07-Nov-11 Lecture 3: Fukushima and Similar Units in Europe 1 THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND IMPLICATIONS FOR EUROPE Steven C. Sholly, Senior Scientist Institute of Safety and Risk Sciences Department of Water, Atmosphere & Environment University of Natural Resources & Life Sciences Course 818022 (Winter 2011)

Transcript of THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4...

Page 1: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

1

THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND

IMPLICATIONS FOR EUROPE

Steven C. Sholly, Senior ScientistInstitute of Safety and Risk Sciences

Department of Water, Atmosphere & EnvironmentUniversity of Natural Resources & Life Sciences

Course 818022 (Winter 2011)

Page 2: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

2

Fukushima Accident Update

Page 3: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Fukushima Update 1

• New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department of Engineering Physics, McMaster University, Canada

• Presented at the NURETH-14 conference in Toronto, 27 September 2011

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

3

Presenter
Presentation Notes
SOURCE: http://nureth14.org/media/NURETH-14_Panel_LessonsLearnedfromFukushimaAccident/LuxatJohn%20FUKUSHIMA%20DAIICHI%20ACCIDENT%20PROGRESSION%20-%20NURETH%2014.pdf
Page 4: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 4

Fukushima Update 2• Recall from Block Lecture Number 2, Japanese

government reports suggest that hydrogen was transported from Unit 3 through the stack release ductwork, and flowed backwards into Unit 4

• But why didn't Unit 4 explode when Unit 3 detonated?

• And note – the ductwork at Unit 3 was blown apart in the Unit 3 hydrogen detonation, so no further hydrogen could have moved from Unit 3 to Unit 4 after the Unit 3 detonation

• You will recall the NGOs and independent scientists suggested that the Unit 4 spent fuel pool was the source of the hydrogen in Unit 4

Lecture 3: Fukushima andSimilar Units in Europe

Page 5: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 5

Fukushima Update 3

• On 17 March 2011, US NRC Chairman Gregory Jaczko announced that the US had indications that the Unit 4 spent fuel pool was dry

• Spraying of fresh water onto the Unit 4 spent fuel pool did not take place until 20 & 21 March 2011

• Concrete pumping truck started pumping sea water to the spent fuel pool on 22 March; pumping of fresh water began on 30 March

Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
Bullet #2: First Japanese Government Report to IAEA, page 13. Bullet #3: First Japanese Government Report to IAEA, page IV-35
Page 6: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Fukushima Update 4• When cameras were finally able to film the Unit 4

spent fuel pool, the pool was found to have the fuel covered by water that was steaming

• There is no visible evidence of fuel damage (i.e., no warping of fuel channels, no warping of fuel assemblies, no charring of pool walls due to hydrogen combustion, no settling of fuel assemblies due to slumping from melting

• Pool water water samples provide no evidence of fuel damage, etc.).

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

6

Presenter
Presentation Notes
SOURCE: http://nureth14.org/media/NURETH-14_Panel_LessonsLearnedfromFukushimaAccident/LuxatJohn%20FUKUSHIMA%20DAIICHI%20ACCIDENT%20PROGRESSION%20-%20NURETH%2014.pdf
Page 7: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Fukushima Update 5• Water volume = 1,425 m3, 2.3 MWt of heat

generation in Unit 4 spent fuel pool• # of spent fuel assemblies in pool = 1,331 (large

number due to full core offload to spent fuel pool to allow replacement of core shroud)

• Newly calculated timeline for Unit 4:– 11 March, 1447 hrs – Earthquake offshore– 11 March, 1538 hrs – Tsunami strikes plant resulting in station

blackout, loss of spent fuel pool cooling, loss of capability to pump additional water to spent fuel pool to make up for losses due to boiling of pool

– 12 March, 2100 hrs – Uncovery of fuel in Unit 4 spent fuel pool starts (calculated)

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

7

Presenter
Presentation Notes
SOURCE: http://nureth14.org/media/NURETH-14_Panel_LessonsLearnedfromFukushimaAccident/LuxatJohn%20FUKUSHIMA%20DAIICHI%20ACCIDENT%20PROGRESSION%20-%20NURETH%2014.pdf
Page 8: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Fukushima Update 6

