The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.
-
Upload
margaretmargaret-beasley -
Category
Documents
-
view
229 -
download
2
Transcript of The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.
![Page 1: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/1.jpg)
The Cost of Maintaining Thermal Protection Systems
Frank E. Jones
NASA-KSC
July 1999
![Page 2: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/2.jpg)
2
Agenda
Background Design Overview Maintenance Drivers
Factors Affecting Cost Materials Access Touch Time Labor Costs per TPS Type Off Line Support
Improvements To Reduce Cost Presently In-work Future Necessities
Beyond Shuttle
![Page 3: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/3.jpg)
3
TPS Surfaces
Lower Surface
Upper Surface
TPS Legend
HRSI (Black) TilesLRSI (White) TilesAFRSI Blankets
GlassExposed Metallic Surfaces
FRSIRCC
![Page 4: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/4.jpg)
4
Tile Configuration
Densified IML Surface
Silicone RTV Adhesive
SIP
Filler BarCoating Terminator
Uncoated Tile
Koropon-Primed Structure
LRSI Tile White Glass Coating
HRSI Tiles - Black RCG Coating
StepGap
![Page 5: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/5.jpg)
5
Fibrous Insulation Blankets
RTV Transfer Coated Surface on IML
A
A
Quartz OMLThread
Quartz OML Fabric
D
DC C
View C-C
Section A-A
View B-B
OML FabricFolded Over To IML and Stitched Through Thickness
BB
Quartz Batting
Glass IML Fabric
Glass IML Thread
IML Fabric
OML Thread
Batting
OML Thread
IML Thread
OML Thread
IML Thread
Detail ESection D-DE
OML Fabric
IML fabric
OML Thread
![Page 6: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/6.jpg)
6
Leading Edge RCC
UpperLeft Wing
Section C-C
CC
Detail D
D
Section E-E
Lower Wing HRSI Tile
Section B-B
Section A-A
B
B
E
Upper Wing AFRSI
Wing Spar
Thermal Barrier
Interface Gap Between RCC and HRSI Tiles
AA
E
Fixed Upstream Gap Between Panel and Tee Seal
Variable Downstream Gap Between Panel and Tee Seal For Thermal Expansion Allowance
I nconel Attachments
ACSS Hardware
RCC Panel (In Foreground)
RCC Tee Seal Web
(In Background)
HRSI Tiles
Upper LESS Access Panel HRSI Tiles
Horsecollar Peripheral Gap Filler Lower LESS Access
Panel HRSI Tile
Upper
Wing
I nconelInsulators
![Page 7: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/7.jpg)
7
Gap Fillers
Pillow With Sleeving
Pillow Captive Type(Single Lip)
Ames Type
RTV or Ceramic Coated Nextel Fabric
Pillow Captive Type(Double Lip)
Nextel Ceramic Fabric
Saffil Alumina Batting
Inconel Foil
Nextel Ceramic Fabric
Nextel Ceramic Sleeving
Saffil AluminaBatting
Inconel Foil
Pillow or Pad Type
Nextel Ceramic Fabric
Saffil Alumina Batting
Inconel Foil
Saffil Alumina Batting
Inconel Foil
Nextel Sleeving
Nextel Ceramic Fabric
![Page 8: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/8.jpg)
8
Thermal Barrier & Seal Locations
1 Nose Landing Gear Door
2 FRCS Module/Fuselage Interface
3 Forward RCS Thrusters
4 Crew Hatch
5 Vent Doors
6 Main Landing Gear Doors
7 External Tank Doors
8 Vertical Stabilizer/Fuselage Interface
9 OMS Pod/Fuselage Interface
10 OMS Pod RCS Thrusters
11 Rudder Speed Brake Split Line
Thermal Barriers
A Wing/Elevon
B Aft Fuselage/Body Flap
C Vertical Stabilizer/Rudder Speed Brake
D Payload Bay Door Expansion Joints
E Payload Bay Door Hinge Covers
Aerothermal Seals
![Page 9: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/9.jpg)
9
Typical Thermal Barrier
