The Azalea Park and Hollywood Park Revitalization Action Plan(RAP) started in October 2000 with the goal of creating a holisticapproach to address revitalization efforts within the neighborhoods ofAzalea Park and Hollywood Park in City Heights. Many issuesaddressed in the Plan are based on the creation of a village-likeatmosphere in both neighborhoods.

Residents, both new and old, met with City staff at the Azalea ParkRecreation Center to start this process. The “Charrette” was success-ful because it outlined the courses of action needed to fix the problems that residents identified in the neighborhoods.Subsequently, at each meeting, the participants discussed a part of theproblem and established a course of action to solve the problem. ThisRAP was very different from the other Revitalization Plans that Ihave been involved with because law enforcement was not an issue.The RAP is a culmination of this holistic approach.

A part of the ongoing process to revitalize the neighborhoods is findingfinancial support to fund improvement projects. During the meetings,many financial avenues were discussed to assist in mitigating commu-nity-identified issues. Each issue has suggestions on where to findfinancial support. As the RAP is implemented, a holistic and creativeapproach will be needed to finance projects.

This document is the beginning of a long and arduous process torevitalize two significant neighborhoods in City Heights. Let thisdocument be used, changed and shaped to continually provide theelements needed to make these two neighborhoods in City Heights apart of the greatest community in San Diego.

Many thanks to Mary Wright and Lara Evans, City planning staff,for their tireless efforts in providing excellence in service to CityHeights and this project. Thanks to all City staff who attendedmeetings and did research on issues. Thanks to the members of thecommunity who came to every meeting, participated fully and gavegreat guidance to this process.

Sincerely,

Michael DunnChair of the Azalea Park and Hollywood ParkRevitalization Action Plan CommitteeAzalea Park Resident

February 6, 2002

Dear Community Members,Government Officials andAgency Employees:

Azalea Park-Hollywood Park Revitalization Action Program

Page 3: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

• Executive Summary

• Initiation of the Azalea Park-Hollywood Park Revitalization Effort

BackgroundStudy Area BoundariesMethodology

• Revitalization Program Recommendations and Accomplishments

Traffic/Circulation ImprovementsCode ComplianceVisual and Streetscape ImprovementsCanyon ImprovementsCommunity PromotionPark and Recreation

• Conclusion

• Acknowledgments

• List of Acronyms

Azalea Park - Hollywood ParkRevitalization Action Program

Page 4: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

The proposed Azalea Park and Hollywood ParkRevitalization Action Program (RAP) is the resultof the community’s desire to enhance their neigh-borhoods through a partnership with the City. Thisgroup of tightly-knit residents have worked togeth-er to reinforce their neighborhood identities andcreate a revitalization plan. The plan is intended toimplement strategies for procuring neighborhoodamenities and infrastructure that exemplify theartistic and inventive efforts of these residents. Inthese two communities, neighbors are friends, shareneighborhood maintenance responsibilities andactively pursue community public improvements aswell as policing, code enforcement and neighbor-hood identification programs.

The RAP provides an action plan designed toorganize the Community’s goals and objectives.This document functions as an implementationplan and status report intended to prioritize themost immediate community development goals.The RAP is also intended toimplement the community’sgoals and recommendationsfound in the Mid-CityCommunities Plan, adoptedby the City Council onAugust 8, 1998.

Azalea Park-Hollywood Park Revitalization Action Program

Executive Summary1

Azalea Park andHollywood Park

Area residents came together as a community andhosted a forum on October 10, 2000 with Cityrepresentatives to discuss their vision and goals fora revitalized community. Thirty-nine residentsattended the evening meeting. From that meeting,a revitalization committee was created to meet on abi-weekly basis with city representatives to discussimplementing the goals and objectives of AzaleaPark and Hollywood Park residents.

The vision established by program participants rec-ognizes that traffic, streetscape, canyon and parkimprovements will provide the greatest physicaland economic benefit to enhance and sustain thewell being of both neighborhoods.

Figure 1

Page 5: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

On October 10, 2000, the residents of Azalea Parkand Hollywood Park and the City of San DiegoPlanning Department sponsored a workshop toidentify the issues affecting quality of life in theirneighborhoods. Issues raised by participants as partof the Azalea Park-Hollywood Park RevitalizationProgram will be addressed in relation to the goalsand recommendations of the Mid-CityCommunities Plan. The Mid-City CommunitiesPlan is the product of a four-year collaborationbetween residents and business representatives, thefour recognized planning committees of Mid-City(including the City Heights Area, Kensington,Talmadge, Normal Heights and Eastern Areas) andCity of San Diego planning staff.

