The Facility for Antiprotonand Ion Research
Günther Rosner NuPECC, FZ Jülich, 15/3/13 1
2
Facility for Antiproton & Ion Research
Günther Rosner NuPECC, FZ Jülich, 15/3/13
Dense Bulk Plasmas (Ion-beam bunch compression& petawatt-laser)
Materials Science & Radiation Biology (Ion & antiproton beams) Accelerator Physics
UNILAC
SIS18 SIS100/300p-Linac
HESR
CR &RESR
NESR
Cryring
Rare-IsotopeProduction Target
Anti-ProtonProduction Target
100 m
QCD-Phase Diagram(HI beams 2 to 45 GeV/u)
Hadron Physics (Stored and cooled14 GeV/c anti-protons)
Nuclear Structure & Astrophysics(Rare-isotope beams)
Fundamental Symmetries& Ultra-High EM Fields(Antiprotons & highly stripped ions)
NuPECC, FZ Jülich, 15/3/13 3
Staging
Günther Rosner
Start Version Phase A(SIS100)
Phase B(SIS300)
Modularised Start Version
Module 0 Module 1 Module 2 Module 3 Module 4 Module 5
SIS100 Exp. halls CBM & APPA
Super-FRS NuSTAR
Antiproton FacilityPANDA & options NuSTAR
LEB, NESR, FLAIR
NuSTAR & APPA
RESRPANDA,
NuSTAR & APPA
2018
NuPECC, FZ Jülich, 15/3/13 4
Modularised Start Version
Günther Rosner
APPA
CBM/HADES
NuSTAR
PANDAExperiments
M1: APPAM1: CBM/HADESM2: NuSTARM3: PANDA
M0
M1
M2M3
M3
NuPECC, FZ Jülich, 15/3/13 5
Costs MSV
Günther Rosner
Accelerators and personnel (including Super-FRS) 502 M€
Civil construction (excluding site related costs) 400 M€
FAIR contribution to experimental end stations * 78 M€
FAIR GmbH personnel & running until 2018 (>8 years) 47 M€
Grand Total MSV, Modules 0 - 3 1027 M€
in 2005 € (inflation escalation until 2018: ca. +50%)
* Total experimental end stations (excluding Super-FRS): ca. 210 M€ (2005) = 315 M€ (2018)
NuPECC, FZ Jülich, 15/3/13 6
FAIR Member StatesContracting Party Contribution
(in 2005 M€)
Finland 5.00
France 27.00
Germany 705.00
India 36.00
Poland 23.74
Romania 11.87
Russia 178.05
Slovenia 12.00
Sweden 10.00
Total 1.008,66
Günther Rosner
• All numbers in 2005 €(escalation until 2018 ca. +50%)
• UK Associated Membership from 3/5/13
• Spain expected to join soon as a member
• Talks with China on Associate FAIR Member status
• Talks with Italy
• Additional contributions to experiments
Synchrotrons: 1.1 kmWith beamlines: 3.2 km
Existing SIS 18
Civil Construction
Günther Rosner NuPECC, FZ Jülich, 15/3/13 7
Total area > 200 000 m2Area buildings ~ 98 000 m2Usable area ~ 135 000 m2Volume of buildings ~ 1 049 000 m3Substructure:~ 1500 pillars, up to 65 m deep
What will be Visible in the End
Günther Rosner NuPECC, FZ Jülich, 15/3/13 8
36 m down into the ground
Central Switchyard Building
...with complex interior
Günther Rosner NuPECC, FZ Jülich, 15/3/13 9
Building Permit
Günther Rosner NuPECC, FZ Jülich, 15/3/13 10
Submission of 771 folders building application to Darmstadt’s civil construction authority in Aug. 2011
Darmstadt Councilor Brigitte Lindscheid handing over the FAIR building permit (21 folders) to FAIR management at the end of Oct. 2012
Aerial View Jan. 2013
Günther Rosner NuPECC, FZ Jülich, 15/3/13 11
13.01.2013
Webcam March 2013
Günther Rosner NuPECC, FZ Jülich, 15/3/13 12
Roadmap Civil Construction
Günther Rosner NuPECC, FZ Jülich, 15/3/13 13
2011 2012 2013 2014 2015 2016 2017 2018
Ground Exploration
Forest Clearing
Site Preparation
Earthwork and Foundation
Batch 1 (Civil Engineering)
Batch 2 (M&E)
Trans-Batch Works
Construction Finished Experiments
14
Fast accelerationHigh gradient, variable frequency
Ferrite & MA loaded cavities
Compact & cost effective acceleratorsFast cycling superconducting magnets
dB/dt ~ 4T/s
Precision beamsElectron & stochastic cooling
XHV @ high beam intensitiesExtremely high vacuum ~10-12 mbar
Accelerator Challenges
Günther Rosner NuPECC, FZ Jülich, 15/3/13
SIS100 dipole magnets Coil production by BNG
SIS100 sextupole magnets Dubna prototype
Superconducting Magnets
Günther Rosner NuPECC, FZ Jülich, 15/3/13 15
HESR Layout
Main machine parameterMomentum range 1.5 to 15 GeV/cCircumference 575 m Magnetic bending power 50 TmDipole ramp 25 mT/sAcceleration rate 0.2 (GeV/c)/s
Geometrical acceptances for βt = 2 m horizontal 4.9 mm mrad vertical 5.7 mm mradMomentum acceptance ± 2.5×10-3
Günther Rosner NuPECC, FZ Jülich, 15/3/13 16
Barrier Bucket Cavity in COSY
-600
-500
-400
-300
-200
-100
0
100
200
0,0 0,5 1,0 1,5 2,0
Time / µsB
B V
olta
ge /
V
-0,1
-0,05
0
0,05
0,1
0,15
0,2
0,25
0,3
Pha
sem
onit
or a
.u.
Günther Rosner NuPECC, FZ Jülich, 15/3/13 17
HESR Prototyping and Tests at COSY
WASA
2 MeVe-Cooler
Barrier Bucket CavityStochastic
Cooling
Residual Gas Profile Monitor
Pellet Target
Günther Rosner NuPECC, FZ Jülich, 15/3/13 18
19
FAIR Experiments
Günther Rosner NuPECC, FZ Jülich, 15/3/13
CBM
PANDANuSTAR
Super-FRS
APPA
GSI FRS FAIR Super-FRS
Günther Rosner NuPECC, FZ Jülich, 15/3/13 20
1000 7500
Super-FRS
FRS
Target area
DipolesQuadrupoles
Sextupoles
Experiment NuSTARRadiation Resistant Magnets• Normal conducting magnets
using mineral insulated cable
• 3 dipole, 3 quadrupole, and 2 sextupole magnets
• Prototype dipole built and tested by BINP
• Prototype dipole delivered and assembled at GSI
Günther Rosner NuPECC, FZ Jülich, 15/3/13 21
IPP, Hefei
Super-FRS Superferric Dipoles• 24 dipoles
required Iron dominated,
warm iron SC coil
• Large aperture ±19cm x ±7cm 50 tons
• Prototype built and tested by China and delivered to GSI
Günther Rosner NuPECC, FZ Jülich, 15/3/13 22
NuPECC, FZ Jülich, 15/3/13 23
Timeline MSV
Günther Rosner
20122011 2013 201620152014
6
Submission building permits
Site preparation
Civil construction contracts
Building of accelerator & detector components
Completion of basic civil construction work
Installation & commissioning of accelerators and detectors
Data taking
7 108
2017 2018 2019
12
6
7
8
9
11
12
10
119