• Newly calculated timeline for Unit 4 (continued from previous page):– 14 March, 1101 hrs – Hydrogen detonation in Unit 3 causes

damage to reactor building wall of Unit 4– 14 March, 2100 hrs – Hydrogen generation begins from

oxidation pf spent fuel in Unit 4 spent fuel pool (metal water reaction of spent fuel cladding with steam) (calculated)

– 15 March 0600 hrs – Hydrogen deflagration/detonation at Unit 4

– No significant release of radioactivity from fuel in spent fuel pool (calculated)

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

8

Presenter
Presentation Notes
SOURCE: http://nureth14.org/media/NURETH-14_Panel_LessonsLearnedfromFukushimaAccident/LuxatJohn%20FUKUSHIMA%20DAIICHI%20ACCIDENT%20PROGRESSION%20-%20NURETH%2014.pdf
Page 9: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Fukushima Update 7• If Unit 3 was so closely connected to Unit 4 via

the exhaust piping, when Unit 3 exploded so would Unit 4 likely have exploded simultaneously

• Instead, the Unit 4 hydrogen detonation/deflagration occurred 19 hours after the Unit 3 detonation

• It appears that even if some hydrogen migrated from Unit 3 to Unit 4, the quantity was not enough to cause a hydrogen deflagration at Unit 4 when Unit 3 exploded (and note that the Unit 3 explosion was violent enough to damage walls at Unit 4)

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

9

Presenter
Presentation Notes
SOURCE: http://nureth14.org/media/NURETH-14_Panel_LessonsLearnedfromFukushimaAccident/LuxatJohn%20FUKUSHIMA%20DAIICHI%20ACCIDENT%20PROGRESSION%20-%20NURETH%2014.pdf
Page 10: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Fukushima Update 8• The calculations by Dr. Luxat indicate that

hydrogen production from the Unit 4 spent fuel pool started 10 hours after the Unit 3 explosion

• The Unit 4 explosion occurred 9 hours after hydrogen generation is calculated to have begun in the Unit 4 spent fuel pool

• My tentative conclusion is that the Japanese Government report is incorrect about the source of the Unit 4 hydrogen – it came primarily from metal/water reaction in the Unit 4 spent fuel pool, not from Unit 3 via the exhaust piping

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

10

Presenter
Presentation Notes
SOURCE: http://nureth14.org/media/NURETH-14_Panel_LessonsLearnedfromFukushimaAccident/LuxatJohn%20FUKUSHIMA%20DAIICHI%20ACCIDENT%20PROGRESSION%20-%20NURETH%2014.pdf
Page 11: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

11

Introduction

Page 12: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

12

Lecture Scope

• This lecture covers similarities between the Fukushima reactors and reactors in Europe.

• The similar reactors include General Electric BWRs, Asea Atom BWRs, Siemens BWR/69 & BWR/72 reactors, and VVER-440/213 PWRs.

Page 13: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

European "Cousins"

• There are no exact duplicates of the Fukushima reactors in Europe.

• However, there are what one might refer to as European "cousins" to the Fukushima reactors.

• These reactors fall into three groups:– BWRs supplied by General Electric.– BWRs supplied by Asea Atom and Siemens.– PWRs of the type VVER-440/213 supplied by

Atomstroyexport and which have pressure suppression confinements and reactor compartment end caps.

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

13

Page 14: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

14

GE BWRs in Europe

Page 15: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

GE BWRs in Europe

• There are four General Electric BWRs in Europe:– Santa María de Garoña (BWR/3 Mark I) and Cofrentes

(BWR/6 Mark III) in Spain.– Mühleberg (BWR/4 Mark I) and Leibstadt (BWR/6 Mark III)

in Switzerland.

