The export activities developed by ENERGOMONTAJ S.A. include both the export of mechanical equipment and the export of services. Equipment export refers to the equipment made by our company on
the basis of projects supplied by our customers. The range of products presented for export, made in concordance with the requirements of ISO 9001 includes electrostatic precipitators, bag filters, silos,
pressure vessels, steel structures, desulphuration plants, heat exchangers, boilers components, industrial halls, aso.
Through the agency of our clients, as the worldwide known companies ALSTOM POWER, FLS Miljo, SIEMENS, KVAERNER, aso, the equipment made by ENERGOMONTAJ was exported to Sweden, Norway,
Italy, France, Germany, Holland, Iceland, United Kingdom, Portugal, United States, Chile, China, Thailand, United Emirates, aso.
Export of services, mechanical and electrical erection works develops either as for completing the equipment export or turn - key contracts, or independently. Among the countries were Import - Export
Direction developed erection works are Holland, Sweden, China, Norway, France, Portugal, United Emirates, Cyprus, Austria, Denmark, Egypt, Estonia and Slovakia.
Sorin ONIGAImport & Export Director
POLAND Branch
Poznan Site
ESTONIA Branch
Narva Site
DENMARKBranch
Aarhus SiteCopenhaga Site
EGYPTBranch
Burrulus Site
TIMISOARA Branch
DR. TR. SEVERIN Branch
ROVINARIBranch
SLATINA IRON GATESBranch
SUPPLY & SALESBranch
BUCHARESTBranch
FRANCEBranch
Fos Sur Mer SiteBouygues Site
NORWAYBranch
Karmoy Site
HEADQUARTERS
* ENERGOMONTAJ sites covering all over the country
Country Year Denomination Contractor/Client
France 2017 GV2 Blast furnace gas boiler dismantling and erection works. Arcelor Mittal
France 2016Laying cableway. Secondary distribution and laying terminals. Campus Centrale Supélec - Building A, France.
École Centrale de ParisBouygues Energies et Services
Estonia 2016Oil shale fired CFB Thermal Power Plant, 300 MW, Narva. Engineering, Design, Supply, Construction, Installation, Start-Up and Commissioning of 300 MW CFB TPP Narva.
GE Power Estonia AS
Norway 2016Steelwork supply - engineering, materials, fabrication, surface treatment and painting, inspection and testing, marking, packing and delivery including documentation.
GE Power Norway AS
Egypt 2016Erection, Testing, Pre-Commissioning and Assistance in Commissioning of the entire mechanical, electrical and instrumentation works for one complete module at the Burullus Combined Cycle Power Plant, Egypt.
Orascom Construction
France 2016 Electrical and automation works, Campus Centrale Supelec, France. Bouygues Energies et Services
France 2016Replacement of low temperature super heaters (RBT1 and RBT2),Cordemais, France.
GE Alstom Power Service
Poland 2015Installation of boilers pressure parts of power units no. 5 and no. 6(package 2), Opole Power Plant, Poland.
Mostostal Power Development
Country Year Denomination Contractor/Client
UK 2015Fabrication of conditioning towers, bag filters, ash silos, lime silos and ducting for Dunbar, Margam, Templeborough and Teeside, UK.
Götaverken Miljö AB
Denmark 2015Mechanical erection works of grate fired biomass plant (boiler package). Lisbjerg, Denmark.
Tecnoservice S.A. RoBurmeister and Wain Energy AS
Denmark 2015Fabrication of flue gas cooler steel parts, Amager Unit 1 Biomass Fired Power Plant.
Alstom Denmark AS
Denmark 2015Fabrication of flue gas by - pass duct steel parts, Amager Unit 1 Biomass Fired Power Plant.
Alstom Denmark AS
Norway 2014 AHEX and fabricated steel for ALCOA Mosjoen AHEX Demo Plant. Alstom Norway AS
Denmark 2014 Primary air ducts for SVV3 – Bio Conversion Studstrup Power Plant Alstom s.r.o. Czech Republic
Slovakia 2013Supply of fabricated steel structures for waste heat recovery system, Holcim Rohoznik Plant, Slovakia.
