in the building program for the purpose of larger community activities.

LOCATIONHalf acre lot on Press Street and Marais Street, in the existing Green Project warehouse. It is 1 block North of an anticipated streetcar stop along St. Claude Avenue along an active railroad track.

PARTNERS The Green Project, Tulane City Center, AEDS Ammar Eloueini

GOALS of RENOVATION - More organized storage space and more effi cient storing routes- Increased visibility between programmed spaces- Optimized usage of building space to accommodate different programs and maintain spatial comforts- More visible and activated presence of entry

Page 6: The Green Project

8

EXISTING CONDITIONS_overall

Page 7: The Green Project

9

OVERALLThe existing structure was previously a warehouse and was repurposed for the operation of the Green Project.

In the course of collecting, storing and selling reclaimed materials without an effective system, the ground fl oor sale space is not organized as a pleasant or optimally functional space. In addition, a distinction between sale area and storage area is missing as result of limited usable storage fl oor space.

Overall, the increase of program and customers call for a better designed, more open and more welcoming building complex.

Page 8: The Green Project

10

EXISTING CONDITIONS_site and 1st fl oor

ACCESSThe main public access to the building is a single door along Marais street without a clear expression of the entry way (see Entrance 1). The secondary public access is a garage door on the west side of the building, behind a cluster of reclaimed materials (see Entrance 2). This entrance leads into the sale area and the cashier on the right.

DISPLAYThe furniture pieces are in poor condition, and not optimally functional, inconducive to being versatile or being subtle backdrops for displayed merchandise.

CIRCULATIONCirculation is constrained by the existing partition walls and illogical layout of shelving funiture.

LIGHTINGArtifi cial illumination provides adequate visibility, however no natural light is permitted within the space.

Page 9: The Green Project

UPUPUPUPUPUPUPUPUPUPUPUUPUPUP UPUPUPUPUPPUUUUUUPUPUPUPUPUPUPUPUP

11

Entrance 1

Entrance 2

1st FLOOR PLAN

Page 10: The Green Project

EXISTING CONDITIONS_2nd fl oor

12

2ND FLOORThe 2nd fl oor space is mainly designated as classrooms, administration offi ces and a limited amount of storage. Due to only two fl ights of stairs connecting the 1st fl oor and 2nd fl oors, one of which is a set of outdoor emergency stairs, the majority of reclaimed materials are stored and sorted on the 1st fl oor exclusively. This leaves the 2nd fl oor isolated from the sorting process.

The opaque partitions on the 2nd fl oor cut off connections between rooms both physically and visually, leaving the entire 2nd fl oor a poorly illuminated and unpleasant space.

Page 11: The Green Project

UPUPUPUPUPUPUPUPUPUPUPUPUPUPUP

13

2nd FLOOR PLAN

Page 12: The Green Project

14

DESIGN CONCEPT

Page 13: The Green Project

15

OVERALLThis comprehensive reconsideration and redesign of the space reorganizes the building for greater effi ciency with the maximum cost to quality of improvement. The proposal creates greater visibility between spaces on the ground fl oor, creating a more expressed and spacious entrance to the main fl oor space that connects with the Press Street entrance - convenient to the anticipated streetcar stop. The design takes an approach of opening up the warehouse building to create a more inviting space, while organizing and effi ciently condensing storage for merchandise.

MAIN ACCESSAnticipating the Loyola Streetcar Route, the project provides an entrance way that brands the building and creates a glowing beacon with new, contemporary materials and technology application in standing out in the community at a minimal cost. Taking advatage of advanced digitally fabricated translucent panels with faceted connections, it creates a translucent facade that allows for light to penetrate into the deep space. The back-lit facade design is a glowing symbol of the Green Project at night, visible from the streetcar line, which adds compelling formal pattern to the main public access way.

FIRST FLOORTo relieve and organize the ground fl oor, dedicated on-the-fl y storage space for incoming goods will be on the second fl oor, conveniently accessible via two service elevators. Adjacent to this dynamic temporary storage will be a space for more long term and compressed storage of these goods. The addition of two, double-entry elevators in the mostly maintained service core of the building will allow for these spaces to be accessed from both the main merchandise area on the fi rst fl oor and from the outdoor unloading area.

SECOND FLOOROpening up the second fl oor spaces to windows and light is crucial in making this a comfortable public area. The reactivation of classrooms and a multi-use entertainment space would take benefi t from eliminating the interior windowless partition area central to the space and having a clear, versatile division between this public program and the proposed storage area both occupying the second fl oor.

EXTERIORThe exterior has a optimized unloading area for goods and has convenient access to the service elevators, paint area, and main fl oor space. The addition of a versatile outdoor rain garden allows for plantings, storage for goods, and the potential to be used as an outdoor social classroom space.

Page 14: The Green Project

16

EXTERIOR_day

Page 15: The Green Project

17

The translucent doors rotate to activate the East Facade of the building during business hours. This optimizes public access to the merchandise area while allowing natural light to illuminate the interior.

