The ASHRAE 90.1-2010 EnergyCode: How it Will Affect YourProjects

This presentation is a first page hit ifyou type “ASHRAE 90.1-2010”

Page 3: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

PresenterJeff Boldt, PE, LEED® AP, HBDP

KJWW Engineering (500 staff)

Principal – Director of Engineering

Voting Member ASHRAE SSPC-90.1• Chair - Healthcare Working Group (WG)

• Chair - Hydronic WG, Elevator WG, Duct Leakage WG

Member ASHRAE 189.1

Author AEDG Small & Large Healthcare

Member WHEA Code Committee, WI Energy & HVAC CCs

Member FGI Acoustical Working Group

Page 4: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Agenda

What is ASHRAE 90.1?

How is ASHRAE 90.1 enforced?

What changed in 90.1-2010?

Challenges?

Suggestions for compliance

Page 5: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

What is ANSI/ASHRAE/IESStandard 90.1?

Page 6: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

ASHRAE 90.1

World’s most adopted building energy code?

Basis for International Energy ConservationCode (IECC)

Compliance option in the IECC

Minimum code standard

NOT aimed at 2030 ChallengeASHRAE to achieve NZEB in AEDGs & 189.1

Page 7: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Scope of ASHRAE 90.1

Energy conservation codefor buildings, except low-rise residential

Envelope

HVAC

Service Water Heating

Power & Lighting

Other

Page 8: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Scope of ASHRAE 90.1

Buildings, except low-rise residentialNot 3 stories or less residential or anysingle-family residences

Low-rise hotel, prison, etc. are covered

New buildings and their systems

New portions of buildings & systems

New systems (equipment) in existingbuildings

Page 9: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

8 Temperature ‘zones’ + ABC = 17

Page 10: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Scope Addition

New equipment or building systemsspecifically identified in the standardthat are part of industrial ormanufacturing processes

Computer rooms are the first application

Page 11: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

How is ASHRAE 90.1Enforced?

Page 12: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

How 90.1 is Enforced

EPAct 1992 requires DOE to revieweach version of 90.1 & requires allstates to have energy codessubstantially equal to the latest‘approved’ version

DOE issues “Determinations”Theoretically, within one year

States are given two years to comply

Page 13: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

DOE Determination

90.1-2010 was given a positivedetermination

States were notified October, 2011 thatthey must comply by October, 2013

Page 14: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Not All States Comply

Several states do not have a statewidebuilding or energy code

Each jurisdiction adopts its own code

Page 15: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Most States Comply

Indiana adopts 90.1-2007

Iowa, and Wisconsin adopt 2009 IECCwith amendments

The 2009 IECC includes 90.1-2007 as acompliance option

Illinois adopted IECC-2012 1/1/2013

2012 IECC adopts 90.1-2010

Page 16: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

State Compliance Map

Page 17: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Why Should I Comply?

Required for LEED CertificationPrerequisite and need a couple points

Appendix G for more points

90.1-2010 for LEED version 4

Onerous requirements in IECC-2012

Required for all federal facilities

Saves energy

Page 18: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

What Changed in ASHRAE90.1 - 2010?

Page 19: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

ASHRAE 90.1-201090.1-2010 was released in October 2010

Goal was 30% less energy than 90.1-2004

2007 version saved only a few %

IECC has incorporated most changes2009 has some

2011 interim update

2012 major edition accepts 90.1-2010

Page 20: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

ASHRAE 90.1-2010

Many ChangesElevators was addendum DF!!

118 addenda proposed

Page 21: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Building Envelope

2007 RequirementsSpecifies wall, floor, and roof R-values

Windows and doors• 40% window limit

• Window U and SHGF (NFRC 400)

• Vestibules

Page 22: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Building Envelope

No change in 2010

Significant Changes in 2013Roof Insul R20/16 cz1 >> R35/20 cz8

SHGF 0.25/0.40 cz1 >> 0.34/0.45 cz8

U-values 0.65/1.2 cz1 >> 0.34/0.45 cz8

VT/SHGC ratio 1.1 includes frame

Page 23: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Building Envelope – Addendum (--)

Insulation (for 2013: not in 2010)Example – Zone 6 (Madison) Steel Framed• 2007 – R-13 + R-7.5 c.i.