Holcim Slovensko AS
Slovakia 2013Mechanical erection works of waste heat recovery system, Holcim Rohoznik Plant, Slovakia.
Holcim Slovensko AS
Norway 2013Mechanical erection works of stainless steel tank utility system WP 054 in Ärdal SO 2. Project EE3-000659.
Alstom Norway AS
Country Year Denomination Contractor/Client
Norway 2013Fabrication works of stainless steel tank utility system WP 054 in Ärdal SO 2. Project EE3-000659.
Alstom Norway AS
Estonia 2012Mechanical erection works and steel structures of oil shale fired circulating fluidized bed boiler of 300 MW, Narva-Estonia Power Plant.
Alstom Estonia AS
Estonia 2012 Fabrication of oil shale and bottom ash silos. Alstom Estonia AS
Norway 2012Fabrication and mechanical erection works of steel WP 051 and WP 053 in ÄrdalSO 2, Project EE3-000659.
Alstom Power NORWAY AS
Dubai (UAE) 2012Providing personnel for maintenance and rehabilitation works at thermal power station in Irak.
Black Sea Power GeneratingFZCO
Norway 2012 Manufacture and delivery works of steel structures in Ardal. Alstom Power NORWAY AS
Norway 2011 AHEX and fabricated Steel for ALCOA Mosjoen AHEX Demo Plant. Alstom Power NORWAY AS
Germany 2011Manufacture and delivery works of various steel structures at SABErkenschwick.
J Christof Baumit GERMANY
Austria 2011Equipment manufacture and delivery works: binders tank and steel structures for titaniumdioxide silos rehabilitation works at Wopfing cement plant.
J Christof Baumit AUSTRIA
Country Year Denomination Contractor/Client
Austria 2011Equipment manufacture and delivery works (steel structures, flue gas ducts, funnel) at Mannersdorf cement plant.
Lafarge AUSTRIA
Austria 2010Equipment manufacture, delivery and mechanical erection works (steel structures, flue gas ducts, dust-separator installation of ceramic blocks, access platforms) at RTO Wopfing cement plant.
J Christof Baumit AUSTRIA
France-Romania
2010Civil and connection (water and steam pipes) erection works; mechanic, electric and automation works for the connection of co-generating installation to the existing ones.
DALKIA ROMANIATHERMO PH-BRAZI
France-Romania
2009
Relocation for a co-generation unit 25MW comprising: transportation from Michelin Cataroux site in Clermont-Ferrand, France and erection works to site, Romania. Transportation of 5MW co-generation unit from the Michelin Combaude site, Clermont-Ferrand France to site, Rom. and unload for storage.
DALKIA ROMANIA
France 2009
Dismantlement for relocation of a co-generation unit 25MW at Michelin Cataroux site, Clermont-Ferrand, France. Dismantlement for relocation of a 5MW co-generation unit at Michelin Combaude site, Clermont-Ferrand, France.
DALKIA FRANCE
Austria 2009 Supply of Silos, Pre-assembly and Erection Works in Wopfing. J Christof Baumit AUSTRIA
Country Year Denomination Contractor/Client
Slovakia 2008 Supply of Silos in Final Cleaning installation in Lietawska Lucka. J Christof Baumit SLOVAKIA
Hungary 2008Supply of Silos and Technical Assistance in Demihydrate Installation in Visonta.
J Christof Baumit HUNGARY
Norway 2008 Supply of Ducts and Supports Steel for Mosjoen Wet Scrubber. Alstom Power NORWAY AS
Kazakhstan 2008 Supply of fabricated Steel for Pavlodar Phase II. Alstom Power NORWAY AS
France 2007 Services, Maintenance, Commissioning and Repairs for FGD. Alstom Power Environment SA
France 2007Supply of Steel Structure, Access ways, Platforms, Ducts and Mechanical Erection of 60MW Boiler parts of the PL 2 line, FOS SUR MER.
