The Corps T ’pondent · 2015. 4. 29. · The Corps’pondent is an unofficial publication...

2
e Corps’pondent is an unofficial publication authorized under the provisions of AR 360-1 and published by the Corporate Communication Office, U.S. Army Corps of Engineers, Baltimore District, P.O. Box 1715, Baltimore, Md. 21203-1715. Phone: 410-962-2809 or Spring Valley Information Line: 800-434-0988. It is printed on recycled paper. Material from this publication may be reproduced without permission. Views and opinions are not necessarily those of the Department of the Army. To be added to our email list please email Rebecca Yahiel: [email protected]. Baltimore District Commander & District Engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Col. Trey Jordan Project Managers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Dan Noble, Brenda Barber and Todd Beckwith Public Affairs Specialist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Andrea Takash Rebecca Yahiel, Spring Valley Community Outreach Team, discusses the project with a group of local realtors. * e RI report public comment period began April 8 and goes thru May 26. Written comments can be sent to the following mailing address: U.S. Army Corps of Engineers, ATTN: Andrea Takash, Rm. 11400, 10 South Howard St., Baltimore, Md. 21201; or by e-mail to: andrea.m.takash@ usace.army.mil no later than May 26. Mailed letters must be postmarked by May 26. Comments also will be taken at the May 12 community meeting. * e Restoration Advisory Board meeting is scheduled for May 5 at 7 p.m. at St. David’s Episcopal Church, 5150 Macomb Street, N.W., Washington, D.C. * A community meeting will be held May 12 in the Vestry Room at the Metropolitan Memorial United Methodist Church, 3401 Nebraska Avenue NW, Washington, DC. e project team will be available to meet with the community during an open house from 6:30-7 p.m. e formal presentation, along with a question and answer session, will run from 7-8 p.m. Reminders for Site-Wide Remedial Investigation Dan Noble, Spring Valley project manager, briefs the Restoration Advsiory Board and community members at the March 10 Resto- ration Advisory Board meeting. Direct link to the RI page T he Spring Valley Formerly Used Defense Site (FUDS) consists of approximately 661 acres in Northwest Washington, D.C. During the World War I-era, the site was known as the American Uni- versity Experiment Station (AUES) and Camp Leach. It was used by the U.S. government for engineer troop training, research and testing of chemical agents, equipment, and munitions. Between 1993 and 2014, the U.S. Army Corps of Engineers performed investigations to gather the data necessary to determine the nature and extent of known contamination, assess risk to human health and the environment, and establish criteria for possible cleanup actions associated with past Department of Defense (DoD) activities. During the investigations, the Corps of Engineers also removed munitions related items and arsenic contaminated soil. Due to the location of the FUDS in a residential community and the nature of the early burial pit findings, the Corps of Engineers took a multi-pronged approach to investigate previously identified areas while concurrently analyzing historical records to plan investigations in additional areas. What is the Remedial Investigation (RI) Report? Preparing the RI Report is part of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. e Spring Valley Site-Wide RI Report summarizes the results of completed field activities performed to char- acterize the nature and extent of any potential contamination resulting from past DoD activities in the Spring Valley FUDS. It reviews past DoD activities in the area now designated as the Spring Valley FUDS. e report describes various ways the area was defined based on his- torical and anecdotal informa- tion during the course of the RI to plan focused investiga- tions. It then includes assess- ments based on the cumulative results of the RI field efforts to evaluate hazards posed by munitions and risks posed by chemical contaminants. Human health risk assess- ments, as well as an ecologi- The Corps ’pondent A newsletter by the U.S. Army Corps of Engineers for Spring Valley Project area www.nab.usace.army.mil/Home/SpringValley April 2015 ~ Vol. 16, No. 1 Remedial Investigation (RI) Report Timeline e project’s regulatory partners (Environmental Protection Agency and D.C. District Department of the Environment) provided comments in February, which we addressed. ------------------------------------------ On Feb. 19, we sent letters to approximately 100 properties that require further consideration in the Feasibility Study. ------------------------------------------ e RI report public comment period began April 8 and goes thru May 26. A community meeting will be held May 12 in the Vestry Room at the Metropolitan Memorial United Methodist Church, 3401 Nebraska Avenue NW, Washington, D.C. An open house is scheduled from 6:30- 7 p.m, with a formal presentation, along with a question and answer session, running from 7 - 8 p.m. ------------------------------------------ Written comments can be sent to the following mailing address: U.S. Army Corps of Engineers, ATTN: Andrea Takash, Rm. 11400, 10 South Howard St., Baltimore, Md. 21201; or by e-mail to: [email protected] no later than May 26. Mailed letters must be postmarked by May 26. ------------------------------------------ e full RI report, along with supporting documents, can be found on the project’s website under Project Efforts/Remedial Investigation. Hard copies also can be found at the Tenley-Friendship Branch Library, 4450 Wisconsin Ave. N.W., Washington, D.C. Site-wide report summarizes 20 years of data from Spring Valley See Remedial Investigation page 2 Soldiers conduct munitions testing at the American University Experiment Station. Testing at the former Circular Test Trench. The former trench was located on what today is Sedgwick Street. Department of the Army U.S. Army Corps of Engineers Baltimore District P.O. Box 1715 Baltimore, MD 21203-1715

Transcript of The Corps T ’pondent · 2015. 4. 29. · The Corps’pondent is an unofficial publication...

