THE COVERPicture defines the conversion of ruralareas from sleeping villages to urbanizedand progressive communities through therural electrification program.

Page 3: The 2007-2009 RE Chronicle
Page 4: The 2007-2009 RE Chronicle

TABLE OF CONTENTS

THE COVERNEA MANDATE-VISION-MISSION-CREDO

FOREWORD

I. NATIONAL SUMMARY

LOCATION MAP / 1 STATUS OF ENERGIZATION / 2

II. LOCATION MAPS & STATISTICAL PROFILE OF ELECTRIC COOPERATIVES

REGION I – ILOCOS / 3-4

ILOCOS NORTE ELECTRIC COOPERATIVE, INC. (INEC) / 5-6 PANGASINAN I ELECTRIC COOPERATIVE, INC. (PANELCO I) / 11-12ILOCOS SUR ELECTRIC COOPERATIVE, INC. (ISECO) / 7-8 CENTRAL PANGASINAN ELECTRIC COOPERATIVE, INC. (CENPELCO) / 13-14LA UNION ELECTRIC COOPERATIVE, INC. (LUELCO) / 9-10 PANGASINAN III ELECTRIC COOPERATIVE, INC. (PANELCO III) / 15-16

REGION II – CAGAYAN VALLEY / 17-18

BATANES ELECTRIC COOPERATIVE, INC. (BATANELCO) / 19-20 ISABELA I ELECTRIC COOPERATIVE, INC. (ISELCO I) / 25-26CAGAYAN I ELECTRIC COOPERATIVE, INC. (CAGELCO I) / 21-22 ISABELA II ELECTRIC COOPERATIVE, INC. (ISELCO II) / 27-28CAGAYAN II ELECTRIC COOPERATIVE, INC. (CAGELCO II) / 23-24 NUEVA VIZCAYA ELECTRIC COOPERATIVE, INC. (NUVELCO) / 29-30

QUIRINO ELECTRIC COOPERATIVE, INC. (QUIRELCO) / 31-32

CAR – CORDILLERA ADMINISTRATIVE REGION / 33-34

ABRA ELECTRIC COOPERATIVE, INC. (ABRECO) / 35-36 IFUGAO ELECTRIC COOPERATIVE, INC. (IFELCO) / 39-40BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) / 37-38 KALINGA-APAYAO ELECTRIC COOPERATIVE, INC. (KAELCO) / 41-42

MOUNTAIN PROVINCE ELECTRIC COOPERATIVE, INC. (MOPRECO) / 43-44

REGION III – CENTRAL LUZON / 45-46

AURORA ELECTRIC COOPERATIVE, INC. (AURELCO) / 47-48 PAMPANGA RURAL ELECTRIC SERVICE COOPERATIVE, INC. (PRESCO) / 61-62TARLAC I ELECTRIC COOPERATIVE, INC. (TARELCO I) / 49-50 PAMPANGA I ELECTRIC COOPERATIVE, INC. (PELCO I) / 63-64TARLAC II ELECTRIC COOPERATIVE, INC. (TARELCO II) / 51-52 PAMPANGA II ELECTRIC COOPERATIVE, INC. (PELCO II) / 65-66NUEVA ECIJA I ELECTRIC COOPERATIVE, INC. (NEECO I) / 53-54 PAMPANGA III ELECTRIC COOPERATIVE, INC. (PELCO III) / 67-68NUEVA ECIJA II ELECTRIC COOPERATIVE, INC. (NEECO II) – AREA 1 / 55-56 PENINSULA ELECTRIC COOPERATIVE, INC. (PENELCO) / 69-70NUEVA ECIJA II ELECTRIC COOPERATIVE, INC. (NEECO II) – AREA 2 / 57-58 ZAMBALES I ELECTRIC COOPERATIVE, INC. (ZAMECO I) / 71-72SAN JOSE CITY ELECTRIC COOPERATIVE, INC. (SAJELCO) / 59-60 ZAMBALES II ELECTRIC COOPERATIVE INC. (ZAMECO II) / 73-74

REGION IV-A - SOUTHERN TAGALOG (CALABARZON) / 75-76

FIRST LAGUNA ELECTRIC COOPERATIVE, INC. (FLECO) / 77-78 QUEZON I ELECTRIC COOPERATIVE, INC. (QUEZELCO I) / 83-84BATANGAS I ELECTRIC COOPERATIVE, INC. (BATELEC I) / 79-80 QUEZON II ELECTRIC COOPERATIVE INC. (QUEZELCO II) / 85-86BATANGAS II ELECTRIC COOPERATIVE, INC. (BATELEC II) / 81-82

REGION IV-B - SOUTHERN TAGALOG (MIMAROPA) / 87-88

LUBANG ELECTRIC COOPERATIVE, INC. (LUBELCO) / 89-90 TABLAS ISLAND ELECTRIC COOPERATIVE, INC. (TIELCO) / 97-98OCCIDENTAL MINDORO ELECTRIC COOPERATIVE, INC. (OMECO) / 91-92 ROMBLON ELECTRIC COOPERATIVE, INC. (ROMELCO) / 99-100 ORIENTAL MINDORO ELECTRIC COOPERATIVE, INC. (ORMECO) / 93-94 BUSUANGA ISLAND ELECTRIC COOPERATIVE, INC. (BISELCO) / 101-102MARINDUQUE ELECTRIC COOPERATIVE, INC. (MARELCO) / 95-96 PALAWAN ELECTRIC COOPERATIVE, INC. (PALECO) / 103-104

REGION V – BICOL / 105-106

CAMARINES NORTE ELECTRIC COOPERATIVE, INC. (CANORECO) / 107-108 ALBAY ELECTRIC COOPERATIVE, INC. (ALECO) / 117-118CAMARINES SUR I ELECTRIC COOPERATIVE, INC. (CASURECO I) / 109-110 SORSOGON I ELECTRIC COOPERATIVE, INC. (SORECO I) / 119-120CAMARINES SUR II ELECTRIC COOPERATIVE, INC. (CASURECO II) / 111-112 SORSOGON II ELECTRIC COOPERATIVE, INC. (SORECO II) / 121-122CAMARINES SUR III ELECTRIC COOPERATIVE, INC. (CASURECO III) / 113-114 FIRST CATANDUANES ELECTRIC COOPERATIVE, INC. (FICELCO) / 123-124CAMARINES SUR IV ELECTRIC COOPERATIVE, INC. (CASURECO IV) / 115-116 MASBATE ELECTRIC COOPERATIVE, INC. (MASELCO) / 125-126

TICAO ISLAND ELECTRIC COOPERATIVE, INC. (TISELCO) / 127-128

REGION VI – WESTERN VISAYAS / 129-130

AKLAN ELECTRIC COOPERATIVE, INC. (AKELCO) / 131-132 GUIMARAS ELECTRIC COOPERATIVE, INC. (GUIMELCO) / 143-144ANTIQUE ELECTRIC COOPERATIVE, INC. (ANTECO) / 133-134 V-M-C RURAL ELECTRIC SERVICE COOPERATIVE, INC. (VRESCO) / 145-146CAPIZ ELECTRIC COOPERATIVE, INC. (CAPELCO) / 135-136 CENTRAL NEGROS ELECTRIC COOPERATIVE, INC. (CENECO) / 147-148ILOILO I ELECTRIC COOPERATIVE, INC. (ILECO I) / 137-138 NEGROS OCCIDENTAL ELECTRIC COOPERATIVE, INC. (NOCECO) / 149-150ILOILO II ELECTRIC COOPERATIVE, INC. (ILECO II) / 139-140ILOILO III ELECTRIC COOPERATIVE, INC. (ILECO III) / 141-142

Page 5: The 2007-2009 RE Chronicle

CONTENTS

REGION VII – CENTRAL VISAYAS / 151-152

NEGROS ORIENTAL I ELECTRIC COOPERATIVE, INC. (NORECO I) / 153-154 PROVINCE OF SIQUIJOR ELECTRIC COOPERATIVE, INC. (PROSIELCO) / 165-166

NEGROS ORIENTAL II ELECTRIC COOPERATIVE, INC. (NORECO II) / 155-156 CAMOTES ELECTRIC COOPERATIVE, INC. (CELCO) / 167-168BANTAYAN ISLAND ELECTRIC COOPERATIVE, INC. (BANELCO) / 157-158 BOHOL I ELECTRIC COOPERATIVE, INC. (BOHECO I) / 169-170CEBU I ELECTRIC COOPERATIVE, INC. (CEBECO I) / 159-160 BOHOL II ELECTRIC COOPERATIVE, INC. (BOHECO II) / 171-172CEBU II ELECTRIC COOPERATIVE, INC. (CEBECO II) / 161-162CEBU III ELECTRIC COOPERATIVE, INC. (CEBECO III) / 163-164

REGION VIII – EASTERN VISAYAS / 173-174

DON ORESTES ROMUALDEZ ELECTRIC COOPERATIVE, INC. (DORELCO) / 175-176 BILIRAN ELECTRIC COOPERATIVE, INC. (BILECO) / 187-188LEYTE II ELECTRIC COOPERATIVE, INC. (LEYECO II) / 177-178 NORTHERN SAMAR ELECTRIC COOPERATIVE, INC. (NORSAMELCO) / 189-190LEYTE III ELECTRIC COOPERATIVE, INC. (LEYECO III) / 179-180 SAMAR I ELECTRIC COOPERATIVE, INC. (SAMELCO I) / 191-192LEYTE IV ELECTRIC COOPERATIVE, INC. (LEYECO IV) / 181-182 SAMAR II ELECTRIC COOPERATIVE, INC. (SAMELCO II) / 193-194LEYTE V ELECTRIC COOPERATIVE, INC. (LEYECO V) / 183-184 EASTERN SAMAR ELECTRIC COOPERATIVE, INC. (ESAMELCO) / 195-196SOUTHERN LEYTE ELECTRIC COOPERATIVE, INC. (SOLECO) / 185-186

REGION IX – ZAMBOANGA PENINSULA / 197-198

ZAMBOANGA DEL NORTE ELECTRIC COOPERATIVE, INC. (ZANECO) / 199-200ZAMBOANGA DEL SUR I ELECTRIC COOPERATIVE, INC. (ZAMSURECO I) / 201-202ZAMBOANGA DEL SUR II ELECTRIC COOPERATIVE, INC. (ZAMSURECO II) / 203-204ZAMBOANGA CITY ELECTRIC COOPERATIVE, INC. (ZAMCELCO) / 205-206

REGION X - NORTHERN MINDANAO / 207-208

MISAMIS OCCIDENTAL I ELECTRIC COOPERATIVE, INC. (MOELCI I) / 209-210 FIRST BUKIDNON ELECTRIC COOPERATIVE, INC. (FIBECO) / 217-218MISAMIS OCCIDENTAL II ELECTRIC COOPERATIVE, INC. (MOELCI II) / 211-212 BUKIDNON II ELECTRIC COOPERATIVE, INC. (BUSECO) / 219-220MISAMIS ORIENTAL I ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO I) / 213-214 CAMIGUIN ELECTRIC COOPERATIVE, INC. (CAMELCO) / 221-222MISAMIS ORIENTAL II ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO II) / 215-216 LANAO DEL NORTE ELECTRIC COOPERATIVE, INC. (LANECO) / 223-224

REGION XI – DAVAO / 225-226

DAVAO ORIENTAL ELECTRIC COOPERATIVE, INC. (DORECO) / 227-228DAVAO DEL NORTE ELECTRIC COOPERATIVE, INC. (DANECO) / 229-230DAVAO DEL SUR ELECTRIC COOPERATIVE, INC. (DASURECO) / 231-232

REGION XII – SOCCSKSARGEN / 233-234

NORTH COTABATO ELECTRIC COOPERATIVE, INC. (COTELCO) / 235-236SOUTH COTABATO I ELECTRIC COOPERATIVE, INC. (SOCOTECO I) / 237-238SOUTH COTABATO II ELECTRIC COOPERATIVE, INC. (SOCOTECO II) / 239-240SULTAN KUDARAT ELECTRIC COOPERATIVE, INC. (SUKELCO) / 241-242

ARMM-AUTONOMOUS REGION IN MUSLIM MINDANAO / 243-244

TAWI-TAWI ELECTRIC COOPERATIVE, INC. (TAWELCO) / 245-246 BASILAN ELECTRIC COOPERATIVE, INC. (BASELCO) / 251-252SIASI ELECTRIC COOPERATIVE, INC. (SIASELCO) / 247-248 CAGAYAN DE SULU ELECTRIC COOPERATIVE, INC. (CASELCO) / 253-254SULU ELECTRIC COOPERATIVE, INC. (SULECO) / 249-250 LANAO DEL SUR ELECTRIC COOPERATIVE, INC. (LASURECO) / 255-256

MAGUINDANAO ELECTRIC COOPERATIVE, INC. (MAGELCO) / 257-258

CARAGA / 259-260

AGUSAN DEL NORTE ELECTRIC COOPERATIVE, INC. (ANECO) / 261-262 DINAGAT ISLAND ELECTRIC COOPERATIVE, INC. (DIELCO) / 269-270AGUSAN DEL SUR ELECTRIC COOPERATIVE, INC. (ASELCO) / 263-264 SURIGAO DEL SUR I ELECTRIC COOPERATIVE, INC. (SURSECO I) / 271-272SURIGAO DEL NORTE ELECTRIC COOPERATIVE, INC. (SURNECO) / 265-266 SURIGAO DEL SUR II ELECTRIC COOPERATIVE, INC. (SURSECO II) / 273-274SIARGAO ELECTRIC COOPERATIVE, INC. (SIARELCO) / 267-268

III. OTHER ELECTRIC DISTRIBUTION UTILITIES (EDUs)

SUMMARY / 275 PER EDU / 276-281

IV. ANNEXES

GRAPHS OF KEY PERFORMANCE INDICATORS

NEA ORGANIZATIONAL STRUCTURE

EDITORIAL BOX

ACKNOWLEDGMENT

Page 6: The 2007-2009 RE Chronicle

NATIONAL ELECTRIFICATION ADMINISTRATION

MANDATETotal electrification on an area coverage basis and competence enhancement

of electric distribution utilities in a deregulated environment

VISIONTotal electrification on an area coverage basis by 2020

MISSIONTo pursue the mandate of rural electrification and to provide FIT assistance to

EDUs to make them highly competitive in delivering quality service

CORPORATE CREDO

Go where the darkness loomsCreate the path of lightWalk with the rural folks

Install the lines of progress

Work with the electric cooperativesSpin the engine of growth

Bring electricity to the industriesCommunities and households

Protect the consumers’ interestServe with your hearts

Share your talents And make a difference

Live honestlyWork efficiently

Promote solidarity

Page 7: The 2007-2009 RE Chronicle

FOREWORD

"Let there be light". This has been the dream of the Philippine government 40 years ago. Then President Ferdinand E. Marcos articulated once ". . .bright lights symbolize . . . job opportunities . . . income . . . recreation . . . culture . . . sophistication . . ." thus Rural Electrification became a priority program of government.

On August 4, 1969, the National Electrification Administration (NEA) was created by virtue of Republic Act No. 6038 declaring as national policy objective the total electrification of the Philippines on an area coverage basis. In retrospect, through a grant from the United States amounting to $3.5 million, two pilot projects signalled the beginning of the now successful government program on Rural Electrification.

In 1997, all the municipalities and cities within the coverage areas of ECs have been energized including those in small and isolated islands nationwide. Program implementation was then shifted to electrification of the barangays.

By end of 2009, barangay electrification level was almost 100%. In the electric cooperatives' (ECs) franchise area comprising 36,030 barangays, 35,860 have already been energized, increasing the level of electrification from 97.6% in 2008 to 99.5% in 2009. This both covers grid and off-grid electrification, made possible through public-private partnership via the Expanded Rural Electrification Program of the Energy Sector under the chairmanship of the National Electrification Administration. Only the remotest, last mile barangays remained unlit and targeted to be fully energized before the end of 2010.

Consumer connection steadily increased, effecting the installation of 1,043,872 meters from 2007 to 2009. This created an impact to the lives of approximately 5.2 million "kababayans" who live in all parts of the country. This is the commitment that the Energy Sector will continue to pursue.

Year 2009 symbolizes a year of celebration for the four (4) decades of the Rural Electrification Program. The month of August was declared as a National Electrification Month through Presidential Proclamation No. 1743. A successful International Convention on Rural Electrification (ICORE) was held and participated in by local and foreign delegates. The 8th million consumer connection was highlighted as milestone during the period.

Another milestone for the year is the awarding of Diamond Awards for excellent performing ECs and General Managers (GMs). A Diamond EC is a distinct class of its own, which has an unsurpassed excellent record of high level of performance in all aspects of operation worth emulating. A Diamond GM exudes confidence in the performance of his tasks with competence and tested managerial skills, possesses leadership traits and enjoys a high degree of credibility.

For four decades, the NEA-ECs partnership has greatly contributed to the improvement of the lives of the rural folks and to the transformation of the rural areas as centers for development and progress, making them attractive for investment, enterprise, education, health, labor and employment opportunities.

This publication manifests the accomplishments of NEA and ECs throughout the years.

We present with pride . . . The Rural Electrification Chronicle 2007-2009.

Page 8: The 2007-2009 RE Chronicle

ILPI

REGION XI

99 - Davao Oriental - City of Mati100 - Davao del Norte - Montevista,

Compostela Valley101 - Davao del Sur - City of Digos

01

03

04

05

06

08

09

10

12 13

14

16

18

1920 23

29

30

31

33

36

REGION IV-A

32 - First Laguna - Lumban33 - Batangas I - Calaca34 - Batangas II - Lipa City35 - Quezon I - Pitogo36 - Quezon II - Infanta

REGION IV-B37 - Lubang - Lubang38 - Occidental Mindoro - San Jose39 - Oriental Mindoro - City of Calapan40 - Marinduque - Boac41 - Tablas - Odiongan, Romblon42 - Romblon - Romblon43- Busuanga - Coron, Palawan44 - Palawan - Puerto Princesa City

REGION VIII

76 - Don Orestes Romualdez - Tolosa77 - Leyte II - Tacloban City78 - Leyte III - Tunga79 - Leyte IV - Hilongos80 - Leyte V - Ormoc City81 - Southern Leyte - City of Maasin82 - Biliran Island - Naval83 - Northern Samar - Bobon84 - Samar I - Calbayog City85 - Samar II - Paranas86 - Eastern Samar - City of Borongan

37

41 42

44

50

57

62

65

68

72

75

87 93

98

99

107

109

110

112

114

115

Lapu-Lapu

Pangataran

Almagro

55

Caluya

Semirara

Sibay

Cuyo

Magsaysay

Rapu-Rapu

Alabat

TingloyIsla Verde

Patnanungan

Jomalig

Anda

Culion I

Linapacan Is.

Araceli Is.

Dumaran Is.

Balabac

TURTLE ISLANDS

Sitangkai I BongaoTandubas I

108

Pata I.

REGION X

91 - Misamis Occidental I - Calamba92 - Misamis Occidental II - Ozamis City93 - Misamis Oriental I - Laguindingan94 - Misamis Oriental II - Medina95 - Bukidnon I - Maramag96 - Bukidnon II - Manolo Fortich97 - Camiguin - Mambajao98 - Lanao del Norte - Tubod

25

22Polillo Is.

REGION III

19 - Aurora - Baler20 - Tarlac I - Gerona21 - Tarlac II - Concepcion22 - Nueva Ecija I - San Isidro23 - Nueva Ecija II-Area 1 - Talavera Nueva Ecija II-Area 2 - San Leonardo24 - San Jose City - San Jose City25 - Pampanga Rural - Anao, Mexico26 - Pampanga I - Mexico27 - Pampanga II - Guagua28 -Pampanga III - Apalit29 - Peninsula - City of Balanga30 - Zambales I - Palauig31 - Zambales II - Castillejos

CAR

14 - Abra - Bangued15 - Benguet - La Trinidad16 - Ifugao - Lagawe17 - Kalinga- Apayao - City of Tabuk18 - Mountain Province - Bontoc

REGION II

07 - Batanes - Basco08 - Cagayan I - Solana09 - Cagayan II - Aparri10 - Isabela I - Alicia11 - Isabela II - Ilagan12 - Nueva Vizcaya - Dupax del Sur13 - Quirino - Diffun

REGION I01 - Ilocos Norte - Dingras02 - Ilocos Sur - Santiago03 - La Union - Aringay04 - Pangasinan I - Bani05 - Central Pangasinan - San Carlos City06 - Pangasinan III - City of Urdaneta

LUECO

DECORP

TEI

KALAYAANGROUP OFISLANDS

PECO

59

CEPALCO

COLIGHT

REGION XII

102 - North Cotabato - Matalam103 - South Cotabato I - City of Koronadal104 - South Cotabato II - General Santos City105 - Sultan Kudarat - City of Tacurong

Sarangani Is.

CARAGA

113 - Agusan del Norte - Butuan City114 - Agusan del Sur - San Francisco115 - Surigao del Norte - Surigao City116 - Siargao - Dapa, Surigao del Norte117 - Dinagat Island - San Jose118 - Surigao del Sur I - City of Bislig119 - Surigao del Sur II - City of Tandag

REGION IX

87 - Zamboanga del Norte - Dipolog City88 - Zamboanga del Sur I - Pagadian City89 - Zamboanga del Sur II - Ipil,

Zamboanga Sibugay90 - Zamboanga City - Zamboanga City

ARMM

106 - Tawi-Tawi - Bongao107 - Siasi - Siasi, Sulu108 - Sulu - Jolo109 - Basilan - City of Isabela110 - Cagayan de Sulu - Mapun, Tawi-Tawi111 - Lanao del Sur - Marawi City112 - Maguindanao - Datu Odin Sinsuat (Dinaig), Maguindanao

Olutanga

Tagbilaran City

104

102

103

91

90

89

101

100

96

119

118

113

95

94

111

105

92

88

67

6669 74

81

79

76

7880 77

7371

70

116117

86

8582

83

84

49 53

48

52

47

45

3546

39

38

43

63

64

58

56

60

40

02

21

24

27

26

28

PAMESAEC

SFELAPCO CELCOR

VECO

MECO

PES Bohol

REGION V

45 - Camarines Norte - Daet46 - Camarines Sur I - Libmanan47 - Camarines Sur II - Naga City48 - Camarines Sur III - Iriga City49 - Camarines Sur IV - Tigaon50 - Albay - Legazpi City51 - Sorsogon I - Irosin52 - Sorsogon II - City of Sorsogon53 - First Catanduanes - Bato54 - Masbate - Mobo55 - Ticao - San Jacinto, Masbate

REGION VI56 - Aklan - Lezo57- Antique - San Jose58 - Capiz - Panitan59 - Iloilo I - Tigbauan60 - Iloilo II - Pototan61 - Iloilo III - Sara62 - Guimaras - Jordan63 - V-M-C Rural - Manapla64 - Central Negros - Bacolod City65 - Negros Occidental. - City of Kabankalan

PUD(Olongapo City)

32

34

ELECTRIC DISTRIBUTION UTILITIESLOCATION AND JURISDICTION

Camiguin I

Calayan I

Panuitan I

Babuyan Is.

07

Itbayat

Uyugan

Sabtang

BASCO

106

17

15

11

51

54

61

97

DLPC

PIOUs / LGUsECs

Head Quarters

Legend:

BELS

MERALCO

Banton Electric System

Corcuera Electric System

Concepcion Electric System

IEES

1

REGION VII

66 - Negros Oriental I - Bindoy67 - Negros Oriental II - Dumaguete City68 - Bantayan Island - Bantayan, Cebu69 - Cebu I - Dumanjug70 - Cebu II - City of Bogo71 - Cebu III - Toledo City72 - Siquijor - Larena73 - Camotes Is. - Poro, Cebu74 - Bohol I - Tubigon75 - Bohol II - Jagna

MMPC

HFMPC

Claveria Mun.Electric System

Page 9: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

Served by Electric Cooperatives:

1 Region I 116 116 116 116 100 3,027 3,026 3,026 3,027 100.00 844,300 704,292 726,211 750,870 89

2 Region II 96 96 96 96 100 2,369 2,269 2,282 2,368 99.96 660,700 510,652 530,141 547,856 83

3 CAR 73 73 73 73 100 1,112 1,078 1,084 1,112 100.00 315,200 231,280 239,591 248,098 79

4 Region III 100 100 100 100 100 2,236 2,230 2,231 2,234 99.91 1,128,600 946,037 986,041 1,026,706 91

5 Region IV-A 71 71 71 71 100 1,946 1,943 1,943 1,945 99.95 641,900 526,090 544,530 565,744 88

6 Region IV-B 69 69 69 69 100 1,415 1,365 1,368 1,405 99.29 546,500 322,878 341,127 360,028 66

7 Region V 112 112 112 112 100 3,410 3,217 3,359 3,407 99.91 1,006,100 684,980 709,673 740,543 74

8 Region VI 132 132 132 132 100 3,870 3,841 3,850 3,867 99.92 1,277,900 826,291 865,781 907,313 71

9 Region VII 121 121 121 121 100 2,713 2,712 2,713 2,713 100.00 951,600 610,931 646,697 682,738 72

10 Region VIII 142 142 142 142 100 4,372 4,151 4,233 4,321 98.83 789,200 515,306 545,707 570,039 72

11 Region IX 72 72 72 72 100 1,865 1,750 1,818 1,862 99.84 614,500 332,820 350,225 365,855 60

12 Region X 85 85 85 85 100 1,843 1,767 1,769 1,778 96.47 598,500 422,759 443,695 464,093 78

13 Region XI 44 44 44 44 100 894 891 891 894 100.00 527,900 291,023 303,679 314,802 60

14 Region XII 55 49 49 55 100 1,226 979 997 1,221 99.59 749,900 329,625 343,736 386,818 52

15 ARMM 114 116 117 114 100 2,422 2,178 2,303 2,398 99.01 550,300 153,514 163,891 143,298 26

16 CARAGA 73 73 73 73 100 1,310 1,285 1,291 1,308 99.85 460,400 355,829 372,862 387,804 84

Total 1,475 1,471 1,472 1,475 100 36,030 34,682 35,158 35,860 99.53 11,663,500 7,764,307 8,113,587 8,462,605 73

Notes on Barangay Energization :

A barangay is considered energized/completed through on-grid electrification when the center of the barangay has gained access to power through

the ECs' backbone lines. On the other hand, off-grid electrification entails the installation of photovoltaic solar home system (PV-SHS), battery

charging stations (BCS) or micro hydro projects. These schemes are mostly applied to far flung or remote areas where infrastructure such as road

network is not yet available, and are composed of unclustered houses with limited load.

As of yearend 2009, there are about 2,195 off-grid barangays. Continuing efforts are being made for these barangays to be electrified on-grid

through the line enhancement program.

Potential

C O N N E C T I O N S

Served

B A R A N G A Y SMUNICIPALITIES / CITIES

REGIONCoverage

EnergizedCoverage

Energized/Completed

22

Others 199,411 224,202 211,404 220,188 236,421 245,435 239,724 252,670 271,313 289,576

Public Bldg. 321,342 352,854 403,708 469,397 501,519 514,884 530,270 579,890 620,200 668,943

Industrial 1,340,888 1,422,973 1,478,426 1,609,404 1,644,799 1,728,355 1,786,017 1,846,922 1,918,956 2,098,300

Residential 3,754,448 4,048,965 4,382,196 4,938,520 5,367,672 5,406,834 5,311,960 5,526,300 5,716,024 6,245,095

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. ELECTRIC COOPERATIVES MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

NATIONAL SUMMARY

Commercial 1,238,267 1,341,742 1,433,782 1,574,591 1,795,975 1,884,816 1,925,309 2,081,256 2,224,141 2,426,958

Total 6,854,356 7,390,736 7,909,516 8,812,100 9,546,386 9,780,324 9,793,280 10,287,038 10,750,634 11,728,872

Page 10: The 2007-2009 RE Chronicle

LEGEND :

3

Energized Coop System

Energized Other System

Headquarters

N

PANELCO IBani, Pangasinan

INECDingras, Ilocos Norte

ISECOSantiago, Ilocos Sur

LUELCOAringay, La Union

Served byDagupan Electric Corp.