– 2” of expanded polystyrene (bead board)

• 2013 – R-13 + R-15 c.i.– 4.0” of expanded polystyrene (at 3.8/inch)

– Potential conflict between 90.1 and IBC

– R-18.8 in Zone 7 = 5” EPS, 4” XPS, or 3.5” ISO

– R-10 in Zone 4 = 3” EPS, 2.5” XPS or 2” ISO

Page 24: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Building Envelope

Page 25: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Building Envelope – for 2013

Maximum 30% glass in prescriptive pathException: 40% if• Distribute glass to daylight > 50% of floor area

• Install daylight dimming

Page 26: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Is Envelope Important?

I think envelopematters!

Page 27: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Envelope – Continuity – Too Late

Page 28: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”
Page 29: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Building Envelope – Air Barrier (bf)

Air barrier & joints must be detailed

Page 30: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Air Barriers

Materials < 0.004 cfm/SF

Assembly < 0.040 cfm/SF

Page 31: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Building Envelope

More S glazing than either E or W (bn)Building orientation

Land purchases and campus planning

No public review comments

ExceptionsStorefront, Shaded building, Infill withnearby building on south, Alterations withno increase in glazing

Page 32: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Building Envelope

Page 33: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Building Envelope – Changing 2013

Page 34: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Miscellaneous

Cool roofs (f)Cz1-3, with exceptions

Page 35: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

5.5.4.2.3 Minimum Skylight Fenestration Area. In enclosedspaces that are:

i. greater than 10,000ft2, and [5,000 ft2*]ii. directly under a roof with ceiling heights greater than 15 ft, andiii. one of the following space types: office, lobby, atrium, concourse,

corridor, storage, gymnasium/exercise center, convention center,automotive service, manufacturing, non-refrigerated warehouse,retail, distribution/sorting area, transportation, or workshop.

The total skylight area shall be either;• a. a minimum of 3% of the roof area of that enclosed space with a

skylight VLT at least 0.40, or• b. such that the daylight area under skylights will be a minimum of

half the floor area and provide a minimum skylight effective apertureof at least 1%.

These skylights shall have a glazing material or diffuser with a measuredhaze value greater than 90% when tested according to ASTM D1003.General lighting in the daylight area shall be controlled as described inSection 9.4.1.4.

Skylights in Large Interior Spaces

Page 36: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Building Envelope

Suggestions for compliancePlan building orientation early

Shade glass or use low SHGF

Early integration of architecture and MEPengineering

• Envelope design affects HVAC design

• Energy modeling for comparing options and balancingefficiency with cost

Page 37: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

HVAC

ScopeEquipment efficiency ratings

Fan Power

Energy recovery

Reheat limitations

Economizers

Duct sealing and leakage

Other

Page 38: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Fan Power

2007 requirementsCAV = 0.94 BHP/1000 cfm + Allowances

VAV = 1.30 BHP/1000 cfm + Allowances

Allowances for:• Ducted return• Return control devices• Filters• Heat recovery (wording clarifications for 2013)• Silencers

Page 39: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Fan Power

2010 requirements (VAV)Offices <1.5 BHP/1000 cfm

Labs & Hospitals <2.3 BHP/1000 cfm• Based on brake HP

• Includes all fans running at peak cooling load

• Also in IECC 2009 & 2012

Page 40: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Fan Power

Suggestions for complianceEfficient fansLow static systems• Larger air handling units (but smaller motors)• Fewer duct turns• Shorter duct runs• Requires early coordination of architectural

design with HVAC design• Sell the advantages!

Page 41: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Fan Power

2007 ERU allowanceWhatever the pressure drop is

2010 ERU allowance (dj)(2.2*effectiveness – 0.5) per airstream,except Runaround coils = 0.6”

Provides incentive for higher efficiencyenergy recovery

Page 42: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Energy Recovery – 2013 Changes?