Page 1: The Corps T ’pondent · 2015. 4. 29. · The Corps’pondent is an unofficial publication authorized under the provisions of AR 360-1 and published by the Corporate Communication

The Corps’pondent is an unofficial publication authorized under the provisions of AR 360-1 and published by the Corporate Communication Office, U.S. Army Corps of Engineers, Baltimore District, P.O. Box 1715, Baltimore, Md. 21203-1715. Phone: 410-962-2809 or Spring Valley Information Line: 800-434-0988. It is printed on recycled paper. Material from this publication may be reproduced without permission. Views and opinions are not necessarily those of the Department of the Army.

To be added to our email list please email Rebecca Yahiel: [email protected].

Baltimore District Commander & District Engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Col. Trey JordanProject Managers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Dan Noble, Brenda Barber and Todd BeckwithPublic Affairs Specialist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Andrea Takash

Rebecca Yahiel, Spring Valley Community Outreach Team, discusses the project with a

group of local realtors.

* The RI report public comment period began April 8 and goes thru May 26. Written comments can be sent to the following mailing address: U.S. Army Corps of Engineers, ATTN: Andrea Takash, Rm. 11400, 10 South Howard St., Baltimore, Md. 21201; or by e-mail to: [email protected] no later than May 26. Mailed letters must be postmarked by May 26. Comments also will be taken at the May 12 community meeting.

* The Restoration Advisory Board meeting is scheduled for May 5 at 7 p.m. at St. David’s Episcopal Church, 5150 Macomb Street, N.W., Washington, D.C.

* A community meeting will be held May 12 in the Vestry Room at the Metropolitan Memorial United Methodist Church, 3401 Nebraska Avenue NW, Washington, DC. The project team will be available to meet with the community during an open house from 6:30-7 p.m. The formal presentation, along with a question and answer session, will run from 7-8 p.m.

Reminders for Site-Wide Remedial InvestigationDan Noble, Spring Valley project manager, briefs the Restoration Advsiory Board and

community members at the March 10 Resto-ration Advisory Board meeting.

Direct link to the RI page

The Spring Valley Formerly Used Defense Site (FUDS) consists of approximately 661

acres in Northwest Washington, D.C. During the World War I-era, the site was known as the American Uni-versity Experiment Station (AUES) and Camp Leach. It was used by the U.S. government for engineer troop training, research and testing of chemical agents, equipment, and munitions. Between 1993 and 2014, the U.S. Army Corps of Engineers performed investigations to gather the data necessary to determine the nature and extent of known contamination, assess risk to human health and the environment, and establish criteria for possible cleanup actions associated with past Department of Defense (DoD) activities. During the investigations, the Corps of Engineers also removed munitions related items and arsenic contaminated soil. Due to the location of the FUDS in a residential community and the nature of the early burial pit findings, the Corps of Engineers took a multi-pronged approach to investigate previously identified areas while concurrently analyzing historical records to plan investigations in additional areas.

What is the Remedial Investigation (RI) Report? Preparing the RI Report is part of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. The Spring Valley Site-Wide RI Report summarizes the results of completed field activities performed to char-acterize the nature and extent of any potential contamination resulting from past DoD activities in the Spring Valley FUDS. It reviews past DoD activities in the area now designated as the Spring Valley FUDS. The report describes various ways the

area was defined based on his-torical and anecdotal informa-tion during the course of the RI to plan focused investiga-tions. It then includes assess-ments based on the cumulative results of the RI field efforts to evaluate hazards posed by munitions and risks posed by chemical contaminants. Human health risk assess-ments, as well as an ecologi-

