The Capitol Subsurface Infiltration Gallery SCVURPPP Green Stormwater Infrastructure Planning November 29, 2018 Robin Lee, PE Agenda: Project Overview Initial Pump Design Revised Design Lessons Learned Construction Pics Questions

Transcript of The Capitol Subsurface Infiltration Gallery

The Capitol Subsurface Infiltration GallerySCVURPPP Green Stormwater Infrastructure Planning

November 29, 2018

Robin Lee, PE

Agenda:

Project OverviewInitial Pump DesignRevised DesignLessons Learned Construction PicsQuestions

2 of 20

The Project:

10.32 acresResidentialRetail/CommercialStorage

3 of 20

Site Plan

4 of 20

Initial Design:

90’x 56’ vault12’ tallPump to bioretentionBio sized on pump rate2,300 sf treatment

5 of 20

Bird’s Eye

6 of 20

Cross Section

7 of 20

Revised Design:

Perc. Rate – 30in/hr10-ft below gradeOpen bottom vaultC3 = infiltration42’ x 90’ 6’ tall25% smaller footprint

8 of 20

Percolation does NOT equal Infiltration!

Percolation Rate = 30 in/hr

Infiltration rate = 9 in/hr

Factor of Safety = 2.5

Infiltration

Percolation

9 of 20

BAHM Reduction Factor

10 of 20

Site Plan

11 of 20

Bird’s Eye

12 of 20

Profile

13 of 20

Cross Section

125.9’3.9’ ponds and infiltrates

Water Quality Volume0.45 ac-feet required 0.57 ac-feet provided

14 of 20

Vault System

15 of 20

Weir Plate Design

16 of 20

Excavation

17 of 20

Light Compaction

18 of 20

Gravel Layer & Vaults

19 of 20

Questions

20 of 20

Project Partners