BACKGROUND

Azalea Park and Hollywood Park are two estab-lished neighborhoods within the Lexington Parksub-division of City Heights and the Mid-CityCommunity. The neighborhoods of Azalea Parkand Hollywood Park are defined by their relation-ship to the two public parks of the same names.Both neighborhoods are characterized by a mixtureof single- and multi-family homes, most of whichwere constructed more than 45 years ago. Smallapartment buildings are clustered along PoplarStreet and most streets have one or two small mul-tifamily structures among the single family homes.Several larger complexes have been built adjacentto Hollywood Park and along Fairmount Avenue.

STUDY AREA BOUNDARIES

The RAP Committee defined the study areaboundaries as represented in Figure I. The generalboundaries of the Azalea Park-Hollywood ParkRevitalization Action Program include FairmountAvenue to the East, Interstate 805 to the West,Manzanita Canyon along the North and HomeAvenue to the South.

METHODOLOGY

During the months of October 2000 throughMarch 2001, the revitalization team met on a regu-lar basis with staff members of various City depart-ments to address the six key issues identified by thecommunity. A number of identified sub-issues werereferred to the appropriate departments for imme-diate action (see following tables). These includedissues related to policing, litter control, codeenforcement, traffic control, canyon restorationand park improvements and are addressed in detailin this report.

The following methodology was followed duringthe development of this revitalization program:

• Staff conducted field surveys and inventories ofland use, traffic, and physical conditions to confirm problem sources and identify solutions.

• Contacts and discussions with staff representing various City departments with responsibility foraddressing the identified issues and to develop technical solutions.

• Validation of issues through neighborhood meetings and staff review.

Azalea Park-Hollywood Park Revitalization Action Program

2

Initiationof theAzalea Park-Hollywood Park Revitalization Effort

Page 6: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

Azalea Park-Hollywood Park Revitalization Action Program

3

The Azalea Park-Hollywood Park RAP Committeeidentified recommendations to address each of thesix key issue areas. In addition, implementationmeasures were identified to achieve each recom-mendation. Some of these implementation meas-ures have been accomplished during the course ofthe RAP effort. The remaining measures have beenprioritized by the committee.

The accomplished and prioritized implementationmeasures are outlined in tabular form on the fol-lowing pages. Each entry describes the recommen-dation and related implementation measure(s) aswell as the responsible lead party, anticipatedschedule, current status, and projected cost.

Revitalization Program Recommendationsand Accomplishments

The six key issues identified by the communityinclude:

1. Traffic/Circulation Improvements2. Code Compliance3. Visual and Streetscape Improvements4. Canyon Improvements5. Community Promotion6. Parks and Recreation

Welcome to Azalea Park

Page 7: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

1) Four-way stop signs were requested at PoplarStreet and Sycamore as well as Violet Streets toenhance both pedestrian and vehicular safety. Staffanalysis determined that these locations do notmeet established warrants and policies for stopsigns. Traffic engineering staff recommend anincrease in enforcement to address safety concerns.

2) Two-way stop signs were requested at DahliaStreet and Poplar Street as well as Tulip Street andPepper Street to enhance both pedestrian andvehicular safety. Staff analysis determined that theselocations do not meet established warrants andpolicies for stop signs. Traffic engineering staff rec-ommend an increase in enforcement to addresssafety concerns.

3) Speed humps were requested at Manzanita Drivefrom Marlborough Avenue to Columbine Street toenhance both pedestrian and vehicular safety. Staffanalysis determined that speed humps do not meetestablished warrants and policies. Traffic engineer-ing staff recommend an increase in enforcement toaddress safety concerns.

Traffic/Circulation Improvements

Azalea Park-Hollywood Park Revitalization Action Program

Poplar Street is a 2-lane collector street that runs through the Azalea Park neighborhood and is character-ized as a neighborhood serving commercial corridor. Many of the concerns with traffic are focused alongthis corridor. However, other traffic issues within the Azalea Park neighborhood were identified. The fol-lowing are traffic and circulation principles that were seen by the community as important to the promo-tion of the neighborhood:

• Enhance safety along the Poplar Street commercial corridor by reducing the speed limit through traffic calming measures.

• Construct “curb extensions” to shorten the crossing distances for pedestrians at intersections.• Prevent cut-through traffic on Manzanita Place from Fairmount Avenue.• Reconstruct sidewalks and pedestrian ramps that meet Americans with Disabilities Act requirements.

4) A turn-about at the intersection of Poplar Streetand Columbine Street was requested to enhanceboth pedestrian and vehicular safety. Staff analysisdetermined that a turn-about does not meet estab-lished warrants and policies. Traffic engineeringstaff recommend an increase in enforcement toaddress safety concerns.