CENPELCOSan Carlos City

Served byLa Union Electric Co.

PANELCO IIICity of Urdaneta

Page 11: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Ilocos Norte 23 23 23 23 100 557 557 557 557 100 133,000 123,522 127,286 131,302 99

2 Ilocos Sur 34 34 34 34 100 768 767 767 768 100 143,000 127,093 132,283 139,110 97

3 La Union 18 18 18 18 100 536 536 536 536 100 124,900 105,170 108,044 111,326 89

4 Pangasinan I 9 9 9 9 100 192 192 192 192 100 72,600 54,667 56,046 57,536 79

5 Central Pangasinan 15 15 15 15 100 553 553 553 553 100 210,600 168,274 172,885 178,054 85

6 Pangasinan III 17 17 17 17 100 421 421 421 421 100 160,200 125,566 129,667 133,542 83

Total 116 116 116 116 100 3,027 3,026 3,026 3,027 100 844,300 704,292 726,211 750,870 89

MUNICIPALITIES/CITIES BARANGAYS

CoverageEnergized

CoverageEnergized

REGION I

Served

CONNECTIONS

Potential

ILOCOS REGION

ELECTRIC DISTRIBUTION

UTILITIES

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 383,043 412,984 457,396 501,646 534,777 532,807 548,211 550,420 521,460 579,785

Commercial 93,910 109,575 125,801 138,600 149,141 159,894 168,020 177,828 170,672 200,273

Industrial 33,721 34,911 38,061 42,361 44,234 45,267 49,293 52,226 49,030 60,043

Public Bldgs. 27,105 30,041 34,674 39,426 46,307 48,229 49,355 52,301 51,597 55,833

Others 14,366 15,332 16,028 18,313 18,350 15,707 13,082 13,476 13,979 15,712

Total 552,145 602,843 671,960 740,346 792,809 801,904 827,961 846,251 806,738 911,646

4

Page 12: The 2007-2009 RE Chronicle

INECINEC

5

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

15 MVA Substation

NPC Substation

Wind Power

Mini Hydro

3 PH Backbone Line

H Q

Energized Coop System

LEGEND :

MH

W P

PAGUDPUD

BANGUIBURGOS

PASUQUIN

BACARRA

CARASI

PINILI

DUMALNEG

MARCOS BANNA(ESPIRITU)CURRIMAO

BADOC

NUEVA ERA

DINGRAS

PIDDIG

SARRAT

VINTAR

SAN. NICOLAS

CITY ofBATAC

PAOAYSOLSONA

ADAMS

LAOAG CITY

H Q

MHN

W P

Page 13: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : July 7, 1971

II. DATE OF FIRST ENERGIZATION : September 11, 1973

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 68.5 98.5 98.5

Subsidy 22.0 63.7 63.7

25.000

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Adams 1 1 1 1 100 0 300 165 176 191 64

2 Bacarra 43 43 43 43 100 0 7,800 7,278 7,452 7,703 99

3 Bangui 15 15 15 15 100 0 4,800 4,526 4,660 4,749 99

4 Burgos 11 11 11 11 100 0 2,500 2,343 2,393 2,440 98

5 Carasi 3 3 3 3 100 0 300 161 162 178 59

6 Dumalneg 1 1 1 1 100 0 300 280 288 296 99

7 Laoag City 80 80 80 80 100 0 28,000 26,375 27,154 27,923 99

8 Pagudpud 16 16 16 16 100 0 4,800 4,453 4,622 4,790 99

9 Pasuquin 33 33 33 33 100 0 6,500 5,906 6,190 6,423 99

10 Piddig 23 23 23 23 100 0 5,200 4,760 4,931 5,055 97

11 Sarrat 24 24 24 24 100 0 5,800 5,465 5,590 5,723 99

12 Vintar 33 33 33 33 100 0 7,500 7,048 7,302 7,469 99

Second District

13 Badoc 31 31 31 31 100 0 6,200 5,692 5,907 6,143 99

14 City of Batac 43 43 43 43 100 0 12,100 11,384 11,687 12,028 99

15 Currimao 23 23 23 23 100 0 2,400 2,165 2,245 2,330 97

16 Dingras 31 31 31 31 100 0 8,400 7,809 8,008 8,377 99

17 Banna (Espiritu) 20 20 20 20 100 0 3,900 3,684 3,765 3,823 98

18 Marcos 13 13 13 13 100 0 3,500 3,215 3,297 3,435 98

19 Nueva Era 11 11 11 11 100 0 1,400 1,297 1,310 1,348 96

20 Paoay 31 31 31 31 100 0 4,600 4,190 4,293 4,400 96

21 Pinili 25 25 25 25 100 0 3,400 2,990 3,136 3,295 97

22 San Nicolas 24 24 24 24 100 0 8,300 7,701 7,926 8,218 99

23 Solsona 22 22 22 22 100 0 5,000 4,635 4,792 4,965 99

Total 557 557 557 557 100 0 133,000 123,522 127,286 131,302 99

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 107,388 90,509 90,668 Residential 113,722 116,831 118,010

MWH Purchased 15,670 15,707 16,543 Commercial 6,750 7,109 7,588

MWH Sold 13,398 13,718 14,404 Industrial 11 12 13

Systems Loss (%) 14 12 13 Public Building 2,490 2,630 2,679

Peak Load (KW) 38,318 34,907 40,277 Others 549 704 3,012

Load Factor (%) 56 62 56 Total 123,522 127,286 131,302

Collection Efficiency (%) 100 97 95

Ave. Systems Rate (P/KWH) 8.01 6.60 6.29

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 69,224 73,144 80,237 87,221 91,061 90,113 93,515 92,890 94,565 99,465

Commercial 23,857 28,910 34,730 37,464 39,883 42,775 44,723 46,891 47,941 49,221

Industrial 5,211 5,358 4,941 5,124 5,255 4,380 3,603 4,068 4,000 4,722

Public Building 8,610 9,452 10,780 11,301 11,896 11,756 12,482 12,538 13,488 13,748

Others 3,126 3,708 4,321 4,462 4,743 4,614 4,750 4,394 4,620 5,695

Total 110,028 120,572 135,009 145,572 152,838 153,638 159,073 160,781 164,614 172,851

Wind

Pagudpud Agua Grande/INEC

Mr. Lorenzo Rey G. Ruiz

Engr. Renato A. Balintec

A+

Mr. Reynaldo M. Lazo

Engr. Renato A. Balintec

A+

Monthly Average

B A R A N G A Y S

Engr. Renato A. Balintec (OIC)

A+

Location

POWER PLANT

122,381

Bangui

Mega Large

North Wind Dev't Corp

C O N N E C T I O N S

Legislative DistrictCoverage

EnergizedUnenerg.

MUNICIPALITIES/CITYServed

Potential

ILOCOS NORTE ELECTRIC COOPERATIVE, INC. (INEC)Brgy. Suyo, Dingras, Ilocos Norte

Tel Nos. (077) 784-7126, 784-7546 to 47; Telefax Nos. (077) 771-3343, 784-7125; E-mail: [email protected]

20092007 2008

Mr. Lorenzo Rey G. Ruiz

Mega Large Mega Large

4.500Mini Hydro

125,966119,066

Project Name/Proponent Type

6

Page 14: The 2007-2009 RE Chronicle

7

N

SINAIT

SANEMILIO

SUYO

SIGAY

BANAYOYO

NAGBUKEL

SANTACATALINA

BANTAY

SAN ILDEFONSO

SAN JUAN (Lapog)

SANTA

ALILEMTAGUDIN

SUGPON

SANTA CRUZ

CERVANTES

GREGORIODEL PILAR(Concepcion) QUIRINO

(Angkaki)

LIDLIDDASANTIAGO

BURGOS

SANESTEBAN

SANTA MARIA

NARVACAN

SANTO DOMINGO

MAGSINGAL

GALIMUYOD

SALCEDO (Baugen)

CITY ofCANDON

SANTALUCIA

CAOAYAN

SANVICENTE

CITY of VIGAN

H Q

P P

CABUGAO

MH

LEGEND :

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

15 MVA Substation

Power Plant

Mini Hydro

3 PH Backbone Line

Energized Coop System

H Q

P PMH

Page 15: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : January 24, 1974

II. DATE OF FIRST ENERGIZATION : December 1974

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 2.3 2.3 2.3 70.000

Subsidy 47.7 86.2 86.2 0.530

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Bantay 34 34 34 34 100 0 6,900 6,220 6,461 6,809 99

2 Cabugao 33 33 33 33 100 0 6,900 6,147 6,520 6,893 99

3 Caoayan 17 17 17 17 100 0 3,700 3,388 3,487 3,629 98

4 Magsingal 30 30 30 30 100 0 5,700 5,070 5,317 5,648 99

5 San Ildefonso 15 15 15 15 100 0 1,400 1,263 1,288 1,348 96

6 San Juan (Lapog) 32 32 32 32 100 0 5,300 4,734 4,947 5,228 99

7 San Vicente 7 7 7 7 100 0 2,600 2,318 2,404 2,521 97

8 Sinait 44 44 44 44 100 0 5,400 4,842 5,033 5,340 99

9 Santa Catalina 9 9 9 9 100 0 2,800 2,596 2,677 2,739 98

10 Santo Domingo 36 36 36 36 100 0 5,500 4,985 5,137 5,457 99

11 City of Vigan 39 39 39 39 100 0 12,000 11,269 11,545 11,924 99

Second District

12 Alilem 9 9 9 9 100 0 1,300 873 954 1,042 80

13 Banayoyo 14 14 14 14 100 0 1,800 1,555 1,623 1,708 95

14 Burgos 26 26 26 26 100 0 2,500 2,267 2,358 2,490 99

15 City of Candon 42 42 42 42 100 0 14,200 13,220 13,670 14,177 99

16 Cervantes 13 12 12 13 100 0 3,100 1,457 1,672 2,149 69

17 Gregorio del Pilar (Concepcion) 7 7 7 7 100 0 900 709 794 833 93

18 Galimuyod 24 24 24 24 100 0 2,200 1,957 2,074 2,137 97

19 Lidlidda 11 11 11 11 100 0 900 724 761 800 89

20 Nagbukel 12 12 12 12 100 0 1,300 1,120 1,167 1,225 94

21 Narvacan 34 34 34 34 100 0 9,400 8,773 9,050 9,396 99

22 Quirino (Angkaki) 9 9 9 9 100 0 1,400 911 975 1,337 96

23 Salcedo (Baugen) 21 21 21 21 100 0 2,200 1,905 1,985 2,120 96

24 San Emilio 8 8 8 8 100 0 1,400 1,046 1,147 1,238 88

25 San Esteban 10 10 10 10 100 0 2,100 1,913 1,967 2,038 97

26 Santa 26 26 26 26 100 0 3,200 2,884 2,957 3,053 95

27 Santiago 24 24 24 24 100 0 4,200 3,854 4,039 4,188 99

28 Sigay 7 7 7 7 100 0 500 393 420 423 85

29 Santa Cruz 49 49 49 49 100 0 9,300 8,492 8,849 9,013 97

30 Santa Lucia 36 36 36 36 100 0 5,400 5,106 5,213 5,341 99

31 Santa Maria 33 33 33 33 100 0 7,300 6,719 6,923 7,241 99

32 Sugpon 6 6 6 6 100 0 500 209 231 235 47

33 Suyo 8 8 8 8 100 0 1,700 1,278 1,353 1,472 87

34 Tagudin 43 43 43 43 100 0 8,000 6,896 7,285 7,918 99

Total 768 767 767 768 100 0 143,000 127,093 132,283 139,110 97

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 95,874 81,208 86,648 Residential 118,772 123,490 126,278

MWH Purchased 14,463 14,998 15,675 Commercial 5,827 6,172 6,305

MWH Sold 12,397 12,932 13,661 Industrial 43 40 44

Systems Loss (%) 14 13 13 Public Building 1,932 2,011 2,058

Peak Load (KW) 33,627 34,077 35,997 Others 519 570 4,425

Load Factor (%) 59 60 60 Total 127,093 132,283 139,110

Collection Efficiency (%) 99 101 101

Ave. Systems Rate (P/KWH) 7.73 6.28 6.34

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 67,740 71,488 79,581 88,312 92,922 95,226 97,425 99,485 102,664 108,760

Commercial 15,230 17,220 19,621 23,266 25,227 26,847 29,680 31,335 33,731 36,300

Industrial 5,810 4,447 4,665 5,709 5,283 4,796 5,166 5,192 4,874 4,608

Public Building 5,495 5,724 6,430 7,687 8,310 8,976 9,629 10,026 10,843 11,012

Others 978 964 1,265 1,642 1,635 2,027 2,100 2,722 3,069 3,254

Total 95,253 99,843 111,562 126,616 133,376 137,871 144,000 148,760 155,181 163,934

ILOCOS SUR ELECTRIC COOPERATIVE, INC. (ISECO)Bigbiga, Santiago, Ilocos Sur 2707

Telefax No. (077) 742-6175 (Main Office); Fax No. (077) 742-5036

20082007 2009

Legislative DistrictPotential

Monthly Average

141,192

MUNICIPALITIES/CITIES

135,787

CoverageEnergized

Project Name/Proponent

Unenerg.Served

Mega Large

147,435

B A R A N G A Y S C O N N E C T I O N S

Mega Large

POWER PLANT

Location

Alilem

Mr. Abelardo Z. Dugat

Mr. Cesar G. Gironella

A+A+

Mr. Tirso S. Savellano, Jr.Mr. Abelardo Z. Dugat

Mr. Cesar G. Gironella Mr. Cesar G. Gironella

A+

Suyo Dawara/ISECO Mini Hydro

Mega Large

Type

Hedcor Hydro

8

Page 16: The 2007-2009 RE Chronicle

9

N

LEGEND :

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Mini Hydro

3 PH Backbone Line

Energized Coop SystemEnergized Other System

H Q

MH

Served byLa Union Electric Co.

Partly served byLa Union Electric Co.

SAN GABRIEL

BURGOS

CABA

SISON PART OF PANGASINAN

BAGULIN

SANTOTOMAS

PUGO

ROSARIO

TUBAO

SANTOL

BALAOAN

ARINGAY

AGOO

SAN JUAN

BAUANG

LUNA

BANGAR

SUDIPEN

SANFABIAN SAN

JACINTOPOZZORUBIO

CITY ofSAN FERNANDO

MH

H Q

NAGUILIAN

BACNOTAN

Page 17: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 6, 1971

II. DATE OF FIRST ENERGIZATION : August 1, 1974

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 495.2 913.7 1,284.7 0.200

Subsidy 67.1 101.3 101.3

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Bacnotan 47 47 47 47 100 0 8,200 7,677 7,871 8,147 99

2 Balaoan 36 36 36 36 100 0 7,300 6,076 6,219 6,427 88

3 Bangar 33 33 33 33 100 0 6,900 5,853 6,002 6,190 90

4 Luna 40 40 40 40 100 0 7,000 6,477 6,614 6,713 96

5 San Gabriel 15 15 15 15 100 0 3,200 1,786 1,876 1,955 61

6 Santol 11 11 11 11 100 0 2,400 1,155 1,276 1,350 56

7 Sudipen 17 17 17 17 100 0 3,300 2,743 2,860 2,920 88

City of San Fernando 14 14 14 14 100 0 1,700 1,271 1,319 1,346 79

San Juan 34 34 34 34 100 0 4,700 4,431 4,517 4,645 99

Second District

8 Agoo 49 49 49 49 100 0 12,700 11,697 11,946 12,656 99

9 Aringay 24 24 24 24 100 0 9,100 8,281 8,453 8,682 95

10 Bagulin 10 10 10 10 100 0 2,100 1,002 1,060 1,109 53

11 Burgos 12 12 12 12 100 0 1,400 1,046 1,112 1,134 81

12 Caba 17 17 17 17 100 0 4,300 4,049 4,163 4,253 99

13 Naguilian 37 37 37 37 100 0 9,500 8,259 8,435 8,648 91

14 Pugo 14 14 14 14 100 0 3,100 2,828 2,946 3,040 98

15 Rosario 33 33 33 33 100 0 9,500 7,741 7,953 8,172 86

16 Santo Tomas 24 24 24 24 100 0 6,800 5,977 6,147 6,270 92

17 Tubao 18 18 18 18 100 0 5,400 4,633 4,779 4,867 90

Bauang 7 7 7 7 100 0 3,400 3,190 3,274 3,323 98

Fourth District, Pangasinan

San Fabian 8 8 8 8 100 0 2,000 1,435 1,470 1,513 76

San Jacinto 3 3 3 3 100 0 500 338 375 377 75

Fifth District, Pangasinan

18 Sison 28 28 28 28 100 0 9,200 6,405 6,533 6,730 73

Pozzorubio 5 5 5 5 100 0 1,200 820 844 859 72

Total 536 536 536 536 100 0 124,900 105,170 108,044 111,326 89

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 72,976 63,824 71,469 Residential 99,356 102,119 104,881

MWH Purchased 10,844 10,838 11,691 Commercial 3,779 3,875 4,307

MWH Sold 9,279 9,354 10,144 Industrial 132 110 109

Systems Loss (%) 14 13 13 Public Building 1,510 1,553 1,617

Peak Load (KW) 26,423 26,474 28,808 Others 393 387 412

Load Factor (%) 56 56 56 Total 105,170 108,044 111,326

Collection Efficiency (%) 100 101 104

Ave. Systems Rate (P/KWH) 7.87 6.82 7.05

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 55,098 58,541 64,841 71,236 75,258 75,148 75,318 77,356 76,301 80,310

Commercial 7,113 7,534 8,814 9,778 10,870 11,748 12,031 12,399 13,460 14,949

Industrial 9,809 9,189 10,687 13,026 11,431 11,538 11,902 11,578 12,588 16,068

Public Building 2,614 2,779 3,282 3,799 5,140 5,770 5,830 6,130 6,143 6,746

Others 3,679 3,479 4,146 4,391 4,158 3,008 3,749 3,880 3,751 3,650

Total 78,313 81,522 91,770 102,230 106,857 107,212 108,830 111,343 112,243 121,723

Mr. Sofronio D. Bambico

Mr. Ramon C. Posadas, Ph.D.

118,162

Mr. Roland A. Balagot

Mr. Ramon C. Posadas, Ph.D.

A+

Mega Large

Amburayan/LUELCO Mini Hydro

Type

A+

Mega Large

121,684

Ms Herminia M. Pascua

Mr. Ramon C. Posadas, Ph.D.

A+

Mega Large

LA UNION ELECTRIC COOPERATIVE, INC. (LUELCO)Sta. Rita East, Aringay, La Union 2503

Tel. Nos. (072) 714-0238, 521-3106, 714-0554; Fax No. (072) 714-0553; E-mail: [email protected]

2008 20092007

C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

Potential

Monthly Average

115,099

Legislative District

MUNICIPALITIES/CITYB A R A N G A Y S

Sudipen

POWER PLANT

Location Project Name/Proponent

10

Page 18: The 2007-2009 RE Chronicle

N

LEGEND :

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

15 MVA Substation

3 PH Backbone Line

Energized Coop SystemH Q

PANELCO IPANELCO I

11

BANI

CITY ofALAMINOS

MABINI

DASOL

AGNO

BURGOS

INFANTA

ANDABOLINAO

H Q

Page 19: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : September 28, 1972

II. DATE OF FIRST ENERGIZATION : December 14, 1975

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 9.0 9.0 9.0

Subsidy 54.5 54.5 69.5

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Agno 17 17 17 17 100 0 5,700 3,893 4,035 4,194 74

2 City of Alaminos 39 39 39 39 100 0 16,800 14,965 15,335 15,732 94

3 Anda 18 18 18 18 100 0 7,400 5,617 5,755 5,886 80

4 Bani 27 27 27 27 100 0 9,800 7,780 7,915 8,083 82

5 Bolinao 30 30 30 30 100 0 13,800 9,638 9,888 10,145 74

6 Burgos 14 14 14 14 100 0 4,100 2,546 2,634 2,706 66

7 Dasol 18 18 18 18 100 0 5,700 3,895 3,985 4,132 72

8 Infanta 13 13 13 13 100 0 4,600 3,282 3,359 3,422 74

9 Mabini 16 16 16 16 100 0 4,700 3,051 3,140 3,236 69

Total 192 192 192 192 100 0 72,600 54,667 56,046 57,536 79

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 39,637 37,666 37,059 Residential 51,386 52,623 54,039

MWH Purchased 5,985 5,739 5,756 Commercial 1,967 2,019 2,041

MWH Sold 4,825 4,706 4,809 Industrial 86 136 144

Systems Loss (%) 18 17 15 Public Building 1,084 1,100 1,095

Peak Load (KW) 14,117 14,416 14,185 Others 144 168 217

Load Factor (%) 58 55 56 Total 54,667 56,046 57,536

Collection Efficiency (%) 105 105 103

Ave. Systems Rate (P/KWH) 8.21 8.00 7.71

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 22,964 25,537 30,375 33,298 35,749 34,554 34,857 36,550 35,255 34,743

Commercial 3,801 4,350 4,909 5,224 5,702 8,919 9,604 9,633 7,771 5,703

Industrial 2,589 2,315 3,610 5,148 8,217 8,353 8,469 8,286 10,216 14,401

Public Building 1,193 1,423 1,786 2,081 2,416 3,256 2,783 3,011 2,887 2,207

Others 1,818 2,053 246 823 344 378 341 421 349 648

Total 32,365 35,678 40,926 46,574 52,427 55,459 56,054 57,901 56,478 57,702

Mr. Rolando O. Reinoso

-

PANGASINAN I ELECTRIC COOPERATIVE, INC. (PANELCO I)San Jose, Bani, Pangasinan

Tel. Nos. (075) 553-2200 to 03, 553-3494 to 95, 553-2198 to 99; Fax No. (075) 553-2005;E-mail:[email protected]

2007 20092008

Monthly Average

Ms. Amelia R. Olores

-

49,346

-

Legislative District

-

MUNICIPALITIES/CITY

Ms. Amelia R. Olores

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

Potential

-

50,573

Ms. Amelia R. Olores

Mr. Rolando O. Reinoso Mr. Rolando O. Reinoso

-

51,957

12

Page 20: The 2007-2009 RE Chronicle

13

LEGEND :

HQ Location

Municipality

Below 5 MVA Substation

5 MVA Substation

10 MVA Substation

20 MVA Substation

NPC Substation

Power Plant

3 PH Backbone Line

Energized Coop System

Energized Other System

H Q

P P

Served by Dagupan Electric Corp.

N

SAN CARLOS CITY

BUGALLON

SUAL

H Q

SANFABIAN

SANTABARBARA

DAGUPAN CITY

CALASIAO

ALCALA

MANGALDAN

MALASIQUI

BAYAMBANG

MANGATAREM

URBIZTONDO

BASISTA

AGUILAR

LABRADOR

LINGAYEN

BAUTISTA

BINMALEY

P P

SAN JACINTO

Page 21: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : October 6, 1975

II. DATE OF FIRST ENERGIZATION : May 6, 1976

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 721.8 979.2 1,450

Subsidy 40.1 91.4 91.4

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Sual 19 19 19 19 100 0 5,900 4,080 4,304 4,492 76

Second District

2 Aguilar 16 16 16 16 100 0 7,600 4,670 4,848 5,066 67

3 Basista 13 13 13 13 100 0 6,000 5,066 5,198 5,341 89

4 Binmaley 33 33 33 33 100 0 16,500 13,133 13,437 13,732 83

5 Bugallon 24 24 24 24 100 0 13,000 9,181 9,475 9,761 75

6 Labrador 10 10 10 10 100 0 4,400 3,642 3,751 3,876 88

7 Lingayen 32 32 32 32 100 0 20,200 18,167 18,737 19,326 96

8 Mangatarem 82 82 82 82 100 0 13,800 10,385 10,757 11,211 81

9 Urbiztondo 21 21 21 21 100 0 9,000 6,482 6,656 6,856 76

Third District

10 Bayambang 77 77 77 77 100 0 21,800 15,959 16,340 16,846 77

11 Malasiqui 73 73 73 73 100 0 25,600 19,709 20,183 20,787 81

12 San Carlos City (86) 84 84 84 84 100 0 34,100 30,176 30,856 31,654 93

Fourth District

13 Mangaldan 30 30 30 30 100 0 18,600 16,689 17,103 17,549 94

Fifth District

14 Alcala 21 21 21 21 100 0 8,000 6,735 6,920 7,111 89

15 Bautista 18 18 18 18 100 0 6,100 4,200 4,320 4,446 73

Total 553 553 553 553 100 0 210,600 168,274 172,885 178,054 85

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 118,216 95,836 116,687 Residential 159,010 163,467 168,268

MWH Purchased 18,023 17,523 19,800 Commercial 6,863 6,934 7,214

MWH Sold 15,085 14,825 16,960 Industrial 117 115 114

Systems Loss (%) 15 14 13 Public Building 1,784 1,876 1,939

Peak Load (KW) 44,335 44,907 49,736 Others 500 493 519

Load Factor (%) 56 53 55 Total 168,274 172,885 178,054

Collection Efficiency (%) 97 96 96

Ave. Systems Rate (P/KWH) 7.84 6.46 6.88

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 90,695 99,898 109,077 117,906 128,063 125,217 129,012 132,678 129,119 145,878

Commercial 13,883 18,430 20,922 24,021 24,661 25,706 27,816 30,642 31,293 37,683

Industrial 4,331 4,276 4,371 4,692 4,690 4,074 3,689 4,110 3,976 4,333

Public Building 5,150 5,996 6,400 7,628 10,875 11,086 11,445 12,340 12,108 13,940

Others 997 1,009 1,631 1,186 1,359 1,426 1,168 1,253 1,399 1,688

Total 115,056 129,609 142,401 155,433 169,648 167,510 173,130 181,023 177,895 203,522

Legislative District

Monthly Average

170,047

MUNICIPALITIES/CITY

POWER PLANT

Location Project Name/Proponent Type

Coverage

2007

Unenerg.Energized

Potential

Mrs. Josefina D. Mandapat

Mega Large

A

Mega Large

Served

175,406

B A R A N G A Y S C O N N E C T I O N S

165,274

SualSual Coal-Fired Power

Plant/San Miguel Energy Corporation

CENTRAL PANGASINAN ELECTRIC COOPERATIVE, INC. (CENPELCO)Padilla Street, San Carlos City, Pangasinan

Tel. Nos. (075) 532-5142, 532-2222 loc. 213; Telefax No. (075) 532-3146; Fax No. (075) 955-5499;E-mail:[email protected]

2008 2009

Mr. Cesar T. EspinoMr. Manuel S. Morillo

Coal 1294.000

Mrs. Josefina D. Mandapat

A

Mega Large

Dr. Henry J. Fernandez

Mrs. Josefina D. Mandapat

A

14

Page 22: The 2007-2009 RE Chronicle

15

LEGEND :Energized Coop System

MH

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

15 MVA Substation

Power Plant

Mini Hydro

3 PH Backbone Line

Energized Other System

H Q

P P

N

BALUNGAO

LAOACMANAOAG

Served byDagupan Electric Corp.