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

15

Presenter
Presentation Notes
Page 16: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Santa María de Garoña (Spain) (1)

• Santa María de Garoña is a 1,381 MWt/446 MWe (net) BWR/3 Mark I unit operating since 1970, and is similar to Fukushima Unit 1

• The plant is located in the Tobalina Valley on the bank of the Ebro River

• The plant is operated by Nuclenor• This plant is scheduled to be finally shut down on

6 July 2013 according to its operating permit from the Ministry of Industry, Tourism and Trade (MITYC)

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

16

Presenter
Presentation Notes
Bullet #4Consejo de Seguridad Nuclear (CSN), Spain: Convention on Nuclear Safety, Fifth National Report, August 2010, http://www.csn.es/images/stories/publicaciones/otras_publicaciones/quinto_informe_2010_ingles.pdf.
Page 17: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Santa María de Garoña (Spain) (2)

• The most recent reported PSA results for Santa Maria de Garoña are a CDF of 1.89×10-6/a, and a large early release frequency (LERF) of 5.17×10-8/a (these are internal events results only)

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

17

Presenter
Presentation Notes
SOURCE:Consejo de Seguridad Nuclear (CSN), Spain: Convention on Nuclear Safety, Fourth National Report, September 2007, http://www.csn.es/images/stories/english/publications/cuartoinformein.pdf.
Page 18: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Santa Maria de Garoña NPP, Spain

07-Nov-11 18Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
SOURCE: http://2.bp.blogspot.com/_IheePluCzY4/Sk_xzy8BYLI/AAAAAAAAAHU/_fhQRRdYnYY/s320/Santa+Maria+de+Garo%C3%B1a.jpg
Page 19: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Cofrentes (Spain) (1)

• Cofrentes is a BWR//6 Mark III BWR with power levels of 3237 MWt/1092 MWe (gross)

• The plant is located in Valencia province on the bank of the Júcar River on the Embarcaderos reservoir

• The plant is operated by Iberdrola• The Mark III containment, unlike the Mark I and

Mark II containments, is not inerted• Hydrogen igniters are provided in the wetwell

only at Cofrentes

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

19

Page 20: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Cofrentes (Spain) (2)

• The most recent reported PSA results for Cofrentes are a CDF of 1.27×10-6/a, and a large early release frequency (LERF) of 1.15×10-7/a (these are internal events results only)

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

20

Presenter
Presentation Notes
SOURCE: Consejo de Seguridad Nuclear (CSN), Spain: Convention on Nuclear Safety, Fourth National Report, September 2007, http://www.csn.es/images/stories/english/publications/cuartoinformein.pdf.
Page 21: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Cofrentes NPP, Spain

07-Nov-11 21Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
SOURCE: http://upload.wikimedia.org/wikipedia/commons/b/b2/Cofrentes_nuclear_power_plant_-_General_view.JPG
Page 22: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Cofrentes NPP Cross Section

07-Nov-11 22Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
SOURCE: http://www.cncofrentes.es/wcofrnts/gc/prod/en_US/conteni/imgs/Caracteristicas_tecnicas_Recargas_de_combustible_recargas_ing.jpg
Page 23: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Mühleberg (Switzerland)

• Mühleberg is a BWR/4 Mark I General Electric BWR producing 1097 MWt/373 MWe (net)

• The plant is located on the Aare River, 1.2 km downstream from a dam that impounds the Wohlensee Reservoir

• The plant is operated by BKW FMB Energie AG

• Mühleberg is expected to cease operation in 2022

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

23

Page 24: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Mühleberg Design 1

• Although Mühleberg is a BWR/4 Mark I plant like Fukushima Units 2-5, it has major design differences compared to these units making it unique among BWR/4 Mark I units in the world

• Mühleberg has a full, flood-proof, double containment; the secondary containment is a steel-lined, reinforced concrete structure with walls 0.9 meters thick at the base, and 0.6 meters thick above +29 meters elevation

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

24

Page 25: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Mühleberg Design 2

• Mühleberg also has a redundant "outer" suppression pool in the secondary containment

• The pool contains a multi-venturi scrubber system (MVSS) that filters air vented from the drywell and from the wetwell airspace

