Transcript of The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this...
![Page 1: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/1.jpg)
The The Campbell Campbell
River River WUP WUP
ProcessProcess
![Page 2: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/2.jpg)
Roderick Haig-BrownRoderick Haig-Brown“What we need and must somehow find
in this last part of the twentieth century is a land and water ethic perhaps better, an ethic of land, air and water. It is perfectly possible to have settlement, industrial development and reasonable exploitation of primary resources without condemning our children to generations of poverty and deprivation because we have ruined the land that should support them”
Nominated in 2005 as one of the all time "Greatest Canadians", Roderick Haig-Brown was a pioneer in the environmentalist movement.
![Page 3: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/3.jpg)
Campbell River Tyee ClubCampbell River Tyee Club
In the summer of 1924, a few fishermen gathered in the Willows Hotel in Campbell River and decided to organize a club somewhat along the lines of the famous Tuna Club of Catalina Island. The purpose was to standardize the sport of salmon fishing in B.C
![Page 4: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/4.jpg)
Instream Flow Presumptive Standards (%mad)
(zero deviations from standards suggest no HADD will occur)
Biological or Physical Requirement Percent Mean Duration per
Annual Discharge Annum
Short-term Biological Maintenance 10 days
Juvenile summer-fall rearing 20 months
Over-wintering 20 months
Riffle Optimization 20 months
Incubation 20 months
Kokanee spawning 20 days-weeks
Smolt Emigration 50 weeks
Gamefish Passage at Partial Barriers 50 to 100 days
Large Fish Spawning/Migration 148*MAD^-0.36 days-weeks
Off-channel Connectivity/Riparian Function 100 weeks
Channel Geomorphology/Sediment Flushing >400 1 to 2 days
![Page 5: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/5.jpg)
![Page 6: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/6.jpg)
Campbell River Weighted Usable Area Curves: Reach 2 Rearers
0
5000
10000
15000
20000
25000
30000
35000
0 20 40 60 80 100 120 140 160 180 200 220 240
Flow (cms)
WU
A (
sq
m)
CH Fry CO Fry
ST Fry ST Parr
![Page 7: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/7.jpg)
![Page 8: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/8.jpg)
Lower Campbell RiverLower Campbell River
• The loss of gravel recruitment and in-river spawning habitat in Campbell River is directly linked to construction and operation of John Hart Dam.
• After 50 years of operation, additional spawning habitat was lost and the current Chinook spawning capacity is now only 33% of the historic or target capacity of 4000 adults.
![Page 9: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/9.jpg)
Instream Gravel Placement
![Page 10: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/10.jpg)
Salmon River Diversion
![Page 11: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/11.jpg)
Upper Quinsam RiverUpper Quinsam River
![Page 12: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/12.jpg)
Quinsam River Cascades
![Page 13: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/13.jpg)
Heber River DiversionHeber River Diversion
![Page 14: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/14.jpg)
Campbell R Elk Falls CanyonCampbell R Elk Falls Canyon
Campbell R Elk Falls Canyon
![Page 15: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/15.jpg)
Post WUP Agreement -what workedPost WUP Agreement -what worked
• Improved working relationships between B.C. Hydro, DFO, MOE, Recreation Groups and Community Interest Groups (increased level of trust)
• The Campbell WUP is a living adaptive process that is re-examined every 5 years
• Interest groups walked away feeling that their situation had improved
• Minimizing the PM s helped simplify analyses and clarify keys concerns
![Page 16: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/16.jpg)
Post WUP Agreement-want didn’t workPost WUP Agreement-want didn’t work
• WUP was very time consuming for technical staff
• Operational issues are still a problem e.g. outages,
• Overwhelmed by the number of PM interaction between plants, reservoirs and rivers
• In contrast to the Campbell, the Cheakamus WUP spent more time with data collection but did not get a resolution likely because there was a poor understanding of the PMs
• Didn’t ensure what is proposed and agreed on can be accomplished by the equipment and operators
![Page 17: The Campbell River WUP Process. Roderick Haig-Brown “What we need and must somehow find in this last part of the twentieth century is a land and water.](https://reader035.fdocuments.us/reader035/viewer/2022070307/551b7745550346a10a8b4c8d/html5/thumbnails/17.jpg)
WUP Monitoring IssuesWUP Monitoring Issues
• Poor Baseline- ability to measure productivity vs. flow (often require 10+ years of data to establish baseline)
• Often a difficulty even measuring a 25% change in fish productivity
• Flow studies may be limited to quantifying production under a single flow regime