2007 – if >70% OA and >5,000 cfm

Page 43: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Reheat – Typical VAV Hospital

Page 44: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Reheat

2007 requirementsUnlimited reheat if there are any pressurecontrolled spaces – many constant volumehospitals and labs

Many exceptions

Page 45: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Reheat2010 requirements

No reheat allowed unless:• ≤30% of peak flow (≤50% if 20% DB) or

• Flow no more than required air changes

Exception if 75% of heat is recovered

Bans CAV systems in most hospitals & labs

ORs only pressurized when unoccupied

Page 46: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

IECC WAS Less Restrictive

2012 IECC deleted a critical exceptionVAV becomes non-compliant for manybuildings (in prescriptive path)

Page 47: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Limit on Overhead Air Heating (BX)

Limits heating air temperature to 20F aboveroom temperature when both supply outletand return/exhaust inlet are >6-feet AFF

Supplemental heat may be needed

OR

Better envelope may be needed

Page 48: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Reheat

Suggestions for complianceVAV systems

Perimeter heating

Condenser reheat

Heat pumps, fan coils, or chilled beamswith dedicated outside air systems (DOAS)and enthalpy recovery

Page 49: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Economizers

2007 requirementsExempt if over 25% of area served ishumidified above 35F dew-point (~22%RH)

Exempt if <11 tons

Not required in 1a&b, 2a, 3a & 4a

Page 50: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Economizers

2007

2010 (cy)

Page 51: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Economizers (cy)

Requires water economizer for somezones required to be humidified

Run cooling towers in the winter

Hospitals & some labs

Page 52: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”
Page 53: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Economizers - 2013

Possible changes in 2013

May have required too much in hot,humid zones in 2010

Page 54: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Economizers – None vs. Air

Page 55: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Economizers – Air vs. Water

Page 56: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Economizers – Water vs. Condenser

Page 57: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Energy Recovery Chillers for HealthcareFacilities & Labs, Etc.

Page 58: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”
Page 59: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”
Page 60: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Economizers

Suggestions for complianceUse a winterized cooling tower• Good energy saving measure for hospitals

Condenser Reheat• No risk of tower freezing

• Good payback in new construction

• Synergistic with water economizer

Page 61: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

AHU Heat Gain (2013)

F&B Coils6.5.2.5 Preheat Coils.Preheat coils shall havecontrols that stop their heatoutput whenever mechanicalcooling, includingeconomizer, is occurring.

Page 62: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Humidifiers – 2013

6.5.2.4.3 Humidification systemdispersion tube hot surfaces in theairstream of ducts or air handling unitsshall be insulated with a product withan insulating value of at least R-0.5.

Page 63: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Duct Sealing (cq)

Ductwork and plenums with pressureratings shall be seal class A

Shaft openings require bushings

25% of duct systems over 3” w.g. andALL outdoor ducts shall be leak tested

Tested sections chosen by owner

Leakage class = 4 for all ducts

Page 64: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Duct Leakage

Seal Class vs. Leakage Class

Seal Class CSeal all transverse joints only

Seal Class BAll transverse joints and longitudinal seams

Seal Class AAll transverse joints, longitudinal seams,and duct wall penetrations

Page 65: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Leakage Class

Example: Leakage Class 4 means 100SF of duct will leak ≤ 4 cfm at 1” w.c.

Formula: Lmax = CLP0.65

Lmax = maximum permitted leakage cfm/100 ft2duct surface area;

CL = 4 (90.1-2010; 6 and 3 in SMACNA), ductleakage class, cfm/100 ft2 duct surface area at 1 in.w.c.; and

P = test pressure, which shall be equal to the designduct pressure class rating, in. w.c.

Page 66: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Domestic Water Preheat

No changes

Required if:Facility operates 24 hours a day.

Total installed heat rejection capacity of thewater-cooled systems exceeds 6,000,000 (~430cooling tons) Btu/h of heat rejection, and

Design service water heating load exceeds1,000,000 Btu/h.