The Corps’pondent

A newsletter by the U.S. Army Corps of Engineers for Spring Valley Project area

www.nab.usace.army.mil/Home/SpringValleyApril 2015 ~ Vol. 16, No. 1

Remedial Investigation (RI) Report Timeline

The project’s regulatory partners (Environmental Protection Agency and D.C. District Department of the Environment) provided comments in February, which we addressed. ------------------------------------------On Feb. 19, we sent letters to approximately 100 properties that require further consideration in the Feasibility Study. ------------------------------------------The RI report public comment period began April 8 and goes thru May 26. A community meeting will be held May 12 in the Vestry Room at the Metropolitan Memorial United Methodist Church, 3401 Nebraska Avenue NW, Washington, D.C. An open house is scheduled from 6:30-7 p.m, with a formal presentation, along with a question and answer session, running from 7 - 8 p.m. ------------------------------------------Written comments can be sent to the following mailing address: U.S. Army Corps of Engineers, ATTN: Andrea Takash, Rm. 11400, 10 South Howard St., Baltimore, Md. 21201; or by e-mail to: [email protected] no later than May 26. Mailed letters must be postmarked by May 26. ------------------------------------------The full RI report, along with supporting documents, can be found on the project’s website under Project Efforts/Remedial Investigation. Hard copies also can be found at the Tenley-Friendship Branch Library, 4450 Wisconsin Ave. N.W., Washington, D.C.

Site-wide report summarizes 20 years of data from Spring Valley

See Remedial Investigation page 2

Soldiers conduct munitions testing at the American University Experiment Station.

Testing at the former Circular Test Trench. The former trench was located on what today is Sedgwick Street.

Department of the ArmyU.S. Army Corps of EngineersBaltimore DistrictP.O. Box 1715Baltimore, MD 21203-1715

Page 2: The Corps T ’pondent · 2015. 4. 29. · The Corps’pondent is an unofficial publication authorized under the provisions of AR 360-1 and published by the Corporate Communication

Remedial Investigation continued from page 1

This map shows the areas the Corps of Engineers plans to further evaluate in the Feasibility Study. The blue shows the area for evaluation of potential hazards from munitions related items. The yellow shows the area for evaluation of potential chemical risks in the soil. The yellow area only consists of a few locations on American University and one private residence. A large-scale version of the map can be found on the main project website under Project Efforts/Remedial Investigation.

cal risk assessment, were developed to evaluate possible chemical contaminants. Munitions hazard assessments are documented in the report to evaluate potential munitions hazards at different areas throughout the Spring Valley FUDS. Finally, the report describes areas identified through the risk and hazard assessment processes, where the Army Corps of Engineers recommends a Feasibility Study (FS) to address potential remaining concerns.

What are the RI Recommendations?• Conduct a FS to address chemical risks in soil: o At a few locations on the American University campus and at the Spaulding Captain Rankin Area (a single private residence).• Conduct a FS to address potential explosive hazards as-sociated with: o Munitions related items possibly remaining in the impact areas of the ballistic test ranges. o Munitions burial pits within the static test fire areas and their surrounding buffer zones. o Possible munitions disposal pits associated with the identified possible disposal areas.

What’s Next?The Army Corps of Engineers will perform a FS focus-

ing on the areas recommended for further evaluation in the Remedial Investigation Report. The FS will outline how the Corps of Engineers plans to address the potential unacceptable risks and hazards. After the FS, the Corps of Engineers will prepare a Proposed Plan, which will identify a preferred clean-up action to address remaining risks and hazards. The public will be invited to review and provide comments on the Proposed Plan during a formal public comment period, which will include a public meet-ing.

The Corps of Engineers remains committed to imple-menting a measured and comprehensive path forward at the Spring Valley Formerly Used Defense Site — the objective being a thorough and complete cleanup, with the safety of the surrounding neighborhood, university com-munity, and site workers as the number one priority.

Where can I learn more?The Site-Wide RI Report can be

found under Project Efforts/Remedial Investigation at this link: www.nab.usace.army.mil/Home/SpringValley. Additional fact sheets are also avail-able on the website.

To learn more, please call our Community Outreach Office at 410-962-2210.

Direct link to the RI page

3

33

((

(

(

(

(

!!!

!

!

!

!

!!!!

!

!

!

!

!!

!

!

!

!

!!

!

!

!

!

!

!

! (((

(

(

(

(

((((

(

(

(

(

((

(

(

(

(

((

(

(

(

(

(

(

(!

!

(

(

!

!

!

! !!

!

!

!!!

!

!

!

!

!

!

!

!

!

!

!

!

!