• The vent lines can be opened manually, but open automatically via rupture disc at a pressure of 0.7 MPa

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

25

Page 26: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Mühleberg Design 3

• Mühleberg also has a bunkered, flood- proofed, reinforced concrete safety complex known as SUSAN

• SUSAN houses 2 of the 3 diesel generators; a separate control room; a redundant RCIC system; a redundant 2- train low pressure injection system; and a redundant 2-train suppression pool cooling system

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

26

Page 27: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Mühleberg Design 4

• The condensate storage tank at Mühleberg is twice as large as the much higher power level Peach Bottom BWR/4 Mark I

• The overall primary containment at Mühleberg is approximately double in volume compared with Peach Bottom on a per MWt basis, as is the suppression pool water volume

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

27

Page 28: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Mühleberg External View

07-Nov-11 28Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
SOURCE: ENSI, http://static.ensi.ch/1313999257/kkw_muhleberg.jpg
Page 29: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Mühleberg NPP Cross Section

07-Nov-11 29Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
SOURCE: BKW EMG Energie AG, from Hauptabteilung für die Sicherhet der Kernanlagen (HSK). Sicherheitstechnische Stellunghahme zur Periodischen Sicherheitsüberprüfung des Kernkraftwerks Mühleberg: Zusammenfassung, Ergebnisse und Bewertung, HSK 11/1100, Würenlingen, Switzerland, 12 November 2007, http://static.ensi.ch/1314202963/psu_muehleberg_2007.pdf, and at http://www.umweltbundesamt.at/fileadmin/site/umweltthemen/kernenergie/Muehleberg/psu_muehleberg_2007.pdf (in German). �
Page 30: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Mühleberg Design 5

• The result of these design changes is that a full scope probabilistic safety assessment (PSA) of Mühleberg estimates the core damage frequency (CDF) at 1.19×10-5/a.

• 64.4% of all core damage accidents are estimated in the PSA to end with the reactor vessel intact, the containment intact, and only normal leakage

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

30

Page 31: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Mühleberg Design 6

• Another 32% of the CDF is estimated to end with the RPV failed, but the containment intact due to manually-initiated filtered venting

• In another 0.5% of the CDF, the RPV is failed, but the containment is intact the the filtered venting system is actuated by the rupture disc bursting

• The remaining 0.5% of the CDF are moderate to large release accidents involving containment isolation failure, early containment failure, drywell melt-through, and containment bypass

• The large release frequency is this estimated at about 6×10-8/a

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

31

Page 32: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Leibstadt (Switzerland) (1)

• Leibstadt is a BWR/6 Mark II General Electric BWR producing 3600 MWt/1165 MWe (net)

• The plant is located on the Rhine River

• The plant is operated by AXPO AG• Final shutdown is scheduled for 2034

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

32

Page 33: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Leibstadt (Switzerland) (2)

• Leibstadt is unique among BWR/6 Mark III units in having a full double pressure suppression containment, as well as a bunkered safety complex and a filtered venting system

• A 2009 PSA estimated the internal events CDF at 4.30×10-7/a, and external events at 3.91×10-6/a (dominated by earthquakes)

• Most likely large release is from early failure of the containment airlock, with an estimated frequency of 2.13×10-7/a

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

33

Presenter
Presentation Notes
Bullet #2: Swiss Federal Nuclear Safety Inspectorate (ENSI), Sicherheitstechnische Stellungnahme zur Periodischen Sicherheitsüberprüfung des Kernkraftwerks Leibstadt, ENSI 12/1300, 10 August 2009, http://www.ensi.ch/fileadmin/deutsch/files/psue_KKL-2009.pdf
Page 34: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Leibstadt External View

07-Nov-11 34Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
SOURCE:http://www.kkl.ch/upload/cms/user/test1123.jpg
Page 35: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

35

Other BWRs in Europe

Page 36: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 36

Other BWRs in Europe

• ASEA-ATOM produced BWRs that are operating in Finland (Olkiluoto 1 & 2) and Sweden (Forsmark 1, 2 & 3; Oskarshamn 1, 2 & 3; Ringhals 1). See next viewgraph.