UMINGAN

SAN MANUEL

TAYUG

SAN NICOLAS

ROSALES

BINALONAN

SANTA MARIA

SANTOTOMAS

VILLASIS

NATIVIDAD

SAN QUINTIN

POZZORUBIO

MAPANDAN

CITY ofURDANETA

ASINGAN

H Q

P P

MH

Page 23: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 20, 1978

II. DATE OF FIRST ENERGIZATION : May 1979

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 376.8 376.8 376.8 345.000

Subsidy 124.4 124.4 153.8 0.750

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Third District

1 Mapandan 15 15 15 15 100 0 6,900 4,975 5,196 5,357 78

Fifth District

2 Binalonan 24 24 24 24 100 0 11,500 10,861 11,083 11,357 99

3 Laoac 22 22 22 22 100 0 6,000 4,448 4,560 4,688 78

4 Pozzorubio (34) 29 29 29 29 100 0 11,900 9,847 10,102 10,378 87

5 Santo Tomas 10 10 10 10 100 0 2,700 2,005 2,058 2,120 79

6 City of Urdaneta 34 34 34 34 100 0 25,300 22,783 23,528 24,278 96

7 Villasis 21 21 21 21 100 0 12,200 10,024 10,327 10,585 87

Sixth District

8 Asingan 21 21 21 21 100 0 11,600 8,943 9,172 9,427 81

9 Balungao 20 20 20 20 100 0 5,300 3,822 3,932 4,047 76

10 Natividad 18 18 18 18 100 0 4,500 3,233 3,386 3,489 78

11 Rosales 37 37 37 37 100 0 11,800 9,389 9,754 10,074 85

12 San Manuel 14 14 14 14 100 0 9,300 6,245 6,467 6,737 72

13 San Nicolas 33 33 33 33 100 0 7,100 3,434 3,631 3,805 54

14 San Quintin 21 21 21 21 100 0 6,400 5,267 5,431 5,557 87

15 Santa Maria 23 23 23 23 100 0 6,300 4,922 5,106 5,248 83

16 Tayug 21 21 21 21 100 0 8,200 6,400 6,620 6,808 83

17 Umingan 58 58 58 58 100 0 13,200 8,968 9,314 9,587 73

Total 421 421 421 421 100 0 160,200 125,566 129,667 133,542 83

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 119,289 104,187 112,634 Residential 115,833 119,499 123,365

MWH Purchased 19,187 19,128 21,122 Commercial 8,462 8,625 8,760

MWH Sold 15,537 15,592 17,447 Industrial 236 464 260

Systems Loss (%) 18 18 17 Public Building 872 898 1,000

Peak Load (KW) 43,851 45,189 49,668 Others 163 181 157

Load Factor (%) 60 58 58 Total 125,566 129,667 133,542

Collection Efficiency (%) 98 93 -

Ave. Systems Rate (P/KWH) 7.68 6.68 6.46

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 77,322 84,376 93,285 103,673 111,724 112,550 118,084 111,461 83,556 110,629

Commercial 30,026 33,131 36,805 38,847 42,799 43,898 44,166 46,928 36,476 56,417

Industrial 5,971 9,326 9,787 8,662 9,358 12,126 16,464 18,992 13,376 15,911

Public Building 4,043 4,667 5,996 6,930 7,670 7,386 7,186 8,256 6,128 8,180

Others 3,768 4,119 4,419 5,809 6,112 4,254 974 806 791 777

Total 121,130 135,619 150,292 163,921 177,663 180,214 186,874 186,443 140,327 191,914

2007

Engr. Solomon B. Villar Engr. Solomon B. Villar

20092008

Engr. Solomon B. Villar

Nancayasan, City of Urdaneta, Pangasinan

Tel. Nos. (075) 568-2399 to 2402, 568-2301; Telefax No. (075) 568-2413; E-mail: [email protected]; Website: www.panelco3.com

Served

C O N N E C T I O N S

Potential

-

-

125,488

Monthly Average

B A R A N G A Y S

Legislative DistrictCoverage

EnergizedUnenerg.

MUNICIPALITIES/CITY

Engr. Ferdinand M. Cerezo

Type

Ms. Neri F. Policina

Location

-

-

121,829

Engr. Ferdinand M. Cerezo

-

-

128,981

Hydro

Natividad Bachelor/PANELCO III Mini Hydro

POWER PLANT

Project Name/ProponentSan Roque Multi Purpose

Hydro/strategic Power Devt. Corp.

San Manuel

16

PANGASINAN III ELECTRIC COOPERATIVE, INC. (PANELCO III)

Page 24: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Headquarters

N

BATANELCOBasco, Batanes

NUVELCODupax del Sur,Nueva Vizcaya

CAGELCO ISolana, Cagayan

CAGELCO IIAparri, Cagayan

ISELCO IIIlagan, Isabela

QUIRELCODiffun, Quirino

ISELCO IAlicia, Isabela

17

Page 25: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Batanes 6 6 6 6 100 29 29 29 29 100 5,100 4,193 4,466 4,637 91

2 Cagayan I 12 12 12 12 100 376 357 368 376 100 123,200 95,159 99,822 103,440 84

3 Cagayan II 21 21 21 21 100 510 482 483 510 100 113,000 82,393 85,508 89,280 79

4 Isabela I 15 15 15 15 100 484 484 484 484 100 156,300 141,026 145,833 150,887 97

5 Isabela II 21 21 21 21 100 545 516 516 545 100 140,800 98,021 102,081 105,639 75

6 Nueva Vizcaya 15 15 15 15 100 275 251 252 274 99 83,200 59,398 60,360 60,360 73

7 Quirino 6 6 6 6 100 150 150 150 150 100 39,100 30,462 32,071 33,613 86

Total 96 96 96 96 100 2,369 2,269 2,282 2,368 99 660,700 510,652 530,141 547,856 83

REGION IICAGAYAN VALLEY REGION

ELECTRIC DISTRIBUTION

UTILITIES

MUNICIPALITIES/CITIES BARANGAYS

CoverageEnergized

CoverageEnergized

Potential

CONNECTIONS

Served

18

Total 340,296 361,603 410,405 430,688 482,315 494,288 489,192 509,673 535,817 582,090

Others 4,510 5,265 6,160 6,863 7,172 9,368 10,439 11,219 12,200 13,041

Public Bldgs. 20,318 21,465 24,768 25,998 27,311 28,010 28,728 34,260 36,983 39,643

Industrial 49,176 54,237 57,769 63,951 76,742 80,868 85,300 68,381 63,667 73,673

Commercial 60,127 62,607 72,067 72,655 79,687 82,570 82,392 109,351 124,682 135,783

Residential 206,165 218,029 249,641 261,221 291,403 293,472 282,333 286,462 298,285 319,950

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 26: The 2007-2009 RE Chronicle

BATANELCO

N

HQ Location

Municipality

Wind Power

Generating Set

3 PH Backbone Line

LEGEND :

Energized Coop System

H Q

G S

ITBAYAT

BASCO

MAHATAO

IVANA UYUGAN

SABTANG

G S

H Q

G S

G S

19

W P

W P

Page 27: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : October 16, 1981

II. DATE OF FIRST ENERGIZATION : April 24, 1989

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 6.1 6.1 6.1 2.591

Subsidy 38.9 40.3 40.3 0.180

0.163

0.326

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District1 Basco 6 6 6 6 100 0 2,500 2,131 2,309 2,390 96

2 Itbayat 5 5 5 5 100 0 900 655 688 714 79

3 Ivana 4 4 4 4 100 0 400 320 335 351 88

4 Mahatao 4 4 4 4 100 0 500 413 435 450 90

5 Sabtang 6 6 6 6 100 0 400 357 374 389 97

6 Uyugan 4 4 4 4 100 0 400 317 325 343 86

Total 29 29 29 29 100 0 5,100 4,193 4,466 4,637 91

VIII. GENERAL STATISTICS

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 2,123 2,043 2,155 Residential 3,225 3,403 3,509

MWH Purchased 372 368 369 Commercial 360 394 416

MWH Sold 336 335 333 Industrial - - -

Systems Loss (%) 9 9 10 Public Building 225 268 251

Peak Load (KW) 1,062 1,102 1,298 Others 383 401 461

Load Factor (%) 48 46 39 Total 4,193 4,466 4,637

Collection Efficiency (%) 102 100 104

Ave. Systems Rate (P/KWH) 6.31 6.10 6.48

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 1,447 1,455 1,873 2,050 2,177 2,183 2,210 2,351 2,313 2,280

Commercial 234 230 345 454 463 528 573 632 675 670

Industrial - - - - - - - - - -

Public Building 299 323 488 597 609 725 698 789 787 754

Others 59 120 199 201 227 278 249 263 246 288

Total 2,039 2,128 2,905 3,302 3,475 3,713 3,730 4,035 4,021 3,992

Diesel

NPC-SPUG Diesel

Type

Diesel

Legislative District

Itbayat

NPC-SPUG

Basco Wind Turbine

Monthly Average

B A R A N G A Y S C O N N E C T I O N S

Coverage Potential

MUNICIPALITIES

IX. CONNECTION PER TYPE OF CONSUMER : (Cum)

EnergizedUnenerg.

Served

BATANES ELECTRIC COOPERATIVE, INC. (BATANELCO)Basco, Batanes

Cel. Nos. (0921)545-9972; E-mail:bataneselco2yahoo.com

2008 20092007

Location

A+

Project Name/Proponent

Basco

3,911 4,233

Sabtang NPC-SPUG

Mr. Arthur E. Faeldon

Ms. Victoria A. Mata (OIC)

Mr. Wilfredo D. Cabitac

Ms. Victoria A. Mata (OIC)

A+

SmallSmall

NPC-SPUG

Mr. Arthur E. Faeldon

Ms. Victoria A. Mata (OIC)

A

Small

4,046

POWER PLANT

20 20

Page 28: The 2007-2009 RE Chronicle

N

21

LEGEND :

Municipality

5 MVA Substation

10 MVA Substation

15 MVA Substation

3 PH Backbone Line

Energized Coop System

HQ LocationH Q

BAGGAO

RIZAL

ALCALA

AMULUNG

IGUIG

PENABLANCA

ENRILE

SOLANA

PIAT

TUAO

TUGUEGARAO

CITY

SANTO NINO (Faire)

H Q

Page 29: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : November 25, 1971II. DATE OF FIRST ENERGIZATION : December 1975

III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009

Residual Loan 632.5 632.5 753.1Subsidy 67.8 113.4 123.5

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District

1 Alcala 25 25 25 25 100 0 7,400 5,615 5,896 6,071 822 Baggao 48 47 47 48 100 0 14,500 8,674 9,428 9,801 68

Second District3 Piat 18 18 18 18 100 0 4,500 3,390 3,565 3,683 824 Rizal 29 23 23 29 100 0 3,200 1,491 1,565 1,611 505 Santo Nino (Faire) (31) 29 21 28 29 100 0 4,600 2,571 2,999 3,199 70

Third District6 Amulung 47 45 47 47 100 0 9,400 5,240 5,808 6,203 667 Enrile 22 22 22 22 100 0 6,500 6,056 6,248 6,410 998 Iguig 23 23 23 23 100 0 5,200 4,734 4,953 5,075 989 Penablanca 24 22 24 24 100 0 8,300 5,970 6,314 6,730 81

10 Solana 38 38 38 38 100 0 14,800 11,028 11,463 11,900 8011 Tuao (32) 24 24 24 24 100 0 9,500 6,828 7,176 7,480 7912 Tuguegarao City 49 49 49 49 100 0 35,300 33,562 34,407 35,277 99

Total 376 357 368 376 100 0 123,200 95,159 99,822 103,440 84

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 76,147 66,393 70,790 Residential 85,704 89,966 93,279 MWH Purchased 10,554 10,927 11,524 Commercial 6,760 6,868 7,136 MWH Sold 9,119 9,593 10,123 Industrial 3 3 5 Systems Loss (%) 13 11 11 Public Building 1,319 1,359 1,415 Peak Load (KW) 27,964 28,771 31,570 Others 1,373 1,626 1,605 Load Factor (%) 52 52 50 Total 95,159 99,822 103,440 Collection Efficiency (%) 97 97 97 Ave. Systems Rate (P/KWH) 8.35 6.92 6.99

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 37,644 40,292 45,826 50,104 54,726 56,110 55,159 55,723 58,680 62,506 Commercial 25,253 27,353 29,492 30,513 33,254 35,571 36,281 38,794 40,868 42,540 Industrial 604 562 622 460 365 438 406 503 551 553 Public Building 7,435 7,993 8,802 9,406 9,524 9,721 10,074 10,972 11,236 12,009 Others 1,999 2,400 2,575 2,475 2,902 3,097 2,945 3,431 3,781 3,869 Total 72,935 78,600 87,317 92,958 100,771 104,937 104,865 109,423 115,116 121,477

Monthly Average

88,522

B A R A N G A Y S C O N N E C T I O N S

Coverage

Mega LargeMega Large

MUNICIPALITIES/CITY

Legislative DistrictServed

A+ A

PotentialEnergized

86,392

Mr. Lorenzo L. Trinidad, Jr.Mr. Lorenzo L. Trinidad, Jr.

A+Mega Large

96,171

Unenerg.

2007Mr. Lorenzo L. Trinidad, Jr.

Engr. Tito R. Lingan

CAGAYAN I ELECTRIC COOPERATIVE, INC. (CAGELCO I)Maddarulug, Solana, Cagayan

Tel. Nos. (078) 844-1595, 824-8039, 501-0062 Telefax No.(078) 844-4528, 501-0882; E-mail:[email protected]/[email protected]

20092008

Engr. Tito R. Lingan Engr. Tito R. Lingan

22

Page 30: The 2007-2009 RE Chronicle

CAGELCO IICAGELCO II

LEGEND :

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Generating Set

3 PH Backbone Line

Energized Coop System

H Q

G S

23

N

PART OF APAYAO

SANTAPRAXEDES

CLAVERIA

PUDTOL

LUNA

APARRI

BALLESTEROS

ABULUG

SANCHEZ MIRA

PAMPLONA

G S

GONZAGA

BUGUEY

ALLACAPAN

GATTARAN

LASAM

SANTA ANA

CAMALANIUGAN

LAL-LO

CAMIGUIN IS

CALAYAN IS

FLORA

SANTAMARCELA

SANTATERESITA

H Q

Page 31: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : January 20, 1978

II. DATE OF FIRST ENERGIZATION : July 1979

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 26.1 53.2 159.3 0.426

Subsidy 48.4 92.1 96.3

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Lone District, Apayao

1 Flora 16 11 11 16 100 0 3,300 1,626 1,695 1,776 54

2 Luna 22 20 20 22 100 0 3,100 2,102 2,165 2,222 72

3 Pudtol 22 13 13 22 100 0 2,400 1,199 1,251 1,279 53

4 Santa Marcela 13 13 13 13 100 0 2,200 1,336 1,398 1,491 68

Calanasan 1 1 1 1 100 0 200 88 97 103 52First District

5 Aparri 42 41 41 42 100 0 12,900 10,427 10,694 10,994 85

6 Buguey 30 30 30 30 100 0 5,800 4,801 4,952 5,134 89

7 Camalaniugan 28 28 28 28 100 0 4,700 3,986 4,125 4,274 91

8 Gattaran 50 49 49 50 100 0 10,500 7,538 7,863 8,132 77

9 Gonzaga 25 25 25 25 100 0 7,000 5,304 5,549 5,901 84

10 Lal-lo 35 34 35 35 100 0 8,000 6,118 6,316 6,520 82

11 Santa Ana 16 15 15 16 100 0 4,700 3,418 3,603 3,777 80

12 Santa Teresita 13 13 13 13 100 0 3,000 2,352 2,392 2,439 81Second District

13 Abulug 20 20 20 20 100 0 5,800 4,208 4,437 4,590 79

14 Allacapan 27 27 27 27 100 0 5,900 3,468 3,748 4,135 70

15 Ballesteros 19 19 19 19 100 0 6,000 4,965 5,107 5,284 88

16 Calayan 12 5 5 12 100 0 2,900 314 314 314 11

17 Claveria 41 41 41 41 100 0 6,500 5,715 5,819 6,014 93

18 Lasam 30 30 30 30 100 0 7,400 5,052 5,286 5,523 75

19 Pamplona 18 18 18 18 100 0 4,400 2,964 3,117 3,244 74

20 Sanchez-Mira 18 18 18 18 100 0 5,100 4,703 4,836 5,084 99

21 Santa Praxedes 10 9 9 10 100 0 700 533 560 604 86

Santo Nino (Faire) 2 2 2 2 100 0 500 176 184 446 89

Total 510 482 483 510 100 0 113,000 82,393 85,508 89,280 79

VIII. GENERAL STATISTICS

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 42,708 40,055 45,931 Residential 77,481 80,389 84,096

MWH Purchased 5,885 6,337 7,067 Commercial 3,004 3,118 3,169

MWH Sold 4,909 5,415 6,039 Industrial - - -

Systems Loss (%) 16 14 14 Public Building 1,601 1,646 1,741

Peak Load (KW) 17,605 18,221 21,131 Others 307 355 274

Load Factor (%) 46 48 46 Total 82,393 85,508 89,280

Collection Efficiency (%) 95 95 99

Ave. Systems Rate (P/KWH) 8.70 7.40 7.61

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 26,235 24,950 34,255 37,391 40,001 40,556 40,279 40,921 43,213 46,883

Commercial 5,920 5,372 7,259 7,928 8,369 8,789 9,413 12,682 16,098 19,310

Industrial - - - - - - - - - -

Public Building 2,671 2,461 3,421 3,893 4,170 4,435 4,795 5,018 5,453 6,048

Others 335 217 242 342 235 333 403 291 216 226

Total 35,161 33,000 45,177 49,554 52,775 54,112 54,890 58,912 64,980 72,467

Engr. Gabriel A. Tordesillas

85,500

POWER PLANT

Type

Engr. Gabriel A. Tordesillas

A+

Mega Large

A+

Extra LargeExtra Large

Mr. Benjamin AF Agatep

CAGAYAN II ELECTRIC COOPERATIVE, INC. (CAGELCO II)Maharlika Highway, Macanaya District, Aparri, Cagayan

Tel. Nos. (078) 888-2173, 888-2308, 888-2092, 822-8209; Telefax No. (078) 822-8900; E-mail: [email protected]

200920082007

Mr. Benjamin AF Agatep (Acting) Mr. Benjamin AF Agatep

Monthly Average

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

Legislative DistrictPotential

MUNICIPALITIES

Engr. Gabriel A. Tordesillas

88,453

A

Calayan NPC-SPUG

Location Project Name/Proponent

91,873

Diesel

24

Page 32: The 2007-2009 RE Chronicle

LEGEND :

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

15 MVA Substation

NPC Substation

Power Plant

Mini Hydro

3 PH Backbone Line

Energized Coop System

H Q

MHP P

25

N

SAN GUILLERMO

SANMATEO

REINAMERCEDES

CITY of SANTIAGO

RAMON

CABATUAN

CITY ofCAUAYAN

CORDON

JONES

SAN AGUSTIN

ANGADANAN

SANISIDRO

LUNA

ECHAGUE

ALICIA

MH

P P

H QMH

P P

Page 33: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : March 24, 1972II. DATE OF FIRST ENERGIZATION : November 6, 1975III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)

Residual Loan 625.9 666.9 717.4 3.000

Subsidy 34.2 83.3 83.3

2.520

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Third District

1 Alicia 34 34 34 34 100 0 14,000 13,029 13,497 13,986 992 Angadanan 59 59 59 59 100 0 8,300 6,165 6,359 6,566 793 Cabatuan 22 22 22 22 100 0 7,500 6,997 7,226 7,405 994 City of Cauayan 65 65 65 65 100 0 25,200 23,654 24,414 25,116 995 Luna 19 19 19 19 100 0 3,500 3,223 3,314 3,425 986 Reina Mercedes 20 20 20 20 100 0 4,600 3,529 3,642 3,839 837 San Guillermo 26 26 26 26 100 0 3,000 2,374 2,484 2,575 868 San Mateo 33 33 33 33 100 0 13,700 12,707 13,187 13,668 99

Fourth District9 Cordon 26 26 26 26 100 0 7,500 6,592 6,966 7,298 97

10 Echague 64 64 64 64 100 0 13,800 12,752 13,034 13,322 9711 Jones 42 42 42 42 100 0 8,800 7,548 7,825 8,090 9212 Ramon 19 19 19 19 100 0 9,300 7,795 8,316 8,726 9413 San Agustin (23) 5 5 5 5 100 0 1,500 1,346 1,372 1,394 9314 San Isidro 13 13 13 13 100 0 4,200 4,000 4,076 4,161 9915 City of Santiago 37 37 37 37 100 0 31,400 29,315 30,121 31,316 99

Total 484 484 484 484 100 0 156,300 141,026 145,833 150,887 97

VIII. GENERAL STATISTICS2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 130,580 102,286 112,797 Residential 126,922 130,012 135,197 MWH Purchased 17,662 18,053 20,166 Commercial 6,747 7,012 7,367 MWH Sold 14,803 15,426 17,322 Industrial 954 223 240 Systems Loss (%) 16 14 14 Public Building 2,035 2,175 2,244 Peak Load (KW) 40,822 43,479 47,016 Others 4,368 6,411 5,839 Load Factor (%) 59 57 59 Total 141,026 145,833 150,887 Collection Efficiency (%) 90 90 95 Ave. Systems Rate (P/KWH) 8.82 6.63 6.51

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 67,049 70,753 77,135 76,975 89,029 90,016 85,108 86,783 89,543 99,499 Commercial 15,526 15,626 18,438 16,069 16,799 16,429 15,351 35,538 43,510 48,490 Industrial 35,297 37,904 40,638 46,007 57,621 60,881 63,764 44,898 40,115 46,564 Public Building 2,910 3,014 3,643 3,023 3,277 3,276 3,233 7,023 8,047 8,926 Others 416 703 884 580 714 2,354 3,322 3,393 3,902 4,388 Total 121,198 128,000 140,738 142,654 167,440 172,956 170,778 177,635 185,117 207,867

360.000

Echague San Antonio Natural Gas

IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

Unenerg.Served

C O N N E C T I O N S

Potential

Magat A&B/ISELCO I Mini Hydro

RamonMagat HEP/SN Aboitiz

Power Corp.Hydro

Engr. Virgilio L. MontañoMr. Quirino G. Lucas Mr. Cesar G. Guzman, Jr.Mr. Cesar G. Guzman, Jr.

Engr. Virgilio L. MontañoEngr. Virgilio L. Montaño

Mega LargeC

Mega LargeA

Mega LargeA

ISABELA I ELECTRIC COOPERATIVE, INC. (ISELCO I)Victoria, Alicia, Isabela

Tel. Nos. (078) 662-7103, 662-7917, Telefax No. (078) 662-7984

20082007 2009

Monthly Average

B A R A N G A Y S

Legislative DistrictCoverage

EnergizedMUNICIPALITIES/CITIES

155,760150,713

POWER PLANTLocation Project Name/Proponent Type

145,490

26

Page 34: The 2007-2009 RE Chronicle

N

ISELCO II

27

LEGEND :

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

15 MVA Substation

Generator Substation

Mini Hydro

3 PH Backbone Line

Energized Coop System

H Q

G SMH

PALANAN

SAN MARIANO

BENITO

SOLIVEN

BURGOS

QUIRINO

DIVILACAN

CABAGAN

SAN PABLO

TUMAUINI

MALLIG

ROXAS

AURORA

NAGUILIAN

SANMANUEL

QUEZON

MACONACON

SANTAMARIA

GAMU

DELFINALBANO(MAGSAYSAY)

SANTOTOMAS

ILAGAN

G S

H Q

MH

Page 35: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : February 25, 1978

II. DATE OF FIRST ENERGIZATION : July 2, 1979

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 385.1 392.3 392.3 0.523

Subsidy 72.5 77.2 120.0 0.250

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District

1 Cabagan 26 26 26 26 100 0 9,300 6,623 6,813 6,813 73

2 Delfin Albano (Magsaysay) 29 29 29 29 100 0 5,300 4,073 4,246 4,356 82

3 Ilagan 91 91 91 91 100 0 27,000 22,975 24,139 25,278 94

4 Palanan 17 6 6 17 100 0 3,400 272 272 272 8

5 San Pablo 17 17 17 17 100 0 4,300 2,898 2,983 2,983 69

6 Santa Maria 20 20 20 20 100 0 4,500 2,409 2,599 2,509 56

7 Santo Tomas 27 25 25 27 100 0 4,800 2,918 3,043 3,137 65

8 Tumauini 46 46 46 46 100 0 11,300 8,410 8,870 9,386 83

9 Divilacan 12 1 1 12 100 0 700 37 37 37 5

10 Maconacon 10 7 7 10 100 0 800 83 83 83 10

Second District

11 Aurora 33 33 33 33 100 0 6,500 5,287 5,485 5,647 87

12 Benito Soliven 29 28 28 29 100 0 5,000 3,288 3,394 4,130 83

13 Burgos 14 14 14 14 100 0 4,600 2,162 2,258 2,336 51

14 Gamu 16 16 16 16 100 0 5,800 4,380 4,452 4,642 80

15 Mallig 18 18 18 18 100 0 5,800 4,322 4,467 4,467 77

16 Naguilian 25 25 25 25 100 0 5,900 4,092 4,287 4,559 77

17 Quezon (15) 13 13 13 13 100 0 4,100 2,527 2,665 2,666 65

18 Quirino 21 21 21 21 100 0 4,500 3,157 3,230 3,230 72

19 Roxas 26 26 26 26 100 0 11,800 11,083 11,432 11,432 97

20 San Manuel 19 19 19 19 100 0 6,100 4,061 4,254 4,412 72

21 San Mariano 36 35 35 36 100 0 9,300 2,964 3,072 3,264 35

Total 545 516 516 545 100 0 140,800 98,021 102,081 105,639 75

VIII. GENERAL STATISTICS

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 57,537 59,071 60,843 Residential 92,241 96,149 99,544

MWH Purchased 8,635 8,928 9,442 Commercial 3,461 3,502 3,563

MWH Sold 6,962 7,259 7,817 Industrial 526 530 539

Systems Loss (%) 19 18 17 Public Building 1,434 1,498 1,551

Peak Load (KW) 23,394 23,951 26,142 Others 359 402 442

Load Factor (%) 51 51 49 Total 98,021 102,081 105,639

Collection Efficiency (%) 94 90 -

Ave. Systems Rate (P/KWH) 8.26 8.14 7.78

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 37,655 40,419 45,876 46,611 54,065 53,805 50,773 51,234 53,216 55,840

Commercial 7,091 7,542 8,757 9,273 10,940 11,278 11,077 11,569 12,780 13,951

Industrial 5,652 7,236 7,420 7,823 9,104 9,780 11,041 12,439 11,949 14,322

Public Building 4,271 4,561 4,931 5,258 5,660 5,672 5,603 5,936 6,577 6,905

Others 1,040 1,148 1,375 2,265 1,870 1,949 1,992 2,365 2,586 2,785

Total 55,709 60,906 68,359 71,230 81,639 82,484 80,486 83,543 87,108 93,803

IX. CONNECTION PER TYPE OF CONSUMER: (Cum)Monthly Average

102,761

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized Served

Tumauini

98,514

Mini Hydro

MUNICIPALITIES/CITY

Palanan DieselNPC-SPUG

Mr. Jose Mari Martin M. Bigornia

Unenerg.Legislative District

-

-

Potential

B

Mr. Ernesto T. Cubangbang (OIC)

Project Name/Proponent

ISELCO II

Mr. Jose Mari Martin M. Bigornia

Mr. Ernesto T. Cubangbang (OIC)

-

Location

Mr. Jose Mari Martin M. Bigornia

Engr. Antonio A. Young (OIC)

107,247

Extra Large

-

Type

POWER PLANT

ISABELA II ELECTRIC COOPERATIVE, INC. (ISELCO II)Alibagu, Ilagan, Isabela

Tel. Nos. (078) 622-2742, 624-2220, 624-2237; Telefax. No. (078) 622-3798

200920082007

28

Page 36: The 2007-2009 RE Chronicle

LEGEND :

HQ Location

Municipality

10 MVA Substation

NPC Substation

3 PH Backbone Line

Energized Coop SystemH Q

N

BAGABAG

KAYAPA

ARITAO

ALFONSOCASTANEDA

KASIBU

QUEZON

DUPAX DEL NORTE

DUPAXDEL SUR

BAYOMBONG

SOLANO

VILLAVERDE

AMBAGUIO

BAMBANG

DIADI

SANTA FE

H Q

29

Page 37: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : September 26, 1972II. DATE OF FIRST ENERGIZATION : May 15, 1977III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009

Residual Loan 459.3 459.3 459.3

Subsidy 36.2 63.8 63.8

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Lone District

1 Alfonso Castaneda 6 5 5 6 100 0 1,000 540 545 545 552 Ambaguio 8 8 8 8 100 0 2,200 153 153 153 73 Aritao 22 22 22 22 100 0 7,200 5,686 5,771 5,771 804 Bagabag 17 17 17 17 100 0 6,900 5,418 5,515 5,515 805 Bambang 25 25 25 25 100 0 9,700 9,205 9,391 9,391 976 Bayombong 25 25 25 25 100 0 11,400 10,415 10,501 10,501 927 Diadi 19 19 19 19 100 0 3,200 1,873 1,908 1,908 608 Dupax del Norte 15 13 13 15 100 0 5,200 3,569 3,609 3,609 699 Dupax del Sur 19 17 17 19 100 0 3,600 2,100 2,128 2,128 59

10 Kasibu 30 23 23 30 100 0 6,400 1,621 1,694 1,694 2611 Kayapa 30 19 20 30 100 0 4,300 1,036 1,055 1,055 2512 Quezon 12 12 12 12 100 0 3,600 1,948 2,017 2,017 5613 Santa Fe 16 15 15 15 94 1 2,900 1,557 1,604 1,604 5514 Solano 22 22 22 22 100 0 12,200 11,835 11,987 11,987 9815 Villaverde 9 9 9 9 100 0 3,400 2,442 2,482 2,482 73

Total 275 251 252 274 99 1 83,200 59,398 60,360 60,360 73

VIII. GENERAL STATISTICS2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 45,462 42,110 47,586 Residential 54,849 55,678 55,369 MWH Purchased 6,240 6,366 6,974 Commercial 2,078 2,103 2,309 MWH Sold 5,047 5,281 5,900 Industrial 440 452 481 Systems Loss (%) 19 17 15 Public Building 1,055 1,253 1,297 Peak Load (KW) 15,313 15,896 17,163 Others 976 874 904 Load Factor (%) 56 55 56 Total 59,398 60,360 60,360 Collection Efficiency (%) 91 93 -Ave. Systems Rate (P/KWH) 9.01 7.97 8.07

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 28,689 31,897 35,783 39,371 41,195 40,715 39,290 39,290 40,985 41,630 Commercial 4,261 4,414 5,239 5,997 7,046 7,158 6,994 7,131 7,591 7,386 Industrial 7,252 8,051 8,585 9,190 9,208 9,363 9,767 10,113 10,536 11,751 Public Building 1,525 1,730 1,981 2,275 2,384 2,452 2,602 2,673 2,888 2,736 Others 596 609 813 936 1,159 1,254 1,405 1,363 1,370 1,394 Total 42,323 46,701 52,401 57,769 60,991 60,943 60,058 60,570 63,370 64,897

Mr. Lopito Lloyd T. ValdezEngr. Narciso S. Salunat (OIC)

-

Mr. Lopito Lloyd T. ValdezEngr. Narciso S. Salunat (OIC)

--

Mr. Lopito Lloyd T. ValdezEngr. Narciso S. Salunat (OIC)

Monthly Average

63,666

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.