During community meetings, the following specific recommendations and implementation measures relat-ing to traffic were proposed. The following traffic-related recommendations require additional analysisand/or alternative implementation measures.

4

Page 8: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

Azalea Park-Hollywood Park Revitalization Action Program

5

Enhance pedestrian andautomobile safety alongPoplar Street.

Install signs to reduce speedlimit to 30 MPH.

City FY 2001 Completed by Traffic Engineering. Budgeted.

Improve pedestrian crossingof Fairmount Avenue adjacentto schools.

Repaint yellow crosswalk markingsand/or install cross walks withenhanced paving, such as raisedand/or brick paving.

City FY 2001 Completed by Traffic Engineering.Crosswalks were repainted atFairmount Avenue and Olive Streetand Fairmount Avenue and Myrtle St.

Budgeted.

Recommendation Implementation Lead Sched. Status Cost

TRAFFIC/CIRCULATION IMPROVEMENTS: ACCOMPLISHMENTS TO DATE

Marlborough Avenue and Poplar Street

Page 9: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

# Recommendation Implementation Lead Sched. Status Cost1

2

3

4

5

6

City

City

City

City

City

PropertyOwner

Enhance pedestriansafety at the intersectionof Poplar Street andColumbine Street.

Improve pedestriansafety and reduce speed-ing through the area.

Prevent cut throughtraffic on ManzanitaPlace.

Alleviate intermittentflooding to surroundingresidences.

Reduce speedingthroughout the studyarea.

Enhance pedestrian anddisabled access alongPoplar Street.

Install curb extensions and cross-walks on all four corners of theintersection of Poplar Street andColumbine Street.

Install two-way stop signs at:Glenfield Street and ManzanitaDrive; Dahlia Street and PoplarStreet; Arbor Vitae and ManzanitaDrive; Violet Street andManzanita Drive; Tulip Street andPepper Street; and ColumbineStreet and Manzanita Drive.

Close vehicular access toManzanita Place from FairmountAvenue by installing bollards.

1)Repair storm drains onGlenfield Street and FairmountAvenue.

2) Reconstruct damaged stormdrain inlets.

3) Create annual program to cleanstorm drains.

1) Reduce speeds on Poplar Streetthrough education, signage, andphysical traffic calming measures.

2) Increase traffic enforcementefforts.

1) Repair/install curb, gutter andsidewalks consistent with stan-dards established by the Americanswith Disabilities Act where side-walks currently exist.

2) Inform property owners andresidents of City’s 75/25 sidewalkreplacement program.

Under review byEngineering.

Traffic engineering deter-mined that Glenfield Streetand Manzanita Drive;Arbor Vitae and ManzanitaDrive; Violet Street andManzanita Drive; andColumbine Street andManzanita Drive meet thecriteria for stop signs.

Initiate a traffic studyquantifying impacts.

Refer to Streets Division.

Reduced speed signage wasinstalled. Physical trafficcalming measures are underreview & education will bean on-going process.

Referred to Police.

Utilize City’s 75/25 side-walk replacement programto repair and replace curb,gutter and sidewalks.

To be determined.

Costs are anticipatedto be borne by theaffected department.

Costs are anticipatedto be borne by theaffected department.

Costs are anticipatedto be borne by theaffected department.

Costs dependent on measures implemented.

Budgeted.

It is anticipated that25% of the costswould be borne bythe property owneror resident and theother 75% by theCity.

FY 2002- FY 2003

FY 2002

FY 2002

FY 2002-FY 2006

FY 2001-FY 2006

FY 2001-FY 2006

FY 2002-FY 2006

TRAFFIC/CIRCULATION IMPROVEMENTS: PRIORITIZED RECOMMENDATIONS

Azalea Park-Hollywood Park Revitalization Action Program

6

Page 10: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

# Recommendation Implementation Lead Sched. Status Cost

Recommendation Implementation Lead Schedule Status Cost

Azalea Park-Hollywood Park Revitalization Action Program

Code Compliance

Organize code enforcementvolunteer team.

Prevent automobiles fromparking in front of firehydrants along Sumac Drive.

Coordinate training and hold on-going meetings to discuss opencases. CHTC Code Staff trained 6Azalea Park and Hollywood Park res-idents on 11/30/00.

Paint curbs red in front of firehydrants along Sumac Drive.

Azalea ParkNeighborhoodAssociation

City

FY 2002-FY 2007

FY 2002

On-going.

Completed byStreets Division.

Budgeted.

Budgeted.

CODE COMPLIANCE: ACCOMPLISHMENTS TO DATE

Prevent vehiclesfrom parking infront yards.

Remove graffiti.

