The European Organisation for the Safety of Air Navigation
Moving Towards an Integrated ASM/ATFCM/ATS Approach
ADR Developments
20-21 Sep 2012
Nil AGACDIKEN
ADR Programme Manager
Official vs. Operational Data
ADR
Permanent/Static(AIRAC, AIP)
Dynamic(NOTAM, ATC)
Sector configs
RW configs
...
AIS
AT
M
OFFICIAL SOURCE
OPERATIONAL PROCESSES
Non-AIP Data
NETWORK
A/UUP
RAD
An
nex
15
Operations
Ac
ce
ss
in
terf
ac
e
(B2
B –
B2
C)
Inte
rfa
ce
(B
2B
–B
2C
)D > 1 week
Static AIRAC dataNOTAM
NOTAM/ RAD
AIP +NOTAM
e-RAD AIXM
SDO AIXM / INO
Static DataAISP
ANSP
RAD
AIP
e-RAD
ADR Data Processing
Data Provision
Output
Traffic restrictions
e-ASM AIXM 5.1extensions
e-RAD AIXM
AUPUUP
e-AMI
ANSP
AMC
Data Provision
Ac
ce
ss
in
terf
ac
e
(B2
B –
B2
C)
Inte
rfa
ce
(B
2B
–B
2C
)
D > 1 day
Static AIRAC dataNOTAM
NOTAM/ RAD
AIP +NOTAM
e-RAD AIXM
SDO AIXM / INO
Static DataAISP
ANSP
e-RADUpd.
EAUP
e-AMI
RAD
AIP
e-RAD
ADR Data Processing
D > 1 week
Output
Traffic restrictions
e-ASM AIXM 5.1extensions
e-RAD AIXM
AUPUUP
e-AMI
ANSP
AMC
Ac
ce
ss
in
terf
ac
e
(B2
B –
B2
C)
Inte
rfa
ce
(B
2B
–B
2C
)
D > 3 hours EOBT
Static AIRAC dataNOTAM
NOTAM/ RAD
AIP +NOTAM
e-RAD AIXM
SDO AIXM / INO
Static DataAISP
ANSP
Airport
ATS Taxi times,
Runway in use
Airspace Activation
e-RADUpd.
EAUP
e-AMI
RAD
AIP
e-RAD
ADR Data Processing
Output
D > 1 day
D > 1 week
• Data Catalogue listing the required data elements released• This catalogue and its annexes will be used as a basis to develop
B2B ADR data download services (FB 441)• AIXM modeling issues are being addressed (i.e. TV, sector
configuration etc)• ADR extension of AIXM 5.1 is released to cover CFMU 16 ADR
developments
ADR Developments on Data Management Activities
ADR Data Catalogue
1. Supported Service Domains 1
Service Domain Data Domain Data Item
FPL ATFM ASM ATS DDR CRCO SAFA
ICAO Location Indicator. X X X X X X X IATA Code X X X X X Aerodrome Name X X X X X X Location Name X X X X X X Type of Aerodrome (Land, Water, Heliport etc.) X X X X X Operations Hours VFR – IFR X X X X X Usage (Civil, Military, Intl, Domestic, VFR, IFR etc.) X X X X X Service Availability (Civil, Military, Intl, Domestic, VFR, IFR etc.) X X X Operating ANSP X X X ARP: Position X X X X X ARP: Elevation X X X Runway directions X X X X Magnetic Variation X Runway Configurations X X X X Runway Configuration Activation X X X X Regional Runway Configurations X X X Regional Runway Configurations Activation X X X Runway Characteristics and declared distances (Length, Width, PCN, Pavement)
X
Taxiway Characteristics (Width, PCN, Pavement) X Taxi Times: Permanent X X X X Taxi Times: Temporary X X X X Terminal (Building) X X Terminal Usage: Permanent X X Terminal Usage: Temporary X X Associated Units (TWR, APP, ARO etc.) X X X X
Aerodrome
Collocation X X X X X X
All Significant Points (Includes also: GeoPoint, BoundaryPoint not mentioned below) Significant Point Identification X X X X X X X
2
Data provision Data Repository Consolidation process
InterfaceFormatFormal Arrangements
Status on Data Management Status on Data Management
IAIP data
IAIP data
SDOAIXM
data set
B2BB2C
EAD
......