Page 67: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Other HVAC Changes

Pump head calculation

Chilled water pipe sizing

Chilled water pump VSDs & pressure reset

Radiant panel insulation

Single-zone VAV requirements

Supply air temperature resetOne of the larger savings

Page 68: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Other Mechanical Changes

Upped equip efficiencies – a, k, y, ao, t,bw, aj, bk

Added new equip – I, …A&L = cooling tower efficiencies

Y = Pool heaters

M = chillers compromise efficiency• Path A & B

Page 69: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Other Mechanical Changes

BT extends chiller rating range andadds glycol and brine

CY extends efficiency tradeoff foreconomizers to all system types

Page 70: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Other Mechanical Changes

BU= data centers = 3% of USA energyCritical data centers definition continues tobe revised

CO increases PTAC efficiency andextends to evap cooled equipment

Page 71: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Other Mechanical Changes

Cp = VRF efficiencies per AHRIEasy limits in 2010

Page 72: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

LightingCovers

Interior spaces of buildings

Exterior building features

Exterior grounds lighting powered through building• Exceptions

– Emergency lighting that is normally off

– Lighting required by life safety statute

– Lighting in dwelling units

Page 73: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Triggering Criteria for Retrofits

2007≥50% of building connected lighting load

2010≥10% of building connected lighting load

Page 74: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

LightingLighting Power Density (LPD)

Building Area Method• Table 9.5.1

Space-by-Space Method• Calculate each zone

Energy Cost Budget Method• For all systems (energy modeling)

Page 75: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Lighting

~ 30 lighting addenda

2 wattage reduction addenda

28 lighting control addenda

LPD dropped a little ~10% on average

Page 76: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Lighting

Lighting power density changes for 2010

* Few changes between 2004 and 2007

*

Page 77: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Lighting Controls

No daylighting rules until 2010

Addenda d, ab, al, ct

Obstructions >5’ tall end daylit areas

Page 78: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”
Page 79: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”
Page 80: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Daylit Lighting Controls (ab)

Lighting control for daylighted spacesPrimary sidelighted area

Secondary sidelighted area

Toplighting

Daylighted area (under skylights)

Page 81: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Exterior Lighting

5 zones (i)National parks

Residential

Other

Metro

0 – 1300W + 0-1.0 W/SF

Page 82: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Occupancy Sensors

Added training rooms, lecture halls,storage 50-1000sf, offices ≤250SF,restrooms, dressing/locker rooms

Manual onExceptions – restrooms, public corridorsand stairs

Bi-level control for most spacesNot corridors

Page 83: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Alterations

Interior and exterior alterations mustcomply

Includes lamp+ballast replacements

Page 84: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Parking Garage

Reduce power 30% if no activity in>3600SF area

Page 85: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Exterior (cd)

MUST turn off exterior lighting whensufficient daylight is available

Astronomical timer or daylight sensor

Façade and landscape lighting off frommidnight or closing to 6am or opening

Page 86: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Control Incentives

Addendum AC allows more LPD if morecontrols are added

Most options allow 5-10% increase

Page 87: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Stairwell & Emergency Lights (cu)

Reduce power 50% within 30 minutes

Controversial in committee

Not approved by BOD, but might saveyou energy

Page 88: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Functional Testing (az)

Lighting control devices and controlsystems shall be tested to ensure thatcontrol hardware and software arecalibrated, adjusted, programmed, andin proper working condition inaccordance with the constructiondocuments and manufacturer’sinstallation instructions.

Page 89: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Lighting Automatic Shutoff

Whole-building shutoff for all spacesExceptions for:• Patient care areas

• Lighting required for 24-hour use

• Where automatic-off would be unsafe

Individual space controls

Page 90: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Tandem Wiring - Deleted

Page 91: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Exit Signs Limited to 5 Watts

Page 92: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Lighting – 2010 Additions

“X” extended shutoff requirements to:Buildings <5,000 SF

Private offices

Storage rooms

Restrooms

Page 93: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

9.4.1.3 Automatic Daylighting Controls for Primary SidelightedAreas. When the combined primary sidelighted area in an enclosed spaceexceeds 1,000 ft2, the lamps for general lighting in the primary sidelightedarea shall be separately controlled by at least one multi-level photocontrol(including continuous dimming devices) having the following characteristics:

(a) the light sensor for the photocontrol shall be remote from wherecalibration adjustments are made;

(b) the calibration adjustments shall be readily accessible; and

(c) the multi-level photocontrol shall reduce electric lighting in responseto available daylight with at least one control step that is between 50%and 70% of design lighting power and another control step that is nogreater than 35% (including off) of design power.