RTV-Stiffened Fabric Tail
Inconel Spring Tube
Nextel Sleeving
Nextel Fabric
Thermal Barrier Support
Thermal Barrier Carrier Plate
Main landing Gear Door Side TileThermal Barrier
Structure Side Tile
Typical Thermal Barrier Detail
Main Landing Gear Door Thermal Barrier
![Page 10: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/10.jpg)
10
Elevon Cove Seal
Lower Elevon TPS
Spanwise Polyimide Primary Seal0.5”
GapHRSI Tiles
Pillow Gap Filler
Lower Wing TPS
Upper Wing TPS FlipperDoor Flipper Door Seal
Elevon Rub Panel
Elevon Rub Tube
Hinge Pins
Uncoated AFRSI Blankets
![Page 11: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/11.jpg)
11
Orbiter TPS
Average tiles damaged from flight requiring replacement ~20
Average tiles replaced per flow ~75
HRSI tiles on the Orbiter ~19,700 (9 lb), 525 (22 lb)
TUFI tiles on the Orbiter 306 (8 lb)
FRCI tiles on the Orbiter 2,950 (12 lb)
LRSI tiles on the Orbiter 725 (9 lb), 77 (12 lb)
FIB blanket area on the Orbiter 2,123 sq ft
FRSI sheet area on the Orbiter 2,024 sq ft
![Page 12: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/12.jpg)
12
Flight Damage History
MISSION IMPACTS > 1" TOTAL IMPACTS
STS-41D/FL1 30 111
STS-51A/FLT2 20 87
STS-51C/FLT3 28 81
STS-51D/FLT4 46 152
STS-51G/FLT5 144 315
STS-51I/FLT6 33 141
STS-26R/FLT7 55 411
STS-29R/FLT8 23 132
STS-33R/FLT9 21 118
STS-31R/FLT10 14 63
STS-41/FLT11 16 76
STS-39/FLT12 16 237
STS-48/FLT13 25 182
STS-42/FLT14 44 209
STS-53/FLT15 23 240
STS-56/FLT16 36 156
STS-51/FLT17 18 154
STS-60/FLT18 15 106
STS-64/FLT19 19 150
STS-63/FLT20 14 125
STS-70/FLT21 9 127
STS-82/FLT22 18 103
STS-85/FLT23 6 102
STS-91/FLT24 50 198
STS-95/FLT25 45 187
OV-103 AVERAGE 30.7 158.5
FLEET AVERAGE 31.1 149.2
![Page 13: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/13.jpg)
13
Materials Cost
Raw Materials* $200k / Flight
Tile PU’s $137k / Flight
Consumables $ 10k / Flight
Total $347k / Flight
* TPSF = RTV’S, Threads, Fabrics, Coatings, etc.
![Page 14: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/14.jpg)
14
Work Access
![Page 15: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/15.jpg)
15
Causes for R&R
Flight33.80%
Modification32.39%
Out-of-Tolerance6.34%
Ground Handling5.63%
Access 21.83%
![Page 16: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/16.jpg)
16
TPS Discrepancies
RSI Tiles73.75%
FRSI, Filler Bar, and All Others 3.56%
Gap Fillers, Thermal Barriers, and O/T Conditions 16.30%
FI Blankets 3.50%
Re Water Proofing 2.88%
![Page 17: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/17.jpg)
17
Work Load for Component R&R
Simple NC Tile 35.02%
Complex Splash Tile 7.79%
FRSI 0.20%
Complex NC 25.29%
Simple AFRSI 3.85%
Complex AFRSI 0.72%Tile Reinstallation 4.18%
Simple Splash Tile 22.96%
![Page 18: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/18.jpg)
18
Labor Hours per Type
0 25 50 75 100
125
150
175
Complex FI Blanket
Simple FI Blanket
FRSI
Reinstall Tile
No Rework NC Tile
Complex NC Tile
Simple NC Tile
Row Time
Touch Labor
![Page 19: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/19.jpg)
19
Tech Labor Breakdown
Removals & Replacements 55.70%
ML0601-9025 Repairs 12.03%
ML0601 Repairs 10.71%
MDR Repairs 14.27%
ML0601-9024 Rework 4.41%
Re water Proofing 2.88%
![Page 20: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/20.jpg)
20
Labor Touch Time per TPS Type
• Tile = 2.27 hours/sq.ft.
• FIB = 0.16 hours/sq.ft.
• FRSI = 0.02 hours/sq.ft.
• ET SOFI = 0.70 hours/sq.ft.