Page 16: The Green Project

18

EXTERIOR_night

Page 17: The Green Project

19

The closed translucent doors are illuminated from inside at night. Viewed from the street, these glowing pieces in the East facade playfully create a sculptural beacon of light.

Page 18: The Green Project

20

1st FLOOR CIRCULATION_public access

Double Height Entry Foyer

Revolving Polycarbonate Doors

Back Access

The current service core is maintained but optmized and made more functional. Elevators are added open to both the loading area and internal shipment processing space. The paint prep room has been opened up by a glass wall on its north side. Retail space shelving units are designed to be angled 45 degrees and double sided to optimize display space and enhance fl uid circulation.

Page 19: The Green Project

DOUBD BLE HEIGHT FOYYEERR

WOMEN

EMPLOYEE LOUNGEE

UPUPPUPUUPUPUP

EXEC. OFFICE

EMPLOYEEEMPLOYEEOFFICE/MEETING

SHIPMENTTPROCESSINNG

DOORS TO ROTATE 90DOORS TO ROTATE 90DOORS TO ROTATED E 90OORS TO ROTATED 90OORSD

RECEPTIONR

GLASS WALL

PAINNT PREP. ROOMP ROOM

COVERED RAIN GARDEN/OUTDOORMERCHANDISE

AREA

21

1st FLOOR PLAN

Page 20: The Green Project

22

2nd FLOOR CIRCULATION_public access

The 2nd fl oor splits public and storage program. Both are connected by double swing doors that rotate 270 degrees. The connectivity between public and private is determined by the position of the doors (see Page 29). The main public access to the 2nd fl oor is the double-height entry located at the south-east corner of the building.

Page 21: The Green Project

ENT/EXHIBITIONNENTERTAINM

GLASS WALLGLASS WALL

LL/CORRIDGRAND HAL ORR

DYNAMIC SSTOORAGESTATIC STORAGESUPPORT/

ADMINWOMEN MEN

GLASS WALL

GLASS WALL

EN TO BELOWOPE

CLAASSSS RRM./STTTUUDIU O RMMM./CLASS R STUDIO S RM.M.M./STUDIOCLASSCCC

CLASS RM /ST/ UDIOCLACLASSSS RM..RM../ST/STST/SSTUDIUUUUDIOOS RM /S OO

LIGHT WEIGHTLIGHT WEIGHTLIGHT WEIGHTLIGHT WEIGHTLIGHT WEIGHTLIGHT WEIGHTWWWWWWWWDOORSDOORSDOORSDOORSDOORSOOOOOOOOOOOO

TO ROTATE 270TO ROTATE 270TO ROTATE 270TO ROTATE 270TO ROTATE 270TTTTTAAAATATAT

UP

23

2nd FLOOR PLAN

Page 22: The Green Project

24

PUBLIC PROGRAM LAYOUT

Page 23: The Green Project

25

A double-height entry space along Marais Street leads into the main retail space on the ground level and up to the public area on the second fl oor containing classrooms and a fl exible entertainment space.

Page 24: The Green Project

26

STORAGE ROUTE_fi rst fl oor entry

Marais Street

Service elevators for storage

Direct service entry to main fl oor space

Outdoor storage

The ground fl oor has direct access to the storage elevators from the outside, in addition to the main retail space, the outdoor storage awning, and the paint area.

Page 25: The Green Project

27

TRANSLUCENT DOOR

The backlit doors of the East facade have faceted translucent pieces with fl at panels on the interior of the store. Minimal aluminum structure adds strength while being hand-operable.

Page 26: The Green Project

28

STORAGE ROUTE_second fl oor storage

Closed Partition Doors

Dynamic Storage

Static Storage

Shipment Processing

Sale Floor

The service elevators lead into the dynamic storage space connected to the longer term storage space through the hallway divided by operable doors. This storage route is most

effi cient in Position 1, and blocked in Position 2 to maximize public access to service area.

Page 27: The Green Project

29

HINGED HALLWAY DOORS

Position 1_Public and private separation Position 2_Exclusively open to public Position 3_Both areas open to each other

The position of the operable doors determine the accessability between the public and the service as well as programmed rooms.

Page 28: The Green Project

30

Page 29: The Green Project

31

lllglolgloglolglogloglogglogloogloglogloglog wswswswswswsswsws s wsws atatatatatat aat atat ttat t iiinignignignignignignignignignignigniginignnignigniniggnignignigiigggggghhhhhhhththhthhththttththhhththththththhthtththt

OUTDOOR PROGRAM

Page 30: The Green Project

32

ACKNOWLEDGEMENTS

CLIENT The Green Project contact: Phyllis Jordan [email protected]

CONSULTANTS Tulane City Center contact: Dan Etheridge, Associate Director [email protected]

AEDS contact: Ammar Eloueini [email protected]

TARGET USERS Community residents Local builders Local educators Streetcar users

Ammar Eloueini Digit-all Studio

Page 31: The Green Project
Page 32: The Green Project

AEDSAmmar Eloueini Digit-all Studio

Page 33: The Green Project

GREEN PROJECTRECYCLE REUSE WAREHOUSE

VISIONING DOUMENT