Overview of the Design Process
• Identify the problem• Lay the foundations for design (time
contraints, $, etc)• Find the best solution• Implement the best solution• Reflect to learn from what you’ve done
(and redesign if necessary)
![Page 3: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/3.jpg)
Identify the Problem
Step 1:
![Page 4: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/4.jpg)
Identify the Problem
• What do you need to accomplish?• Break it up into small pieces
– Some small pieces might already have solutions!
• Ask others for input if you are unfamiliar with the topic
![Page 5: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/5.jpg)
Identify Constraints
Step 2:
![Page 6: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/6.jpg)
Constraints
• Advisor wants this done by…• It must cost less than…• I want to graduate by…
![Page 7: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/7.jpg)
Gantt Chart
Have a plan of how to spend your time:
![Page 8: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/8.jpg)
Gantt Chart
• A graphical representation of WHAT and WHEN
• Can also be used to show the “critical path”
Critical path: the sequence of activities with the longest overall duration, determining the shortest time possible to complete the project. Any delay of an activity on the critical path directly impacts the planned project completion date (i.e. there is no float on the critical path). (from Wikipedia)
![Page 9: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/9.jpg)
Gantt Chart: Building a House
![Page 10: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/10.jpg)
FRDPARRC Chart
Finding the best solution:
pergatory.mit.edu/2.007
![Page 11: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/11.jpg)
FRDPARRC Chart
• Functional Requirements (events)• Design Parameters (design ideas)• Analysis• References• Risks• Countermeasures
![Page 12: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/12.jpg)
FRDPARRC Chart
![Page 13: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/13.jpg)
FRDPARRC Chart
Example
![Page 14: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/14.jpg)
Pugh Chart
Picking the best solution:
![Page 15: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/15.jpg)
Pugh Chart
• Compares your possible solutions against a set of criteria
• Great for organizing complicated lists of pros and cons
![Page 16: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/16.jpg)
Pugh Chart
Criteria 1
Criteria 2
Criteria 3
Criteria 4
Criteria 5
Idea 1
Idea 2
Idea 3
![Page 17: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/17.jpg)
Pugh Chart
Criteria 1
Criteria 2
Criteria 3
Criteria 4
Criteria 5
Idea 1 1
Idea 2 0
Idea 3 -1
![Page 18: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/18.jpg)
Pugh Chart: carrying textbooksConfortble
strapsWeather-
proofStylish Padded
laptop pocket
TOTAL
backpack 1 1 -1 1 2
Mesenger bag
0 1 0 0 1
Leather briefcase
-1 -1 1 -1 -2
![Page 19: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/19.jpg)
Just Do It
Implementing the best solution:
That’s what the rest of this class is about!
![Page 20: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/20.jpg)
For more information
• pergatory.mit.edu/2.007 -> Fundamentals of Design (FRDPARRC chart)
• Wikipedia.com (Gantt chart)
![Page 21: The Design Process](https://reader035.fdocuments.us/reader035/viewer/2022062520/56815bd4550346895dc9c463/html5/thumbnails/21.jpg)
• 4pm: Material selection
Tuesday• 3-4pm: Design basics• 4-5pm: Design tips and mistakes
Wednesday• 3-4pm: Manufacturing: metal removal• 4-5pm: Design for milling/turning/drilling
Thursday• 3-4pm: Manufacturing: rapid prototyping, molding, forming, casting• 4-5pm: Drawing, dimensioning, tolerancing, and working with outside shops
Friday• 3-4pm: Effective use of drills, saws, taps, and dies • 4-5pm: Motion control