Require homes to display address.

Address commerciallitter, loitering andgraffiti issues.

Pro-actively enforce MunicipalCodes for parking.

1) Utilize graffiti abatement program with assistance from theSDPD.2) Residents can receive training forgraffiti eradication through ProjectC.L.E.A.N.

Neighborhood Association to coordinate with property owners perMunicipal Code 62.07.

Refer to Neighborhood Code forfurther investigation. Where applicable, report violations to ABC.

City

City/NeighborhoodAssociation

NeighborhoodAssociation

City

FY 2002-FY 2007

FY 2002-FY 2007

FY 2002

FY 2002-FY 2007

Refer to CodeEnforcement.

On-goingsince 1984.

NeighborhoodAssociation to initiate curb painting program.

On-going.

Costs are anticipated tobe borne by the affecteddepartment.

1) Costs are anticipatedto be borne by theaffected department.2) Costs are covered by$7000 CDBG Fundsshared with the rest ofCity Heights.

To be determined.

Costs are anticipated tobe borne by the affecteddepartment.

1

2

3

4

7

CODE COMPLIANCE: PRIORITIZED RECOMMENDATIONS

Code compliance promotes conformity with theCity’s Municipal Code and helps to abate theimpacts of inconsistent property maintenance andfailure to observe existing codes regulating land-scaping and trash disposal. Uniform adherence tothe City’s existing codes can help foster a sense ofcommunity pride, commitment and participation.The code compliance component of the RAPincludes the following principles and are intendedto encourage code conformance by residents andbusiness owners alike:

• Enforce litter codes consistently and pro-actively.• Assist property owners, through a design

assistance program, to develop unobstructiveenclosures for trash receptacles.

• Establish a litter abatement education programfor local school children.

• Continuous clean-ups of canyons and otherproperties through an annually sponsored “springcleaning”event, in coordination with the neighborhood, private garbage haulers and theCity’s Environmental Services Department and Project C.L.E.A.N.

• Azalea Park Neighborhood Association

Page 11: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

# Recommendation Implementation Lead Sched. Status Cost

Educate residentsregarding pertinentmunicipal codes.

Improve pedestrian accessalong Poplar Street andColumbine Street.

Remove abandoned cars.

Improve appearance ofthe neighborhood.

Assist homeless individu-als residing along thecommercial corridor, inparks and canyons to findhousing and job opportunities.

Clean trash dumpsters atlocal markets and apartment complexes.

Remove litter.

Prohibit illegal after-hours activity in AzaleaPark.

Improve appearance ofalley along ModestoStreet and Sumac Drive.

Prevent unleashed andunlicensed dogs fromroaming freely in theneighborhood.

Hold community forum to reviewcode language.

Trim overgrown shrubbery. If nec-essary, refer to Code Compliance.

Pro-actively enforce MunicipalCodes for parking.

1) Schedule regular “communityclean-ups” and “facelifts” and cre-ate an on-going neighborhood“clean-up” calendar.

2) Enforce municipal solid wastecodes.

3) Assist property owners, througha design assistance program, todevelop unobstructive enclosuresfor trash receptacles.

Provide housing and job place-ment services.

Contact merchants, propertymangers and refuse company todiscuss exchanging old dumpstersfor new receptacles.

1) Install city-maintained trashreceptacles along Poplar Street andat bus-stops.

2) Enforce municipal solid wastecodes for containment.

3) Create a litter abatement pro-gram for school children

Enforce curfew and park hours.

1) Utilize graffiti abatement program.

2) Remove litter.

Pro-actively enforce MunicipalCodes for animal control.

City

City

NeighborhoodAssociation/City

NeighborhoodAssociation/City/ ProjectC.L.E.A.N./SDNHS

City/Social ServiceAgencies

NeighborhoodAssociation/CodeEnforcement

City/NeighborhoodAssociation/SDUSD

City

City/ProjectC.L.E.A.N.

NeighborhoodAssociation/City

FY 2002-FY 2007

FY 2002-FY 2007

FY 2002-FY 2007

FY 2002 -FY 2007

FY 2002-FY 2007

FY 2002-FY 2007

FY 2001

FY 2002-FY 2007

FY 2002-FY 2007

FY 2002-FY 2007

FY 2002-FY 2007

On-going.

On-going.

On-going.

On-going.

On-going.

Work with mer-chants and propertymanagers to establish dumpsterexchange program.

Completed. StreetsDivision will place3 trash cans alongPoplar Street andwill monitor levels.

On-going.

Work with SDUSDand parents.

On-going. Refer toSan Diego PoliceDepartment.

Refer toNeighborhoodCode Compliancefor further review.