![Page 21: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/21.jpg)
21
Discipline Comparison
Maintenance Technicians 37%
Logistics 3%
Operations 8%Quality Assurance 15%
Engineering 18%
Manufacturing Technicians 19%
![Page 22: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/22.jpg)
22
Orbiter Processing at KSC
Vehicle Landing Transfer to KSC For Non-KSC Landings
Preparations for Tow
Roll Over To OPF
Orbiter Landing Operations (1 to &+ Days)
Closeout for Right
Rollout To Pad
Orbiter /ET /SRB Mate Test / Checkout in VAB
Rollout to VAB
Pre-Right TestingRewater Proofing
Pre-Rollout InspectionsTPS MaintenancePost Right Inspections
Launch
Launch Pad Operations (3 Weeks)
VAB Operations (1Week)
OPF Operations (10 Weeks)
![Page 23: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/23.jpg)
23
OPF Processing
Orbiter Landing at KSC, Tow to OPF, Jack and LevelPLBD Strong back Installation, PLBD Open Up
TPS Post Flight InspectionTPS Waterproofing
TPS Processing
Payload Removal
Payload Bay ReconfigurationFRCS Functional
SSME Heat Shield RemovalSSME Removal
OMS Pod Functional
Hydraulic System Fill and Bleed Removal Aerosurfaces
Fuel Cell Voltage TestPayload Premate Testing
Drag Chute Installation
APU Servicing and CheckoutPayload Bay Cleaning
Payload Installation
SSME InstallationAll Closeouts
Final Payload Bay CleaningET Door Functional
SSME Heat Shield Installation
MPS/ SSME Integration
TPS Rollout Inspection
Landing Gear Door FunctionalPLBD Closure
Orbiter Jack Down, WT & cg, OTV OPSOrbiter Power Down
Roll Out VAB
1 Week
TPS OperationsSSME/MPS Ops
Payload OpsVehicle Ops
![Page 24: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/24.jpg)
24
TPS Workforce
0 25 50 75 100 125 150 175
USA Technicians (Incl. 13 Supv.)
USA Quality Assurance (Incl. 2 Supv.)
USA TPS Engineering (Includes Structures)
USA Operations (Incl. Structures and Logistics)
NASA TPS Engineering
NASA Quality Assurance (TPS Dedicated)
NASA Operations and Logistics
BNA TPS Orbiter Engineering
USA TPSF Tecnicians
USA TPSF Quality assurance
USA TPSF Manufacturing Eng.
USA TPSF Support Personnel
BNA TPSF Orbiter Engineering
USA TPSF Logistics
NASA-JSC
USA-JSC / BNA-Houston
BNA-Downey
Pre USA TPSOrganization
Latest TPSOrganization
![Page 25: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/25.jpg)
25
Past TPS Organization
TPS Organization Personnel
SPC Technicians (Incl. 13 Supv.) 178
SPC Quality Assurance (Incl. 2 Supv.) 47
SPC TPS Engineering 33
SPC Operations 31
NASA TPS Engineering 8
NASA Quality Assurance (TPS Dedicated) 4
NASA Operations and Logistics 3
Rockwell TPS Orbiter Engineering 16
Rockwell TPSF Tecnicians 95
Rockwell TPSF Quality assurance 23
Rockwell TPSF Manufacturing Eng. 5
Rockwell TPSF Support Personnel 6
Rockwell TPSF Orbiter Engineering 4
Rockwell TPSF Logistics 15
NASA-JSC 4
Rockwell-Houston 5
Rockwell-Downey 13
Total TPS Workforce 490
![Page 26: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/26.jpg)
26
Present TPS Organization
TPS Organization Personnel
USA Technicians (Including 13 Supervisors) 100
USA Quality Assurance (Incl. 2 Supv.) 32
USA TPS Engineering (Includes Structures) 34
USA Operations (Includes Structures and Logistics) 7
NASA TPS Engineering 3
NASA Quality Assurance (TPS Dedicated) 1
NASA Operations and Logistics 1
BNA TPS Orbiter Engineering 10
USA TPSF Tecnicians 52
USA TPSF Quality assurance 11
USA TPSF Manufacturing Eng. 3
USA TPSF Support Personnel 13
BNA TPSF Orbiter Engineering 4
USA TPSF Logistics 5
NASA-JSC 6
USA-JSC 3
BNA-Houston 1
BNA-Downey 32
Total TPS Workforce 318
![Page 27: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/27.jpg)
27
Improvements To Reduce Cost
Presently In-work
•Processing Reductions•Less Toxic Re-Waterproofing•Surface Defect Analyzer
Future Improvements
•White TUFI•Ceramic Captive G/F•Thermal Barrier Improvements
![Page 28: The Cost of Maintaining Thermal Protection Systems Frank E. Jones NASA-KSC July 1999.](https://reader030.fdocuments.us/reader030/viewer/2022033022/5697bf7d1a28abf838c84ae4/html5/thumbnails/28.jpg)
28
Beyond Shuttle
• Internal Vehicle Health Monitoring
• RF replaces Ground Connections
• No Penetrations
• No Windows
• Self Healing TPS