The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

15
Guido Negri – Pisa, 12 June 2003 The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

description

The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna. General Informations. CNAF is the INFN National Centre for Research and Development in Telematics and Informatics Technologies. - PowerPoint PPT Presentation

Transcript of The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Page 1: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

The CNAF Tier1 center

XXIV HTASC MeetingPisa, 12 June 2003

Guido Negri – INFN-CNAF, Bologna

Page 2: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

General Informations

• CNAF is the INFN National Centre for Research and Development in Telematics and Informatics Technologies.

• Originally was dedicated to the measurements of the Bubble Chambers photos.

• Hosted by the Physics Dept. of the University of Bologna.

• Personnel: 17 staff + 17 time limited contracts.• Total annual budget around 1.7 M€ + Projects

funds

Page 3: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

CNAF Activities

• General INFN services AFS, DNS, WWW, News and Mail… Video Conference: H320 & H323 MCU Hosting of training courses (C, C++, ODB…)

• Projects TIER1 Regional Center GRID: DataGrid, DataTAG, INFN-GRID, EGEE, LCG,

Grid.it High Bandwidth Networks: Optical Networks, WDM,

GARR-G Pilot Testing of new technologies

Page 4: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

TIER1 – General Considerations

TIER1 is meant as a computing facility for INFN HNEP communityCNAF will be a multi-experiment TIER1 (ATLAS, CMS, LHCb, ALICE, VIRGO and later CDF)Aims• providing experiments with computing resources• support to TIER2s and TIER3s• coordination with TIER0, other TIER1s and TIER2s

INFN-TIER1 is only a prototype• TIER1 becomes fully operational: end of 2003• end of project Phase I: beginning of 2004

Page 5: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

TIER1 Services

• Computing servers (CPU farms)• Access to on-line data (disks)• Mass storage / tapes• Broad-band network access and QoS• System administration• Database administration• Experiment specific library software• Helpdesk

Page 6: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

IssuesTechnical staff

Recruiting & Training Resource management

Minimization of manual operationsSharing of resources (network, CPU, storage, HR) among experiments

Resource use optimizationCompatibility between tests and production activity

Technological tests for Tier-1 Prototype phase (LHC experiments)Production phase (VIRGO, BaBar, CDF II, etc.)

Integration with grid framework (EDG, EDT and LCG)Interoperation Common tool development and test

Page 7: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

Computing ResourcesComputing servers (CPU farms)• 150 (soon ~320) 1U bi-processors Pentium III/IV 800-

2400 MHZ (IBM, DELL, SuperMicro)• System installation and administration

– Linux RedHat (6.2, 7.2, 7.3)– Experiment specific libraries and software– LCFG, Remote access to KVM.

Access to on-line data (DAS, NAS, SAN)• ~35 TB (soon to become >70 TB)• Study of large file system solutions (GFS, GPFS)• SAN on WAN tests (collaboration with CASPUR)• Test of several HW technologies (EIDE, SCSI, FC)

Page 8: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

Network (1)

New GARR-B Backbone with 2.5 Gbps F/O lines already in place (soon to pass to 10 Gbps).CNAF-TIER1 access is now 1 Gbps.Gigapop is collocated within INFN-TIER1.Many TIER2s are now 155 Mbps.International Connectivity via Geant: 10 Gbps access in Milano and 3x2.5 Gbps links of Geant with US (Abilene) already in place

Page 9: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

Network (2) GARR-B

MI

BO

RM

PI

TO

CT

PD

2.5 Gbps

2.5 Gbps

2.5

Gbp

s2.5 Gbps

2.5 Gbps

2.5 Gbps

2.5

Gbp

s155 Mbps

155 Mbps

TIER1

CNAF1 Gbps

GEANT

10 Gbps

Page 10: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

TIER1 Network

GARR-B

NA

S4

FarmSWG1Extreme 7i

SSR8600Gigabit

Switch Router

Bo 12KGP

Sez. Di Bologna

Catalyst6500R&D

SSR2000R&D

NA

S2

NA

S3

Matrix M5

1Gb/s

Disk-serv-CMS

8TF.C.

Page 11: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

StorageMass storage/tapes

• StorageTek library with 9840 (30 tapes) and LTO drives (150 tapes, 100 GB each) • CASTOR as front-end software for archiving

– Direct access for end-users– Oracle as back-end

New library with 2000-5000 tapes capability in SeptemberDisk storage

• 8 TB Fibre Channel (DELL)• 2 TB Fibre Channel-EIDE (AXUS)• 2 TB SCSI (Raitec) used as staging for CASTOR• 16 TB NAS based on FC (Procom)• 2 TB NAS IDE

Page 12: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

CASTOR at CNAF2 drive 9840

4 drive LTO Ultrium

SCSI

LEGATO NSR

(Backup)

Robot access via SCSI

ACSLS

CASTOR

STK L180

LAN

2 TB Staging Disk

SCSI

Page 13: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

Developed at CNAF – Monitoring

Farm monitoring tool• series of light scripts (bash, Perl)

monitoring the status of a computing farm (CPU Load, disk usage...)

• fast: <1 sec for 100 machines• tainted: no shell allowed• no multi-thread (no hacking allowed)• remote monitoring• soon to come more efficient tool (Python)

by Felice Rosso

Page 14: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

Developed at CNAF – Resources Database

Aims• Centralized repository for hardware informations• Monitoring• Alarm• Configuration facilitiesBased on• PostgreSQL• PHP interface• Web interfaceManaged Data• Batch informations• hardware informations• Technical assistance• Software configuration• Network configuration

by Barbara Martelli

Page 15: The CNAF Tier1 center XXIV HTASC Meeting Pisa, 12 June 2003 Guido Negri – INFN-CNAF, Bologna

Guido Negri – Pisa, 12 June 2003

Conclusions

INFN TIER1 is offering an experimental service…• VIRGO, CMS, ATLAS, LHCb, ALICE• DataGrid and DataTAG test-beds…but we are still in a test phase• Study and tests of technological solutionsMain goals of the prototype are• train people• adopt standard solutions• optimize resource usage• integration with the gridOperational phase forseen starting from end of 2003