Lighting controls when day-lit (ab)

Page 94: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Lighting

Suggestions for complianceMinimize or eliminate incandescent use

Use efficient sources – e.g. super T-8

Use efficient fixtures

Pick your battles

Page 95: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Power – Controversial! (overturned)

“BZ” may add separate monitoring of:Total electrical energy

HVAC systems electricity

Exterior lighting

Interior lighting

Receptacle circuits

15-minute reporting

Page 96: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Power - Receptacles (bs)

50% of 120V need automatic control inoffices and computer classrooms

Includes modular partitions

OptionsTime of day

Occupancy sensor

Another control or alarm system

Page 97: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Power - Receptacles (bs)

Exceptions:Receptacles specifically designated forequipment requiring 24 hour operation

Spaces where patient care is rendered

Spaces where an automatic shutoff wouldendanger the safety or security of theroom or building occupant(s).

Page 98: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Other Equipment

Booster PumpsSensor to start and/or control speed

Remote sensor or simulation logic

No PRV at pumps

Pumps off when no flow

Page 99: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Other Equipment

ElevatorsLighting efficacy ≥35 LPW

Ventilation ≤ 0.33 W/cfm

Lights & fans off if unused for >15 minutes

2013 – Elevator movement efficiency

2013 – Escalators & fast-walks

Page 100: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

ECB & Appendix G

AI clarifies purchased heat/cooling

BJ = ventilation effectiveness

DA – baseline ventilation is code, notsame in both models!

DN – adds systems 10 & 11 forwarehouses, stairwells, etc that aren’theated

Page 101: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Energy Modeling

16 buildings, 17 climate zones

Weighting factors

Hospital 2.8% of USA SF, Clinic 3.5%

Warehouse 13%, Stand-alone retail12%

44 addenda for 2007

64 more for 2010

Page 102: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

90.1 Progress Indicator

1,632 runs = 16 buildings x 17 climatezones x three 90.1 standards x two 62.1standards

Page 103: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

90.1-2010 Savings over 90.1-2004

25% including plug loads

31% excluding plug loads

Page 104: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Which Facility Do You Want to Own?

Page 105: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Check Lists

Page 106: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”
Page 107: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”
Page 108: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”
Page 109: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

What if I Want More?

IgCC 2010 (includes 189.1) – More thanenergy

ASHRAE-USGBC-IESNA Standard 189.1

Advanced Energy Design Guide seriesOffice, school, small healthcare, warehouse

50% now for SMO. Large Hospitals.

Page 110: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

AEDG

Small HealthcareHospitals

Clinics

Cookbook method toachieve ~40%savings over 90.1-1999

Page 111: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

AEDG – Small Healthcare

Up to 90,000 SF

Includes hospitals, ASC, etc.

Not MOB that has no procedures

Page 112: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

AEDG – Small Healthcare

Similar savings to ASHRAE 90.1-2010

AEDGs qualify for LEED EnergyPrerequisite without energy modeling

Documentation is still required

Existing AEDGs also qualify for 1 point

Page 113: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

AEDG – Large Healthcare

Page 114: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

AEDG – Large Healthcare

Page 115: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

AEDG Big PictureNO STEAM

“Advanced” VAV

Heat pump and Fan-Coil with DOAS

Lower fan energy

Ceiling height controversy

Unoccupied patient room ventilation

Page 116: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

AEDG Big Picture

Many requirements for a simpleprescriptive path – no trusting anenergy model!

Hospitals can use 50% less energy,even with USA codes!

We’ve done +/- 100 KBtu/Sf/Year

Page 117: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”

Other Healthcare Topic

AEDG Large Healthcare

FGI-2010 Acoustical Requirements

Geothermal Healthcare HVAC

Page 118: The ASHRAE 90.1-2010 Energy Projects - · PDF fileThe ASHRAE 90.1-2010 Energy Code: How it Will Affect Your Projects This presentation is a first page hit if you type “ASHRAE 90.1-2010”