THE COST AND LEVEL OF SERVICE
P R E S E N T E D BY:
C O U RT N E Y R E I C H , A I C PE C O L O G I C A L P L A N N I N G G R O U P
Stormwater Management Programs for Local Governments
DRIVERS & GOALS
The Need for Stormwater Management Programs (SWMPs)
SWMP Drivers
Flood ControlState & Federal NPDES Stormwater RegulationsAging & Expanding Drainage Infrastructure Infrastructure Inventory & Condition Assessment Drainage System Proactive MaintenanceDrainage Capital Improvement Projects Conditional Compliance with other NPDES
Wastewater Treatment & Water Supply PermitsStormwater Pollution Prevention/Erosion ControlWhat are your communities stormwater
management needs?
SWMP Elements
Stormwater
Program
Development
Regulation
Regulatory Compliance
Drainage System O&M
Capital Drainage
Improvement Projects
SWMP Elements
Regulatory Compliance
Phase I & II NPDES Stormwater Permits
TMDLs
Water/Wastewater Permits
Industrial NPDES Permits
SWMP Future Goals
1. Meet the needs and expectations of your citizens.
2. Ensure future drainage system functionality.3. Achieve compliance with regulatory
requirements. 4. Balance protection of the local governments’
water resources with an individual’s right to develop their land.
5. Sustain economic growth for the local governments’ and the region.
6. Other community specific goals.
PROGRAM
Two Step Building Process
FUNDING
Courtesy of Thomas Brown, Boyle Engineering.
GARDEN CITY, GEORGIA EXAMPLE
SWMP Cost Of Service
SWMP Responsibilities
Department SWMP Responsibilities
Planning and Zoning Department
Site Plan Review, NPDES Phase I MS4 Permit Compliance, CIP, GIS Inventory, Floodplain Management, Planning, Development Regulation
Public Works Department
O&M, Street Sweeping, Yard Waste Removal, CIP
Code Enforcement Department
E&S Inspections, Code Enforcement
Water and Wastewater Department
Water Quality Monitoring
Garden City SWMPCurrent Budget
Current SWMP Cost
Program Coordination
FTEs SalaryTime Dedicated
to SWMPTotal*
Director of Planning & Zoning 1 $60,000 25% $21,000
Finance Director 1 $75,000 5% $5,250
E&S Inspectors 2 $70,000 25% $24,500
Administrative Assistant 1 $45,000 50% $31,500
Regulatory Compliance $10,000
Subtotal $92,250
Operations & Maintenance
FTEs SalaryTime Dedicated
to SWMPTotal
Public Works Director 1 $65,000 50% $45,500
Field Crew Personnel 17 $562,435 60% $337,461
Spring Clean Up $7,500
Materials, Rentals, & Operating Budget $72,415
Subtotal $462,876
Capital Improvement Program
Outsourced Engineering $45,000
Capital Projects $150,000
Subtotal $195,000
Program Total $750,126
Current SWMP Funding Revenue Sources
Current Revenue Source2007 Annual
Revenue
General Fund $600,000
SPLOST $150,000
Total $750,000
Funding Sources & Budget Status
General Fund Revenues & Service Fees Funds a $750,000 (approx) program per year
Limited funds budgeted annually for: Drainage system O&M
Results in a reactive maintenance program
Drainage Capital Improvement Projects (CIP) Results in deferral of projects
Regulatory Compliance New regulations require additional
funding
SWMP Level of Service Matrix
= Current Limited LOS
Program Type Cost/Acre/Year Typical Level of Service Features
Existing SWMP $50 - $100
Reactive maintenance programs, development regulation, inspections, some planning, some illicit discharge detection, moderate regulatory compliance, FEMA flood program, limited private detention system inspection
Proposed/ Recommended
SWMP$100 - $150
ADD: Proactive O&M of public drainage system, master planning, funded CIP program, WQ monitoring, enhanced land development regulation & enforcement, program meets minimal regulatory standards
Potential Future SWMP $150+
ADD: Updated floodplain mapping, advanced floodplain and development management, comprehensive CIP, voluntary regulatory programs, BMP demonstration projects, watershed WQ monitoring, private detention pond O&M
Georgia Stormwater Management Manual, City of Griffin
Future SWMP Funding
Projected Expenditure ≈ $1.2 Million
Program Coordination ≈ $220,000 Operations & Maintenance ≈ $660,000 CIP ≈ $320,000
SWMP Level of Service Matrix
= Current Limited LOS = Proposed Expanded LOS
Program Type Cost/Acre/Year Typical Level of Service Features
Existing SWMP $50 - $100
Reactive maintenance programs, development regulation, inspections, some planning, some illicit discharge detection, moderate regulatory compliance, FEMA flood program
Proposed/ Recommended
SWMP$100 - $150
ADD: Proactive O&M of public drainage system, master planning, funded CIP program, WQ monitoring, enhanced land development regulation & enforcement, program meets minimal regulatory standards, limited private detention system inspection
Potential Future SWMP $150+
ADD: Updated floodplain mapping, advanced floodplain and development management, comprehensive CIP, voluntary regulatory programs, BMP demonstration projects, watershed WQ monitoring, private detention pond O&M
Cost of Service (COS) Comparison
Current and Future COS Compairison
$47,250
$0
$462,876
$195,000
$116,250
$31,500
$658,840
$325,000
$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
Administration GIS O&M CIP
Program Element
Fu
nd
ing
Current COS Future COS Funding Gap = $450,000
Now its your turn…
Now its your turn…
Step 1: Community Overview Characteristics Key issues
Step 2: Need for Program Expansion What are YOUR
drivers? Flooding Regulatory compliance O&M Deteriorating drainage
system
Step 3: Program Goals The enhanced utility
will accomplish the following
Step 4: SWMP Cost (Cost of Providing Service) Existing Future