Alstom Power Boilers SA
Norway 2007 Erection Packages for Hydro Aluminum Ärdal. Alstom Power NORWAY AS
Norway 2007Supply of Fabricated Steel Packages incl. Filter tops for Hydro Aluminum Ärdal.
Alstom Power NORWAY AS
Kazakhstan 2006 Supply of Fabricated Steel. Alstom Power NORWAY AS
Country Year Denomination Contractor/Client
Norway 2007 Erection Packages for Hydro Aluminum AS Sunndal. Alstom Power NORWAY AS
Norway 2007 Supply of Fabricated Steel Packages for Hydro Aluminum AS Sunndal. Alstom Power NORWAY AS
Austria 2007 Supply of Silos, Pre-assembly and Erection Works in Badischl. J Christof Baumit AUSTRIA
Bulgaria 2007 Supply of Silos and Technical Assistance in FPA Elin Pelin. J Christof Baumit AUSTRIA
France 2007 Services, Maintenance, Commissioning and Repairs for FGD and SCR. Alstom Power Environment SA
Iceland 2006 Supply of Fabricated Steel Packages for Nordural Phase V. Alstom Power NORWAY AS
Norway 2005 Supply of Fabricated Steel for FTP 4 by-pass. Alstom Power NORWAY AS
France 2005Supply and Mechanical Erection of steel structures, Ducts, Silos, Access Ways, Platforms for FGD - Centrale Gardanne.
Alstom Power NORWAY AS
France 2005Supply and Mechanical Erection of steel structures, Ducts, Silos, Access Ways, Platforms for FGD - Centrale Emile Huchet.
Alstom Power Environment SA
Country Year Denomination Contractor/Client
Iceland 2005 Supply of Fabricates Steel Packages Nordural Phase IV, Grundartangi, Iceland. Alstom Power Environment SA
Iceland 2004 Supply of Fabricates Steel Packages Nordural Phase III, Grundartangi, Iceland. Alstom Power NORWAY AS
Germany 2003 Stahlbau Kessel/Gebäude BKF Fechenheim. Alstom Power NORWAY AS
Germany 2003 2 Stk. Dampfkessel Typ SEU/Tailend BKF Fechenheim. SEU Schenkel AG
Germany 2003Schlackeschacht, Aschetricher, Rostabschluss Sowie Kompensator FHKW Berlin Neuköln.
SEU Schenkel AG
Germany 2003 Lufkanäle und Rohrleitungen FHKW Berlin Neuköln. SEU Schenkel AG
Germany 2003 Dosierbehälter Komplett und Fallschächte (3 Stück) FHKW Berlin Neuköln. SEU Schenkel AG
Germany 2003 Stahlbau Kessel/Gebäude FHKW Berlin Neuköln. SEU Schenkel AG
Cyprus 2003 Supply of Steel Work for Vasilikos Power Station Phase II No 3 Unit, Cyprus. Alstom Power NORWAY AS
Country Year Denomination Contractor/Client
Portugal 2003 Manufacturing and Erection of ESP for Soporcel, Portugal.Alstom Power Oy FINLAND
Environmental Control Systems
Greece 2003 Supply of Steel Work for Megalopolis, Greece. ALSTOM POWER SWEDEN AB
Slovakia 2003 Manufacturing of Steel Structure for Ruzomberok, Slovakia.Alstom Power Oy FINLAND
Environmental Control Systems
Greece 2002Supply of ESP Inlet Screen Plates and Rapping Systems for Kardia, Greece.
