THE FUTURE OF KENNEDY SPACE CENTER Robert Cabana Director, Kennedy Space Center

description

The Future of Kennedy Space Center. Robert Cabana Director, Kennedy Space Center . KSC Vision and Mission. VISION: KSC is the world’s preeminent launch complex for Government and commercial space access, enabling the world to explore and work in space - PowerPoint PPT Presentation

Transcript of The Future of Kennedy Space Center

Page 1: The Future of  Kennedy Space Center

THE FUTURE OF KENNEDY SPACE CENTER

Robert CabanaDirector, Kennedy Space Center

Page 2: The Future of  Kennedy Space Center

KSC VISION AND MISSION

• VISION: KSC is the world’s preeminent launch complex for Government and commercial space access, enabling the world to explore and work in space

• MISSION: KSC safely manages, develops, integrates, and sustains space systems through partnerships that enable innovate, diverse access to space and inspires the Nation’s future explorers

Page 3: The Future of  Kennedy Space Center

Launch ServicesProgram (LSP)

Ground Systems Development and

Operations Program (GSDO)

Commercial Crew Program

(CCP)

KSC PROGRAMS

Page 4: The Future of  Kennedy Space Center

LAUNCH SERVICES PROGRAM (LSP)2012

2013

2014

NuStar - Nuclear Spectroscopic

Telescope Array

RBSP – Radiation Belt Solar Probes

TDRS K – Tracking and Data Relay System

IRIS – Interface Region Imaging Spectrograph

MAVEN - Mars Atmosphere

and Volatile EvolutioN

LDCM – Landsat Data Continuity

Mission

OCO 2 - Orbiting Carbon

Observatory

MMS –Magnetospheric

Multiscale

SMAP – Soil Moisture

Active Passive

TDRS L – Tracking and Data Relay System

Jason-3

Page 5: The Future of  Kennedy Space Center

GROUND SYSTEMS DEVELOPMENT AND OPERATIONS (GSDO)

Clean pad Flexible Launch Capability

Shuttle pad configuration

Multi-use Integration (VAB)Mobile Launcher

Page 6: The Future of  Kennedy Space Center

PAD B MODIFICATIONS

• Demolished FSS/RSS• Installed Lightning

Protection

• Cable trays repaired and replaced

• Shuttle instrumentation racks removed

• Weather instrumentation racks installed

Page 7: The Future of  Kennedy Space Center

SPACE LAUNCH SYSTEM (SLS)

Block 1 (70t)

Block 1A (105t)

Block 2 (130t)

Page 8: The Future of  Kennedy Space Center

MULTI PURPOSE CREW VEHICLE (MPCV)Processing in the Operations and Checkout Building at KSC

Page 9: The Future of  Kennedy Space Center

COMMERCIAL CREW PROGRAM

Blue Origin Boeing Sierra Nevada SpaceX

ATK ExcaliburAlmaz

ULA

Page 10: The Future of  Kennedy Space Center

PARTNERSHIPS

Center Planning and Development Office KSC’s “Front Door” to engage new business focusing on:

Master plan for KSC infrastructure, land use, and real estate strategies Commercial space transportation and services Retention of highly skilled aerospace workers and facility assets

Page 11: The Future of  Kennedy Space Center

Recommended Program Allocation Historical STS & ISS Utilization

REUTILIZATION OF FACILITIES

Page 12: The Future of  Kennedy Space Center

Launch Complex 39 Area

Industrial Area

Mobile Launcher

Mobile Launch Platforms

AVAILABLE FACILITIES AND ASSETS

Page 13: The Future of  Kennedy Space Center

• 15 year use permit agreement

• Operations and maintenance savings of approximately $9.1 million to KSC

• Space Florida has an agreement to lease OPF 3 to Boeing

ORBITER PROCESSING FACILITY 3 AGREEMENT

Page 14: The Future of  Kennedy Space Center

EXPLORATION PARK

Page 15: The Future of  Kennedy Space Center
Page 16: The Future of  Kennedy Space Center