63,666

IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

MUNICIPALITIES

Legislative District

--

Potential

-

62,553

Served

NUEVA VIZCAYA ELECTRIC COOPERATIVE, INC. (NUVELCO)Gabut, Dupax del Sur, Nueva Vizcaya 3707

Tel. Nos. (078) 326-7486, 322-1090, 326-7808; Telefax. No. (078) 322-1187; E-mail: [email protected]

20092007 2008

30

Page 38: The 2007-2009 RE Chronicle

QUIRELCO

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

3 PH Backbone Line

Energized Coop System

N

SAGUDAY

NAGTIPUNAN

DIFFUN

AGLIPAY

MADDELA

CABARROGUIS

H Q

31

Page 39: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : July 7, 1977

II. DATE OF FIRST ENERGIZATION : February 1980

III. ELECTRIC COOPERATIVE OFFICIALS :

President : Mr. Flor B. Perez Mr. Flor B. Perez Mr. Flor B. Perez

Gen. Manager : Engr. Jimmy M. Tumacder Engr. Jimmy M. Tumacder Engr. Fidel V. Pascua (OIC)

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 21.5 21.5 21.5

Subsidy 34.2 44.6 44.6

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 Aglipay 25 25 25 25 100 0 5,200 3,789 3,980 4,190 81

2 Cabarroguis 17 17 17 17 100 0 6,300 5,383 5,662 5,926 94

3 Diffun 33 33 33 33 100 0 9,500 7,978 8,483 9,003 95

4 Maddela 32 32 32 32 100 0 7,700 6,343 6,639 6,919 90

5 Nagtipunan 16 16 16 16 100 0 4,100 1,811 1,919 1,992 49

6 Saguday 9 9 9 9 100 0 3,100 2,587 2,725 2,846 92

Fourth District, Isabela

San Agustin 18 18 18 18 100 0 3,200 2,571 2,663 2,737 86

Total 150 150 150 150 100 0 39,100 30,462 32,071 33,613 86

VIII. GENERAL STATISTICS

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 13,126 13,018 13,001 Residential 27,780 29,370 30,795

MWH Purchased 1,561 1,621 1,761 Commercial 1,864 1,849 1,920

MWH Sold 1,296 1,342 1,466 Industrial 32 27 27

Systems Loss (%) 17 17 16 Public Building 747 789 832

Peak Load (KW) 4,187 4,503 4,818 Others 39 36 39

Load Factor (%) 51 49 50 Total 30,462 32,071 33,613

Collection Efficiency (%) 84 85 -

Ave. Systems Rate (P/KWH) 10.13 9.70 8.87

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 7,446 8,263 8,893 8,719 10,209 10,087 9,514 10,160 10,335 11,312

Commercial 1,842 2,070 2,537 2,421 2,817 2,817 2,703 3,005 3,160 3,436

Industrial 371 484 504 471 444 405 322 428 516 483

Public Building 1,207 1,383 1,502 1,546 1,689 1,731 1,723 1,849 1,995 2,265

Others 65 68 72 64 66 103 123 113 99 91

Total 10,931 12,268 13,508 13,221 15,224 15,143 14,385 15,555 16,105 17,587

Monthly Average

28,850

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.

IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

30,044

Served

Legislative District

-

-

Potential

-

-

27,541

MUNICIPALITIES

-

-

QUIRINO ELECTRIC COOPERATIVE, INC. (QUIRELCO)Aurora East, Diffun, Quirino

Tel. No. (078) 694-7002; Fax No. (078) 694-7015; E-mail:[email protected]

20092007 2008

32

Page 40: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Headquarters

N

IFELCOLagawe, Ifugao

KAELCOCity of Tabuk

ABRECOBangued, Abra

MOPRECOBontoc, Mt. Province

BENECOLa Trinidad, Benguet

APAYAO

KALINGA

Served byCAGELCO II

33

Page 41: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Abra 27 27 27 27 100 303 303 303 303 100 47,200 38,631 39,939 41,261 87

2 Benguet 14 14 14 14 100 269 265 267 269 100 153,200 127,433 130,320 133,454 87

3 Ifugao 11 11 11 11 100 175 173 173 175 100 34,700 17,709 18,859 20,489 59

4 Kalinga Apayao 11 11 11 11 100 221 193 197 221 100 48,400 24,101 25,734 27,262 56

5 Mt. Province 10 10 10 10 100 144 144 144 144 100 31,700 23,406 24,739 25,632 81

Total 73 73 73 73 100 1,112 1,078 1,084 1,112 100 315,200 231,280 239,591 248,098 79

CAR

Potential

CORDILLERA ADMINISTRATIVE REGION

EnergizedELECTRIC

DISTRIBUTION UTILITIES

MUNICIPALITIES/CITIES

Served

BARANGAYS

CoverageEnergized

Coverage

CONNECTIONS

34

Total 197,589 219,913 242,771 271,137 304,379 307,598 307,358 320,409 338,816 354,950

Others 7,130 17,875 12,754 3,814 5,640 6,865 8,362 9,076 8,912 9,505

Public Bldgs. 13,917 14,064 21,941 32,308 35,436 36,965 35,933 38,153 39,312 39,642

Industrial 2,834 2,577 3,012 3,597 4,018 5,691 6,826 6,859 7,474 7,929

Commercial 58,458 63,572 69,438 80,271 97,728 97,355 96,279 100,141 105,843 107,109

Residential 115,250 121,825 135,626 151,147 161,558 160,723 159,958 166,180 177,275 190,765

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

Page 42: The 2007-2009 RE Chronicle

N

LEGEND :

HQ Location

Municipality

5 MVA Substation

Generating Set

Mini Hydro

3 PH Backbone Line

H QEnergized Coop System

G S

TINEG

LACUBSAN JUANDANGLAS

MALIBCONG

DAGUIOMANBUCLOC

BOLINEY

TUBO

SALLAPADAN

LUBA

LICUAN-BAAY (Licuan)

DOLORESBANGUED

BUCAY

SAN ISIDRO

SAN QUINTINPENARUBBIA

PILAR

VILL

AVIC

IOSA

PIDIGAN

LAPAZ

LANGIDENTAYUM

MANABO

LAGAYAN

LAGANGILANG

MH

G S

G S

H Q

35

M H

Page 43: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : March 28, 1972II. DATE OF FIRST ENERGIZATION : September 1973III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)

Residual Loan 28.4 28.4 28.4 0.085Subsidy 40.9 51.3 51.7 0.400

0.400

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Lone District

1 Bangued 31 31 31 31 100 0 12,000 11,210 11,583 11,923 992 Boliney 8 8 8 8 100 0 700 253 263 273 393 Bucay 21 21 21 21 100 0 3,100 2,485 2,582 2,686 874 Bucloc 4 4 4 4 100 0 400 301 316 327 825 Daguioman 4 4 4 4 100 0 300 254 272 289 966 Danglas 7 7 7 7 100 0 800 533 548 567 717 Dolores 15 15 15 15 100 0 2,100 1,861 1,944 1,990 958 La Paz 12 12 12 12 100 0 2,700 2,081 2,153 2,227 829 Lacub 6 6 6 6 100 0 500 173 191 199 40

10 Lagangilang 17 17 17 17 100 0 2,500 2,120 2,184 2,241 9011 Lagayan 5 5 5 5 100 0 800 527 542 556 7012 Langiden 6 6 6 6 100 0 600 407 420 433 7213 Licuan-Baay (Licuan) 11 11 11 11 100 0 800 411 422 439 5514 Luba 8 8 8 8 100 0 1,300 747 778 812 6215 Malibcong 12 12 12 12 100 0 800 206 207 229 2916 Manabo 11 11 11 11 100 0 2,000 1,835 1,894 1,959 9817 Peñarrubia 9 9 9 9 100 0 1,100 975 1,010 1,046 9518 Pidigan 15 15 15 15 100 0 2,300 2,061 2,122 2,202 9619 Pilar 19 19 19 19 100 0 1,800 1,458 1,517 1,593 8920 Sallapadan 9 9 9 9 100 0 1,100 823 845 871 7921 San Isidro 9 9 9 9 100 0 900 708 742 784 8722 San Juan 19 19 19 19 100 0 1,800 1,699 1,737 1,773 9923 San Quintin 6 6 6 6 100 0 1,000 911 945 992 9924 Tayum 11 11 11 11 100 0 2,800 2,562 2,631 2,693 9625 Tineg 10 10 10 10 100 0 1,000 453 453 453 4526 Tubo 10 10 10 10 100 0 1,000 775 798 821 8227 Villaviciosa 8 8 8 8 100 0 1,000 802 840 883 88

Total 303 303 303 303 100 0 47,200 38,631 39,939 41,261 87

VIII. GENERAL STATISTICS2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 19,895 18,490 21,543 Residential 36,104 37,358 38,596 MWH Purchased 2,632 2,625 2,785 Commercial 1,294 1,298 1,344 MWH Sold 2,229 2,239 2,350 Industrial 146 157 179 Systems Loss (%) 14 14 15 Public Building 792 824 851 Peak Load (KW) 6,783 6,805 7,131 Others 295 302 291 Load Factor (%) 53 53 53 Total 38,631 39,939 41,261 Collection Efficiency (%) 106 108 -Ave. Systems Rate (P/KWH) 8.93 8.26 9.17

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 13,248 13,668 15,987 17,809 17,687 18,299 18,508 18,987 17,487 18,210 Commercial 3,377 3,634 4,039 4,191 4,361 3,468 2,857 2,884 2,593 2,790 Industrial 319 332 348 303 269 1,235 1,961 2,057 2,003 2,198 Public Building 1,944 1,570 1,745 1,931 2,122 2,024 2,157 2,239 2,057 2,154 Others 347 328 460 612 674 650 768 577 488 503 Total 19,235 19,532 22,579 24,846 25,112 25,676 26,251 26,744 24,628 25,855

Boliney

43,492

- - -

EC

Project Name/Proponent Type

GenSetMalibcong

44,676- -

46,081

2009Mr. David B. Guzman, Jr. Mr. David B. Guzman, Jr.Mr. Loreto P. Seares, Jr.

2008Mr. David B. Guzman, Jr.

Mr. Loreto P. Seares, Jr.

LGU

POWER PLANTLocation

Micro-Hydro

-

IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

Unenerg.Served

B A R A N G A Y S

Monthly Average

ABRA ELECTRIC COOPERATIVE, INC. (ABRECO)Bangued, Abra

Tel. No. (074) 752-8086; Fax No. (074) 752-8628

Mr. Loreto P. Seares, Jr.

2007

Tubo EC GenSet

Legislative DistrictPotential

MUNICIPALITIESCoverage

EnergizedC O N N E C T I O N S

36

Page 44: The 2007-2009 RE Chronicle

LEGEND :

Energized Coop SystemHQ Location

Municipality

Below 5 MVA Substation

5 MVA Substation

10 MVA Substation

20 MVA Substation

NPC Substation

Power Plant

Mini Hydro

3 PH Backbone Line

H Q

MH

P P

37

N

BAKUN

KIBUNGAN

BUGUIAS

ATOK

KABAYAN

MANKAYAN

TUBLAY

KAPANGAN

BOKOD

ITOGON

TUBA

SABLAN

LA TRINIDAD

BAGUIOCITY

P P

P P

P P

H Q

MH

MH

MH

MH

Page 45: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : October 5, 1973

II. DATE OF FIRST ENERGIZATION : November 10, 1973

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 76.7 98.7 172.5 100.750

Subsidy 77.6 123.6 130.0

6.000

0.500

18.350

0.560

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Lone District

1 Atok 8 8 8 8 100 0 3,600 2,123 2,187 2,240 62

2 Bakun 7 6 7 7 100 0 2,600 1,584 1,665 1,763 68

3 Bokod 10 10 10 10 100 0 2,500 1,603 1,658 1,729 69

4 Buguias 14 14 14 14 100 0 7,200 5,237 5,414 5,862 81

5 Itogon 9 9 9 9 100 0 10,200 7,012 7,345 7,694 75

6 Kabayan 13 12 12 13 100 0 2,700 1,175 1,301 1,361 50

7 Kapangan 15 15 15 15 100 0 3,900 2,334 2,431 2,505 64

8 Kibungan 7 5 6 7 100 0 3,300 1,507 1,554 1,602 49

9 La Trinidad 16 16 16 16 100 0 20,000 18,384 18,962 19,551 98

10 Mankayan 12 12 12 12 100 0 7,500 3,571 3,660 3,806 51

11 Sablan 8 8 8 8 100 0 2,100 1,616 1,649 1,720 82

12 Tuba 13 13 13 13 100 0 8,400 5,195 5,414 5,578 66

13 Tublay 8 8 8 8 100 0 3,000 2,157 2,222 2,370 79

Lone District, Baguio City

14 Baguio City 129 129 129 129 100 0 76,200 73,935 74,858 75,673 99

Total 269 265 267 269 100 0 153,200 127,433 130,320 133,454 87

VIII. GENERAL STATISTICS

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 165,273 142,090 129,081 Residential 115,942 118,717 121,682

MWH Purchased 24,897 26,154 27,579 Commercial 9,754 9,776 9,701

MWH Sold 21,845 23,331 24,351 Industrial 26 31 31

Systems Loss (%) 12 11 12 Public Building 1,517 1,588 1,596

Peak Load (KW) 57,473 58,159 67,438 Others 194 208 444

Load Factor (%) 59 62 56 Total 127,433 130,320 133,454

Collection Efficiency (%) 104 110 108

Ave. Systems Rate (P/KWH) 7.57 6.09 5.30

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 88,075 91,597 102,000 113,604 123,003 121,985 122,450 127,647 138,887 150,144

Commercial 52,444 56,877 62,040 72,651 89,631 89,494 89,032 92,553 98,044 98,769

Industrial 1,971 1,720 2,120 2,717 2,907 2,952 3,067 3,039 3,569 3,562

Public Building 9,750 9,916 17,150 27,091 30,026 31,589 30,347 32,210 33,194 33,085

Others 6,032 16,572 11,169 1,824 3,339 4,500 5,935 6,693 6,280 6,647

Total 158,272 176,682 194,479 217,887 248,906 250,519 250,831 262,142 279,974 292,207

Mr. Joel A. Alangsab

Mr. Gerardo P. Verzosa

A+

Mega Large

Mini Hydro

Sablan Hydro Electric Dev't. Corp. Hydro

Philex Mining Corp.Itogon

Mini Hydro

NIA Baligatan

BENGUET ELECTRIC COOPERATIVE, INC. (BENECO)Alapang, La Trinidad, Benguet

Tel. Nos. (074) 422-5671 to 73, 422-2110, 422-2000, 422-2969; Fax Nos. (074) 443-9601, 422-2848, 422-4515; E-mail: [email protected]

Mr. Gerardo P. Verzosa

2009

Atty. Victorio T. Palangdan

2008

Atty. Benny O. Bomogao

Mr. Gerardo P. Verzosa

2007

Ambuclao-Binga HEP/SN Aboitiz Power Hydro, Inc.

101,936

Mega Large

POWER PLANT

Mega Large

103,655 105,758

Location Type

AA+

BakunBakun-Benguet Hydro

Plants/Amlan Holdings Corp. Mini Hydro

Project Name/Proponent

Bokod Hydro

Legislative District

B A R A N G A Y SMUNICIPALITIES/CITY

C O N N E C T I O N S

ServedCoverage

Club John Hay

175.000

Mini Hydro

IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

EnergizedUnenerg. Potential

Monthly Average

Baguio City

38

Page 46: The 2007-2009 RE Chronicle

N

LEGEND :

HQ Location

Municipality

NPC Substation

3 PH Backbone Line

Energized Coop SystemH Q

BANAUE

MAYOYAO AGUINALDO

TINOC

KIANGAN

ALFONSO LISTA (POTIA)

LAMUT

HUNGDUAN

HINGYON

LAGAWE

ASIPULO

H Q

39

Page 47: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 16, 1977

II. DATE OF FIRST ENERGIZATION : August 1980

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 12.3 17.2 18.3

Subsidy 27.3 40.2 46.4

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Lone District

1 Aguinaldo* 16 15 15 16 100 0 3,500 721 824 919 26

2 Alfonso Lista (Potia)** 20 20 20 20 100 0 4,500 2,554 2,765 2,925 65

3 Asipulo* 9 9 9 9 100 0 2,600 495 540 576 22

4 Banaue 18 18 18 18 100 0 4,400 2,044 2,143 2,221 50

5 Hingyon* 12 12 12 12 100 0 2,100 1,138 1,194 1,234 59

6 Hungduan 9 9 9 9 100 0 2,000 685 763 809 40

7 Kiangan 14 14 14 14 100 0 3,000 1,831 1,910 1,996 67

8 Lagawe 20 20 20 20 100 0 3,400 3,055 3,206 3,322 98

9 Lamut 18 18 18 18 100 0 4,200 3,771 3,921 4,161 99

10 Mayoyao 27 26 26 27 100 0 3,000 1,060 1,231 1,395 47

11 Tinoc* 12 12 12 12 100 0 2,000 355 362 931 47

Total 175 173 173 175 100 0 34,700 17,709 18,859 20,489 59

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 7,248 7,327 8,629 Residential 15,253 16,340 17,952

MWH Purchased 871 920 1,008 Commercial 1,132 1,130 1,130

MWH Sold 679 754 824 Industrial 129 122 113

Systems Loss (%) 22 18 18 Public Building 730 789 851

Peak Load (KW) 1,900 2,020 2,154 Others 465 478 443

Load Factor (%) 63 62 64 Total 17,709 18,859 20,489

Collection Efficiency (%) 93 95 97

Ave. Systems Rate (P/KWH) 10.67 9.72 10.47

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 3,163 4,169 4,725 5,437 5,285 4,933 4,556 4,651 5,166 5,633

Commercial 902 1,093 1,194 1,192 1,290 1,526 1,478 1,565 1,727 1,848

Industrial 147 191 172 161 274 573 530 445 491 558

Public Building 496 646 828 910 996 1,070 1,120 1,320 1,456 1,618

Others 76 161 236 220 240 186 159 170 203 229

Total 4,784 6,260 7,155 7,920 8,084 8,288 7,843 8,151 9,043 9,886

* Not included in the EC's Certificate of Franchise

**With Provisional Franchise, NEC Res. No. 4 s. 1976

Engr. Jaime Pe Benito, Jr.

B

Mr. Roy G. Sambrano Mr. Antonio L. Padduyao

B

Engr. Jaime Pe Benito, Jr.

Mr. Alejandro C. Cleofas

Engr. Jaime Pe Benito, Jr.

19,991

B

Medium

18,396

Large

17,514

Medium

IFUGAO ELECTRIC COOPERATIVE, INC. (IFELCO)Rizal Avenue, Poblacion, Lagawe, Ifugao

Telefax No. (074) 382-2092

200920082007

Legislative DistrictPotential

MUNICIPALITIES

Monthly Average

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

40

Page 48: The 2007-2009 RE Chronicle

N

HQ Location

Municipality

5 MVA Substation

Generating Set

Micro Hydro

3 PH Backbone Line

LEGEND :

H QEnergized Coop System

G S

CALANASAN (Bayag)

CONNER

BALBALAN

RIZAL(Liwan)

PASIL

TANUDAN

MT. PROVINCETIE LINE

KABUGAO

PINUKPUK

APAYAO

KALINGA

CITY ofTABUK

LUBUAGAN

TINGLAYAN

G S

G S

MH

H Q

G S

MH

41

MH

Page 49: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 15, 1977

II. DATE OF FIRST ENERGIZATION : January 1979

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 69.8 96.8 127.4 0.643

Subsidy 66.3 79.9 83.6 0.025

0.025

0.550

0.025

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Lone District, Apayao

1 Conner 21 20 20 21 100 0 4,600 1,685 1,815 1,928 42

2 Kabugao 21 11 11 21 100 0 3,100 694 726 735 24

3 Calanasan (Bayag) (18)* 17 11 11 17 100 0 2,600 111 111 111 4Lone District, Kalinga

4 Balbalan 14 12 13 14 100 0 2,400 130 151 156 7

5 Lubuagan 9 9 9 9 100 0 2,000 417 456 567 28

6 Pasil 14 12 13 14 100 0 1,900 94 94 203 11

7 Pinukpuk 23 21 22 23 100 0 5,400 1,867 2,067 2,221 41

8 Rizal (Liwan) 14 14 14 14 100 0 2,900 1,981 2,023 2,103 73

9 City of Tabuk 42 42 42 42 100 0 16,200 14,339 15,275 16,057 99

10 Tanudan 16 12 12 16 100 0 2,000 260 271 276 14

11 Tinglayan 20 19 20 20 100 0 2,800 966 1,137 1,207 43Second District, Isabela

Quezon 2 2 2 2 100 0 400 235 244 265 66

Second District, Cagayan

Rizal 50 56 57

Third District, Cagayan

Tuao 8 8 8 8 100 0 2,100 1,243 1,279 1,346 64

Lone District, Mt. Province

Paracelis 29 29 30

Total 221 193 197 221 100 0 48,400 24,101 25,734 27,262 56

VIII. GENERAL STATISTICS

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 10,582 11,061 11,596 Residential 22,520 24,382 25,757

MWH Purchased 1,361 1,414 1,517 Commercial 576 574 606

MWH Sold 1,118 1,200 1,299 Industrial 146 45 86

Systems Loss (%) 17 14 14 Public Building 782 668 745

Peak Load (KW) 3,780 3,821 4,142 Others 77 65 68

Load Factor (%) 49 51 50 Total 24,101 25,734 27,262

Collection Efficiency (%) 95 95 96

Ave. Systems Rate (P/KWH) 9.46 9.22 8.93

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 7,343 8,163 8,234 9,002 9,858 10,062 9,250 9,215 9,747 10,471

Commercial 775 892 1,055 917 991 1,257 1,222 1,347 1,536 1,675

Industrial 397 334 372 416 567 931 1,268 1,318 1,411 1,611

Public Building 1,199 1,297 1,560 1,580 1,468 1,413 1,382 1,402 1,546 1,607

Others 142 145 134 192 163 204 137 136 156 222

Total 9,856 10,831 11,355 12,107 13,048 13,866 13,259 13,418 14,396 15,586

22,200

Tinglayan NGO/BGY Micro-Hydro

Pasil DOE/BGY

Large

23,517

POWER PLANT

Location Project Name/Proponent

Large

KALINGA-APAYAO ELECTRIC COOPERATIVE, INC. (KAELCO) Purok 5, Provincial Rd.,Bulanao, City of Tabuk, Kalinga

E-mail: [email protected], [email protected]

A

Mr. Victor MC. Tanggawohn, Sr.

Ms. Corazon D. Tomas

A+

Ms. Corazon D. Tomas

Mr. Victor MC. Tanggawohn, Sr.

C

2009

Legislative District

2007

Mr. Basilio D. Baluyan

Ms. Corazon D. Tomas (OIC)

MUNICIPALITIES

CoverageEnergized

2008

Large

Monthly Average

Potential

IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

Type

GenSet

Lubuagan

Micro-HydroDOE/BGY

Diesel

Unenerg.Served

NPC-SPUG

B A R A N G A Y S C O N N E C T I O N S

Balbalan

Kabugao

NPC-SPUG Diesel

42

Page 50: The 2007-2009 RE Chronicle

SADANGA

PARACELIS

NATONIN

BARLIG

TADIAN

SAGADA

BESAO

BAUKO

SABANGAN

BONTOC

H Q

N

LEGEND :

H Q HQ Location

Municipality

Below 5 MVA Substation

3 PH Backbone Line

Energized Coop System

43

Page 51: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 25, 1974

II. DATE OF FIRST ENERGIZATION : January 1975

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 0.2 0.2 0.2

Subsidy 50.8 58.5 64.6

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Lone District

1 Barlig 11 11 11 11 100 0 1,300 848 873 898 69

2 Bauko 22 22 22 22 100 0 6,000 5,149 5,396 5,603 93

3 Besao 14 14 14 14 100 0 2,100 1,358 1,431 1,476 70

4 Bontoc 16 16 16 16 100 0 6,200 5,590 5,876 6,090 99

5 Natonin 11 11 11 11 100 0 1,900 905 981 1,036 55

6 Paracelis 9 9 9 9 100 0 4,100 1,720 1,995 2,097 51

7 Sabangan 15 15 15 15 100 0 1,800 1,679 1,733 1,771 98

8 Sadanga 8 8 8 8 100 0 1,800 1,019 1,115 1,174 65

9 Sagada 19 19 19 19 100 0 2,600 2,351 2,474 2,539 98

10 Tadian 19 19 19 19 100 0 3,900 2,787 2,865 2,948 76

Total 144 144 144 144 100 0 31,700 23,406 24,739 25,632 81

VIII. GENERAL STATISTICS

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 8,163 7,956 7,959 Residential 21,318 22,472 23,332

MWH Purchased 1,001 1,063 1,127 Commercial 1,421 1,459 1,448

MWH Sold 829 898 951 Industrial - - -

Systems Loss (%) 16 15 15 Public Building 629 764 809

Peak Load (KW) - - - Others 38 44 43

Load Factor (%) - - - Total 23,406 24,739 25,632

Collection Efficiency (%) 95 102 94

Ave. Systems Rate (P/KWH) 9.84 8.86 8.37

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 3,421 4,228 4,680 5,295 5,725 5,443 5,194 5,680 5,988 6,307

Commercial 960 1,076 1,110 1,320 1,455 1,610 1,690 1,792 1,943 2,027

Industrial - - - - - - - - - -

Public Building 528 635 658 796 825 869 927 982 1,059 1,178

Others 533 669 755 966 1,224 1,326 1,363 1,500 1,785 1,904

Total 5,442 6,608 7,203 8,377 9,229 9,248 9,174 9,954 10,775 11,416

Mr. Andrew M. Magwilang

B A R A N G A Y S C O N N E C T I O N S

Engr. Jude A. Domoguen

Mr. Andrew M. Magwilang

Engr. Jude A. Domoguen

Mr. Andrew M. Magwilang

Engr. Jude A. Domoguen

B

Large

EnergizedUnenerg.