ALSTOM POWER SWEDEN AB
Germany 2002 2 Stk. Dampfkessel Typ SEU/Tailend FHKW Berlin Neuköln. SEU Schenkel AG
Germany 2002 Manufacturing and Erection of ESP for Stendal, Germany.Alstom Power Oy FINLAND
Environmental Control Systems
Portugal 2002 Manufacturing and Erection of ESP for Soporcel, Portugal.Alstom Power Oy FINLAND
Environmental Control Systems
Brazil 2002 Manufacturing of Fabric Filter Parts for Jacarei Curitiba Brazil. Alstom Power Oy FINLAND
Finland 2001 Manufacturing of ESP Internal Parts for Punkaharju Finland. Alstom Power Oy FINLAND
Country Year Denomination Contractor/Client
Finland 2001 Manufacturing of ESP Internal Parts for Pellosniemi Finland. Alstom Power Oy FINLAND
Finland 2001 Manufacturing of ESP Internal Parts for Iisalmi Finland. Alstom Power Oy FINLAND
Norway 2001Manufacturing and Erection of Fabric Filter for Hydro AluminiumAS Sunndal.
Alstom Power NORWAY
Brazil 2001 Manufacturing of ESP Internal Parts for Curitiba Brazil. Alstom Power Oy FINLAND
Chile 2001 Manufacturing of ESP Internal Parts and Ducts for Arauco Chile. Alstom Power Oy FINLAND
Brazil 2001 Manufacturing of ESP Internal Parts for Aracruz Brazil. Alstom Power Oy FINLAND
Norway 2001 Manufacturing and Erection of fabric Filter for Sor-Norge Aluminium AS. Alstom Power NORWAY
Germany 2001 Manufacturing and Delivery of Ducts for KW Mittelsburen Block 4. Logicom GmbH GERMANY
UAE 2001 Manufacturing of Drive and Turning Stations at IHI Sharjah. FLS Miljo A/S DENMARK
Malaysia 2001 Manufacturing of Drive and Turning Stations at Rawang Plant. FLS Miljo A/S DENMARK
Country Year Denomination Contractor/Client
Portugal 2001 Manufacturing of Fabric Filters at Secil Outao#9. FLS Miljo A/S DENMARK
Portugal 2001 Manufacturing of Fabric Filters at Secil Outao#8. FLS Miljo A/S DENMARK
Malaysia 2001 Manufacturing of Drive and Turning Stations at Rawang Plant. FLS Miljo A/S DENMARK
UAE 2001 Manufacturing of Pressure Tanks for Fabric Filter at IHI Sharjah. FLS Miljo A/S DENMARK
UAE 2001 Manufacturing of Pressure Tanks for Fabric Filter at IHI Sharjah. FLS Miljo A/S DENMARK
UAE 2001 Manufacturing of Pressure Tanks for Fabric Filter at IHI Sharjah. FLS Miljo A/S DENMARK
UAE 2001 Manufacturing of Fabric Filter at IHI Sharjah. FLS Miljo A/S DENMARK
UAE 2001 Manufacturing of Dust Transporter at IHI Sharjah. FLS Miljo A/S DENMARK
Italy 2000 Manufacturing of ESP & Ducts at Centrale Biomasse Crotone Linea 2 . ALSTOM POWER ITALY
Italy 2000 Manufacturing of ESP & Ducts at Centrale Biomasse Bando d’Argenta Linea 2. ALSTOM POWER ITALY
UAE 2000 Manufacturing of Drive and Turning Stations at Sharjah Plant. FLS Miljo A/S DENMARK
Country Year Denomination Contractor/Client
France 2000Manufacturing and Erection of ESP & Ducts at Dedusting Plant SollacDunkerque.
ALSTOM POWER ITALYUnita daneco ITALY
Iceland 2000Manufacturing of Fabric Filter for Pollution System at NORDURAL h.f. GRUNDARTANGI Phase II.
ALSTOM POWER NORWAY
Spain 2000 Manufacturing of Hand railings, Ladders and Stairs for Solvay Barcelona. Willems N V BELGIUM
Germany 2000 Manufacturing of Hand railings, Ladders and Stairs for Bad Hersfeld. Willems N V BELGIUM
Holland 2000Manufacturing of Hand railings, Ladders and Stairs for IndustrieChimiques du Senegal.