On-going. Refer toCounty AnimalControl.

Costs are anticipatedto be borne by theaffected department.

Costs are anticipatedto be borne by theaffected department.

Costs are anticipatedto be borne by theaffected department.

Costs are anticipatedto be borne by theaffected department.

Costs are anticipatedto be borne by theaffected department.

Costs are anticipatedto be borne by theaffected departmentand/or merchant.

Costs are anticipatedto be borne by theaffected department.

Costs are anticipatedto be borne by theaffected department.

Costs are anticipatedto be borne by theaffected department.

Costs are anticipatedto be borne by theaffected department.

5

6

7

8

9

10

11

12

13

14

CODE COMPLIANCE: PRIORITIZED RECOMMENDATIONS

Page 12: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

Many of the concerns raised by participants duringthe revitalization meetings relate to the characterand visual quality of the streets within the studyarea. A comprehensive program of streetscapeimprovements, addressing both public and privateproperty, has been developed based on participantcomments.

Visual and StreetscapeImprovements

The visual/streetscape component includes the following principles:

• Development of a street tree planting programfor Poplar Street concentrating on the area from Fairmount Avenue to Violet Street as well asother streets in Azalea Park and Hollywood Park.

• Development of gateways setback southwesterly from the corner of Fairmount Avenue and Poplar Street as well as at the north end of the I-805 bridge to include prominent physical features that celebrate the character and diversity of the neighborhood.

• Construction of additional street signage thatreflects the street names found in Azalea Park.

• Extension of commercial storefront design assistance and improvement program to aid merchants in improving their storefronts.

• Establishment of a residential design assistanceand improvement program to assist homeowners in improving their homes and properties.

• Establishment of an apartment facade designassistance and improvement program to assistapartment owners to improve and maintain their properties.

Azalea Park-Hollywood Park Revitalization Action Program

9

Page 13: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

Recommendation Implementation Lead Schedule Status Cost

Azalea Park-Hollywood Park Revitalization Action Program

Remove litter alongPoplar Street.

VISUAL AND STREETSCAPE IMPROVEMENTS:ACCOMPLISHMENTS TO DATE

Provide city-maintained trashcans along Poplar Street.

City FY 2002 Completed. Streets Division hasplaced 3 trash cans along PoplarStreet and will monitor levels.

Budgeted.

10

# Recommendation Implementation Lead Sched. Status Cost1

2

3

4

5

Enhance streetscape fea-tures at the intersectionof Poplar Street andColumbine Street.

Improve maintenance ofpublic rights-of-way andpromote pedestrianenvironment.

Enhance street lighting.

Utilize landscaping as ameans of improvingpublic rights-of-way.

Improve overall streetappearance in theneighborhood.

Incorporate landscaping and sculptures.

Provide temporary “No Parking”signs and create regularly scheduledstreet sweeping program.

Incorporate additional ornamentalstreet lights into streetscape design.

Plant street trees in curb extensionsto promote neighborhood beautyand pride.

Develop a residential landscapeenhancement program. Create aweed abatement program.

1) Construct a landscaped medianalong Poplar Street from Fairmountto Violet Street. Incorporate treesand sculptures, if feasible.

2) Provide landscaped planter boxeson I-805 overpass.

3) Create community identifyinggateways with prominent physicalfeatures to include landscaping, afountain and art at the entrance ofPoplar Street and FairmountAvenue, at I-805 and Tulip Streetand in the proposed round-about atColumbine Street and Poplar Street.

City/NeighborhoodAssociation

City

City

City/People for Trees/LMD

City/NeighborhoodAssociation

NeighborhoodAssociation/City

FY 2002-FY 2004

FY 2002-FY 2004

FY 2002-FY 2007

FY 2002-FY 2004

FY 2002-FY 2005

FY 2002-FY 2007

Work with commu-nity group.

On-going.

On-going. Workwith communitygroup.

On-going. Workwith People forTrees and otherinterested groups.

On-going. Workwith communitygroups to imple-ment.

Coordinate effortswith TrafficEngineering andCity’s revitalizationstaff. Also, refer as acommunity artsproject.

Coordinate effortswith CALTRANS

Refer as a commu-nity arts project tobe coordinated withthe City’s revitaliza-tion staff.

Depends on measuresimplemented.

Budgeted.

$25,000.

$5,000/year.

$5,000/year.

Cost dependent on measures implemented.

To be determined.

Cost dependent on measures implemented.

VISUAL AND STREETSCAPE IMPROVEMENTS: PRIORITIZED RECOMMENDATIONS

Page 14: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

# Recommendation Implementation Lead Sched. Status Cost6

7

8

9

10

Improve appearance ofexisting bus stop.

