The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate...
-
Upload
mary-evans -
Category
Documents
-
view
221 -
download
0
Transcript of The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate...
![Page 1: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/1.jpg)
The Critical PathOpportunities for Efficiency in
Development
Robert J. Temple, M.D.Associate Director for Medical PolicyCenter for Drug Evaluation and ResearchU.S. Food and Drug Administration
FDA Science Board Advisory Committee MeetingApril 22, 2004
![Page 2: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/2.jpg)
2
What Would Represent Efficiency?Two major possibilities
1. Decreasing the cost of studies or the number of studies• Simpler, lower cost studies – collect less data• Trials offshore• Develop pre-existing trial networks, more use of
central IRB’s• More efficient study designs• Use existing flexibility; no talk of lowering standards,
but– fewer patients in life-threatening diseases– better assessment and utilization of valid or
reasonable surrogate endpoints
Real possibilities here and I’ll discuss some, but there is a second greater efficiency
![Page 3: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/3.jpg)
3
What Would Represent Efficiency?2. Improve the quality of development to obtain valid
answers earlier; i.e., get the right answer in phase 2
• Terminate development of ineffective or unsafe drugs sooner
• Proceed into full development only with drugs likely to succeed
• Not lose effective and safe drugs because of the wrong dose or other design defects
This is the area of greatest potential gain to industry and the public and is primarily what I will consider
![Page 4: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/4.jpg)
4
Startling FactPhRMA says that of drugs completing phase 2, about 50% fail in phase 3, often because of lack of effectiveness
But phase 2 is supposed to demonstrate effectiveness in some defined population. What is going wrong?
Well, we don’t know yet and PhRMA’s number 1 task should be to find out
But we at FDA have some ideas and a commitment to try to help: the Critical Path Initiative, studies of how to improve translational research
![Page 5: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/5.jpg)
5
Specific FDA Efforts1. Under PDUFA 3, pilot 2
Much more intense early interaction with sponsors for selected drugs. Goal is greater efficiency, fewer omissions of critical data, etc.
2. “Track IV GRP” and related efforts – develop checklists and guidance for critical meetings to be sure needed data of all kinds are discussed. Premise (my view): you can’t only respond to sponsors’ questions; sponsors may not ask everything that should be asked because of a) anxiety about answer, b) unawareness of an issue. FDA staff need to ask the omitted questions.
![Page 6: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/6.jpg)
6
Specific FDA Efforts (cont.)
3. Guidance on specific clinical areas and more general guidance, such as:
• Exposure-response• QT evaluation• Evaluation of hepatotoxicity
![Page 7: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/7.jpg)
7
Specific FDA Efforts (cont.)Again, FDA’s efforts will help only somewhat until phase 3 failures are better understood as:
• Unavoidable− Surprise infrequent adverse effect− No valid biomarker, so no possible
early insight until phase 3 (oral iib/iiia inhibitors)
− Adverse effects showing up with longer exposure
![Page 8: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/8.jpg)
8
Specific FDA Efforts (cont.)• Avoidable (partial list)
– Failure to use biomarkers in dose evaluation– Study too narrow a dose range– Overoptimism regarding less than adequate
phase 2 (leading to “confirm” before you’ve “learned” enough)
– Failure to continue dose finding in phase 3, choosing wrong single dose or regimen based on too little data
– Inadequate metabolic, QT or interaction work-up– Subset chasing
![Page 9: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/9.jpg)
9
Focus on Phase 2I will examine ways that phase 2 controlled trials can be redesigned to give more unequivocal answers than they apparently now do
There are design possibilities, infrequently used, that may be more efficient, i.e., giving a surer answer with less effort, and may provide added important data. These include:
• Enrichment approaches - larger effect sizes give surer answers
• Reversing the sequence - the randomized withdrawal study
• Better dose finding - a useful titration design (Sheiner) and attention throughout phase 3 to dose
![Page 10: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/10.jpg)
10
Enrichment
Enrichment of a population is any selection maneuver that makes the population more likely to be able to participate properly in the study, have the endpoint of interest, or respond to treatment, all of which increase study power for showing an effect of treatment by increasing effect size, increasing the number of events or decreasing heterogeneity. All studies (almost) are enriched to some degree, but some enrichments are more controversial than others, and provoke concerns about “generalizability,” i.e., relevance to the population that will get the drug
![Page 11: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/11.jpg)
11
Enrichment (cont.)