(

(

(

( ((

(

(

(((

(

(

(

(

(

(

(

(

(

(

(

(

(

!(

!(

!(

!(!(

!( !(!(!( !(

!(!(!(

!(

!(

!( !(

!(!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!( !( !(

!(!(

!(

!(

!(

!(

!(

!(

!(

!(

_̂_̂_̂!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

_̂!(

!(

11

10

Sedg

wick

Stre

et

3

4

39

9

24

6

13

24

12

7

1

9

6

5

26

8

2

Tilden Street

49th

Stre

et

Van Ness Street

Upton Street

Ford

ham

Roa

d

48th

Stre

et

Rodman Street

Quebec Street

Dale

carli

a Pa

rkwa

y

Glenbrook Road

47th

Stre

et

Rockwood Parkway

52nd Street

Indian Lane

Loughboro Road

Massachusetts Avenue

Unive

rsity

Ave

nue

Overlook Road

Woodway Lane

46th

Stre

et

Hillbrook Lane

51st Street

45th

Street

Kree

ger M

usic

Road

way

Nebraska Ave

nue

Core

y Plac

e

50th

Stre

et

Overlo

ok Lan

e

48th

Plac

e

Maud S

treet

Macom

b Stre

et

Rockwood Parkway

52nd

Stre

et

Legend

Figure 8-1Areas for Evaluation

in the FS

Spring Valley FUDS Washington, DC

0 500250Feet

February 2015

.( Non-AUES MD! MD (miscellaneous)

! Livens MD! 75 mm MD

Items

Range Fan

Point of Interest (POI)

Parcels

FUDS Boundary

Area of Interest (AOI)

! Stokes Mortar MD

_̂ Thermite Grenade (MEC)_̂ 75 mm Projectile (MEC)_̂ Stokes Mortar (MEC)_̂ Livens Projectile (MEC)

_̂ Disposal Area (MEC/CWM)_̂ Pipe with Explosives (MEC)

Buffer Zone (150 FT) of Statically Fired Testing Areas

Areas of Potential Explosive Hazard for Evaluation in the FS

Function Test Range(Stokes and Livens)

Function Test Range(Stokes and Livens)

Public Safety BuildingPossible Disposal Area

AOI 13Possible Disposal Area

AU

Static Test Fire AreaBuffer Zones

Static Test Fire AreaBuffer Zones

BAK/SV-BAK-03

SV-AU-05

AU/SV-AU-03

Areas of Potential Carcinogenic / Non-Carcinogenic Risk for Evaluation in the FS

SOUTHERN AUEXPOSURE UNIT

SPAULDING - RANKINEXPOSURE UNIT

Soil OutlierLocations

Univ

ersi

ty A

venu

eVanNess Street

Glenbrook RoadIndian Lane

Dale

carli

a Pa

rkw

ay

Rockwood Parkway

Ford

ham

Roa

d

49th

Str

eet

Tilden Street

Groundwater Update The groundwater study will have its own stand alone RI report. However, a summary of current ground-water sampling data is included in Appendix G of the Site-Wide RI. On Jan. 15, the new groundwater monitoring well (MP-5) off of the Rockwood Parkway 'Island' was sampled for the first time. All samples were non-detect for perchlorate, and less than 1 parts per billion for arsenic. MP-5 will be sampled again in early summer. The annual sampling of select wells is sched-uled for the end of April/early May.

Work progressing under the second tent location at 4825 Glenbrook Road

Crews are con-tinuing excava-tion of the soils

under the second tent, in the backyard at 4825 Glenbrook Road. High probability operations under the second tent location started in December 2014, and since then 21 roll-offs have been filled with soil and seven roll-offs of rubble have been recovered. Crews have removed approxi-mately 168 cubic yards of material with an anticipated amount of 329 cubic yards just in the backyard. More than 13 pounds of

glassware associated with the American University

Experiment Station (AUES), three 75mm munitions debris items and two 4.7 inch projectiles were safely recovered so far this year. No chemical agent has been detected under the second tent. No intact glass containers have been found under the second tent.

During high probability excavation work in December, at 8-inches below the surface, the team encountered con-crete in the backyard area. The thick concrete pad extended over an approximate area of 60’ X 10’, and required addi-tional work to remove it. Crews inspected the slab as it was being broken into disposable pieces, to ensure it was not associated with any contamination.

In addition to our high probability operations this year, the Corps of Engineers recently installed new fencing along

the Glenbrook Road side of the project site. With our operations in the front yard complete, we had the abil-ity to move the fence off of the street, and install a more robust fence on the property. The new fence is taller (10 feet instead of 6 feet) with a grey screen of non-translucent fabric. In response to requests from the neighbors, we also placed tan colored fabric over the support equipment in the front yard area (including the personnel decontami-nation station, the redress tent, and medical monitoring shed) to match the color of the tent and minimize the visual impact at the street level.

The team will continue to excavate the backyard area down to competent saprolite over the next few months. Then the foundation walls will be removed. We remain on schedule despite the adverse winter weather this year, and the quantity of the AUES-related items recovered. After we complete the high probability excavation work under the third tent in the winter of 2016/2017, we will start the remaining low probability excavation, and finish in spring 2017. Site restoration is scheduled to take place from spring 2017 through summer 2017.

The Glenbrook Road fence line was moved out of the street and semi-permanently installed on the property in March.

Crews safely recovered this 75mm munitions debris item on Feb. 11.

Crews safely recovered this open cav-ity, unfired, unfuzed 4.7 inch projectile on Feb. 10.