Willems N V BELGIUM
Italy 2000 Manufacturing of ESP & Ducts at Centrale Biomasse Bando d’Argenta Linea 1. ABB Sadelmi SpA ITALY
Italy 1999 Manufacturing of ESP & Ducts at Centrale Biomasse di Crotone Linea 2. ABB Sadelmi SpA ITALY
Portugal 1999 Manufacturing of Fabric Filter at Cimpor Souselas Kiln#1 and 3. FLS Miljo A/S DENMARK
Cyprus 1999 Electrical Erection and Automatization at Vasilikos Power Plant 2x130 MW.Caramondani Engineers Ltd.
CYPRUS
Portugal 1999 Manufacturing, Delivery & Erection of ESP at Compania di Celulosa do CAIMA. ABB Power Oy FINLAND
France 1999Manufacturing, Delivery, Erection & Insulation of ESP at UPM CHAPELLE D’ARBLAY.
ABB Power Oy FINLAND
Country Year Denomination Contractor/Client
England 1999 Fabrication & Delivery of Fabric Filter for Fifoot Point.ABB Environmental Systems
AB SWEDEN
Italy 1999 Manufacturing & Delivery of Fabric Filter. Hascon Engineering ITALY
Peru 1998 Manufacturing of ESP for ILO PERU.ABB Environmental Systems
AB SWEDEN
Bosnia And Herzegovina
1998Manufacturing & Delivery of Internal Parts for ESP at KAKANJ Power Plant Unit 6.
ABB Sae Sadelmi ITALY
Switzerland 1998 Manufacturing & Delivery of ESP and Ducts at KVA NIEDERURNEN.ABB Environmental Systems
AB SWEDEN
Italy 1997 Manufacturing of ESP and Ducts at GELA. ABB Sae Sadelmi ITALY
Denmark 1997Manufacturing & Preassembling Works for Fabric Filter, Ducts and Silos at I/S KARA.
ABB Energi &Industri A/SDENMARK
Iceland 1997Manufacturing of ESP for Pollution System at NORDURAL h.f. GRUNDARTANGI.
ABB Environmental NORWAY
USA 1997 Manufacturing & Workshop Assembly of ESP ELPAC at OWENS CORNING. ABB Flakt Industri SWEDEN
Denmark 1997Manufacturing & Preassembling Works for Fabric Filter and Ducts at I/S VESTFORBRAENDING Waste to energy plant.
ABB Energi &Industri A/SDENMARK
Country Year Denomination Contractor/Client
UAE 1996 Relocation of Diesel Power Plant from MADINAT ZAYED Banyas Islands.Water and Electricity Department - Dubai
Norway 1996Manufacturing & Erection of Electrostatic Precipitator for Pollution Control System at Aluminum Installation KARMOY.
ABB Environmental NORWAY
Sweden 1996 Manufacturing & Erection of ESP at FROVI. ABB Flakt Industri SWEDEN
Norway 1996Manufacturing & Erection of Electrostatic Precipitator for Pollution Control System at Aluminum Installation ARDAL.
ABB Environmental NORWAY
Sweden 1996 Manufacturing of ESP Specific Equipment at GOTEBORG. ABB Flakt Industri SWEDEN
Sweden 1996 Manufacturing & Erection of ESP at KVT KARLSHAMN. ABB Flakt Industri SWEDEN
The Netherlands
1996Manufacturing & Erection of Equipment for “AVI TWENTE Pollution Control System” Waste to Energy Plant.
ABB Flakt Industri SWEDEN
China 1994 Equipments Supply & Technical Assistance at PUCHENG Power Plant.China National Technical
Imp. Corporation
UAE 1992Manufacturing & Erection for “Relocation of 2x500 T/D Krupp ; Desalination Units to GHOZLAN Islands”.