A. Practical – routine, almost always acceptable• Find (prospectively) likely compliers• Choose people who will not drop out• Eliminate placebo-responders in a lead-in
period• Eliminate people who give inconsistent
treadmill results• Eliminate people with diseases likely to lead
to early death• Eliminate people on drugs with same effect as
test drug
![Page 12: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/12.jpg)
12
Enrichment (cont.)B. Pathophysiological - based on understanding of
disease, also almost always acceptable
• Edema can result from hepatic, renal or cardiac causes. Choose the last for study of an inotrope
• CHF can result from systolic or diastolic dysfunction. Choose the former for study of an inotrope
• We distinguish (some) causes of pain: angina, vasospastic angina, migraine, menstrual pain, etc., where we believe etiologies are distinct and particular pharmacologic effects are pertinent
![Page 13: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/13.jpg)
13
Enrichment (cont.)B. Pathophysiologic - based on understanding of disease
• Hypertension can be high-renin or low-renin. Could study BB’s, ACE’s, or AIIB’s in the former. There is no doubt a high renin population would show a much larger effect than a mixed population
• A well-established genetically determined difference could be the basis for a pathophysiologically selected enriched population. In some cases, a marker associated with a particular tumor characteristic or even found retrospectively to predict response could be a basis for selection. Most convincing so far are tumor genetics: Herceptin for Her2+ breast tumors; selection of ER+ breast tumors for anti-estrogen treatment
![Page 14: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/14.jpg)
14
Enrichment (cont.)C. Clinical Response - potentially more controversial
- examining patient response before entry to identify likely responders, who would then be studied in a rigorous trial
1. Response other than trial response
CAST carried out in people with > 70% VPB suppression (study endpoint was survival)
Trial of topical nitrate in people with BP response to sublingual NTG
![Page 15: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/15.jpg)
15
Enrichment (cont.)2. Screen for true drug response, then
randomize only the responders. Particularly powerful where a low response rate is expected
a. Past examples• Oates, Woosley, Roden
antiarrhythmic studies• Trial of nitrate patch after screen
for treadmill response to NTG• History of response to a class
![Page 16: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/16.jpg)
16
![Page 17: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/17.jpg)
17
Enrichment (cont.)b. Other possibilities
In a clinical screen, you would give drug to a group, find apparent responders, take the drug away, then randomize to drug vs. control when sign or symptom reappears (What Oates, et. al. did). Promising in any setting where effectiveness is hard to show because only some of the population responds
• GI disease - notorious difficulty in showing effect of motility-modifying drugs (cisapride, domperidone). Consider open screen, then randomize the responders to placebo-controlled trial for their next episode
• Pulmonary drugs - anti-asthmatics other than beta agonists and steroids difficult to show effect. Suppose open screen to find responders, then study (Cromolyn anecdote)
![Page 18: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/18.jpg)
18
Enrichment (cont.)3. Picking people likely to have the event
• Automatic in treating symptoms or lab abnormalities – 100% of patients thought to have the condition
• Regularly used in outcome trials to find high risk patients (cholesterol trials, BP trials, CHF trials started with highest risk patients). In fact, any secondary prevention trial, whether in AMI, stroke, or breast cancer, is a high risk population
• Genetic risk factors (for cancers, Alzheimers’s Disease) can be used in this way, as could “proteomic” risk factors (high CRP, PlGF)
• Known response to provocation - Successful meal-associated heartburn trials used people who responded to a provocative meal (pizza with everything and unlimited Chianti wine). Had a well-defined, 100% with condition to be treated, population.
![Page 19: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/19.jpg)
19
Enrichment (cont.)