Served

A

LargeLarge

B

Legislative District

23,472

Monthly Average

23,695

Potential

24,136

MUNICIPALITIES

IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

Coverage

MOUNTAIN PROVINCE ELECTRIC COOPERATIVE, INC. (MOPRECO)Poblacion, Bontoc, Mountain Province

Telefax: (074) 602-1054; E-mail:[email protected]

2008 20092007

44

Page 52: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Energized Other System

Headquarters

45

N

Served byCabanatuan Electric Corp.

Served byMERALCOBULACAN

SAJELCOSan Jose City

NEECO II - AREA 2San Leonardo, Nueva Ecija

PRESCOAnao, Mexico,Pampanga

PELCO IIIApalit, Pampanga

Served by PantabanganMunicipal Electric System

PELCO IMexico, Pampanga

AURELCOBaler, Aurora

Served byTarlac Electric, Inc.

Served byPublic Utilities Dept.OLONGAPO CITY

Served byAngeles Electric Corp.

NEECO II - AREA 1Talavera, Nueva Ecija

NEECO ISan Isidro, Nueva Ecija

TARELCO IIConcepcion, Tarlac

ZAMECO IPalauig, Zambales

ZAMECO IICastillejos, Zambales

PELCO IIGuagua, Pampanga

TARELCO IGerona, Tarlac

PENELCOCity of Balanga

Served bySan Fernando Electric Light& Power Co.

Page 53: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Aurora 9 9 9 9 100 157 156 157 157 100 41,400 33,621 35,538 37,043 89

2 Tarlac I 15 15 15 15 100 421 421 421 421 100 135,500 117,813 122,118 126,819 94

3 Tarlac II 5 5 5 5 100 120 120 120 120 100 82,000 67,252 70,484 73,522 90

4 Nueva Ecija I 5 5 5 5 100 95 95 95 95 100 72,800 66,158 68,382 70,720 97

5 Nueva Ecija II-Area 1 10 10 10 10 100 291 291 291 291 100 111,000 82,484 85,409 88,714 80

6 Nueva Ecija II-Area 2 11 11 11 11 100 228 228 228 228 100 97,000 72,264 75,804 78,715 81

7 SAJELCO 1 1 1 1 100 38 38 38 38 100 27,200 25,463 26,276 27,154 99

8 PRESCO - - - - - 34 34 34 34 100 16,800 15,067 15,538 15,988 95

9 Pampanga I 6 6 6 6 100 112 112 112 112 100 84,500 75,533 78,303 81,117 96

10 Pampanga II 7 7 7 7 100 175 172 172 175 100 132,100 109,854 115,351 123,008 93

11 Pampanga III 6 6 6 6 100 95 95 95 95 100 69,700 52,365 56,101 57,580 83

12 PENELCO 12 12 12 12 100 241 241 241 241 100 140,400 126,184 131,057 136,560 97

13 Zambales I 6 6 6 6 100 118 116 116 116 98 56,400 45,031 46,645 48,382 86

14 Zambales II 7 7 7 7 100 111 111 111 111 100 61,800 56,948 59,035 61,384 99

Total 100 100 100 100 100 2,236 2,230 2,231 2,234 99 1,128,600 946,037 986,041 1,026,706 91

REGION III

CONNECTIONS

Coverage CoverageEnergized

Potential

CENTRAL LUZON REGION

ELECTRIC DISTRIBUTION

UTILITIES

MUNICIPALITIES/CITIES BARANGAYS

ServedEnergized

46

Total 946,607 1,026,070 1,133,592 1,264,021 1,374,420 1,353,758 1,362,781 1,277,535 1,451,604 1,591,251

Others 40,808 45,624 26,977 19,149 21,799 22,174 23,274 24,498 26,009 27,370

Public Bldgs. 22,863 25,901 28,357 31,686 34,283 36,728 38,649 37,263 44,255 46,865

Industrial 172,238 172,299 210,319 236,973 254,904 253,881 249,889 200,373 229,464 256,340

Commercial 105,778 120,077 134,145 144,975 157,175 157,587 164,985 161,455 200,154 218,131

Residential 604,920 662,169 733,794 831,238 906,259 883,388 885,984 853,946 951,722 1,042,545

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 54: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

Generating Set

3 PH Backbone Line

Energized Coop System

G S

47

N

DILASAG

D INGALAN

SAN LUIS

BALERMARIAAURORA

METERING POINTNEECO II - A1 /NEECO II - A2

CASIGURAN

DINALUNGAN

DIPACULAO

G S

H Q

DINAPIGUE

Page 55: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : March 26, 1980

II. DATE OF FIRST ENERGIZATION : August 18, 1982

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 133.7 199.3 269.7 1.935

Subsidy 75.4 91.2 96.9

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Lone District

1 Baler 13 13 13 13 100 0 8,700 8,016 8,292 8,615 99

2 Casiguran 24 24 24 24 100 0 4,600 3,345 3,554 3,753 82

3 Dilasag 11 11 11 11 100 0 3,300 1,656 1,818 1,932 59

4 Dinalungan 9 9 9 9 100 0 2,100 1,034 1,227 1,232 59

5 Dingalan 11 11 11 11 100 0 4,500 4,004 4,244 4,306 96

6 Dipaculao 25 25 25 25 100 0 5,100 4,239 4,501 4,761 93

7 Maria Aurora 40 40 40 40 100 0 7,700 7,157 7,421 7,700 100

8 San Luis 18 17 18 18 100 0 4,700 3,909 4,121 4,327 92 Fourth District, Isabela

9 Dinapigue 6 6 6 6 100 0 700 261 360 417 60

Total 157 156 157 157 100 0 41,400 33,621 35,538 37,043 89

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 12,637 12,447 13,229 Residential 31,355 33,077 34,435

MWH Purchased 1,698 1,833 2,023 Commercial 1,202 1,274 1,357

MWH Sold 1,459 1,580 1,759 Industrial 95 101 103

Systems Loss (%) 14 13 13 Public Building 895 1,005 1,060

Peak Load (KW) 3,615 3,879 3,926 Others 74 81 88

Load Factor (%) 64 65 71 Total 33,621 35,538 37,043

Collection Efficiency (%) 97 97 100

Ave. Systems Rate (P/KWH) 8.66 7.88 7.52

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 8,891 9,573 10,235 11,093 11,503 12,090 11,427 12,522 13,635 15,031

Commercial 1,129 1,277 1,362 1,463 1,506 1,606 1,718 1,961 2,123 2,454

Industrial 376 348 400 398 554 304 392 563 552 602

Public Building 1,343 1,449 1,483 1,545 1,664 1,858 1,988 2,267 2,442 2,759

Others 282 264 226 218 207 211 203 196 212 263

Total 12,021 12,911 13,706 14,717 15,433 16,069 15,728 17,509 18,964 21,109

Mr. Benjamin M. Mina

Engr. Agripino A. Teh San

Large

Mr. Rico H. Porquerino

Engr. Agripino A. Teh San

A+

Large

AURORA ELECTRIC COOPERATIVE, INC. (AURELCO)Brgy. Reserva, Baler, Aurora

Fax No. (042) 209-4000 (PT&T); E-mail:[email protected]/[email protected]

20092007 2008

Mr. Rico H. Porquerino

Engr. Agripino A. Teh San

Monthly Average

B A R A N G A Y S

CoverageEnergized

Unenerg.

34,010 35,434

A+

31,942

A+

Large

POWER PLANT

Location

Legislative District

MUNICIPALITIES

Casiguran

Potential

Project Name/Proponent Type

Served

DieselNPC-SPUG

C O N N E C T I O N S

48

Page 56: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

Energized Coop SystemTARELCO I

49

N

PURA

VICTORIA

SAN JOSE

SAN MANUEL

CUYAPO

MONCADA

NAMPICUAN

CAMILING

SAN

CLEM

ENTE

SANTAIGNACIAMAYANTOC

GERONA

ANAO

PANIQUI

Part of NUEVA ECIJA

RAMOS

H Q

Page 57: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : January 24, 1975

II. DATE OF FIRST ENERGIZATION : July 16, 1975

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 69.2 75.6 91.9

Subsidy 51.5 96.4 97.6

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District

1 Anao 18 18 18 18 100 0 2,400 2,186 2,252 2,355 98

2 Camiling 61 61 61 61 100 0 16,800 15,671 16,177 16,704 99

3 Mayantoc 24 24 24 24 100 0 5,800 4,727 4,902 5,098 88

4 Moncada 37 37 37 37 100 0 11,700 9,783 10,121 10,508 90

5 Paniqui 35 35 35 35 100 0 19,500 18,190 18,844 19,453 99

6 Pura 16 16 16 16 100 0 4,900 4,377 4,529 4,709 96

7 Ramos 9 9 9 9 100 0 3,900 3,172 3,287 3,424 88

8 San Clemente 12 12 12 12 100 0 2,700 2,262 2,316 2,372 88

9 San Manuel 15 15 15 15 100 0 4,900 3,799 3,901 4,072 83

10 Santa Ignacia 24 24 24 24 100 0 9,000 8,197 8,534 8,938 99 Second District

11 Gerona 44 44 44 44 100 0 17,100 15,119 15,663 16,231 95

12 San Jose 13 13 13 13 100 0 6,900 3,350 3,529 3,768 55

13 Victoria 26 26 26 26 100 0 11,900 10,869 11,281 11,673 98

City of Tarlac 5 5 5 5 100 0 1,900 1,474 1,540 1,634 86 First District, Nueva Ecija

14 Cuyapo 51 51 51 51 100 0 11,900 10,898 11,289 11,718 98

15 Nampicuan 21 21 21 21 100 0 2,400 2,056 2,179 2,274 95

Guimba 10 10 10 10 100 0 1,800 1,538 1,621 1,734 96

Licab 58 66 67 Second District, Pangasinan

Mangatarem 87 87 87

Total 421 421 421 421 100 0 135,500 117,813 122,118 126,819 94

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 75,755 66,197 77,099 Residential 108,981 112,812 116,319

MWH Purchased 11,262 11,584 12,774 Commercial 3,608 3,785 4,280

MWH Sold 10,178 10,587 11,689 Industrial 245 227 294

Systems Loss (%) 9 8 8 Public Building 977 977 1,163

Peak Load (KW) 27,257 27,486 29,672 Others 4,002 4,317 4,763

Load Factor (%) 57 58 59 Total 117,813 122,118 126,819

Collection Efficiency (%) 92 90 91

Ave. Systems Rate (P/KWH) 7.44 6.25 6.60

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 53,599 60,919 66,489 77,725 81,927 81,532 82,134 83,610 86,889 94,824

Commercial 6,410 7,654 9,241 9,966 10,471 11,030 11,744 13,253 15,351 17,388

Industrial 13,593 15,690 16,813 16,493 17,181 16,842 16,926 18,041 16,572 19,148

Public Building 1,060 1,093 1,107 1,284 1,366 1,315 1,527 2,601 3,589 4,091

Others 1,802 2,217 2,385 2,805 3,706 3,947 4,425 4,626 4,646 4,816

Total 76,464 87,573 96,035 108,273 114,650 114,666 116,756 122,131 127,047 140,267

Mr. Antonio C. Perez, Jr.Mr. Jose I. Hidalgo, Sr.

Potential

MUNICIPALITIES/CITY

Coverage

Mr. Francisco A. Diza

Engr. Resurreccion R. Coronel Engr. Resurreccion R. Coronel

A+

Mega Large

TARLAC I ELECTRIC COOPERATIVE, INC. (TARELCO I)Amacalan, Gerona, Tarlac 2302

Tel. Nos. (045) 931-0971 to 75, 931-2212, 931-0973; Fax No. (045) 931-0974 loc. 120

2008 20092007

Engr. Resurreccion R. Coronel

EnergizedUnenerg.

Served

Legislative District

Monthly Average

A+

Mega Large

115,669111,635

A+

Mega Large

B A R A N G A Y S C O N N E C T I O N S

120,055

50

Page 58: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Power Plant

3 PH Backbone Line

Energized Coop SystemEnergized Other System

P P

51

Part of NUEVA ECIJA

CITY of TARLAC

Served byTarlac Electric, Inc.

ZARAGOZALA PAZ

CONCEPCIONCAPAS

BAMBAN

TARELCO I

P P

H Q

Page 59: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : June 6, 1981

II. DATE OF FIRST ENERGIZATION: March 14. 1983

III. ELECTRIC COOPERATIVE OFFICIALS:

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 24.3 24.3 24.3 18.900

Subsidy 120.9 143.4 151.2

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District, Nueva Ecija1 Zaragoza (19) 18 18 18 18 100 0 8,500 5,624 5,960 6,289 74

Third District2 Bamban 15 15 15 15 100 0 11,200 10,136 10,605 11,175 99

3 Capas* 20 20 20 20 100 0 22,500 20,048 21,147 22,007 98

4 Concepcion 45 45 45 45 100 0 27,100 22,445 23,294 24,199 89

5 La Paz 21 21 21 21 100 0 12,400 8,999 9,478 9,852 78

City of Tarlac 1 1 1 1 100 0 300

Total 120 120 120 120 100 0 82,000 67,252 70,484 73,522 90

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 74,204 62,585 67,920 Residential 63,231 66,184 68,900

MWH Purchased 11,255 11,798 12,904 Commercial 3,262 3,415 3,685

MWH Sold 10,039 10,729 11,804 Industrial 71 74 76

Systems Loss (%) 11 9 9 Public Building 550 669 712

Peak Load (KW) 26,262 27,048 30,801 Others 138 142 149

Load Factor (%) 59 60 57 Total 67,252 70,484 73,522

Collection Efficiency (%) 95 97 97

Ave. Systems Rate (P/KWH) 7.39 5.83 5.75

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 40,060 44,175 49,755 56,876 61,639 60,250 60,388 63,185 67,026 74,272

Commercial 8,422 9,055 9,586 10,697 12,672 13,520 15,206 16,736 17,992 19,990

Industrial 5,735 5,390 28,123 39,821 40,246 41,985 37,913 36,982 39,831 43,051

Public Building 761 1,020 1,050 1,312 1,538 2,065 2,250 2,453 2,680 3,005

Others 27,035 30,864 10,619 1,082 1,041 1,082 1,069 1,112 1,223 1,330

Total 82,013 90,504 99,133 109,788 117,135 118,902 116,826 120,468 128,752 141,648

TARLAC II ELECTRIC COOPERATIVE, INC. (TARELCO II)San Nicolas, Concepcion, Tarlac

Tel. Nos. (045) 923-0460, 923-0449, 923-0383 to 84 ; Fax No. (045) 923-0471

2008 20092007

74,846

Extra Large

80,810

Extra Large

77,878

Extra Large

Mr. Emerson S. Gomez

Engr. Jose F. Bognot, Jr. (OIC)

A+

Mr. Orlando C. Masibay

Ms. Amelia S. Tioaquen (OIC)

Mr. Emerson S. Gomez

Engr. Jose F. Bognot, Jr. (OIC)

A+A+

Monthly Average

B A R A N G A Y S

CoverageEnergized

Unenerg.

DieselCapas

C O N N E C T I O N S

Served

Tarlac Electric, Inc.

included in La Paz

POWER PLANT

Location Project Name/Proponent Type

Legislative District

MUNICIPALITIES/CITY

Potential

52

Page 60: The 2007-2009 RE Chronicle

N

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Mini Hydro

3 PH Backbone Line

LEGEND :

H Q

Energized Coop System

MH

53

CITY of GAPAN

SANANTONIO

JAEN

CABIAO SANISIDRO

MH

H Q

Page 61: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : November 24, 1973II. DATE OF FIRST ENERGIZATION : January 1974III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)

Residual Loan 81.7 82.0 116.7 0.300Subsidy 13.2 58.9 35.4

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Fourth District

1 Cabiao 23 23 23 23 100 0 14,300 13,199 13,630 14,101 99 2 City of Gapan 23 23 23 23 100 0 21,300 19,822 20,442 21,230 99 3 Jaen (27) 24 24 24 24 100 0 12,400 11,379 11,828 12,203 98 4 San Antonio 16 16 16 16 100 0 14,800 12,323 12,773 13,201 89 5 San Isidro 9 9 9 9 100 0 10,000 9,435 9,709 9,985 99

Total 95 95 95 95 100 0 72,800 66,158 68,382 70,720 97

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 55,797 50,716 54,840 Residential 63,597 65,537 67,723 MWH Purchased 8,874 9,058 9,655 Commercial 2,349 2,626 2,775 MWH Sold 6,949 7,514 8,230 Industrial 76 75 76 Systems Loss (%) 22 17 15 Public Building 34 31 31 Peak Load (KW) 19,722 19,825 20,900 Others 102 113 115 Load Factor (%) 62 63 63 Total 66,158 68,382 70,720 Collection Efficiency (%) 93 93 94 Ave. Systems Rate (P/KWH) 8.03 6.75 6.66

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2001* 2002 2003 2004 2005 2006 2007 2008

Residential 39,228 36,046 50,491 58,294 63,305 60,785 59,357 59,816 63,574 70,447 Commercial 7,125 6,364 8,233 9,096 9,656 9,174 8,795 9,104 11,365 12,871 Industrial 5,654 4,333 5,877 6,664 7,414 8,164 13,016 13,321 13,913 14,013 Public Building 985 946 1,027 841 939 940 741 751 797 833 Others 229 208 224 255 299 362 383 396 524 597 Total 53,221 47,897 65,852 75,150 81,613 79,425 82,292 83,388 90,173 98,761

* 10 months

65,929 68,088 69,977

Mini Hydro

Legislative DistrictServed

Potential

C O N N E C T I O N S

City of Gapan

B B

Monthly Average

MUNICIPALITIES/CITYCoverage

EnergizedB A R A N G A Y S

Unenerg.

Peñaranda

POWER PLANTLocation Project Name/Proponent Type

NUEVA ECIJA I ELECTRIC COOPERATIVE, INC. (NEECO I)Malapit, San Isidro, Nueva Ecija 3106

Tel. No. (044) 486-0201; Telefax No. (044) 486-2026

20092007 2008Rev. Fr. Antonio A. Mangahas, Jr. (MSEC)Rev. Fr. Antonio A. Mangahas, Jr. (MEC) Rev. Fr. Antonio A. Mangahas, Jr. (MEC)

Extra Large Extra Large Extra LargeA

Mr. Rogelio B. Marzan Engr. Bonifacio A. Patiag Engr. Bonifacio A. Patiag

54

Page 62: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

NPC Substation

3 PH Backbone Line

Energized Coop System

Energized Other System

55

CARRANGLAN

LUPAO

ALIAGA

SANTODOMINGO

GUIMBA

SCIENCECITY ofMUÑOZ

TALUGTUG

LICABQUEZON

TALAVERA

Served by PantabanganMunicipal Electric System

PANTABANGAN

H Q

Page 63: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : September 22, 1975

II. DATE OF FIRST ENERGIZATION : September 11, 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 980.9 1,110.7 1,155.0

Subsidy 27.9 33.7 57.4

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District

1 Aliaga 26 26 26 26 100 0 11,600 7,966 8,301 8,634 74

2 Guimba (64) 54 54 54 54 100 0 18,700 13,513 14,137 15,099 81

3 Licab 11 11 11 11 100 0 5,000 3,297 3,407 3,512 70

4 Quezon 16 16 16 16 100 0 7,300 4,783 4,971 5,163 71

5 Santo Domingo 24 24 24 24 100 0 10,600 7,607 7,827 8,068 76

6 Talavera 53 53 53 53 100 0 22,400 19,357 19,880 20,429 91 Second District

7 Carranglan 17 17 17 17 100 0 7,300 3,890 4,080 4,265 58

8 Lupao 24 24 24 24 100 0 8,100 6,365 6,585 6,786 84

9 Science City of Muñoz 37 37 37 37 100 0 15,200 12,266 12,676 13,062 86

10 Talugtug 28 28 28 28 100 0 4,300 3,092 3,188 3,331 77

Conversion, Pantabangan 1 1 1 1 100 0 500 348 357 365 73

Total 291 291 291 291 100 0 111,000 82,484 85,409 88,714 80

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 64,088 58,087 65,627 Residential 79,505 82,264 85,317

MWH Purchased 8,621 8,773 9,394 Commercial 2,008 2,099 2,229

MWH Sold 6,906 7,084 8,114 Industrial 372 382 403

Systems Loss (%) 19 18 12 Public Building 393 426 488

Peak Load (KW) 24,200 22,377 28,516 Others 206 238 277

Load Factor (%) 49 54 45 Total 82,484 85,409 88,714

Collection Efficiency (%) 95 93 94

Ave. Systems Rate (P/KWH) 9.28 8.20 8.09

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 36,997 43,526 48,010 53,548 60,231 57,844 54,569 56,372 57,439 65,420

Commercial 3,872 4,453 4,426 4,528 4,772 4,412 4,131 4,413 4,694 5,297

Industrial 11,714 14,062 13,394 13,881 16,053 16,665 18,361 19,983 20,930 24,406

Public Building 659 819 877 1,029 1,190 1,178 1,176 1,069 1,116 1,264

Others 509 556 661 867 895 1,290 827 1,033 826 982

Total 53,751 63,416 67,368 73,853 83,141 81,388 79,064 82,870 85,005 97,369

Mr. Reynaldo V. Villanueva

Ms. Eulalia M. Castro

NUEVA ECIJA II ELECTRIC COOPERATIVE, INC. (NEECO II-Area 1)Calipahan, Talavera, Nueva Ecija

Tel Nos. (044) 411-3285, 411-4289; Telefax: (044) 411-1007

2008 20092007

Mr. Reynaldo V. Villanueva

Ms. Eulalia M. Castro

Monthly Average

B

Extra Large

88,961

Extra Large

Unenerg.Legislative District

Potential

A A+

Served

Extra Large

91,645

C O N N E C T I O N S

86,498

Mr. Reynaldo V. Villanueva

Ms. Eulalia M. Castro (OIC)

MUNICIPALITIES/CITY

CoverageEnergized

B A R A N G A Y S

56

Page 64: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

NPC Substation

3 PH Backbone Line

Energized Coop SystemEnergized Other System

N

57

Served by CABANATUAN ELECTRIC CORP.RIZAL

LLANERABONGABON

LAUR

GABALDON (Bitulok & Sabani)

GENERAL TINIO (Papaya)

SANTAROSA

PALAYAN CITY

SANLEONARDO

GENERAL MAMERTONATIVIDAD

PEÑARANDAH Q

CABANATUAN CITY

Page 65: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION :

II. DATE OF FIRST ENERGIZATION :

III. ELECTRIC COOPERATIVE OFFICIALS :

President:

General Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan - 309.0 309.0

Subsidy 20.5 49.4 55.4

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District

Zaragoza 1 1 1 1 100 0 100 67 70 71 71 Second District

1 Llanera 22 22 22 22 100 0 7,000 4,704 4,944 5,106 73

Pantabangan 4 4 4 4 100 0 1,200 874 916 942 79

2 Rizal 26 26 26 26 100 0 11,400 9,210 9,597 9,936 87 Third District

3 Bongabon 28 28 28 28 100 0 11,500 9,172 9,737 10,075 88

4 Gabaldon (Bitulok & Sabani) 16 16 16 16 100 0 6,500 3,879 4,122 4,364 67

5 General Mamerto Natividad 20 20 20 20 100 0 6,700 4,729 5,032 5,230 78

6 Laur 17 17 17 17 100 0 6,200 4,464 4,649 4,803 77

7 Palayan City 19 20 19 19 100 0 7,200 5,309 5,536 5,911 82

8 Santa Rosa 33 33 33 33 100 0 12,100 9,117 9,534 9,895 82

Cabanatuan City 1 1 1 1 100 0 300 172 178 189 63

Fourth District

9 General Tinio (Papaya) 13 12 13 13 100 0 8,200 6,281 6,649 6,838 83

10 Peñaranda 10 10 10 10 100 0 5,700 4,596 4,802 4,946 87

11 San Leonardo 15 15 15 15 100 0 11,700 9,175 9,502 9,861 84

Jaen 3 3 3 3 100 0 1,200 514 535 547 46

Lone District, Aurora

Dingalan 1 1 1

Total 228 228 228 228 100 0 97,000 72,264 75,804 78,715 81

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 62,838 58,590 62,415 Residential 69,726 72,977 75,836

MWH Purchased 8,491 8,797 9,656 Commercial 1,577 1,688 1,688

MWH Sold 7,491 7,911 8,711 Industrial 98 100 109

Systems Loss (%) 11 9 9 Public Building 656 790 792

Peak Load (KW) 21,412 21,308 22,311 Others 207 249 290

Load Factor (%) 54 57 59 Total 72,264 75,804 78,715

Collection Efficiency (%) 94 94 98

Ave. Systems Rate (P/KWH) 8.39 7.41 7.17

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 41,725 44,341 47,777 54,940 60,815 59,421 59,224 61,158 63,276 69,280

Commercial 5,889 6,448 6,802 7,092 7,737 8,066 8,569 9,163 10,123 11,351

Industrial 7,938 7,992 10,254 11,098 11,253 11,859 11,845 15,582 17,395 19,366

Public Building 809 882 1,035 1,339 1,483 1,474 1,399 1,356 1,450 1,583

Others 1,539 1,912 2,120 2,584 2,837 2,670 2,584 2,627 2,685 2,950

Total 57,900 61,575 67,988 77,053 84,125 83,491 83,621 89,886 94,929 104,530

NUEVA ECIJA II ELECTRIC COOPERATIVE, INC. (NEECO II-Area 2)Maharlika Highway (Diversion Road), San Leonardo, Nueva Ecija

2009

Tel. No. (044) 958-1051 to 52; 958-1019; Telefax: (044) 958-1053; E-mail: [email protected]

2007 2008

Mr. Reynaldo V. VillanuevaMr. Reynaldo V. VillanuevaMr. Reynaldo V. Villanueva

Engr. Ramon M. De Vera Engr. Ramon M. De Vera Engr. Ramon M. De Vera

72,682

Monthly Average

B A R A N G A Y S

CoverageEnergized

Unenerg.