Water and Electricity Department - Dubai
Project Denomination Main Contractor/ Client DenominationYear of
completion
TPP ROVINARI – Unit 6– 330 MW
Termoelectrica – SE Rovinari Rehabilitation works of Boiler, Pressure System1993-1996
Program A2
TPP ROVINARI – Unit 6 – 330 MW Termoelectrica – SE Rovinari Complete Erection Works of Boiler & Auxil., 1035 t/h 1976-1979
TPP ROVINARI – Unit 5 – 330 MW Termoelectrica – SE Rovinari Complete Erection Works of Boiler & Auxil., 1035 t/h 1975-1977
TPP ROVINARI – Unit 4 – 330 MW Termoelectrica – SE Rovinari Complete Erection Works of Boiler & Auxil., 1035 t/h 1974-1977
TPP ROVINARI – Unit 3 – 330 MWTermoelectrica – SE Rovinari
ALSTOM FranceComplete Erection Works of Boiler & Auxil., 1035 t/h 1973-1976
Project Denomination Main Contractor/ Client DenominationYear of
completion
Desulphurization Installation Valcea County CouncilDetail design; civil works and steel structures; manufacturing absorber, ducts, piping; erection of absorber, ducts, piping;
Electrical works; I&C works Insulation & Cladding
2014-in progress
Replace HP Piping of Unit no 5 Valcea County CouncilLimit boiler pipingChemical doosing
2007-2009;2013
Project Denomination Main Contractor/ Client DenominationYear of
completion
Desulphurization Installation CE Oltenia – SE CraiovaSteel structures; erection of absorber, ducts,
piping; Insulation & Cladding
2015-in progress
Project Denomination Main Contractor/ Client DenominationYear of
completion
TPP ISALNITA – Unit 7 – 315 MWTermoelectrica
SE CraiovaRehabilitation works of Piping, Rotary Air Pre-heater (Fabric., Detail Engineering, Erection)
2004
TPP ISALNITA – Unit 7 – 315 MWTermoelectrica
SE CraiovaRehabilitation works of ESP, Ducts, Fans
(Fabric., Detail Engineering, Erection)2002-2003
TPP ISALNITA – Unit 7 – 315 MWTermoelectrica
SE CraiovaComplete Erection Works of Boiler & Auxil,
1020 t/h1965-1967
Project Denomination Main Contractor/ Client Denomination
TPP BRAILA – Unit 4 – 330 MWTermoelectrica
SE BrailaComplete Erection Works of Boiler & Auxil., 1035 t/h
Project Denomination Main Contractor/ Client DenominationYear of
completion
TPP TURCENI – Unit 5 –330 MW
CE Oltenia – SE TurceniRehabilitation works of Boiler, ESP, Ducts, Turbine of 330 MW,
Annexes (electrical works; I&C Works) – dense slurry installation2012-2013
TPP TURCENI – Unit 4 –330 MW
CE Oltenia – SE TurceniRehabilitation works of Boiler, ESP, Ducts, Turbine of 330 MW,
Annexes (electrical works; I&C Works) – dense slurry installation2011-2013
TPP TURCENI – Unit 5 –330 MW
ABB & Babcock (Germany)/Termoelectrica – SE Turceni
Rehabilitation works of Boiler, Piping, Auxil. (Fabric., Detail Engineering, Erection)
1997-2005Program A3
TPP TURCENI – Unit 4 –330 MW
ABB & Babcock (Germany)/Termoelectrica – SE Turceni
Rehabilitation works of Boiler, Piping, Auxil. (Fabric., Detail Engineering, Erection)
1996-2002Program A3
TPP TURCENI – Unit 6 –330 MW
TermoelectricaSE Turceni
Rehabilitation works of Boiler, Pressure System1994-1995
Program A2
TPP TURCENI – Unit 3 –330 MW
TermoelectricaSE Turceni
Rehabilitation works of Boiler, Pressure System1994-1996
Program A2
Project Denomination Main Contractor/ Client DenominationYear of
completion
TPP TURCENI – Unit 7– 330 MW Termoelectrica - SE Turceni Complete Erection Works of Boilers 1984-1987
TPP TURCENI – Unit 6 – 330 MW Termoelectrica - SE Turceni Complete Erection Works of Boilers 1982-1985
TPP TURCENI – Unit 5 – 330 MW Termoelectrica - SE Turceni Complete Erection Works of Boilers 1981-1984