Improve appearance ofneighborhood commer-cial corridor.

Improve appearance ofresidentialstructures/property.

Discourage residentialchain link fencing.

Remove overhead utilitylines and poles.

1) Create concrete bus stop pad.

2) Work with MTDB to constructnew bus shelter at Violet Street andPoplar Street.

1) Develop incentive program forbusinesses to improve their storefronts.

2) Enforce local sign and facadecodes.

1) Enforce building codes and land-scaping regulations.

2) Provide facade enhancementassistance for property owners.

3) Send letters to absentee landlordsinforming them of the poor state oftheir properties.

4) Expand housing rehabilitationservices and create a calendar ofrehabilitation events.

Provide design and landscape assistance for alternative types offencing. Project C.L.E.A.N.provides plants to cover fences.

Work with utility companies tounderground existing utilities.

City/ MTDB

City/CHCDC/CHBIA

City/SDNHS/CHCDC/NeighborhoodAssociation/CHTC &CHBIA

City/NeighborhoodAssociation/ProjectC.L.E.A.N.

CommunityPlanningGroup/ City

FY 2002-FY 2004

FY 2002-FY 2007

FY 2002-FY 2007

FY 2002-FY 2005

FY 2002-FY 2007

Refer to MTDB.

On-going. Coordinate revital-ization efforts withbusiness owners toimprove area.

Annual Allocation.

To be initiated.

Work with propertyowners/NeighborhoodAssociation

On-going.

Ongoing. Workwith property own-ers & BIDs.

On-going.

Dependent on measures implemented.

Costs are anticipatedto be borne by theaffected department.

Budgeted.

$5,000 per property.

$500 for materialsand mailing.

Part of larger pro-gram for Mid-City.

$5,000 per property.

Costs are anticipatedto be borne by theaffected department.

VISUAL AND STREETSCAPE IMPROVEMENTS: PRIORITIZED RECOMMENDATIONS

Azalea Park-Hollywood Park Revitalization Action Program

11

Page 15: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

# Recommendation Implementation Lead Sched. Status Cost1

2

3

4

5

Azalea Park-Hollywood Park Revitalization Action Program

The canyon system, including Manzanita, Snowdrop,Tuberose, Shamrock, Violet, Hollywood, and Peppercanyons, is an integral part of both Azalea Park andHollywood Park. Neighborhood participants statedthat improvements to these neighborhood canyonsare a high priority in terms of restoration and preser-vation. The development of a brush managementplan for residents to utilize to reduce the risk of fire aswell as restoration of the natural habitat are twoimportant components addressed in the RAP.

Restore canyon habitatsin both neighborhoods.

Improve access toManzanita Canyon.

Prevent park litter fromentering canyon.

Identify and reduce firehazards in canyon.

Prohibit dumping incanyons.

1) Adopt a preservation programto enhance and promote areacanyons.2) Identify funding for a parkranger to help manage canyons.

1) Create bike/pedestrian/skatepathway along sewer/fire road incanyon with access fromMarlborough Avenue.

2) Install a permanent map plac-ard at the entrance to ManzanitaCanyon.

3) Create a handicap accessiblepathway into Manzanita Canyon.

Place additional trash receptaclesin Azalea Park and provide regu-larly scheduled refuse pickup byEnvironmental Services.

Create brush management andmitigation program.

Install “No Dumping” signs atcanyon entrances and cul-de-sacs.

City/NeighborhoodAssociation

NeighborhoodAssociation/ City

City

NeighborhoodAssociation/ City

City

FY 2002-FY 2007

FY 2002-FY 2007

FY 2002-FY 2007

FY 2002

FY 2002-FY 2007

On-going.

Refer to Park andRecreation Departmentfor further analysis.

Refer to Park andRecreation Departmentfor further analysis.

Refer to Park andRecreation Departmentfor further analysis.

Referred toEnvironmentalServices.

Coordinate efforts withFire Department/NeighborhoodAssociation.

Referred toEnvironmentalServices.

Costs are anticipated tobe borne by the affect-ed department.

Costs dependent onmeasures implemented.

$1,000.

Costs dependent onmeasures implemented.

To be determined.Cost dependent onnumber of receptacles.

Costs are anticipated tobe borne by the affect-ed department.

Costs dependent onmeasures implemented.

12

Canyon Improvements

CANYON IMPROVEMENTS:PRIORITIZED RECOMMENDATIONS

Welcome toManzanita

Canyon• Reduce fire hazards.• Restore natural habitats.• Improve access to the canyons.• Prohibit litter and dumping in and along the canyons.• Erect plaques recognizing the entrance-ways to the canyons.