MUNICIPALITIES/CITIES

Legislative District

76,222

A+ A+

Served

C O N N E C T I O N S

A+

79,134

Extra Large

Potential

Extra Large Extra Large

58

Page 66: The 2007-2009 RE Chronicle

N

HQ Location

Municipality

10 MVA Substation

3 PH Backbone Line

LEGEND :

H QEnergized Coop System

59

SAN JOSE CITY

H Q

Page 67: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : November 1967 / March 5, 1986II. DATE OF FIRST ENERGIZATION : November 1969III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009

Residual Loan - - -Subsidy 4.0 10.6 10.6

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Second District, Nueva Ecija

1 San Jose City 38 38 38 38 100 0 27,200 25,463 26,276 27,154 99

Total 38 38 38 38 100 0 27,200 25,463 26,276 27,154 99

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 31,047 27,277 32,061 Residential 22,527 23,083 24,039 MWH Purchased 4,684 4,626 4,992 Commercial 951 950 977 MWH Sold 4,046 4,005 4,383 Industrial 45 46 47 Systems Loss (%) 13 13 12 Public Building 215 236 246 Peak Load (KW) 10,478 11,160 12,361 Others 1,725 1,961 1,845 Load Factor (%) 61 57 55 Total 25,463 26,276 27,154 Collection Efficiency (%) 95 95 -Ave. Systems Rate (P/KWH) 7.67 6.81 7.31

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 15,316 15,951 17,625 19,933 21,396 21,407 20,184 20,663 20,744 22,127 Commercial 6,517 6,587 7,960 8,555 9,340 8,655 8,266 8,649 8,852 9,687 Industrial 7,892 8,455 8,639 9,872 12,283 12,399 13,571 17,492 16,619 18,772 Public Building 871 943 1,096 1,133 1,214 1,232 1,304 1,359 1,419 1,604 Others 225 230 293 347 402 380 371 394 422 410 Total 30,821 32,166 35,613 39,840 44,636 44,072 43,696 48,557 48,056 52,600

Legislative District

Monthly Average

B A R A N G A Y S

CoverageEnergized

Unenerg.CITY

Served

--

23,369 24,156

C O N N E C T I O N S

Potential

-

2007

SAN JOSE CITY ELECTRIC COOPERATIVE, INC. (SAJELCO)Maharlika Hi-way, San Jose City 3121

Tel. Nos. (044) 947-2798, 511-0374 to 75; Telefax: (044) 511-1250

20092008

22,658

Engr. Andres R. GarciaMr. Celestino P. Pobre

--

Engr. Andres R. GarciaMr. Celestino P. Pobre

Engr. Andres R. GarciaMr. Melquisidec A. Lagmay

-

60

Page 68: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

10 MVA Substation

3 PH Backbone Line

Energized Coop System

61

ARAYAT

SANTA ANAMEXICO

H Q

Page 69: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : November 2, 1968

II. DATE OF FIRST ENERGIZATION : May 1969

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 6.8 9.3 16.5

Subsidy 4.4 8.8 8.8

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First DistrictMagalang 1 1 1 1 100 0 500 368 380 387 77

Third DistrictArayat 5 5 5 5 100 0 3,400 3,137 3,217 3,301 97

Mexico 24 24 24 24 100 0 10,400 9,639 9,972 10,281 99

City of San Fernando

Santa Ana 4 4 4 4 100 0 2,500 1,923 1,969 2,019 81

Total 34 34 34 34 100 0 16,800 15,067 15,538 15,988 95

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 14,801 12,036 13,613 Residential 14,537 14,955 15,380

MWH Purchased 2,051 2,116 2,308 Commercial 300 343 361

MWH Sold 1,805 1,889 2,088 Industrial - - -

Systems Loss (%) 12 11 9 Public Building 185 183 183

Peak Load (KW) - - - Others 45 57 64

Load Factor (%) - - - Total 15,067 15,538 15,988

Collection Efficiency (%) 93 93 94

Ave. Systems Rate (P/KWH) 8.20 6.37 6.52

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 9,911 11,247 12,411 14,441 15,911 16,309 16,686 17,079 17,240 19,225

Commercial 1,035 1,923 2,099 2,489 2,898 3,292 3,867 4,120 4,903 5,228

Industrial - - - - - - - - - -

Public Building 189 198 226 263 279 309 308 314 322 392

Others 136 131 144 385 171 140 161 152 197 214

Total 11,271 13,499 14,880 17,578 19,260 20,050 21,022 21,665 22,662 25,059

PAMPANGA RURAL ELECTRIC SERVICE COOPERATIVE, INC. (PRESCO)San Ros Subd., Ninoy Aquino By-Way, Brgy. Anao, Mexico, Pampanga

Tel No. 865-1243; E-mail: [email protected]/ [email protected]/ [email protected]

20092007 2008

Legislative District

Served

A+

Medium

14,358 14,772

C O N N E C T I O N S

Potential

MUNICIPALITIES/CITY

Mr. Vicente S. Baljadia

Mr. Efren M. Tongol

A+

Medium

A+

Ms. Zenaida G. Quiambao

Mr. Efren M. Tongol

Mr. Eduardo G. David

Mr. Efren M. Tongol

Medium

13,939

Monthly Average

B A R A N G A Y S

CoverageEnergized

Unenerg.

62

Page 70: The 2007-2009 RE Chronicle

N

LEGEND :

H Q

Municipality

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

Energized Coop System

HQ Location

63

MAGALANG

SAN LUIS

CANDABASANTA ANA

MEXICO

ARAYAT

H Q

Page 71: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : December 20, 1972

II. DATE OF FIRST ENERGIZATION : April 1973

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 130.3 130.3 130.3

Subsidy 66.1 85.5 85.8

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Magalang (27) 25 25 25 25 100 0 17,400 16,190 16,736 17,341 99

Third District

2 Arayat (30) 25 25 25 25 100 0 20,800 18,031 18,695 19,385 93

3 Mexico (43) 19 19 19 19 100 0 19,100 17,713 18,373 18,998 99

4 Santa Ana (14) 10 10 10 10 100 0 7,900 7,348 7,583 7,820 99

Fourth District

5 Candaba (33) 16 16 16 16 100 0 9,500 8,086 8,366 8,636 91

6 San Luis 17 17 17 17 100 0 9,800 8,165 8,550 8,937 91

Total 112 112 112 112 100 0 84,500 75,533 78,303 81,117 96

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 74,679 71,582 76,795 Residential 70,810 74,015 76,728

MWH Purchased 10,481 11,049 12,080 Commercial 3,508 3,170 3,221

MWH Sold 9,028 9,702 10,824 Industrial 27 24 23

Systems Loss (%) 13 12 10 Public Building 892 909 957

Peak Load (KW) 25,668 27,638 26,984 Others 296 185 188

Load Factor (%) 56 55 61 Total 75,533 78,303 81,117

Collection Efficiency (%) 92 93 96

Ave. Systems Rate (P/KWH) 8.27 7.38 7.10

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 47,866 54,212 60,314 69,259 77,983 77,747 78,416 81,012 83,017 91,506

Commercial 8,777 9,668 11,183 12,788 14,792 15,565 16,380 18,449 23,221 23,320

Industrial 4,095 4,150 4,151 4,645 5,218 5,384 5,154 3,648 4,626 8,966

Public Building 1,509 1,750 2,045 2,579 2,917 3,284 3,370 3,806 4,135 4,613

Others 1,206 1,529 1,506 881 1,072 1,098 1,298 1,423 1,424 1,481

Total 63,453 71,309 79,199 90,152 101,982 103,078 104,618 108,338 116,423 129,886

PAMPANGA I ELECTRIC COOPERATIVE, INC. (PELCO I)Sto. Domingo, Mexico, Pampanga

Tel. Nos. (045) 966-0604, 966-0269; Telefax No. (045) 966-0270; E-mail: [email protected]

20092007 2008

Legislative District

Served

A+

Extra Large

83,743 85,922

C O N N E C T I O N S

Potential

MUNICIPALITIES

Mr. Carlos D. De Jesus

Engr. Loliano E. Allas

A+

Extra Large

A+

Mr. Carlos D. De Jesus

Engr. Loliano E. Allas

Mr. Carlos D. De Jesus

Engr. Loliano E. Allas

Extra Large

81,179

Monthly Average

B A R A N G A Y S

CoverageEnergized

Unenerg.

64

Page 72: The 2007-2009 RE Chronicle

65

HQ Location

Municipality

10 MVA Substation

15 MVA Substation

25 MVA Substation

Power Plant

3 PH Backbone Line

LEGEND :

H Q

Energized Coop SystemEnergized Other System

P P

N

Served by San FernandoElectric Light & Power Co.

ANGELES CITY

PORAC

CITY of SANFERNANDO

BACOLOR

`FLORIDABLANCA

Served byAngeles Electric Co.

MABALACAT

SASMUAN(SEXMOAN)

LUBAO

GUAGUA

SANTA RITA

H Q

P P

5 MVA Substation

Page 73: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : April 23, 1979

II. DATE OF FIRST ENERGIZATION : November 15, 1979

III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 113.6 113.6 136.0 50.000

Subsidy 126.1 156.2 160.4

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District

1 Mabalacat 27 27 27 27 100 0 40,200 34,488 36,104 39,506 98

Magalang 1 1 1 1 100 0 2,600 2,424 2,476 2,536 98 Second District

2 Guagua 31 31 31 31 100 0 22,800 19,343 20,047 20,728 91

3 Lubao 44 44 44 44 100 0 29,600 22,063 23,361 24,449 83

4 Porac 29 26 26 29 100 0 19,000 14,754 15,997 17,686 93

5 Sasmuan (Sexmoan) 12 12 12 12 100 0 5,300 4,308 4,412 4,546 86

6 Santa Rita 10 10 10 10 100 0 8,800 8,202 8,442 8,767 99

Floridablanca 2,638 2,670 2,775Third District

7 Bacolor 21 21 21 21 100 0 3,800 1,634 1,842 2,015 53

Total 175 172 172 175 100 0 132,100 109,854 115,351 123,008 93

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 139,084 114,974 134,860 Residential 105,100 99,085 106,500

MWH Purchased 23,800 24,653 26,587 Commercial 3,771 3,924 4,182

MWH Sold 18,672 20,120 22,648 Industrial 98 100 119

Systems Loss (%) 21 18 14 Public Building 824 899 930

Peak Load (KW) 54,446 55,185 58,305 Others 61 11,343 11,277

Load Factor (%) 60 61 62 Total 109,854 115,351 123,008

Collection Efficiency (%) 80 80 84

Ave. Systems Rate (P/KWH) 7.45 5.71 5.95

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 104,321 114,115 125,210 141,339 154,733 142,392 164,013 163,026 172,550 193,440

Commercial 20,067 25,294 28,466 29,800 31,236 29,915 34,882 35,203 40,682 46,485

Industrial 7,193 8,235 7,782 10,715 10,963 11,153 13,243 13,323 15,489 18,623

Public Building 2,589 2,969 3,170 3,624 3,859 3,632 4,479 4,629 4,946 5,449

Others 4,205 4,223 4,608 5,571 5,842 5,420 6,557 7,877 7,771 7,776

Total 138,375 154,836 169,236 191,049 206,632 192,511 223,174 224,058 241,438 271,773

Served

C O N N E C T I O N S

Mabalacat

Potential

B A R A N G A Y S

CoverageEnergized

Unenerg.

Asia Pacific Energy, Corp. Coal

Monthly Average

Mega Large

135,914

Legislative District

MUNICIPALITIES

141,044

POWER PLANT

Location Project Name/Proponent

D

Mr. Antonio D. DecenaMr. Sulpicio C. Lagarde, Jr.

PAMPANGA II ELECTRIC COOPERATIVE, INC. (PELCO II)San Roque, Guagua, Pampanga

Tel. Nos. (045) 900-0611, 900-0689, 900-0474, 900-0408; Telefax No. (045) 900-2650; Fax Nos. (045) 901-0534, 900-0092

200920082007

Mr. Anterto P. FloresMr. Amador T. Guevarra

D

Mr. John David R. SunioMr. Amador T. Guevarra

Type

C

Mega LargeMega Large

164,045

66

Page 74: The 2007-2009 RE Chronicle

N

67

LEGEND :

H Q HQ Location

Municipality

10 MVA Substation

15 MVA Substation

3 PH Backbone line

Energized Coop System

SAN SIMON SANTOTOMAS

MINALIN

MACABEBE

MASANTOL

APALIT

H Q

Page 75: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 16, 1981

II. DATE OF FIRST ENERGIZATION : May 26, 1981

III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 51.9 51.9 51.9

Subsidy 17.2 30.6 30.6

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Fourth District

1 Apalit (12) 9 9 9 9 100 0 19,100 17,024 18,027 18,313 96

2 Macabebe 25 25 25 25 100 0 15,400 9,310 10,401 10,717 70

3 Masantol 26 26 26 26 100 0 10,900 5,551 6,071 6,259 57

4 Minalin 15 15 15 15 100 0 8,200 6,618 6,845 6,989 85

5 San Simon (14) 13 13 13 13 100 0 7,500 6,355 6,763 6,761 90

6 Santo Tomas 7 7 7 7 100 0 8,600 7,507 7,994 8,541 99

Total 95 95 95 95 100 0 69,700 52,365 56,101 57,580 83

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 50,831 61,324 Residential N 53,576 55,002

MWH Purchased N 12,023 11,772 Commercial 1,879 1,881

MWH Sold 8,397 9,609 Industrial D 35 35

Systems Loss (%) D 30 18 Public Building 483 504

Peak Load (KW) 27,620 27,356 Others A 128 158

Load Factor (%) A 60 59 Total - 56,101 57,580

Collection Efficiency (%) - 90

Ave. Systems Rate (P/KWH) 6.05 6.38

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 51,423 53,614 55,285 60,146 66,492 64,097 55,495 N 62,812 75,096

Commercial 9,993 11,165 14,010 15,320 16,365 15,806 14,271 17,066 18,370

Industrial 72,270 62,060 70,311 74,471 78,834 74,545 64,461 D 16,139 17,592

Public Building 1,989 2,352 2,655 2,924 3,130 3,446 3,190 3,138 2,762

Others 1,412 1,110 1,092 953 1,605 1,691 1,280 A 1,614 1,493

Total 137,087 130,301 143,353 153,814 166,425 159,585 138,697 100,769 115,313

NDA - No Data Available

Atty. Restituto C. Capulong Atty. Restituto C. Capulong Atty. Restituto C. CapulongMs. Magdalena P. Bondoc (OIC) Ms. Magdalena P. Bondoc (OIC) Ms. Magdalena P. Bondoc (OIC)

- - E

- - Extra Large

58,843 60,803 64,864

PAMPANGA III ELECTRIC COOPERATIVE, INC. (PELCO III)Quintos Bldg. Mc Arthur Highway San Vicente, Apalit, Pampanga

Tel. Nos. (045) 302-5114, 879-0563 to 64, 652-0224; Telefax No. (045) 302-5785

2007 2008 2009

Monthly Average

Legislative District

ServedPotential

MUNICIPALITIESB A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.

68

N D A - No Data Available

Page 76: The 2007-2009 RE Chronicle

N

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

NPC Substation

Power Plant

3 PH Backbone Line

Energized Coop System

LEGEND :

H Q

P P

69

ORANISAMAL

ABUCAYMORONG

BAGAC

PILAR

ORION

LIMAY

MARIVELES

MILITARYRESERVATION

CITY ofBALANGA

HERMOSA

DINALUPIHAN

H Q

P P

Page 77: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : April 10, 1990

II. DATE OF FIRST ENERGIZATION : December 1, 1974

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 115.1 115.1 115.1

Subsidy 34.6 67.4 75.0

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District, Bataan

1 Abucay 9 9 9 9 100 0 8,200 7,517 7,790 8,136 99

2 Dinalupihan 46 46 46 46 100 0 20,500 18,687 19,487 20,425 99

3 Hermosa 23 23 23 23 100 0 10,700 9,415 9,829 10,324 96

4 Morong 5 5 5 5 100 0 5,100 4,152 4,393 4,650 91

5 Orani 29 29 29 29 100 0 12,700 11,987 12,284 12,651 99

6 Samal 14 14 14 14 100 0 6,900 6,433 6,639 6,833 99

Second District, Bataan

7 Bagac 14 14 14 14 100 0 5,200 4,489 4,649 4,824 93

8 City of Balanga 25 25 25 25 100 0 18,300 17,065 17,614 18,233 99

9 Limay 12 12 12 12 100 0 11,400 10,409 10,880 11,378 99

10 Mariveles 18 18 18 18 100 0 22,000 19,996 20,909 21,862 99

11 Orion 23 23 23 23 100 0 10,400 8,967 9,267 9,648 93

12 Pilar 19 19 19 19 100 0 7,700 7,067 7,316 7,596 99

Second District, Pampanga

Floridablanca 3 3 3 3 100 0 1,200

First District, Zambales

Subic 1 1 1 1 100 0 100

Total 241 241 241 241 100 0 140,400 126,184 131,057 136,560 97

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 150,785 127,960 143,920 Residential 117,017 121,605 126,652

MWH Purchased 21,197 22,115 23,760 Commercial 6,700 6,863 7,151

MWH Sold 18,824 19,714 21,432 Industrial 654 703 771

Systems Loss (%) 11 11 10 Public Building 1,444 1,508 1,571

Peak Load (KW) 48,008 49,294 52,800 Others 369 378 415

Load Factor (%) 60 61 62 Total 126,184 131,057 136,560

Collection Efficiency (%) 91 92 92

Ave. Systems Rate (P/KWH) 8.01 6.49 6.72

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 104,314 111,936 121,833 134,836 144,505 143,160 141,842 148,583 152,372 164,997

Commercial 16,729 17,498 17,880 19,111 20,018 20,173 20,170 21,981 23,241 25,123

Industrial 24,645 29,168 30,986 33,252 38,348 39,031 38,900 42,512 47,033 52,148

Public Building 6,225 6,813 7,642 8,354 8,677 9,425 9,611 9,411 10,560 11,130

Others 1,617 1,559 1,784 2,021 2,673 2,840 2,703 3,405 3,356 3,789

Total 153,530 166,974 180,125 197,574 214,222 214,629 213,226 225,892 236,562 257,187

Monthly Average

141,070

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

141,523

Gas Turbine

Legislative District

A+

Mega Large

Potential

A+

Mega Large

137,478

MUNICIPALITIES/CITY

Limay

2007

Mr. Alberto A. Villaruz

Engr. Loreto C. Marcelino

PENINSULA ELECTRIC COOPERATIVE, INC. (PENELCO)Roman Super Highway, Tuyo, City of Balanga

Telefax Nos. (047) 791-5155, 791-5103; E-mail: [email protected]/[email protected]

20092008

Mr. Alberto A. Villaruz

Engr. Loreto C. Marcelino

Ms. Ma. Lilibeth R. Fuster

Engr. Loreto C. Marcelino

A+

Mega Large

620.000Limay CCPP/San Miguel

Energy Corp.

POWER PLANT

Location Project Name/Proponent Type

7070

Page 78: The 2007-2009 RE Chronicle

N

ZAMECO IREGION III

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

NPC Substation

Power Plant

3 PH Backbone Line

Energized Coop System

P P

71

SANTA CRUZ

CANDELARIA

PALAUIG

MASINLOC

BOTOLAN

IBA

P P

H Q

Page 79: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : June 30, 1972II. DATE OF FIRST ENERGIZATION : December 1974III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 359.7 408.4 437.9

Subsidy 44.2 59.2 60.2

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Second District

1 Botolan 31 31 31 31 100 0 11,300 7,538 7,753 7,966 70 2 Candelaria 16 16 16 16 100 0 5,700 4,812 5,010 5,150 90 3 Iba 14 14 14 14 100 0 10,500 9,520 9,956 10,366 99 4 Masinloc 13 12 12 12 92 1 9,600 7,350 7,626 7,968 83 5 Palauig 19 18 18 18 95 1 7,300 5,777 5,971 6,215 85 6 Santa Cruz 25 25 25 25 100 0 12,000 10,034 10,329 10,717 89

Total 118 116 116 116 98 2 56,400 45,031 46,645 48,382 86

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 38,498 37,714 41,494 Residential 41,495 43,056 44,706 MWH Purchased 5,587 5,679 5,982 Commercial 2,915 2,941 3,006 MWH Sold 4,543 4,786 5,122 Industrial 107 107 103 Systems Loss (%) 18 16 14 Public Building 418 439 460 Peak Load (KW) 15,075 13,775 14,078 Others 96 102 107 Load Factor (%) 51 56 58 Total 45,031 46,645 48,382 Collection Efficiency (%) 93 91 92 Ave. Systems Rate (P/KWH) 8.47 7.88 8.10

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 23,822 26,102 28,298 33,625 36,050 35,974 32,532 34,201 35,571 37,232 Commercial 5,285 5,709 5,752 6,335 6,914 7,075 7,329 7,856 8,639 9,782 Industrial 4,530 4,837 5,990 7,108 7,768 7,586 7,586 9,403 10,224 10,782 Public Building 1,333 1,390 1,402 1,635 1,794 1,968 2,090 2,410 2,482 2,875 Others 342 341 347 460 397 380 525 643 521 790 Total 35,312 38,379 41,789 49,163 52,923 52,982 50,062 54,513 57,437 61,461

Mr. Isagani Q. Yap

ZAMBALES I ELECTRIC COOPERATIVE, INC. (ZAMECO I)San Vicente, Palauig, Zambales

Tel. No. (047) 603-0106; Fax No. (047) 0821-1029

20092008

Engr. Rene A. Divino

49,902

Mr. Richard E. ReglosEngr. Rene A. Divino

ALarge Large

B

Monthly Average

48,693

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

Potential

47,427

Legislative District

2007

BLarge

MUNICIPALITIES

Mr. Isagani Q. YapEngr. Rene A. Divino

600.000MasinlocMasinloc CFTPP/ Masinloc

Power Partners Co., Ltd.Coal

POWER PLANT

Location Project Name/Proponent Type

72

Page 80: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

Below 5 MVA Substation

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

Energized Coop SystemEnergized Other System

N

73

Served byPublic Utilities Dept.OLONGAPO CITY

OLONGAPO CITY

SUBIC

CABANGAN

SAN FELIPE

SAN NARCISO

SANANTONIO

SAN MARCELINO

CASTILLEJOS

H Q

Page 81: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : October 14, 1984

II. DATE OF FIRST ENERGIZATION : 1984

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 0.6 10.6 10.6

Subsidy 35.9 51.2 63.9

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District1 Castillejos 14 14 14 14 100 0 10,400 9,338 9,763 10,321 99

2 San Marcelino 18 18 18 18 100 0 9,300 8,725 8,965 9,233 99

3 Subic (16) 15 15 15 15 100 0 16,900 15,268 16,022 16,840 99

Second District4 Cabangan 22 22 22 22 100 0 5,000 4,585 4,746 4,927 99

5 San Antonio 14 14 14 14 100 0 8,300 7,756 7,957 8,202 99

6 San Felipe 11 11 11 11 100 0 5,500 5,206 5,362 5,498 99

7 San Narciso 17 17 17 17 100 0 6,400 6,070 6,220 6,363 99

Total 111 111 111 111 100 0 61,800 56,948 59,035 61,384 99

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 50,236 47,135 50,301 Residential 51,055 52,909 55,221

MWH Purchased 7,606 8,022 8,538 Commercial 3,166 3,396 3,449

MWH Sold 6,522 6,949 7,429 Industrial 69 73 76

Systems Loss (%) 14 13 13 Public Building 456 462 469

Peak Load (KW) 16,880 17,623 24,937 Others 2,202 2,195 2,169

Load Factor (%) 62 62 47 Total 56,948 59,035 61,384

Collection Efficiency (%) 94 95 -

Ave. Systems Rate (P/KWH) 7.70 6.78 6.77

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 27,447 36,412 40,061 45,183 49,768 50,379 49,717 52,719 55,577 49,648

Commercial 4,528 6,982 7,145 7,735 8,801 9,297 9,657 10,567 11,902 10,785

Industrial 6,603 7,579 7,599 8,555 8,791 7,964 8,521 9,523 10,141 8,871

Public Building 2,541 3,277 3,542 3,824 4,232 4,603 5,216 4,837 5,179 4,505

Others 269 480 968 720 652 665 888 614 588 479

Total 41,388 54,730 59,315 66,017 72,243 72,909 73,999 78,260 83,387 74,288

Monthly Average

63,904

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Legislative District

-

-

Served

66,41961,642

MUNICIPALITIES

Potential

A+

ZAMBALES II ELECTRIC COOPERATIVE, INC. (ZAMECO II)Magsaysay, Castillejos, Zambales

Tel. No. (047) 623-2401; Telefax No. (047) 623-2402

200920082007

Engr. Dominador A. Gallardo

-

Mr. Paulino T. Lopez (PS) Engr. Alvin M. Farrales (OIC)

-

Engr. Fidel S. Correa (OIC)

Extra Large -

Engr. Dominador A. Gallardo (IBP)

Engr. Alvin M. Farrales (OIC)

74

Page 82: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Energized Other System

Headquarters

N

POLILLO IS.

Served byIbaan Electric & Engineering System

FLECOLumban, Laguna

QUEZELCO IIInfanta, Quezon

QUEZELCO IPitogo, Quezon

BATELEC ICalaca, Batangas

BATELEC IILipa City

Served byMERALCO (RIZAL) Served by

MERALCO(METRO MANILA)

Partly Served by MERALCO (LAGUNA)

Partly Served byMERALCO(QUEZON)

Served byBauan Electric Light System

MERALCO (BATANGAS)

Served byMERALCO (CAVITE)

Partly Served by

75

Page 83: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

CONNECTIONS

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Laguna 11 11 11 11 100 164 164 164 164 100 64,400 49,711 51,378 53,018 82

2 Batangas I 12 12 12 12 100 366 366 366 366 100 134,500 122,764 127,400 133,847 99

3 Batangas II 17 17 17 17 100 482 482 482 482 100 227,200 209,363 216,815 224,002 99

4 Quezon I 23 23 23 23 100 805 805 805 805 100 175,100 121,205 125,080 129,697 74

5 Quezon II 8 8 8 8 100 129 126 126 128 99 40,700 23,047 23,857 25,180 62

Total 71 71 71 71 100 1,946 1,943 1,943 1,945 99 641,900 526,090 544,530 565,744 88

SOUTHERN TAGALOG REGION

Potential

REGION IV-A (CALABARZON)

ELECTRIC DISTRIBUTION UTILITIES

MUNICIPALITIES/CITIES BARANGAYS

ServedCoverage

EnergizedCoverage

Energized

76

Total 559,518 615,666 597,822 730,263 768,732 782,100 774,796 840,046 843,576 940,347

Others 28,319 31,124 27,495 35,544 37,667 39,123 39,985 43,467 43,663 46,072

Public Bldgs. 11,520 13,193 13,566 16,938 19,540 20,401 20,773 22,764 24,350 26,817

Industrial 103,117 112,989 110,607 139,021 138,565 154,916 169,399 196,113 180,835 226,985

Commercial 113,122 124,904 120,227 145,972 156,967 160,374 159,227 172,061 183,563 196,839

Residential 303,440 333,456 325,927 392,788 415,992 407,285 385,412 405,641 411,165 443,634

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 84: The 2007-2009 RE Chronicle

N

77

SAN PEDRO

BIÑAN

SANTA ROSA

CABUYAO

CALAMBA

BAY CALAUAN

SAN PABLO CITY

RIZAL

NAGCARLAN

VICTORIAPILA

SANTACRUZ

LUISIANA

MAJAYJAY

LILIW

ALAMINOS

CAVINTIPAGSANJAN

LUMBAN

KALAYAAN

PAETE

PAKIL

PANGILSINILOANFAMY

MABITAC

SANTA MARIA

TALIM IS.