An enriched population must be recognized for what it is, but studies using these approaches can demonstrate an effect in the group studied far more efficiently, providing “proof of principle,” clear evidence of clinical effectiveness. Phase 3 then refines that evidence for different doses, populations, etc., but with firm assurance that the drug is effective (at least in some people)
![Page 20: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/20.jpg)
20
Randomized WithdrawalAmery in 1975 proposed a “more ethical” design for angina trials, which then often ran 8 weeks to 6 months in patients with frequent attacks (before regular CABG and angioplasty)
Patients initially receive open treatment with the test drug, then are randomized to test drug (at one or more doses) or placebo. Endpoint can be time to failure (early escape) or conventional measure (attacks per week)
![Page 21: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/21.jpg)
21
Randomized WithdrawalNow standard for anti-depressant maintenance studies, where it is the obvious choice, but useful whenever you want to assess long-term effectiveness but would not want to use a long-term placebo (BP, cholesterol, possibly blood sugar, CHF). Attractive in pediatric studies because of short period of symptoms without treatment [Note that in depression, where standard studies fail 50% of the time, randomized withdrawal studies almost never fail]
![Page 22: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/22.jpg)
22
Randomized Withdrawal
Illustrations
1. Vasospastic Angina
2. Cataplexy
![Page 23: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/23.jpg)
23
![Page 24: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/24.jpg)
24
![Page 25: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/25.jpg)
25
![Page 26: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/26.jpg)
26
Patients on treatment with sodium oxybate for cataplexy with narcolepsy for 7-44 months randomized to continued treatment of placebo
median attacks/2 weeks Baseline Change in Rate
Placebo (29) 4.0 +21.0
sodium oxybate (26) 1.9 0
p<0.001
Clearly demonstrated persisting long-term effect
![Page 27: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/27.jpg)
27
Randomized Withdrawal (cont.)Other Possibilities
1. Confirm a subset observation
One potential source of erroneous progression to phase 3 is “over-interpretation” of a subset finding in phase 2. These are known to be “treacherous.” Such a finding could, however, be confirmed by a randomized withdrawal trial in the responder subset. A favorable response would be strong evidence of active drug
![Page 28: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/28.jpg)
28
Randomized Withdrawal (cont.)Other Possibilities
2. Confirm a dramatic response
Studies are designed to show average responses and, usually, the range of responses seen on drug and placebo is similar. That means you cannot really use the size of individual responses easily to conclude that the drug has very large effects in some people.
But a WD study might do this
When Lotronex was found to cause ischemic colitis and “surgical constipation,” one possibility, I thought, was a randomized WD trial in the “hyperresponders,” people previously disabled by IBS, still on drug, who might have been willing to help save it by their participation. I believe the study could have been completed in a few months at most. Never done.
![Page 29: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/29.jpg)
29
Randomized Withdrawal (cont.)Design has major advantages
• Efficient: “enriched,” with larger drug-placebo difference
• Efficient: patients already exist and known, e.g., a part of an open, or access protocol
• Ethical: can stop as soon as failure criterion met, very attractive in pediatrics
• Can verify a subgroup finding when overall study result is negative. Reassuring for phase 3 effort
• Potential for rigorous evaluation of good responders; possible Lotronex study of people with dramatic improvements (either from trials or open experience)
• Can easily incorporate D/R
![Page 30: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/30.jpg)
30
Dose-Finding
We won’t know until failures are well-examined, but I believe an important cause of phase 3 failure is not getting the dose or dose-interval right, leading to unacceptable toxicity or inadequate effectiveness
![Page 31: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/31.jpg)
31
Better Dose-FindingBefore considering designs:
The impression that dose-finding is largely completed in phase 2 is a terrible error
Phase 2 studies almost never can detect small differences in effect, and cannot give useful information on safety except for the most common events
Having all or most phase 3 studies be D/R is usual for antihypertensives and antidepressants, anti-migraines, and anti-psychotics. This should be more common
![Page 32: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/32.jpg)
32
Efficiency in D/R
A. Use PD information and efficient designs to narrow range of doses to study clinically:
Where PD mechanism is well understood (ACEI’s, AIIB’s, beta blockers, inhibitors of platelet function) use the PD information, with particular attention to duration, to identify dose range (but don’t just believe it; test the expectation; sometimes clinical effect has different duration)
![Page 33: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/33.jpg)
33
Efficiency• It is well-recognized that field studies of anti-
histamines require large patient samples (> 200 per group often) and fail regularly nonetheless. Chamber studies (antigen introduced, don’t depend on pollen, winds) are a kind of PD study (but with a standard clinical endpoint), require much smaller numbers
Will also need field studies, but initial dose finding surely should be in chamber studies (also better for time of onset, duration of effect). Then try to confirm in field studies
![Page 34: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/34.jpg)
34
EfficiencyConsider conducting dose response studies for effectiveness in known responders to the drug or drug class to increase sensitivity, or identify responders pharmacologically, if possible. The only effect of including non-responders is to obscure (flatten) the dose-response relationship. Note, though, that non-responders may have adverse effects and cannot be ignored.
