Stay informed » Visit www.nzta.govt.nz/tel for the latest news and construction progress. » To receive construction and traffic updates delivered directly to your email inbox, sign up by visiting our website or emailing us at [email protected] » Speak directly to a member of the project team by visiting the visitor information centre, 65 Tara Road, Papamoa. The Tauranga Eastern Link will deliver the following benefits: » Safer and easier travel. » Reduced travel times between Tauranga and Paengaroa. » More efficient connections for business, industry and tourism. » Support regional growth. » Generate jobs and a flow-on effect into the local economy in the form of wages and salaries. The future of tolling is free-flow The Tauranga Eastern Link will use an electronic tolling system to enable you to travel the 23km journey without having to stop or slow down to pay. The proposed location of the toll collection point is to be between Kaituna River and the future Rangiuru Business Park intersection. The exact tolling system to be used will be selected closer to completion of the road. free phone 0800 TEL INFO (0800 835 463) email [email protected] website www.nzta.govt.nz/tel Our contact details Roads of national significance The Government has identified seven essential state highways that are linked to New Zealand’s economic prosperity. Called the roads of national significance, the NZ Transport Agency is charged with delivering these highway projects. The Tauranga Eastern Link is a key strategic transport corridor for the Bay of Plenty region and a highway recognised by the government as a road of national significance. June 2011 Map Roads of national significance Project map Tauranga Eastern Link

Transcript of The future of tolling is free-flow Tauranga Eastern · PDF fileThe $455 million Tauranga...

Stay informed» Visit www.nzta.govt.nz/tel for the latest news and

construction progress.

» To receive construction and traffic updates delivered directly to your email inbox, sign up by visiting our website or emailing us at [email protected]

» Speak directly to a member of the project team by visiting the visitor information centre, 65 Tara Road, Papamoa.

The Tauranga Eastern Link will deliver the following benefits:» Safer and easier travel.

» Reduced travel times between Tauranga and Paengaroa.

» More efficient connections for business, industry and tourism.

» Support regional growth.

» Generate jobs and a flow-on effect into the local economy in the form of wages and salaries.

The future of tolling is free-flowThe Tauranga Eastern Link will use an electronic tolling system to enable you to travel the 23km journey without having to stop or slow down to pay.

The proposed location of the toll collection point is to be between Kaituna River and the future Rangiuru Business Park intersection.

The exact tolling system to be used will be selected closer to completion of the road.

free phone 0800 TEL INFO (0800 835 463) email [email protected] www.nzta.govt.nz/tel

Our contact details

Roads of national significanceThe Government has identified seven essential state highways that are linked to New Zealand’s economic prosperity. Called the roads of national significance, the NZ Transport Agency is charged with delivering these highway projects.

The Tauranga Eastern Link is a key strategic transport corridor for the Bay of Plenty region and a highway recognised by the government as a road of national significance.

June 2011

Map

Roads of national significance

Project map

Tauranga Eastern Link

The $455 million Tauranga Eastern Link will be the largest state highway project ever built in the Bay of Plenty.

Construction of the Bay’s largest highway started late 2010. Under the design and construct delivery model,

the Fulton Hogan HEB Construction Alliance decide when and how the construction is done. With three

million cubic metres of earth to move, and seven bridges to build, it’s a large scale project to plan and manage.

Section one: Te Maunga to Domain RoadUpgrade 6km of existing highway to four lanes with median barrier. Key features include: • widening the existing state highway from Te Maunga to Domain Road• improving Te Maunga intersection• new and safer access for properties fronting State Highway 2• two new interchanges at Mangatawa and Domain Road• left-in/left-out intersections at Bruce and Kairua Roads.

Section two: Domain Road to Paengaroa junction (SH2/SH33)Construction of a new 17km highway with four lanes and a median barrier. Key features include:• Parton Road overbridge• 150m four lane bridge over the Kaituna River• overpasses over Maketu Road and railway line• roundabout at SH2 and SH33 intersection near Paengaroa.

Expected completion Construction of the Tauranga Eastern Link is expected to take five to six years, depending on soil and weather conditions. All going well, it will be open to traffic in 2016.

The Bay of Plenty’s largest highway

PAENGAROA

Girv

en R

oad

Gloucester RoadEversham RdMaunganui Road

Stat

e Hig

hway

29

Truman Lane

Welcome Bay

Road

Gravatt Road

Pah Road

Kaituna Road

(new)

State Highway 2

(current)

Kairu

a Roa

d(le

ft in

/out

onl

y)Young Road

State Highway 33

Bell Road

Parton Road

Tara Road

Domain Road

State Highway 2

(current)

Mak

etu

Road

Te Tumu Road

Bruce Road

(left

in/out o

nly)

Man

gata

wa

Lane

State Highway 2

(State Highway 2)

Kaituna Road

(existing)

Visitor information centre and site oce

PPA

State Highway 2

(current)

7. Maketu Road underpass and Te Tumu Road realignment

8. Paengaroa roundabout

ung Road

Mak

etu

Road

Te Tumu Road

oad

ng)

6. Proposed toll collection point

Pah Road

4. Parton Road overbridge

formationfformationd site oce d e osite o ece

5. Kaituna River Bridgeand Bell Road underpass

Pa

Bell Road

3. Domain Road interchange

Domain Rd

Tara Rd

Te Puke

TEL on-rampPapamoa

Tauranga

Paengaroa/Rotorua/WhakatanePapamoa/

Te Puke exit

TEL on-ramp TEL o�-ramp

Papamoa

Tauranga

WWelcome Bay

Roadcomecome

te Highway 2

(current)2

arton Road

Kairu

a R(le

ft in

/out

o

Man

ga

Domain Rd

ma

DDoomo

ddTara RdRdddRd

ra RTaTTaraarTa

Te PukekekePuk

Te Te PPue PPPukkekekkeekk

TEL on-ramp-raPapamoa

Tauranga

TauauurauuuuraT

gangnnggngagaa

Ta

Paengaroa/Rotorua/WhakatPaengaroa/Rotorua/WhakataneWh

PaPPPPapamoa/moa

TeTe Puke exit

TTEL on-rampmamampmpmra ppmamon-ram

amp

TEL o�-raPapamoa

ppaapaa oamoaoaPapamoaPaP

aaoamoPPPapamoaPapamoaPapam

Taurangag

2. Mangatawa interchange

Stat

e Hig

hway

29

y 2)

1. Te Maunga and new residential access lane

Girv

en R

oad

Girv

en

Gloucester RoadE

Gravatt Road

a Road

Domain Road

State

Road

only

)

Tar

Taa Rd

Bruce Road

Bru in/out o

nly)

(left

in/

ataw

a La

neaw

a La

neGloucester RoadEvershamm RRdRdRd

Evershd

Maunganui Rooadadadd

Mau

TruTruTru amanman LLa Lanene

State Highway 2)

(Stat

Truman Lane

State Highway 29

Bay ParkResidential access lane

Gloucester Road access

Eversham Road access

Baypark Stadium

Kaitu

na R

iver

Lower Kaituna Wildlife

Management Reserve

Proposed Rangiurubusiness park

Gordon Spratt

Reserve

TE PUKE

Future Papamoa East interchange

PAPAMOA

Future business park interchange

Bayfair Shopping

Centre

TE MAUNGA

NOTE: The illustration and images are indicative of the proposed finished design.