The voice of construction SMEs
The Green Deal for Small Firms
Thursday 17 November 2011
Hayley Fry Head of Training
Federation of Master Builders
![Page 2: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/2.jpg)
The voice of construction SMEs
The Green Deal for Small Firms
•The Green Revolution
•The FLASH experience
•FMB’s Social Networks
![Page 3: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/3.jpg)
The voice of construction SMEs
The Green Revolution
•UK legal commitment to cut carbon emissions by 80%
•85% of existing homes will still be standing in 2050
•26 million homes need to be retrofitted + 2 million non domestic buildings
•Scale is unprecedented both in terms of challenges and opportunities
•Potential to create new jobs and stimulate economy
![Page 4: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/4.jpg)
The voice of construction SMEs
Retrofit Market
FMB research commissioned from Oxford University
New market for construction SMEs - £3.5 billion to £6.5 billion per annum
But.........
• Absence of strong consumer demand
• Absence of a clear delivery plan
• Absence of knowledge and skills
![Page 5: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/5.jpg)
The voice of construction SMEs
The Green Deal – Customer Journey
•ADVICE – All households/smaller businesses entitled to an energy assessment from a qualified assessor. An enhanced EPC
•FINANCE – a finance mechanism that will enable the cost of installed energy efficiency measures to be paid back via the customer’s energy bill
![Page 6: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/6.jpg)
The voice of construction SMEs
The Green Deal – Customer Journey
• INSTALLATION – only accredited installers allowed to install measures. Designed to give consumer confidence
•REPAYMENTS – a charge will be added to the energy meter at the property. Repayment obligation will stay with the property and will transfer to any new occupier
![Page 7: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/7.jpg)
The voice of construction SMEs
The Green Deal - Legislative Timetable
•Energy Bill receives Royal Assent - autumn 2011
•Formal consultation on secondary legislation - autumn 2011
•Secondary legislation laid before Parliament - early 2012
•Detailed industry guidance - spring 2012
•Green Deal launched in October 2012
![Page 8: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/8.jpg)
The voice of construction SMEs
Green Deal Concerns
•Householders won’t find it sufficiently attractive
•Australian experience – need for accredited builders
•High street retailers/energy companies dominating the market
•Only Green Deal Providers will have direct link with the client
![Page 9: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/9.jpg)
The voice of construction SMEs
Green Deal relationships.............
Key relationships
PROVIDER
INSTALLER
CUSTOMER
ASSESSOR
![Page 10: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/10.jpg)
The voice of construction SMEs
Installation: Business ModelsE
PC
+ M
easu
re A
sses
smen
t
Customer
SME Installer (locally sub-
contracted to a GD provider)
One-Stop GD
Provider
Pro
du
ct a
sses
smen
t/qu
ote
and
sche
dule
of
wor
ks
Installation
Information to:
Energy Comp
Finco
Installer Oversight Body
Information to:
One-stop GD Provider
SME Installer (acts
independently selling service,
obtaining finance through
third party)
![Page 11: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/11.jpg)
The voice of construction SMEs
Buildings Cycle
![Page 12: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/12.jpg)
The voice of construction SMEs
Involving Small Firms: Skills
• Existing skills approach is ‘trade based ‘and not ‘outcome based’
• Numerous skill and industry organisations
• No comprehensive, coherent system of qualifications
• No train the trainers system in place
• Lack of available investment funds
• No accreditation of builders !!
![Page 13: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/13.jpg)
The voice of construction SMEs
FMB Rising to the Challenge
Working Across the Construction Sector
•Meetings with other Trade Associations
Energy Bill
•Lobbying MPs to set clearer targets and consider the issue of demand
FMB Working with Government:
•Capacity and Innovation Forum
• access to the market for SMEs
•Accreditation and Skills Forum
• Code of Practice for installers
• PAS 2030
![Page 14: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/14.jpg)
The voice of construction SMEs
FMB Options for the Future
•Springboard to drive professionalism and standards
•A qualification for general builders – a first!
•Competent Persons Scheme application
•Talks with GD Providers
•Training for experienced workers – additional knowledge
•Ongoing CPD requirements
![Page 15: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/15.jpg)
The voice of construction SMEs
So to conclude ...................
• Green Deal offers opportunities and threats to construction SMEs
• Incentives will be needed to create demand for Green Deal
• Training required in the whole construction sector
• Threat of more regulation – consequential building works
• FMB needs to reposition itself and take the lead in driving up standards
![Page 16: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/16.jpg)
The voice of construction SMEs
The FLASH experience
•FMB = Small builders ‘FLASH’ network
•Partnership with Institute for Sustainability
•Business case for low carbon
•100+ small firms registered in London
•Forthcoming Events:
• 7 December: Introduction to Retrofit (focus on traditional buildings)
• 13 December: Essentials of Renewable Energy
• 20 December: FITs
![Page 17: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/17.jpg)
The voice of construction SMEs
The FLASH experience!
![Page 18: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/18.jpg)
The voice of construction SMEs
The Social Media Challenge: FMB’s response
•Democratic Governance Structure requires member engagement
•Traditional communication methods
•FMB Social Networking site;
•Groups
•@Hayley1961
•@fmbuilders
![Page 19: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/19.jpg)
The voice of construction SMEs
The FLASH experience!
![Page 20: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/20.jpg)
The voice of construction SMEs
![Page 21: The Green Deal for Small Firms](https://reader035.fdocuments.us/reader035/viewer/2022062511/54b8a29d4a79590e6f8b458d/html5/thumbnails/21.jpg)
The voice of construction SMEs
Thank you ...................
For more information contact:
Hayley FryHead of TrainingFederation of Master Builders14-15 Great James StreetLondon WC1N 3DP
E: [email protected] T: 020 7092 3875W: www.fmb.org.uk