It would usually be important to test non-responders separately to see if they merely have a shift in D/R, an important discovery, if true, and, if responders are not identifiable, studies in a non-selected population would be needed to assess overall B/R.
![Page 35: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/35.jpg)
35
![Page 36: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/36.jpg)
36
Efficiency
Other areas (in addition to hypertension) where looking at responders in dose response studies could be useful:
• Asthma drugs (Cromolyn-anecdote)• All symptomatic GI conditions • Anti-arrhythmics• Anti-depressants• BPH drugs
![Page 37: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/37.jpg)
37
Efficiency
B. Study a full range of doses in phase 3 to establish dose response for both favorable and unfavorable effects and to locate less than fully effective dose that may still be useful. Also, if possible, try to see whether sub-effective dose represents some people responding fully or all people responding a little. Doing this may need individual dose response curves and crossover designs
![Page 38: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/38.jpg)
38
Efficiency
C. Examine maintenance dose
When dose-finding occurs, it is almost always during initial treatment. For long half-life drugs particularly, but others too, examining the maintenance dose response could be very useful
• If 20 mg of fluoxetine works acutely and drug and metabolites have half lives well > 1 week, the maintenance dose is surely well under 20 mg, based solely on PK arguments. Lower maintenance doses could lead to a wide range of safety advantages. This has never been studied
![Page 39: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/39.jpg)
39
Efficiency• It would not be surprising if the dose needed to
treat acute exacerbations of mania, depression, and other diseases was larger than the dose needed to maintain patients. Perhaps alternate day dosing would work. (Could this be true for Lotronex? Would lower doses have given less constipation or even less ischemic colitis?)
• Astemizole has a long half-life but was used acutely in seasonal allergies. It could have been used as a loading dose of 10 mg with subsequent lower doses < 3 mg. That would have placed dose at about 1/5 of QT prolonging dose, instead of at 1/2. The drug might still be available
![Page 40: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/40.jpg)
40
Efficiency
Maintenance dose-response studies are easy. Use randomized withdrawal design. People on treatment, doing well, are randomized to placebo and several doses of the drug
![Page 41: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/41.jpg)
41
Lots of Possibilities
The alternative study designs I’ve shown have all been used
They may make people nervous but they have one feature in common. They are all rigorous RCTs so they definitely tell you something. There could be debates about generalizability, effects in the “rest” of the population, etc., but are worth considering
As early “proof of concept” trials, there will be little regulatory controversy but greater assurance
![Page 42: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/42.jpg)
42
Efficiency
D. Consider Sheiner optional titration design with mixed effects modeling (NONMEM), a “learn-confirm” approach (although he didn’t mention it in his learn-confirm paper)
Titration studies are recognized problem (ICH E-4) because they confound increased dose and increased duration, are hard to use for safety evaluation, and do not represent randomized comparisons, leading, if examined naively, to odd results (umbrella-shaped dose response because only poor responders are up-titrated)
Sheiner, Beal, and Sambol solved some of that problem by looking at individual dose response information within the group
![Page 43: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/43.jpg)
43
![Page 44: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/44.jpg)
44
EfficiencySheiner didn’t use a placebo, so that some of effect seen is not drug effect (tends to underestimate, i.e., L-shift, the ED50)
But a placebo controlled titration design should be useful in any stable condition (BP, cholesterol, chronic pain, e.g., osteoarthritis) in which a symptomatic, not disease-modifying, treatment is used
Much more efficient than randomized, parallel dose-response, because you can study many doses in only 2 groups; number of doses is limited only by rate of dose escalation and acceptable duration of placebo period
Could be very valuable initial study (phase 2)• Shows effect vs. placebo; i.e, one A&WC study• Locates definitive dose-response study
NEVER USED
![Page 45: The Critical Path Opportunities for Efficiency in Development Robert J. Temple, M.D. Associate Director for Medical Policy Center for Drug Evaluation and.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649ed15503460f94bdf703/html5/thumbnails/45.jpg)
45
Conclusions
This is a sample of design that can be used to give a more certain answer about effectiveness in phase 2. It is just one of many possible approaches to improving translational efforts and making drug development more efficient