CFMU
CIAM
AUP/UUPAUP/UUP
CACDAIXM 5.1 (e-AMI)
B2B B2C
ATFCM ATFCM
No formal arrangements
Restrictions
Restrictions
Ops. Airspace
Ops. Airspace
CACDManual
ATM static
ATM static
AIXM
CFMU
SDO Data Completeness
Is the main focus
Improvement of Data Provision means
is the main focus
Data Consistency with SDO
is the main focus
• EAD/SDO Data Alignment Exercise
• Major progress has been made on the data alignment and harmonization activity between EAD/SDO & CACD
• Data alignment exercise started in March 2010
• Data concerned are: AD, PT, AS and RT (only enroute. TP’s are not part of the minimum SDO data set )
• Amount of data in CACD:• AD :7852 • PT: 19333• AS: 7921• RT: 4603
• Area coverage : limited to ECAC+
Status on Data Management Status on Data Management
Status on Data Alignment
InconsistenciesAerodrome
- Natural key ID (missing in one of the databases) - coordinates problems- At start 822 AD’s, today 67 AD’s
Pending issues- Software improvement ( AD collocated with AD or PT)- Military AD, private AD (not published in EAD)- Still few coordinates problems
Points- Natural key ID (missing in one of the databases) - type for NAVAIDS (VOR, NDB, ILS,..)- coordinates problems- At start 2252 PT, today 758 PT (715 require extension of min SDO dataset)
Pending issues- Software improvement ( PT collocated with AD or with other PT)- Military PT, VFR PT , AD points (not published in EAD)- coordinates problems
!! TP’s not being part of the minimum SDO dataset, AD navaids (Llz, Ils,Loc,..) are missing in SDO
Status on Data Alignment
Milestones
AD: Data issues under control.Software CR to finish the work (CFMU 17 release)
PT: Data issues finished by AIRAC 12 Jan 2012. Software CR to finish the work (CFMU 17 release)
AS: Analyze and data correction by End 2012.
RT: Analyze and data correction by End 2012
Status on Data Alignment
2009 2010
e-RAD Operational
• e-AMI pilot phase• EAUP on NOP
2012 EAD R6E1 CFMU 15.5 CFMU 16 CFMU 16.5
ADR Related Release Developments 2012
2011
Corrections for FB 441/432 ( FB 566)
• Enabling interoperability with ASM tools (FB 432) • Access to AIXM aligned operational data (FB 441)
Publication of FRA/DCT restrictions
with e-RAD e-Restrictions via ftp
e-AMI operational
AirspaceRequests
RequestedConfirmedAccepted
EarmarkedIn Queue
Allocated
Reference Allocated
ADR
Airspace Request3
1
AIRAC: Base definitions + Airspace Available (FB 441)
2
CDR 1 & Airspace Availability Live Updates (FB 510)
Airspace Allocation / Route Opening & Closure
ETFMS
AMCASM Tool
6 ( OPS
deployed) eAMI
EAUP
IFPS
ADR Developments enabling ASM Process ADR Developments enabling ASM Process
4
AUP/UUP
(FB 432/FB 566)
(FB 572)
5
NM operations
CACD
EAD
Interoperability between EAD and CACD (FB569 – NM17,
FB511 – NM18)
Remote provision of ATM / non-AIP data (FB532 – NM18)
Publication of ATM Data through ADR: Live Updates (FB510 –
NM17.5) and New Data (FB567 – NM18)
NO
P A
cce
ss L
aye
r
Prepare Ops Deployment with ASM tools (FB572 – NM17)
ADR Road Map 2013-2014
• ADR Safety Case development started in Feb 2012 in order to demonstrate the level of data quality going out from CACD downstream
• FHA Workshop took place on 25 April 2012
• FHA/PSSA report delivered
Status on ADR Developments