Served by MERALCO

MAGDALENA

LOSBAÑOS

P PH Q

Served byMERALCO

Part ofPAKIL Part of

PANGILMH

P PP P

MH

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Power Plant

Mini Hydro

3PH Backbone Line

Energized Coop SystemEnergized Other System

P P

Page 85: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : April 3, 1973II. DATE OF FIRST ENERGIZATION : September 1, 1973III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)

Residual Loan 251.0 351.6 444.8Subsidy 34.7 48.7 48.7

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Fourth District

1 Cavinti 19 19 19 19 100 0 5,200 4,136 4,271 4,428 85 2 Famy 20 20 20 20 100 0 2,800 1,848 1,911 2,009 72 3 Kalayaan 3 3 3 3 100 0 5,000 3,442 3,560 3,704 74 4 Lumban 16 16 16 16 100 0 7,000 5,499 5,686 5,893 84 5 Mabitac 15 15 15 15 100 0 4,000 2,836 2,954 2,987 75 6 Paete 9 9 9 9 100 0 6,400 5,264 5,414 5,562 87 7 Pagsanjan 16 16 16 16 100 0 9,000 8,423 8,643 8,864 98 8 Pakil 13 13 13 13 100 0 4,800 3,682 3,845 3,985 83 9 Pangil 8 8 8 8 100 0 5,600 3,980 4,100 4,193 75

10 Siniloan 20 20 20 20 100 0 8,000 6,491 6,703 6,887 86 11 Santa Maria 25 25 25 25 100 0 6,600 4,110 4,291 4,506 68

Total 164 164 164 164 100 0 64,400 49,711 51,378 53,018 82

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 41,060 34,300 40,237 Residential 47,384 48,739 50,277 MWH Purchased 6,199 6,244 6,417 Commercial 1,745 1,739 1,835 MWH Sold 4,756 4,747 5,335 Industrial 74 71 75 Systems Loss (%) 23 23 16 Public Building 324 603 622 Peak Load (KW) 14,798 14,192 14,829 Others 184 226 209 Load Factor (%) 57 60 59 Total 49,711 51,378 53,018 Collection Efficiency (%) 84 91 93 Ave. Systems Rate (P/KWH) 8.63 7.22 7.54

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 33,086 36,491 38,726 42,798 43,943 42,774 40,333 41,969 41,417 47,145 Commercial 5,158 5,366 5,643 7,048 8,204 8,012 7,580 7,724 7,938 8,954 Industrial 3,623 3,930 4,435 4,512 4,414 4,528 4,294 4,491 4,403 4,261 Public Building 486 558 662 916 1,507 1,669 1,781 2,001 2,139 2,546 Others 517 645 583 552 547 685 892 886 1,073 1,113 Total 42,870 46,990 50,049 55,826 58,615 57,668 54,880 57,071 56,970 64,019

0.150

Kalayaan

709.000

Botocan/Electric Power Dev't. Corp.

Hydro 23.000

San Juan River/Kalayaan Ice Plant

Mini Hydro

Monthly Average

B A R A N G A Y S

CoverageEnergized

Unenerg.Legislative District

MUNICIPALITIES

Extra Large

ServedC O N N E C T I O N S

Potential

POWER PLANT

23.500

Project Name/ProponentLocation

Kalayaan 1,2,3,4/Electric Power

Dev't. Corp.Hydro

Large

FIRST LAGUNA ELECTRIC COOPERATIVE, INC. (FLECO)Brgy. Lewin, Lumban, Laguna

Tel. Nos. (049) 808-4478, 813-0858; Telefax No. (049) 808-5008

20092007 2008

DLarge

Engr. Edgardo R. Piamonte (PS/AGM)Mr. Ricardo R Leron Mr. Felix Q. FloresMr. Ricardo R Leron

Engr. Edgardo R. Piamonte (PS/AGM)BD

Mr. Evamgelito S. Estaca (PS/AGM)

50,047 51,221 52,511

LumbanCaliraya/Electric Power

Dev't. Corp.Hydro

Type

78

Page 86: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Power Plant

3 PH Backbone Line

Energized Coop System

P P

79

TUY

SAN LUIS

LIAN

SANTATERESITA

TAAL

CALATAGAN

AGONCILLO

BALAYAN

CALACA

SANNICOLAS

NASUGBU

H Q

P P

LEMERY

Part ofSAN NICOLAS

Page 87: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : June 14, 1972II. DATE OF FIRST ENERGIZATION : December 14, 1974III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)

Residual Loan 83.1 84.0 100.0Subsidy 51.0 88.6 88.6

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District

1 Balayan 48 48 48 48 100 0 18,000 16,498 17,011 17,933 99 2 Calaca 40 40 40 40 100 0 14,800 13,420 13,900 14,748 99 3 Calatagan 25 25 25 25 100 0 10,800 10,082 10,415 10,741 99 4 Lemery 46 46 46 46 100 0 17,400 15,783 16,473 17,352 99 5 Lian 19 19 19 19 100 0 10,400 9,338 9,742 10,317 99 6 Nasugbu 42 42 42 42 100 0 23,000 20,925 21,746 22,950 99 7 Taal 42 42 42 42 100 0 10,600 9,816 10,122 10,528 99

8 Tuy 22 22 22 22 100 0 8,800 7,771 8,270 8,773 99

Second District

9 San Luis 26 26 26 26 100 0 6,600 6,111 6,315 6,556 99 Third District

10 Agoncillo 21 21 21 21 100 0 6,900 6,320 6,510 6,808 99 11 San Nicolas 18 18 18 18 100 0 3,800 3,537 3,661 3,770 99 12 Santa Teresita 17 17 17 17 100 0 3,400 3,163 3,235 3,371 99

Total 366 366 366 366 100 0 134,500 122,764 127,400 133,847 99

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 119,728 104,356 114,071 Residential 108,626 112,865 118,586MWH Purchased 18,398 19,524 20,594 Commercial 3,739 3,844 3,875 MWH Sold 15,993 16,841 17,873 Industrial 18 17 20 Systems Loss (%) 13 13 13 Public Building 1,235 1,245 1,322 Peak Load (KW) 42,089 44,024 49,710 Others 9,146 9,429 10,044 Load Factor (%) 60 61 57 Total 122,764 127,400 133,847Collection Efficiency (%) 97 97 96 Ave. Systems Rate (P/KWH) 7.49 6.20 6.38

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 75,625 82,952 86,135 97,836 102,971 101,541 99,733 104,528 105,047 111,855Commercial 30,856 35,615 36,844 40,058 48,172 49,220 51,194 54,400 61,900 66,476 Industrial 9,251 8,435 9,138 13,070 11,920 13,985 13,813 16,298 17,876 17,435 Public Building 2,843 3,288 3,437 3,999 4,278 4,388 4,950 5,240 5,424 6,125 Others 6,504 6,993 7,185 8,691 9,706 10,462 10,638 11,450 11,851 12,581 Total 125,079 137,283 142,739 163,654 177,047 179,596 180,328 191,916 202,098 214,472

Location

A+

Ms. Raquel Rowena A. RodriguezEngr. Ricardo C. Castillo, Jr. (OIC)

Mr. Rodolfo C. ReyesMr. Demetrio V. Ellao

A+Mega Large

133,491

Mr. Calixto A. BernalesMr. Demetrio V. Ellao

Type

Batangas (Calaca) CFTPP/DMCI Holdings,

Inc.Calaca Coal

A+Mega Large

138,783 141,317

Potential

POWER PLANTProject Name/Proponent

BATANGAS I ELECTRIC COOPERATIVE, INC. (BATELEC I)Calaca, Batangas 4212

Tel. Nos. (043) 424-0500, 424-0600, 223-5684, 223-5226; Fax Nos. (043) 424-0413; Cel.No. (0912) 308-3182

200920082007

Mega Large

600.000

Legislative District

Monthly Average

B A R A N G A Y S

CoverageEnergized

Unenerg.MUNICIPALITIES

ServedC O N N E C T I O N S

80

Page 88: The 2007-2009 RE Chronicle

81

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

15 MVA Substation

NPC Substation

Generating Set

3 PH Backbone Line

Energized Coop SystemEnergized Other System

G S

20 MVA Substation

N

LAUREL

TINGLOY

STO TOMAS

SANPASCUAL

BATANGAS CITY

Served byBauan Electric Light System

Served by MERALCO

Served by MERALCO

IBAAN

Served by Ibaan Electric &Engineering System

ROSARIO

LIPA CITY

TAYSAN

TALISAY

CITY ofTANAUANY

MALVAR

MATAASNA KAHOY

SAN JOSE

ALITAGTAG PADRE GARCIA

SAN JUAN

LOBO

MABINI

BAUAN

CUENCA

BALETE

G S

H Q

Part ofTALISAY

Part ofBATANGAS CITY

Page 89: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 12, 1977II. DATE OF FIRST ENERGIZATION : May 1978III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :IV. CATEGORY

CLASSIFICATIONV. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)

Residual Loan 123.5 231.6 231.6 1.183Subsidy 73.0 134.9 134.9

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Second District

1 Lobo 26 26 26 26 100 0 9,300 8,747 8,987 9,216 99 2 Mabini 34 34 34 34 100 0 9,500 9,069 9,247 9,431 99 3 Tingloy 15 15 15 15 100 0 2,900 1,922 2,017 2,108 73

Third District4 Alitagtag 19 19 19 19 100 0 4,700 4,145 4,229 4,319 92 5 Balete 13 13 13 13 100 0 3,800 3,454 3,599 3,749 99 6 Cuenca 21 21 21 21 100 0 7,200 6,757 6,937 7,098 99 7 Laurel 21 21 21 21 100 0 7,400 6,788 7,000 7,309 99 8 Malvar 15 15 15 15 100 0 8,000 7,211 7,588 7,890 99 9 MataasnaKahoy 16 16 16 16 100 0 5,700 5,400 5,545 5,657 99

10 Talisay 21 21 21 21 100 0 7,500 5,506 5,737 5,992 80

11 City of Tanauan 48 48 48 48 100 0 30,700 27,783 29,208 30,354 99

Fourth District

12 Lipa City 72 72 72 72 100 0 55,100 50,561 52,852 55,089 99 13 Padre Garcia 18 18 18 18 100 0 8,300 7,726 7,997 8,244 99 14 Rosario 48 48 48 48 100 0 23,000 21,710 22,295 22,915 99 15 San Jose 33 33 33 33 100 0 12,100 10,952 11,326 11,715 97 16 San Juan 42 42 42 42 100 0 23,600 22,684 23,091 23,566 99 17 Taysan 20 20 20 20 100 0 8,400 8,027 8,214 8,387 99

Batangas City 921 946 963Total 482 482 482 482 100 0 227,200 209,363 216,815 224,002 99

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 334,657 274,342 313,032 Residential 199,577 206,677 213,466 MWH Purchased 46,929 46,370 51,064 Commercial 6,949 7,138 7,385 MWH Sold 40,675 39,710 45,370 Industrial 45 46 46 Systems Loss (%) 13 14 11 Public Building 1,523 1,602 1,656 Peak Load (KW) 100,590 111,870 122,004 Others 1,269 1,352 1,449 Load Factor (%) 64 57 57 Total 209,363 216,815 224,002 Collection Efficiency (%) 96 96 96 Ave. Systems Rate (P/KWH) 8.23 6.91 6.90

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 134,686 148,549 131,910 175,264 189,125 186,987 178,511 188,554 191,106 204,810 Commercial 67,139 73,128 66,491 86,416 87,699 90,753 88,496 96,664 99,407 105,791 Industrial 77,589 88,951 85,267 108,860 109,168 123,066 139,106 163,858 146,787 192,288 Public Building 4,594 5,326 4,991 7,108 7,973 8,391 8,404 9,259 9,923 10,678 Others 18,110 19,977 17,790 24,477 25,835 26,532 27,094 29,764 29,300 30,877 Total 302,118 335,931 306,449 402,125 419,800 435,730 441,611 488,099 476,523 544,444

A+Mega Large

197,416

Monthly Average

B A R A N G A Y S

CoverageEnergized

Unenerg.

LocationTingloy

Legislative District

MUNICIPALITIES/CITIESServed

A+Mega Large

204,370 211,032

C O N N E C T I O N S

Potential

POWER PLANT

Mr. Ruperto H. Manalo

Ms. Marilyn M. Caguimbal

BATANGAS II ELECTRIC COOPERATIVE, INC. (BATELEC II)Antipolo del Norte, Lipa City 4217

Telefax Nos. (043) 756-1021, 756-1424, 756-6337, 981-1865, 757-0951; E-mail: [email protected]

20092007 2008

Ms. Marilyn M. CaguimbalMr. Evangelito S. Estaca (PS)

NPC-SPUG Diesel

Mr. Michael Angelo C. Rivera

A+Mega Large

Mr. Michael Angelo C. Rivera

Ms. Marilyn M. Caguimbal

Project Name/Proponent Type

82

Page 90: The 2007-2009 RE Chronicle

QUEZELCO I

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

Energized Coop System

Energized Other System

Served by MERALCO

83

N

MAUBAN

SAMPALOC

TAYABAS

SANANTONIO

PAGBILAO

TIAONG

DOLORES

CALAUAG

CATANAUAN

SANFRANCISCO (AURORA)

SANANDRES

PITOGO

TAGKAWAYAN

DEL GALLEGO,CAMARINES SUR

QUEZON

PEREZ

ATIMONAN

PADRE BURGOS

GENERALLUNAMACALELON

MULANAY

ALABAT

ALABAT IS.

SUBMARINE CABLE ( 1.2 kms )

SANNARCISO

LOPEZ

GUMACA

PLARIDEL

LUCENACITYSARIAYA

AGDANGAN

LUCBAN

H Q

UNISAN

BUENAVISTA

STA. ELENA,CAMARINESNORTE

Page 91: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : April 24, 1972II. DATE OF FIRST ENERGIZATION : March 1976III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009

Residual Loan 168.9 318.9 413.9Subsidy 107.2 183.0 187.4

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Third District

1 Agdangan 12 12 12 12 100 0 2,600 2,373 2,431 2,508 96 2 Buenavista 37 37 37 37 100 0 5,200 2,082 2,169 2,236 43 3 Catanauan 46 46 46 46 100 0 13,200 7,892 8,221 8,575 65 4 General Luna 27 27 27 27 100 0 4,800 3,333 3,419 3,560 74 5 Macalelon 30 30 30 30 100 0 5,200 3,975 4,117 4,315 83 6 Mulanay 28 28 28 28 100 0 10,500 5,256 5,378 5,532 53 7 Padre Burgos 22 22 22 22 100 0 4,300 3,457 3,565 3,722 87 8 Pitogo 39 39 39 39 100 0 4,800 4,278 4,409 4,578 95 9 San Andres 7 7 7 7 100 0 6,200 1,701 1,728 1,851 30

10 San Francisco (Aurora) 16 16 16 16 100 0 11,000 3,809 3,904 4,231 38 11 San Narciso 24 24 24 24 100 0 8,800 4,027 4,194 4,385 50 12 Unisan 36 36 36 36 100 0 4,800 4,403 4,468 4,554 95

Fourth District13 Alabat 19 19 19 19 100 0 3,400 3,113 3,233 3,278 96 14 Atimonan 42 42 42 42 100 0 13,000 11,107 11,369 11,558 89 15 Calauag 81 81 81 81 100 0 15,100 12,752 13,388 13,928 92 16 Guinayangan 54 54 54 54 100 0 8,500 5,974 6,193 6,447 76 17 Gumaca 59 59 59 59 100 0 13,900 12,499 12,791 13,135 94 18 Lopez 95 95 95 95 100 0 18,000 12,362 12,643 13,115 73 19 Perez 14 14 14 14 100 0 2,300 1,742 1,827 1,888 82 20 Plaridel 9 9 9 9 100 0 2,100 1,860 1,898 1,945 93 21 Quezon 24 24 24 24 100 0 3,300 2,634 2,742 2,843 86

22 Tagkawayan 45 45 45 45 100 0 10,100 7,662 7,986 8,401 83

First District, Camarines Sur23 Del Gallego (32) 30 30 30 30 100 0 4,000 2,914 3,007 3,112 78

Lone District, Camarines NorteSta. Elena 9 9 9 9 100 0Total 805 805 805 805 100 0 175,100 121,205 125,080 129,697 74

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 59,929 54,536 59,689 Residential 115,230 118,940 123,298 MWH Purchased 8,908 9,321 9,899 Commercial 3,055 3,091 3,244 MWH Sold 7,160 7,471 8,146 Industrial 61 60 60 Systems Loss (%) 19 20 17 Public Building 2,224 2,337 2,444 Peak Load (KW) 24,127 23,864 25,616 Others 635 652 651 Load Factor (%) 51 54 53 Total 121,205 125,080 129,697 Collection Efficiency (%) 95 95 95 Ave. Systems Rate (P/KWH) 8.37 7.30 7.33

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 51,511 55,463 58,670 65,020 68,120 64,935 55,759 58,691 60,884 66,336 Commercial 7,870 8,485 8,977 9,945 10,446 10,196 9,342 10,287 11,048 11,987 Industrial 12,004 11,175 11,285 12,369 12,980 13,249 11,426 10,527 10,826 12,110 Public Building 3,486 3,868 4,335 4,594 5,248 5,347 4,990 5,496 6,038 6,511 Others 2,961 3,252 1,667 1,405 1,176 1,086 907 917 855 813 Total 77,832 82,243 84,934 93,333 97,970 94,813 82,424 85,918 89,651 97,757

B

125,401

BBExtra Large

Monthly Average

CoverageEnergized

Mega Large116,148

Mega Large120,161

Legislative District

C O N N E C T I O N SB A R A N G A Y SServed

MUNICIPALITIESPotentialUnenerg.

QUEZON I ELECTRIC COOPERATIVE, INC. (QUEZELCO I)Brgy. Poctol, Pitogo, Quezon 4308

Tel. Nos. (042) 318-8156; Fax No. (042) 421-1122

200920082007

Engr. Carlito M. Rufo, Jr. Engr. Carlito M. Rufo, Jr.

Dr. Agripino P. Tullas

Engr. Carlito M. Rufo, Jr.

Dr. Agripino P. Tullas Dr. Agripino P. Tullas

84

Page 92: The 2007-2009 RE Chronicle

N

LEGEND :

Energized Coop System

H Q HQ Location

Municipality

5 MVA Substation

Generating Set

3 PH Backbone Line

G S

85

JOMALIG

PATNANUNGAN

PANUKULAN

INFANTAGENERAL NAKAR

REAL

BURDEOS

POLILLO

G S

G S

G SH Q

Page 93: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 11, 1978

II. DATE OF FIRST ENERGIZATION : January 1983

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 32.6 53.4 53.4 3.180

Subsidy 40.0 47.2 47.2 0.326

0.317

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Burdeos 14 14 14 14 100 0 4,500 940 1,026 1,159 26

2 General Nakar 19 17 17 19 100 0 5,400 1,852 1,965 2,084 39

3 Infanta 36 36 36 36 100 0 12,000 10,478 10,814 11,225 94

4 Jomalig* 5 5 5 5 100 0 1,300 290 298 354 27

5 Panukulan 12 12 12 12 100 0 2,500 883 907 999 40

6 Patnanungan* 6 6 6 6 100 0 2,500 657 685 715 29

7 Polillo 20 20 20 20 100 0 5,500 3,430 3,494 3,560 65

8 Real 17 16 16 16 94 1 7,000 4,517 4,668 5,084 73

Total 129 126 126 128 99 1 40,700 23,047 23,857 25,180 62

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 12,029 11,093 13,065 Residential 21,344 21,068 21,802

MWH Purchased 1,678 1,799 1,907 Commercial 1,130 1,144 1,184

MWH Sold 1,420 1,528 1,638 Industrial 79 31 167

Systems Loss (%) 15 15 14 Public Building 304 350 371

Peak Load (KW) 3,588 3,584 3,801 Others 190 1,264 1,656

Load Factor (%) 64 69 69 Total 23,047 23,857 25,180

Collection Efficiency (%) 96 92 99

Ave. Systems Rate (P/KWH) 8.47 7.26 7.98

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 8,532 10,001 10,486 11,870 11,832 11,048 11,076 11,899 12,711 13,488

Commercial 2,099 2,310 2,272 2,505 2,447 2,192 2,615 2,986 3,270 3,631

Industrial 650 498 482 210 83 88 760 939 943 891

Public Building 111 153 141 321 535 608 648 768 826 957

Others 227 257 270 419 403 357 454 450 584 688

Total 11,619 13,219 13,651 15,325 15,299 14,293 15,553 17,042 18,334 19,655

* With Provisional Franchise, NEC Res. No. 4 s. 1976

B

Large

20,909

Monthly Average

B A R A N G A Y S

CoverageEnergized

Unenerg.

Location

Polillo

Legislative District

MUNICIPALITIESServed

C

Large

21,551 22,733

C O N N E C T I O N S

Potential

POWER PLANT

Mr. Antonio L. Astejada

Engr. Victor R. Cada

QUEZON II ELECTRIC COOPERATIVE, INC. (QUEZELCO II)Brgy. Gumian, Infanta, Quezon

Tel. Nos. (042) 535-2265, 535-2105, 535-3406, 535-4302; Telefax No. (042) 535-3151; (042) 536-3406

20092007 2008

NPC-SPUG Diesel

Mr. Adelo S. Leynes

Engr. Victor R. Cada

A

Large

Mr. Adelo S. Leynes

Engr. Victor R. Cada

Project Name/Proponent Type

Patnanungan NPC-SPUG Diesel

Jomalig NPC-SPUG Diesel

86

Page 94: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Energized Other SystemHeadquarters

N

BISELCOCoron, Palawan

PALECOPuerto Princesa City

87

LUBELCOTilik, Lubang, Occ. Mindoro

ORMECOCity of Calapan

OMECOSan Jose, Occ. Mindoro

ROMELCORomblon, Romblon

TIELCOOdiongan, Romblon

MARELCOBoac, Marinduque

Served byBanton MunicipalElectric System

Served byCorcuera MunicipalElectric System

Served byConcepcion MunicipalElectric System

Page 95: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

CONNECTIONS

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives :

1 Lubang 2 2 2 2 100 25 25 25 25 100 7,600 5,931 6,171 6,364 84

2 Mindoro Occ. 9 9 9 9 100 137 136 136 137 100 81,300 50,151 53,085 55,911 69

3 Mindoro Or. 15 15 15 15 100 426 422 425 426 100 163,300 108,291 115,145 123,043 75

4 Marinduque 6 6 6 6 100 218 218 218 218 100 48,900 38,825 40,203 41,600 85

5 Tablas 10 10 10 10 100 112 112 112 112 100 34,200 22,173 23,283 24,583 72

6 Romblon 4 4 4 4 100 66 66 66 66 100 19,900 10,438 11,039 11,709 59

7 Busuanga 4 4 4 4 100 61 58 58 61 100 17,900 6,269 6,962 7,473 42

8 Palawan 19 19 19 19 100 370 328 328 360 97 173,400 80,800 85,239 89,345 52

Total 69 69 69 69 100 1,415 1,365 1,368 1,405 99 546,500 322,878 341,127 360,028 66

EnergizedPotential

Served

REGION IV-B (MIMAROPA)SOUTHERN TAGALOG REGION

ELECTRIC DISTRIBUTION

UTILITIES

MUNICIPALITIES/CITIES BARANGAYS

CoverageEnergized

Coverage

88

Total 206,532 225,052 239,206 260,012 282,735 302,048 290,970 309,463 325,326 354,578

Others 3,943 4,064 4,737 5,353 6,453 7,228 6,654 6,920 7,200 7,908

Public Bldgs. 17,477 19,013 20,721 23,764 25,028 26,071 26,821 29,486 32,195 35,840

Industrial 15,547 17,828 18,872 19,166 23,590 26,830 27,577 28,575 29,552 34,688

Commercial 48,575 50,205 54,078 57,957 64,208 69,724 70,305 76,802 82,040 86,503

Residential 120,990 133,942 140,798 153,772 163,457 172,194 159,613 167,680 174,339 189,639

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 96: The 2007-2009 RE Chronicle

N

LUBELCO

LEGEND :

H Q HQ Location

Municipality

Below 5 MVA Substation

Generating Set

3 PH Backbone Line

Energized Coop System

G S

LOOC

LUBANG

TABAOTAMBO

AMBIL IS.

CABRA IS.

GOLO IS.

TALAOTAO

G S

H Q

89

Page 97: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : February 20, 1975

II. DATE OF FIRST ENERGIZATION : December 2, 1978

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 0.8 0.8 5.8 1.704

Subsidy 11.8 13.9 13.9

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District, Occidental Mindoro

1 Looc 9 9 9 9 100 0 2,100 1,264 1,302 1,340 64

2 Lubang 16 16 16 16 100 0 5,500 4,667 4,869 5,024 91

Total 25 25 25 25 100 0 7,600 5,931 6,171 6,364 84

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 969 1,409 1,644 Residential 5,658 5,881 6,056

MWH Purchased 127 196 228 Commercial 116 120 131

MWH Sold 103 162 192 Industrial 28 28 27

Systems Loss (%) 19 17 15 Public Building 95 103 110

Peak Load (KW) 713 565 643 Others 34 39 40

Load Factor (%) 24 47 49 Total 5,931 6,171 6,364

Collection Efficiency (%) 92 100 97

Ave. Systems Rate (P/KWH) 9.44 8.73 8.56

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 916 1,102 1,190 1,207 1,110 1,224 1,088 924 1,394 1,617

Commercial 153 184 185 191 155 198 228 166 324 402

Industrial 12 12 32 30 41 45 40 23 42 60

Public Building 79 92 88 82 82 121 75 65 106 141

Others 22 24 34 43 43 53 46 54 72 84

Total 1,182 1,414 1,529 1,553 1,430 1,641 1,477 1,232 1,938 2,304

Legislative District

Lubang (Cabra Is.)

Potential

MUNICIPALITIESB A R A N G A Y S C O N N E C T I O N S

Served

POWER PLANT

Small

6,376 6,591 6,756

Monthly Average

CoverageEnergized

Unenerg.

Ms. Prescila T. Balibay (OIC)

AD D

SmallSmall

NPC-SPUG

Project Name/Proponent

Diesel

Location Type

- - Mr. Romeo C. Puli

Engr. Alex C. Labrador (Deputized GM) Engr. Alex C. Labrador (Deputized GM)

LUBANG ELECTRIC COOPERATIVE, INC. (LUBELCO)Tilik, Lubang, Occidental Mindoro

Cel. Nos. (0918) 306-8970, 302-3446, 306-8970; (0919) 254-6984

2007 2008 2009

90

Page 98: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Generator Substation

3 PH Backbone Line

Energized Coop System

G S

PALUAN

SAN JOSE

ILIN ISLAND

GARZA IS.

DONGON IS.

PANDANISLAND

AMBULONG IS.