TPP TURCENI – Unit 4 – 330 MW Termoelectrica - SE Turceni Complete Erection Works of Boilers 1978-1982
TPP TURCENI – Unit 3 – 330 MW Termoelectrica - SE Turceni Complete Erection Works of Boilers 1978-1981
TPP TURCENI – Unit 2 – 330 MW Termoelectrica - SE Turceni Complete Erection Works of Boilers 1977-1979
TPP TURCENI – Unit 1 – 330 MW Termoelectrica - SE Turceni Complete Erection Works of Boilers 1976-1978
Project Denomination Main Contractor/ Client DenominationYear of
completion
SOUTH TIMISOARA TPPRehabilitation works of three steam boilers (CAE
1, CAE 2 and CAE 3)Timisoara TPP
Manufacturing and supply of mechanical equipment;
Equipment erection of thermal insulation and refractory masonry
2012-2013
TIMISOARA CENTER TPPRefurbishment works of two hot water boilers,
CAF2 and CAF4Timisoara TPP
Manufacturing and supply of mechanical equipment;
Equipment erection of thermal insulation and refractory masonry
2012-2013
Project Denomination Main Contractor/ Client DenominationYear of
completion
TPP PetroBrazi – 2 units x 135 to/h HRSG Hyundai-Petrom/OMV Austria Erection works 2002
TPP PetroBrazi – 2 units x 510 to/h HRSG Metka Greece – OMV Austria Erection works 2010
Project Denomination Main Contractor/ Client DenominationYear of
completion
Manufacturing, delivery and erection of pressure parts for steam boilers and air and gas ducts of 2 boilers of 52
MW
Ekol SPOL sro Czech -Botosani TPP
Equipment erection of thermal insulation and refractory masonry
2011
Project Denomination Main Contractor/ Client DenominationYear of
completion
Heating plant capacity increase of Unit no 3 of 210 MW
Deva TPP
Manufacturing and Erection works (boilers, steel structures, boiler house equipment, pumps, ducts,
limit boiler piping, chemical dosing)Electrical works; I&C works Insulation &
Cladding
2004-2006
Project DenominationMain
Contractor/ Client
DenominationYear of
completion
Paroseni TPP – boiler no 4 of 540 t/h, coal-fired, 150 MW
TermoelectricaSE Paroseni
Manufacturing and Erection works (boilers, steel structures, boiler house equipment, pumps, ducts, limit
boiler piping, chemical dosing)Steam turbine
GeneratorBOP&Piping
Electrical worksI&C works
Insulation & CladdingWFG Desulphurization Installation (2015-in progress)
2004-2007
Project DenominationMain Contractor/
ClientDenomination
Year of completion
2 ENERGY BOILERSLukoil Energy & Gas
RoErection works of boiler no. 4, 260 to steam/h with a SCC
cokes petroleum burning technology2010
Project Denomination Main Contractor/ Client DenominationYear of
completion
TPP Lukoil Teleajen – boiler of 210 t/h, coal-fired Foster - Wheeler Erection works of CFB 2009
Project DenominationMain Contractor/
ClientDenomination
Year of completion
SOUTH BUCHAREST TPPSouth Bucharest TPP – Unit 2, 420
t/h, gas-fired boilerSaacke
Erection works ofconversion to Low-Nox burners
2006
BUCHAREST GROZAVESTI TPPBucharest Grozavesti TPP – Unit 1,
420 t/h, gas-fired boilerSaacke
Erection works ofconversion to Low-Nox burners
2006
WEST BUCHAREST TPPWest Bucharest TPP, 260 t/h, HRSG
ALSTOM Power Czech - Termoelectrica
Erection works (Boilers, Steel Structures, Boiler House Equipment, Pumps, Ducts, Limit Boiler Piping, Chemical
Doosing - Electrical works, I&C works, Insulation&Cladding2008
ATERMON Greece-Termoelectrica
Piping turbine house, piping connection boiler-turbine; HP&MP PIPING
2008
103-105 Dorobantilor Avenue, 1st District, 010561 zip code, Bucharest, Romania