• Siemens produced two lines of BWRs (BWR/69 and BWR/72) in Germany. All of the BWR/69 units are now closed. Only the BWR/72 units at Gundremmingen B & C remain in operation.

Lecture 3: Fukushima andSimilar Units in Europe

Page 37: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

37

Asea Atom BWRs

Page 38: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 38

Asea-Atom BWRs (1)

• Asea-Atom produced BWRs that are operating in Finland (Olkiluoto 1 & 2) and Sweden (Forsmark 1, 2 & 3; Oskarshamn 1, 2 & 3; Ringhals 1).

• Asea-Atom merged with another company to form ABB. ABB purchased Combustion Engineering, and was later merged with BNFL. BNFL subsequently sold its nuclear operations to Westinghouse, and then Westinghouse was acquired by Toshiba.

Lecture 3: Fukushima andSimilar Units in Europe

Page 39: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 39

Asea-Atom BWRs (2)• The Asea-Atom BWRs were equipped with MVSS

filtered venting systems after the Three Mile Island accident.

• Note that the end cap in the Asea-Atom BWR design is under water during normal operation. This feature, combined with the filtered venting system, could significantly reduce radiological releases to the environment ("source terms").

• 2009 PSA results for Olkiluto 1 & 2: CDF estimated at 1.3E-5/a; large early release frequency (LERF) estimated at 6E-6/a (corresponding to 0.1% or greater release of Cesium-137 or the equivalent)

Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
Bullet #3: Radiation and Nuclear Safety Authority (STUK), Finnish Report on Nuclear Safety: Finnish 5th National Report as Referred to in Article 5 of the Convention on Nuclear Safety, STUK-B 120, August 2010, page 40, www.stuk.fi/julkaisut/stuk-b/stuk-b120.pdf
Page 40: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

ASEA-ATOM BWR Containment

07-Nov-11 40Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
SOURCE:TVO, Nuclear Power Plant Units Olkiluoto 1 and Olkiluoto 2, January 2008.
Page 41: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

41

Siemens BWR/69 & BWR/72

Page 42: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 42

Siemens BWRs• Siemens built four BWR/69 units that operated in

Germany (Brunsbüttel, Isar Unit 1, Krümmel, and Philippsburg Unit 1)l the never operated Zwentendorf plant in Austria was also a BWR/69 design

• All BWR/69 units in Germany were permanently closed following the Fukushima accidents

• Only the BWR/72 units at Gundremmingen B&C remain in operation

• No recent publicly-available PSA results for Gundremmingen have been located so far

Lecture 3: Fukushima andSimilar Units in Europe

Page 43: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Gundremmingen External View

07-Nov-11 43Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
SOURCE: Wikipedia, http://upload.wikimedia.org/wikipedia/commons/thumb/b/bb/Gundremmingen_Nuclear_Power_Plant.jpg/774px-Gundremmingen_Nuclear_Power_Plant.jpg
Page 44: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Zwentendorf External View

07-Nov-11 44Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
SOURCE:Wikipedia, http://upload.wikimedia.org/wikipedia/commons/thumb/3/32/AKW_Zwentendorf.jpg/796px-AKW_Zwentendorf.jpg
Page 45: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

45

VVER-440/213 PWRs

Page 46: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 46

VVER-440/213 (1)• VVER-440/213 units are operating in the

Czech Republic (Dukovany 1-4), the Russian Federation (Kola 3 & 4), Slovakia (Bohunice V2 3 & 4, Mochovce 1 & 2), and Ukraine (Rovno 1 & 2). Two more units are under construction at Mochovce.

• These reactors are six-loop PWRs with horizontal steam generators housed in a pressure suppression confinement.

Lecture 3: Fukushima andSimilar Units in Europe

Page 47: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 47

VVER-440/213 (2)• There are three main similarities between

GE Mark I BWRs and VVER-440/213s (despite the fact that the latter are PWRs and not BWRs):– First, VVER-440/213 plants rely on a pressure suppression

system to reduce steam pressure in case of an accident (via a so-called "bubbler-condenser" tower).