Page 16: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

Aerial Map of Canyon Systems

Azalea Park-Hollywood Park Revitalization Action Program

13

MMaannzzaanniittaa

CCaannyyoonn

PPeeppppeerrCCaannyyoonn

SSnnoowwddrrooppCCaannyyoonn

VViioolleettCCaannyyoonn

SShhaammrroocckkCCaannyyoonn

TTuubbeerroosseeCCaannyyoonn

HHooll

llyyww

oooodd

CCaann

yyoonn

Page 17: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

# Recommendation Implementation Lead Sched. Status Cost1

2

3

4

5

6

Azalea Park-Hollywood Park Revitalization Action Program

Community promotion is a key component of therevitalization strategy to be undertaken by area resi-dents. Area residents have a history of initiatingsuccessful efforts to enhance and promote bothAzalea and Hollywood Parks. Participants in therevitalization program made recommendationsrelating to the enhancement of public safety andthe promotion of the study area as a desirable loca-tion to live and work. This comprehensive programrelates to improving the character and visual quali-

Reinforce neighborhood identity.

Discourage storage ofresidential trash recepta-cles in the public view.

Provide regular streetcleaning throughoutneighborhood.

Promote commercial building onMarlborough Avenuebetween Poplar Streetand Manzanita Drive.

Market commercial corridor north ofHeather Street toFairmount Ave. to newbusinesses.

Clean sidewalks in commercial corridor.

1) Install “gateway” elements atFairmount Avenue/Poplar Streetand I-805 and Tulip Street.

2) Identify locations for land-marks and incorporate new devel-opment and/or streetscapeimprovement programs.

3) Change street names onMarlborough Avenue andGlenfield Street to be consistentwith other neighborhood botanical street names.

Create flyer and talk with resi-dents about locating trash cans toalternate, private area.

Provide temporary “No Parking”signage indicating schedule forparking restrictions and streetsweeping.

Process street vacation.

1) Evaluate opportunities to mar-ket the commercial corridor tonew businesses. For example, abookstore, a dog-o-mat and acafe.2) Create a BusinessImprovement District.

Discuss options such as powerwashing and regular cleaning withtenants and property owners.

NeighborhoodAssociation/City

NeighborhoodAssociation

City

City

NeighborhoodAssociation,CHCDC/City/CHBIA

City/NeighborhoodAssociation

FY 2002-FY 2004

FY 2002-FY 2004

FY 2002-FY 2004

FY 2002-FY 2007

FY 2002

FY 2002

FY 2002-FY 2007

FY 2002-FY 2007

Refer as a community artsproject.

On-going.

Neighborhood Associationwill submit application toEngineering for review.

On-going.

On-going.

Neighborhood Associationwill submit application toDevelopment Services,Street Vacation Division.

On-going.

Initiate program with localmerchants.

(Refer toStreetscapeImprovement rec’s).

Budgeted.

Budgeted.

$500 for cost ofprinting and fliers.

Budgeted.

Budgeted.

Budgeted.

To be determined.

14

ty of the street. The following principles highlightthe concerns of the residents as well as incorporatesolutions:

• Ensure that many positive characteristics ofAzalea Park and Hollywood Park are preserved.

• Foster investment in quality commercial establishments.

• Reinforce neighborhood identity throughgateway elements.

Community Promotion

COMMUNITY PROMOTION: PRIORITIZED RECOMMENDATIONS

Page 18: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

# Recommendation Implementation Lead Sched. Status Cost1

2

The Lexington Park subdivision has two dedicatedCity parks: Azalea Park, which comprises 9.00acres, and Hollywood Park, constituting 13.19acres. Azalea Park provides the neighborhood with asmall recreation center, basketball court, a children’splay area, picnic tables and an amphitheater likeslope area. Hollywood Park serves the surroundingarea with its children’s play area, two softball fields,and picnic areas. Hollywood Park is the beginningof an inner city system of inter-connective canyontrails and is a regional center for youth soccer.

Parks and Recreation

Azalea Park-Hollywood Park Revitalization Action Program

Create more park andrecreation opportunitiesfor children and adults.

Develop a public areafrom 43rd Street andFairmount Avenue toManzanita Place.

Expand Park andRecreation Facility.

Evaluate the opportunitiesto develop a neighbor-hood park.

City/NeighborhoodAssociation

City/NeighborhoodAssociation

FY 2002-FY 2007

FY 2002-FY 2007

Work with Park andRecreation Dept. andcommunity groups.

Work with Park andRecreation Dept. andcommunity groups.

Costs dependenton measuresimplemented.

Costs dependenton measuresimplemented.

