The Geysers: an Injection Success Story M. Ali Khan 1.

24
The Geysers: an Injection Success Story M. Ali Khan 1

Transcript of The Geysers: an Injection Success Story M. Ali Khan 1.

Page 1: The Geysers: an Injection Success Story M. Ali Khan 1.

The Geysers:an Injection Success Story

M. Ali Khan

1

Page 2: The Geysers: an Injection Success Story M. Ali Khan 1.

Division of Oil, Gas and Geothermal Resources – State of California

The Location

2

Page 3: The Geysers: an Injection Success Story M. Ali Khan 1.

The Geysers

3

Page 4: The Geysers: an Injection Success Story M. Ali Khan 1.

Field Summary

Area 16 x 6 km = 64 sq km

Wells 460 Steam Wells, 75 Injection Wells

Average Well Depth 2,500 m

Average Caprock Depth 1,200 m

Bottom Hole Temperature 300/250oC

Reservoir Pressure 500 psi /150 psi

Cumulative Steam Produced 2.4 trillion kg ~398 million bbls

Steam Production (2009) 59 billion kg

Injection (2009) 42 billion kg

Electricity Produced (2009) 7.6/6.9 (gross/net) million megawatt hrs

4

Page 5: The Geysers: an Injection Success Story M. Ali Khan 1.

The ProblemRapid Steam Production Decline

Page 6: The Geysers: an Injection Success Story M. Ali Khan 1.

The Solution

6

Illustration courtesy of Northern California Power Agency

Page 7: The Geysers: an Injection Success Story M. Ali Khan 1.

The Results Steam Production is Stabilized

7

Page 8: The Geysers: an Injection Success Story M. Ali Khan 1.

Incremental ElectricitySoutheast Geysers

8

Page 9: The Geysers: an Injection Success Story M. Ali Khan 1.

NCGs & Effluent Injection

9

Page 10: The Geysers: an Injection Success Story M. Ali Khan 1.

10

Injection & Induced Seismicity>1.5 (ML)

Page 11: The Geysers: an Injection Success Story M. Ali Khan 1.

11

Induced Seismicity2005 - 2010, >1.5 (ML)

Page 12: The Geysers: an Injection Success Story M. Ali Khan 1.

12

Mass Replacement Status

Page 13: The Geysers: an Injection Success Story M. Ali Khan 1.

CaprockCaprock

1,200 m

1,7

00 p

si150 p

si150 p

siReservoirReservoir

13

Page 14: The Geysers: an Injection Success Story M. Ali Khan 1.

Conclusions

Additional Green Electricity

Innovative Sewage Disposal

Cleaner Air Emission

x Induced Seismicity

14

50 Years Production; added another

50

Added 200+ MWe

Page 15: The Geysers: an Injection Success Story M. Ali Khan 1.

Say Cheese…Motion Sensor Camera is on!

Thank you!Thank you!

15

Page 16: The Geysers: an Injection Success Story M. Ali Khan 1.

16

Slides after this are not for presentation!

Page 17: The Geysers: an Injection Success Story M. Ali Khan 1.

Best Reservoir Model…

Page 18: The Geysers: an Injection Success Story M. Ali Khan 1.

Underneath The Geysers, a mile deepA huge tea-kettle was in superheat

Approaching single phase and no mateBeyond saturation point, in dry-out state

Rescue came from treated human wasteFrom the counties of Sonoma and Lake

Green energy from Flush to FlashOnce again, Phoenix rises from ash

Piped-in, to inflate, and re-hydrateEnthalpy was a little downer, of late

Plenty of micro earthquakes and shakesScaring everybody, but no faults or breaks

Nevertheless, the huge kettle lived happily After the shotgun date, with recycled waste

Page 19: The Geysers: an Injection Success Story M. Ali Khan 1.

An Injection Well

Page 20: The Geysers: an Injection Success Story M. Ali Khan 1.

A Production Well

Page 21: The Geysers: an Injection Success Story M. Ali Khan 1.

A Power Plant

Page 22: The Geysers: an Injection Success Story M. Ali Khan 1.
Page 23: The Geysers: an Injection Success Story M. Ali Khan 1.

California Rule of Capture

sınır

Soru?Soru?

Page 24: The Geysers: an Injection Success Story M. Ali Khan 1.

24

The ProblemRapid Steam Production Decline