– Second, the reactor shaft is closed by an end cap similar in concept to the BWR Mark I drywell closure cap.

– Third, the structure above the refueling deck is simple industrial construction, and is not designed either to retain pressure or radioactivity released in an accident.

Lecture 3: Fukushima andSimilar Units in Europe

Page 48: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 48

VVER-440/213 (3)• Most (if not all) VVER-440/213 units have

been retrofitted with passive autocatalytic recombiners (PARs) to reduce the threat of hydrogen combustion

• Other retrofits include reactor cavity flooding provisions to attempt to retain core debris in the reactor vessel, additional water sources for confinement spray and vessel injection, and extra protection for the reactor cavity door

Lecture 3: Fukushima andSimilar Units in Europe

Page 49: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 49

VVER-440/213 (4)• VVER-440/213 units are vulnerable to severe

accidents occurring when the reactor shaft end cap and reactor vessel heads are removed (for refueling). Such accidents result in rapid failure of the industrial structure above, and a large direct release path to the environment (as well as contamination of the adjacent unit)

• Other VVER-440/213 vulnerabilities are steam generator tube ruptures and collector failures, unmitigated core debris interaction with the reactor cavity door, and unmitigated high pressure melt ejection & direct confinement heating

Lecture 3: Fukushima andSimilar Units in Europe

Page 50: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 50

VVER-440/213 (5)• Recent probabilistic safety assessment

(PSA) studies for VVER-440/213 units indicate core damage frequencies in the range of about 4 ×10-6/a to 2 ×10-4/a

Lecture 3: Fukushima andSimilar Units in Europe

Page 51: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

VVER-440/213 Design

07-Nov-11 51Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
SOURCE:International Nuclear Safety Center, Pacific Northwest National Laboratory (PNNL), http://insp.pnnl.gov/-profiles-reactors-vver213.htm
Page 52: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Dukovany Design Cutaway

07-Nov-11 52Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
SOURCE:CEZ
Page 53: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

Passive Autocatalytic Recombiner (PAR)

07-Nov-11 53Lecture 3: Fukushima andSimilar Units in Europe

Presenter
Presentation Notes
SOURCE:Framatome ANP GmbH, http://www.jso.kiev.ua/index.files/main.files/pictures/Pic15_97B.jpg
Page 54: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

54

Next Lecture

Page 55: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

55

Next Lecture

• Block Lecture 4 can take place on either 14 November or 28 November from 18:30 – 20:00. We will discuss the Japanese Government's two official reports on the Fukushima accidents, as well as the IAEA's "Fact-Finding" Mission report.– http://fukushima.grs.de/sites/default/files/NISA-IAEA-

Fukushima_2011-06-08.pdf – http://www.iaea.org/newscenter/focus/fukushima/japan-

report2/japanreport120911.pdf– http://www-

pub.iaea.org/MTCD/Meetings/PDFplus/2011/cn200/documentation/ cn200_Final-Fukushima-Mission_Report.pdf

Page 56: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 Lecture 3: Fukushima andSimilar Units in Europe

56

Contact Information

Page 57: THE FUKUSHIMA ACCIDENT: CAUSES, RESULTS AND …New calculation of accident progression in Unit 4 spent fuel pool by Dr. John Luxat (Research Chair in Nuclear Safety Analysis, Department

07-Nov-11 57

Contact Information

• Email: [email protected]• Direct line: +43-1-47654-7711; Secretariat: -7700• Institute URL (Deutsch): http://www.risk.boku.ac.at

• Course URL (English): https://online.boku.ac.at/BOKUonline/lv.detail?clvnr=259955&cperson_nr=&sprache=2

• Course URL (Deutsch): https://online.boku.ac.at/BOKUonline/lv.detail?clvnr=259955

• Lecture Details (date, room, time):https://online.boku.ac.at/BOKUonline/te_ortzeit.liste?corg=16590&clvnr=259955

• Viewgraphs:http://www.risk.boku.ac.at/materials

Lecture 3: Fukushima andSimilar Units in Europe