15

The following recommendations stem from the community’s desire to have open recreation areas:

• Expansion of existing park space• Evaluation and development of new park space

Azalea Park and Recreation Center

COMMUNITY PARK AND RECREATION:PRIORITIZED RECOMMENDATIONS

Page 19: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

Azalea Park-Hollywood Park Revitalization Action Program

ConclusionThis Revitalization Action Program establishes ablueprint for neighborhood improvement that focus-es on the application of existing City programs andidentifies additional annual costs that must be pro-grammed from City and other funds, including butnot limited to: Community Development BlockGrants (CDBG), transportation funding and facaderebate funding. Ongoing monitoring and annualsoliciting for grant funding opportunities will benecessary to achieve the objectives identified. TheAzalea Park Neighborhood Association should spear-head this effort since some grant funds are typicallyonly available to non-profit organizations. CityPlanning Department staff will assist as needed, andpursue other grants available to government entities.

Implementation of the recommendations identifiedin this Revitalization Action Program will requirecooperative efforts of City staff, property owners andtenants, the City Heights Area Planning Committee,business improvement associations, neighborhoodassociations, and others interested in the preserva-tion and enhancement of the study area. In additionto accessing currently budgeted programs, imple-mentation will require that additional funds, includ-ing public and private grants, be obtained.

16

Page 20: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

Azalea Park-Hollywood Park Revitalization Action Program

17

Cruz NuñezChuck AldridgeJoan BaconTom BensonAlex BocciarelliGene BrentzelKaren BuceyCarlos CastedaKelly CassPaul ConnaughtonJoni CraigDiane DavidVicki DavisElsa Delgado

Special acknowledgments are due to the participants in the Azalea Park-Hollywood ParkRevitalization Action Program Committee. Without their commitment, this program would nothave been possible.

Jennifer DiethrichGreg DiethrichMichael DunnNina DunnLoretta EbingerBill FisherKevin FortierMario GuzmanMike HancockSuzanne HuberBill HudsonKathy HudsonChris Irvin-DayAlbert Isordia

COMMUNITY PARTICIPANTS

Acknowledgments

CITY OF SAN DIEGO STAFF & OTHER PARTICIPANTS

The following staff participated in the Azalea-Hollywood Park Revitalization Action Program:

Steve Celniker, Transportation DepartmentRon D’Argento, Transportation DepartmentLeo DeJesus, Planning DepartmentMeredith-Dibden Brown, Community and Economic Development DepartmentLara Evans, Planning DepartmentRick Brown, Print Shop Graphics SectionSam Riordan, Print Shop Graphics SectionCurtis Hussey, Neighborhood Code Compliance DepartmentAlicia Martinez-Higgs, Community and Economic Development DepartmentGene Matter, Transportation Department, Street DivisionDrew Potoki, Transportation DepartmentTom Romstad, Planning DepartmentAl Stasukevich, City Heights Town CouncilJim Tulumello, San Diego Police Department, Community Relations OfficerAllan Wake, Development Services Department, Land Development Review DivisionMark Wiedenhoff, Environmental Services Department, Environmental Programs DivisionLuis Sainz, Environmental Services Department, Environmental Programs DivisionJanet Wood, Community and Economic Development DepartmentMary Wright, Planning DepartmentAzalea Park and Recreation Staff, Park and Recreation Department

Liz JacobsDavid LandisTom LashbrookVicki LeonLarry MayMichael McPhersonMatt O’BrienRick Pecor Linda Pennington Mark PenningtonNick PresnerRobin SearsMichael SpragueBarbara Starr

Maxx StalheimDavid StoneLori TaylorLynn TomaroThom TurnerJim VarnadoreJoanne WahlJeff WassomSteve WelchRita WolfRebecca YoungerMiguel ZuletaJohn Zrodlowski

Page 21: The Azalea Park and Hollywood Park Revitalization Action Plan · Manzanita Place from Fairmount Avenue by installing bollards. 1)Repair storm drains on Glenfield Street and Fairmount

Azalea Park-Hollywood Park Revitalization Action Program

18

List of AcronymsABC Alcohol and Beverage ControlBID Business Improvement DistrictCALTRANS California Department of Transportation CDBG Community Development Block GrantC&ED Community and Economic DevelopmentCHAPC City Heights Area Planning CommitteeCHBIA City Heights Business Improvement AssociationCHCDC City Heights Community Development Corp.CHTC City Heights Town CouncilDSD Development Services DepartmentLMD Landscape Maintenance DistrictMTDB Metropolitan Transit Development BoardOSB Office of Small BusinessRAP Revitalization Action ProgramSDNHS San Diego Neighborhood Housing ServicesSDUSD San Diego Unified School District