ABRA DE ILOG

MAMBURAO

SANTA CRUZ

SABLAYAN

CALINTAAN

MAGSAYSAY

RIZAL

G S

G S

H Q

GS

91

Page 99: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION: March 25, 1974

II. DATE OF FIRST ENERGIZATION: May 1974

III. ELECTRIC COOPERATIVE OFFICIALS:

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 48.6 48.6 246.6 0.800

Subsidy 52.0 79.4 85.0 14.000

5.750

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 Abra de Ilog 9 9 9 9 100 0 5,200 2,471 2,635 2,778 53

2 Calintaan 7 7 7 7 100 0 5,500 2,655 2,802 2,915 53

3 Magsaysay 12 12 12 12 100 0 6,700 2,997 3,172 3,386 51

4 Mamburao 15 15 15 15 100 0 7,300 5,897 6,238 6,498 89

5 Paluan* 12 11 11 12 100 0 2,800 770 770 770 28

6 Rizal 11 11 11 11 100 0 6,900 3,347 3,671 3,899 57

7 Sablayan 22 22 22 22 100 0 14,600 8,690 9,460 10,179 70

8 San Jose 38 38 38 38 100 0 26,000 20,368 21,118 22,018 85

9 Santa Cruz 11 11 11 11 100 0 6,300 2,956 3,219 3,468 55

Total 137 136 136 137 100 0 81,300 50,151 53,085 55,911 69

*Operated by the Municipality

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 32,002 34,214 38,045 Residential 46,273 48,932 51,623

MWH Purchased 4,343 4,585 5,022 Commercial 2,777 2,971 3,008

MWH Sold 3,563 3,812 4,185 Industrial 62 65 69

Systems Loss (%) 17 16 16 Public Building 940 1,006 1,074

Peak Load (KW) 15,386 11,628 13,307 Others 99 111 137

Load Factor (%) 39 54 52 Total 50,151 53,085 55,911

Collection Efficiency (%) 100 100 101

Ave. Systems Rate (P/KWH) 8.98 8.97 9.09

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 16,500 17,871 18,301 18,904 21,084 22,198 22,220 22,969 24,684 26,765

Commercial 5,170 5,462 5,462 5,577 6,246 6,660 7,110 7,915 8,733 9,669

Industrial 4,584 5,443 5,513 4,992 6,315 6,925 7,680 8,839 8,921 10,010

Public Building 1,356 1,469 1,616 1,676 1,866 2,167 2,444 2,745 3,105 3,446

Others 249 230 297 258 425 354 261 286 306 332

Total 27,859 30,475 31,189 31,407 35,936 38,303 39,715 42,754 45,749 50,222

Legislative District

Monthly Average

CoverageEnergized

B A R A N G A Y S

NPC-SPUG

MUNICIPALITIES

Project Name/Proponent

ServedUnenerg. Potential

C O N N E C T I O N S

DieselMamburao NPC-SPUG

San Jose

Diesel

Large

OCCIDENTAL MINDORO ELECTRIC COOPERATIVE, INC. (OMECO)M.H. Del Pilar St. cor. Quirino St., San Jose, Occidental Mindoro

Tel. Nos. (043) 491-1021, 491-1981; Telefax No. (043) 491-1364

2007 2008 2009

POWER PLANT

Location

DieselPB 106/Genset

Type

Extra Large

C

45,286

Extra Large

50,55047,382

Paluan LGU

C C

Mr. Leonardo S. Dela Fuente Mr. Jerry R. Villanada

Engr. Alex C. Labrador

Mr. Samuel A. Villar

Engr. Alex C. Labrador Engr. Alfred A. Dantis (OIC)

92

Page 100: The 2007-2009 RE Chronicle

LEGEND :

HQ Location

Municipality

Below 5 MVA Substation

5 MVA Substation

NPC Substation

Power Plant

Generator Substation

Mini Hydro

3 PH Backbone Line

H Q

Energized Coop System

MH

G S

P P

93

N PUERTOGALERA

VICTORIA

SOCORRO

BONGABONG

ROXAS

MANSALAY

BULALACAO(San Pedro)

BACO

POLA

PINAMALAYAN

BANSUD

GLORIA

NAUJAN

CITY ofCALAPAN

SANTEODORO G S

MH

P P

P P

H Q

Page 101: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : ORMECO I - Feb. 16, 1973 ; ORMECO II - Aug. 15, 1977 ; Merged - May 20, 1988

II. DATE OF FIRST ENERGIZATION : June 1, 1974

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 62.1 88.4 134.5 26.000

Subsidy 78.6 140.7 142.8 22.500

7.500

1.600

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Baco 27 27 27 27 100 0 6,500 4,421 4,609 4,930 76

2 City of Calapan 62 62 62 62 100 0 31,500 28,039 29,596 31,403 99

3 Naujan 70 68 69 70 100 0 19,100 13,527 14,595 15,377 81

4 Pola 23 23 23 23 100 0 7,200 3,667 3,833 4,014 56

5 Puerto Galera 13 13 13 13 100 0 6,400 5,556 5,944 6,385 99

6 San Teodoro 8 8 8 8 100 0 3,100 2,136 2,229 2,424 78

7 Socorro 26 26 26 26 100 0 8,400 4,957 5,217 5,447 65

8 Victoria 32 32 32 32 100 0 9,700 7,714 8,124 8,513 88

Second District

9 Bansud 13 13 13 13 100 0 7,900 4,113 4,427 4,787 61

10 Bongabong 36 35 36 36 100 0 13,500 6,957 7,461 8,235 61

11 Bulalacao (San Pedro) 15 14 15 15 100 0 6,300 1,214 1,501 1,774 28

12 Gloria 27 27 27 27 100 0 8,800 4,862 5,172 5,609 64

13 Mansalay 17 17 17 17 100 0 8,900 2,884 3,100 3,438 39

14 Pinamalayan 37 37 37 37 100 0 16,600 12,307 12,897 13,729 83

15 Roxas 20 20 20 20 100 0 9,400 5,937 6,440 6,978 74

Total 426 422 425 426 100 0 163,300 108,291 115,145 123,043 75

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 84,065 91,391 92,381 Residential 96,514 103,976 111,254

MWH Purchased 10,437 10,692 11,548 Commercial 8,040 8,295 8,669

MWH Sold 9,072 9,402 10,194 Industrial 74 84 109

Systems Loss (%) 12 11 11 Public Building 2,308 2,519 2,692

Peak Load (KW) 25,050 24,530 28,320 Others 1,355 271 319

Load Factor (%) 57 60 56 Total 108,291 115,145 123,043

Collection Efficiency (%) 99 101 100

Ave. Systems Rate (P/KWH) 9.27 9.72 9.06

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 42,301 48,109 52,080 57,075 59,976 65,065 56,474 61,435 62,840 68,694

Commercial 14,785 16,538 18,954 21,744 23,405 26,169 25,389 29,093 30,681 29,847

Industrial 3,042 4,108 4,076 4,268 6,083 7,242 7,277 8,184 8,393 11,325

Public Building 4,254 5,090 5,706 6,555 7,164 8,032 8,008 9,042 9,764 11,155

Others 754 888 1,024 1,101 1,211 1,250 1,108 1,110 1,145 1,303

Total 65,136 74,733 81,840 90,743 97,838 107,758 98,256 108,864 112,823 122,324

Project Name/Proponent Type

Diesel

Puerto Galera Minolo Power Barge

Calapan NPC-SPUG Diesel/Modular GenSet

CoverageEnergized

B A R A N G A Y S

Pinamalayan Mirant

95,161 100,782 107,643

POWER PLANT

Location

C O N N E C T I O N S

Dulangan/ORMECO

Monthly Average

Mega Large

Unenerg. Potential

MUNICIPALITIES/CITY

Baco

Served

Legislative District

Mega Large Mega Large

ORIENTAL MINDORO ELECTRIC COOPERATIVE, INC. (ORMECO)Simaron, Sta. Isabel, City of Calapan, Oriental Mindoro

Tel. No. (043) 288-2349; Telefax Nos. (043) 286-9424, 286-9375; E-mail: ormeco-coop@com

2007 2008 2009

Mr. Platanos T. Suarez Mr. Platanos T. Suarez Mr. Platanos T. Suarez

Mini Hydro

Mr. Romeo N. Cuasay Mr. Romeo N. Cuasay Mr. Romeo N. Cuasay

A+A+ A+

94

Page 102: The 2007-2009 RE Chronicle

N

MARELCO

LEGEND :

HQ Location

Municipality

Below 5 MVA Substation

NPC Substation

Generating Set

3 PH Backbone Line

H QEnergized Coop System

G S

95

MOGPOG

SANTA CRUZ

TORRIJOSGASAN

BUENAVISTA

BOAC

GASPAR IS.

MELCHOR IS.

BALTAZAR IS.

ELEPHANT IS.

SALAMAGUEIS.

MANIWAYA IS.

MOMPONG IS.

POLO IS.SANAHO IS.

HATANGKO IS.

G S

G S

G S

G S

G S

H Q

G S

Page 103: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : March 27, 1973

II. DATE OF FIRST ENERGIZATION : December 9, 1973

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 37.6 55.4 59.2 5.650

Subsidy 65.7 93.1 95.7 7.200

0.500

0.45

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 Boac 61 61 61 61 100 0 11,000 9,863 10,148 10,478 95

2 Buenavista 15 15 15 15 100 0 4,300 2,709 2,889 3,032 71

3 Gasan 25 25 25 25 100 0 6,700 5,464 5,607 5,747 86

4 Mogpog 37 37 37 37 100 0 7,200 6,261 6,480 6,683 93

5 Santa Cruz 55 55 55 55 100 0 13,500 10,044 10,427 10,852 80

6 Torrijos 25 25 25 25 100 0 6,200 4,484 4,652 4,808 78

Total 218 218 218 218 100 0 48,900 38,825 40,203 41,600 85

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 17,478 17,845 18,926 Residential 35,383 36,713 38,078

MWH Purchased 2,401 2,415 2,597 Commercial 2,184 2,184 2,172

MWH Sold 1,975 1,950 2,103 Industrial 160 167 173

Systems Loss (%) 17 18 18 Public Building 888 925 950

Peak Load (KW) 6,970 7,334 7,660 Others 210 214 227

Load Factor (%) 47 45 46 Total 38,825 40,203 41,600

Collection Efficiency (%) 98 97 97

Ave. Systems Rate (P/KWH) 8.85 9.15 9.00

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 13,097 14,485 15,188 16,140 16,691 16,996 15,055 15,926 15,244 15,953

Commercial 3,192 3,265 3,293 3,391 3,341 3,287 3,087 3,413 3,305 3,381

Industrial 344 482 387 448 679 857 952 988 1,220 2,144

Public Building 1,756 1,825 2,027 2,311 2,293 2,348 2,340 2,451 2,632 2,775

Others 421 492 606 728 947 973 856 919 997 979

Total 18,810 20,549 21,501 23,018 23,951 24,460 22,290 23,697 23,398 25,232

CoverageEnergized

Type

Diesel/Genset

Power Barge

Torrijos NPC-SPUG

Sta. Cruz NPC-SPUG Diesel

Legislative District

Monthly Average

40,695 41,725

Unenerg. Potential

Boac NPC-SPUG

Mogpog

42,878

MUNICIPALITIES

POWER PLANT

Location Project Name/Proponent

Served

NPC-SPUG

Diesel

B A R A N G A Y S C O N N E C T I O N S

Mr. Joel R. Palatino

Mr. Eduardo Q. Bueno Mr. Eduardo Q. Bueno Mr. Eduardo Q. Bueno

Mr. Augusto Leo M. Livelo Mr. Augusto Leo M. Livelo

B B B

Large LargeLarge

MARINDUQUE ELECTRIC COOPERATIVE, INC. (MARELCO)Brgy. Ihatub, Boac, Marinduque

Tel. Nos. (042) 332-1043 to 44; Fax No. (042) 332-1837; E-mail: [email protected]/marelco.pldtdsl.net

2007 2008 2009

96

Page 104: The 2007-2009 RE Chronicle

N

TIELCO

LEGEND :

H Q HQ Location

Municipality

Generating Set

3 PH Backbone Line

Energized Coop System

G S

97

SIBUYAN ISLAND

ALCANTARA

SANTA FE

SANJOSE

FERROL

ODIONGAN

LOOC

SANTA MARIA(IMELDA)

SANANDRES

SANAGUSTIN

CALATRAVA

H Q

G S

G S

G S

Part of LOOC

Page 105: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : February 6, 1978

II. DATE OF FIRST ENERGIZATION : September 3, 1983

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 14.6 17.6 17.6 6.870

Subsidy 19.4 28.8 34.3 0.576

1.740

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District, Romblon

1 Alcantara 12 12 12 12 100 0 3,100 2,015 2,098 2,181 70

2 Calatrava 7 7 7 7 100 0 1,900 1,159 1,265 1,357 71

3 Ferrol 6 6 6 6 100 0 1,300 820 859 889 68

4 Looc 12 12 12 12 100 0 4,500 3,090 3,241 3,385 75

5 Odiongan 25 25 25 25 100 0 9,100 7,681 8,020 8,395 92

6 San Agustin 15 15 15 15 100 0 4,800 2,495 2,599 2,732 57

7 San Andres 13 13 13 13 100 0 3,000 1,869 1,952 2,031 68

8 San Jose 5 5 5 5 100 0 1,800 631 712 832 46

9 Santa Fe 11 11 11 11 100 0 3,100 1,635 1,704 1,876 61

10 Santa Maria (Imelda) 6 6 6 6 100 0 1,600 778 833 905 57

Total 112 112 112 112 100 0 34,200 22,173 23,283 24,583 72

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 9,450 9,466 10,774 Residential 20,588 21,681 22,889

MWH Purchased 1,352 1,390 1,536 Commercial 833 841 879

MWH Sold 1,215 1,250 1,382 Industrial 89 92 94

Systems Loss (%) 10 10 10 Public Building 556 563 582

Peak Load (KW) 4,284 3,923 4,100 Others 107 106 139

Load Factor (%) 43 49 51 Total 22,173 23,283 24,583

Collection Efficiency (%) 99 95 99

Ave. Systems Rate (P/KWH) 7.77 7.57 7.80

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 7,416 7,920 8,100 9,550 10,181 10,551 10,033 10,421 10,454 11,454

Commercial 1,325 1,464 1,496 1,608 1,722 1,911 2,114 2,206 2,327 2,617

Industrial 288 311 314 309 301 249 231 226 227 230

Public Building 807 856 868 1,170 1,323 1,369 1,382 1,513 1,754 1,968

Others 231 265 284 320 275 309 267 219 238 312

Total 10,067 10,816 11,062 12,957 13,803 14,389 14,027 14,585 15,000 16,581

24,693

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Diesel

Type

Diesel

San Agustin NPC-SPUG

A+

Large

Legislative District

Monthly Average

22,531 23,485

Unenerg. Potential

San Jose NPC-SPUG

MUNICIPALITIES

POWER PLANT

Location Project Name/Proponent

Served

Odiongan NPC-SPUG

PB 109

Large Large

Mr. Marcelino R. Tanguilig, Jr. Mr. Ulysses P. Ancheta Mr. Martin F. Lasaga III

Engr. Orville F. Ferranco (OIC) Engr. Orville F. Ferranco Engr. Orville F. Ferranco

A+ A+

TABLAS ISLAND ELECTRIC COOPERATIVE, INC. (TIELCO)Tielco Road, Torrel, Odiongan, Romblon 5505

Tel Nos. (042) 567-5170, 567-5172; Telefax No. (042) 567-5171

2007 2008 2009

98

Page 106: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

Generating Set

3 PH Backbone Line

Energized Coop System

Energized Other System

G S

99

ALAD ISLAND

ROMBLON ISLAND

SIBUYAN ISLAND

ROMBLON

SAN FERNANDO

MAGDIWANG

COBRADOR ISLAND

G S G S

G S

G S

H Q

BANTON IS.

CORCUERA IS.

SIMARA IS.CONCEPCION IS.

Served by ConcepcionMunicipal Electric System

Served by BantonMunicipal Electric System

Served by CorcueraMunicipal Electric System

CAJIDIOCAN

Page 107: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : June 14, 1989

II. DATE OF FIRST ENERGIZATION : January 1990

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 0.9 12.9 37.3 3.020

Subsidy 53.4 59.0 61.0 3.006

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 Cajidiocan 14 14 14 14 100 0 4,300 1,838 1,964 2,153 50

2 Magdiwang 9 9 9 9 100 0 2,600 1,177 1,274 1,428 55

3 Romblon 31 31 31 31 100 0 8,300 5,288 5,579 5,827 70

4 San Fernando 12 12 12 12 100 0 4,700 2,135 2,222 2,301 49

Total 66 66 66 66 100 0 19,900 10,438 11,039 11,709 59

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 5,780 6,362 6,321 Residential 9,199 9,801 10,418

MWH Purchased 795 823 891 Commercial 716 704 698

MWH Sold 683 707 769 Industrial 6 6 6

Systems Loss (%) 14 14 13 Public Building 324 340 369

Peak Load (KW) 2,060 2,204 2,275 Others 193 188 218

Load Factor (%) 53 51 54 Total 10,438 11,039 11,709

Collection Efficiency (%) 95 99 96

Ave. Systems Rate (P/KWH) 8.46 9.00 8.22

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 3,226 3,793 3,878 4,479 4,469 4,602 4,528 5,149 5,237 5,678

Commercial 1,084 1,132 1,073 1,137 1,064 1,462 1,358 1,491 1,553 1,711

Industrial 172 140 92 171 193 293 260 257 192 204

Public Building 422 528 669 739 683 737 774 948 1,050 1,183

Others 301 243 295 326 338 329 291 355 452 453

Total 5,205 5,836 6,007 6,852 6,747 7,424 7,211 8,200 8,484 9,229

Diesel/Power Barge

Diesel

Legislative District

Monthly Average

10,437 11,269

Unenerg. Potential

Romblon NPC-SPUG

San Fernando

11,921

MUNICIPALITIES

POWER PLANT

Location Project Name/Proponent

Served

NPC-SPUG

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Type

Mr. Cyril A. Tansiongco

Engr. Rene M. Fajilagutan Engr. Rene M. Fajilagutan Engr. Rene M. Fajilagutan

Engr. Anthony G. Rugas Engr. Anthony G. Rugas

A A A

Medium MediumMedium

ROMBLON ELECTRIC COOPERATIVE, INC. (ROMELCO)Capaclan, Romblon, Romblon

Tel./ Fax No. (02) 412-2864 loc. 2613

2007 2008 2009

100

Page 108: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

Below 5 MVA Substation

Generating Set

3 PH Backbone Line

Energized Coop System

G S

CALIBANGBANGAN

101

BARONGONAN

CORON

CULION

CALAWIT

LINAPACAN

CHEEY CARAGA IS.

BUSUANGA

SN ISIDRO

PANATAN

MAGLALANBAY

TARA IS.

MALAUIG

DINARAG IS.

LATALA

LUAC

BURABON

HASLEY

BULALACAO

DIPALIJAN

CABUNLAWAN

NANGALAOCALALAYAN

PICAL

SAN NICOLAS

DICABAITOT

CORON IS.

GALUC

G S

G S

G S

H Q

N

Page 109: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : June 27, 1979

II. DATE OF FIRST ENERGIZATION : May 18, 1983

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 3.7 6.7 13.6 1.680

Subsidy 14.7 16.7 16.7 0.423

0.108

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District, Palawan

1 Busuanga 16 16 16 16 100 0 4,000 872 1,098 1,180 30

2 Coron 23 23 23 23 100 0 8,200 3,992 4,398 4,736 58

3 Culion 12 10 10 12 100 0 3,500 1,172 1,214 1,273 36

4 Linapacan* 10 9 9 10 100 0 2,200 233 252 284 13

Total 61 58 58 61 100 0 17,900 6,269 6,962 7,473 42

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 2,962 3,193 3,977 Residential 5,075 5,800 6,148

MWH Purchased 485 543 675 Commercial 749 797 927

MWH Sold 419 472 591 Industrial 2 2 3

Systems Loss (%) 13 12 12 Public Building 181 209 216

Peak Load (KW) 1,464 1,773 - Others 262 154 179

Load Factor (%) 45 42 - Total 6,269 6,962 7,473

Collection Efficiency (%) 90 83 87

Ave. Systems Rate (P/KWH) 7.06 6.76 6.73

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 1,758 1,819 1,932 2,204 2,450 2,395 2,391 2,575 2,791 3,347

Commercial 886 882 1,033 1,186 1,379 1,478 1,609 1,814 2,147 2,869

Industrial 110 174 263 105 17 23 21 14 10 61

Public Building 204 226 251 317 356 365 431 587 666 747

Others 30 37 51 57 96 82 70 43 54 63

Total 2,988 3,138 3,530 3,869 4,298 4,342 4,522 5,033 5,668 7,087

* With Provisional Franchise, NEC Res. No. 4 s. 1976

CoverageEnergized

Type

Diesel

Diesel

Linapacan NPC-SPUG

Legislative District

Monthly Average

5,761 6,442

Unenerg. Potential

Busuanga NPC-SPUG

Culion

6,893

MUNICIPALITIES

POWER PLANT

Location Project Name/Proponent

Served

NPC-SPUG

Diesel

B A R A N G A Y S C O N N E C T I O N S

Mr. Virgilio P. Daculla

Ms. Ruth L. Galang (OIC) Ms. Ruth L. Galang (OIC) Ms. Ruth L. Galang (OIC)

Mr. Adolfo Y. Arceo Mr. Adolfo Y. Arceo

A A A

Small SmallSmall

BUSUANGA ISLAND ELECTRIC COOPERATIVE, INC. (BISELCO)Brgy. I, Poblacion, Coron, Palawan

Tel. No. (048) 723-0326; Cell. No. (0919) 668-4132

2007 2008 2009

102

Page 110: The 2007-2009 RE Chronicle

CUYO

LEGEND :

H Q HQ Location

Municipality

NPC Substation

Generator Substation

3 PH Backbone Line

Energized Coop System

G S

103

PALECO

KALAYAAN GROUP

TAYTAY

SAN VICENTE

ROXAS

ARACELI

DUMARAN

PUERTO PRINCESA CITY

ABORLAN

BATARAZA

RIZAL(Marcos)

BALABAC

EL NIDO(Bacuit)

AGUTAYA

MAGSAYSAY

SOFRONIO ESPAÑOLA

NARRAQUEZON

CAGAYANCILLO

G S

G SG S

G S

G S

G S

G S

G S G S

G S

G S

G S

G S

G S

G S

G S

G S

CUYO

H Q

G S

G S

G S

BROOKE'S POINT

N

Page 111: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : January 25, 1974

II. DATE OF FIRST ENERGIZATION : January 11, 1975

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 2.6 2.6 2.6 1.850

Subsidy 69.9 69.9 90.1 0.830

0.923

1.403

3.948

0.217

0.326

0.217

26.800

0.356

0.326

5.000

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Agutaya 10 6 6 10 100 0 2,500 242 257 261 10

2 Araceli 13 13 13 13 100 0 2,600 455 455 520 20

3 Cagayancillo 12 8 8 12 100 0 1,500 232 268 280 19

4 Cuyo 17 17 17 17 100 0 4,500 3,464 3,555 3,640 81

5 Dumaran 16 16 16 16 100 0 4,100 208 246 246 6

6 El Nido (Bacuit) 18 17 17 18 100 0 6,700 855 922 1,047 16

7 Magsaysay 11 8 8 11 100 0 2,700 1,669 1,711 1,765 65

8 Roxas 31 22 22 31 100 0 11,700 3,170 3,321 3,555 30

9 San Vicente 10 7 7 10 100 0 5,300 1,240 1,371 1,511 29

10 Taytay 31 27 27 31 100 0 13,200 1,370 1,421 1,504 11

Second District

11 Aborlan 19 19 19 19 100 0 6,300 3,522 3,695 3,839 61

12 Balabac 20 7 7 10 50 10 6,200 333 364 383 6

13 Bataraza 22 22 22 22 100 0 10,200 1,321 1,499 1,602 16

14 Brooke's Point 18 18 18 18 100 0 12,100 5,587 5,952 6,281 52

15 Narra 22 22 22 22 100 0 14,100 10,008 10,322 10,575 75

16 Puerto Princesa City 66 66 66 66 100 0 45,000 40,791 42,894 44,982 99

17 Quezon 14 14 14 14 100 0 10,300 3,650 3,885 4,054 39

18 Rizal (Marcos) 11 10 10 11 100 0 7,800 475 744 851 11

19 Sofronio Española 9 9 9 9 100 0 6,600 2,208 2,357 2,449 37

Total 370 328 328 360 97 10 173,400 80,800 85,239 89,345 52

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 73,384 77,052 83,549 Residential 65,285 69,297 72,856

MWH Purchased 9,927 10,582 11,451 Commercial 5,002 5,239 5,606

MWH Sold 8,758 9,356 10,133 Industrial 104 118 128

Systems Loss (%) 11 11 11 Public Building 1,537 1,606 1,675

Peak Load (KW) 21,500 21,500 21,500 Others 8,872 8,979 9,080

Load Factor (%) 63 67 73 Total 80,800 85,239 89,345

Collection Efficiency (%) 88 92 91

Ave. Systems Rate (P/KWH) 8.38 8.24 8.25

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 35,776 38,843 40,129 44,213 47,495 49,163 47,824 48,281 51,695 56,131

Commercial 21,980 21,278 22,582 23,123 26,896 28,561 29,410 30,704 32,970 36,007

Industrial 6,995 7,158 8,195 8,843 9,962 11,197 11,116 10,044 10,547 10,654

Public Building 8,599 8,927 9,496 10,914 11,261 10,933 11,367 12,135 13,118 14,425

Others 1,935 1,885 2,146 2,520 3,118 3,879 3,755 3,934 3,936 4,382

Total 75,285 78,091 82,548 89,613 98,732 103,732 103,472 105,098 112,266 121,599

Diesel

NPC-SPUG

LGU

MUNICIPALITIES/CITY

Diesel

Diesel

Diesel

Diesel

San Vicente NPC-SPUG

Legislative District

Cuyo

Agutaya

Rizal

Narra

Coverage

Balabac

Araceli

Monthly Average

Unenerg. Potential

Puerto Princesa

Served

C O N N E C T I O N S

NPC-SPUG/PPC

NPC-SPUG

Energized

B A R A N G A Y S

Roxas

NPC-SPUG

NPC-SPUG

NPC-SPUG

NPC-SPUG

NPC-SPUG

Cagayancillo

NPC-SPUG Diesel

Taytay

- -

85,59178,450 82,208

-

POWER PLANT

Location Project Name/Proponent Type

NPC-SPUG

- - -

Diesel

El Nido

Mr. Jose P. Tan-Paredes, Jr. Mr. Jose P. Tan-Paredes, Jr. Mr. Jose P. Tan-Paredes, Jr.

Mr. Ponciano D. Payuyo Mr. Ponciano D. Payuyo Mr. Ponciano D. Payuyo

PALAWAN ELECTRIC COOPERATIVE, INC. (PALECO)National Highway, Brgy. Tiniguiban, Puerto Princesa City 5300

Tel. Nos. (048) 433-2001; 433-2544; 433-5646; Telefax: (048) 433-5645, 433-9144; E-mail: [email protected]

2007 2008 2009

Diesel

Diesel

Diesel

Diesel

Diesel

104104

Page 112: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Headquarters

N

CASURECO IINaga City

CASURECO IVTigaon, Camarines Sur

CANORECODaet, Camarines Norte

CASURECO ILibmanan, Camarines Sur

CASURECO IIIIriga City

ALECOLegazpi City

MASELCOMobo, Masbate

TISELCOSan Jacinto, Masbate

SORECO IIrosin, Sorsogon

FICELCOBato, Catanduanes

SORECO IICity of Sorsogon

105

Page 113: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Camarines Norte 12 12 12 12 100 273 273 273 273 100 100,600 76,434 79,916 83,280 83

2 Camarines Sur I 11 11 11 11 100 309 295 296 309 100 81,800 51,108 52,521 54,798 67

3 Camarines Sur II 10 10 10 10 100 259 259 259 259 100 105,800 81,794 86,710 89,645 85

4 Camarines Sur III 7 7 7 7 100 229 229 229 229 100 81,700 56,305 57,820 59,561 73

5 Camarines Sur IV 9 9 9 9 100 258 258 258 258 100 62,800 40,728 42,361 44,190 70

6 Albay 18 18 18 18 100 720 718 718 718 99 243,400 184,814 186,745 194,464 80

7 Sorsogon I 8 8 8 8 100 253 253 253 253 100 61,200 45,757 47,252 48,757 80

8 Sorsogon II 7 7 7 7 100 288 288 288 288 100 85,100 71,712 74,050 77,051 91

9 Catanduanes 11 11 11 11 100 315 315 315 315 100 47,500 39,539 41,126 42,557 90

10 Masbate 15 15 15 15 100 434 283 411 433 99 119,900 32,226 36,258 40,898 34

11 Ticao Island 4 4 4 4 100 72 46 59 72 100 16,300 4,563 4,914 5,342 33

Total 112 112 112 112 100 3,410 3,217 3,359 3,407 99 1,006,100 684,980 709,673 740,543 74

EnergizedCoverage

EnergizedPotential

Served

BICOL REGIONREGION V

ELECTRIC DISTRIBUTION UTILITIES

MUNICIPALITIES/CITIES BARANGAYS CONNECTIONS

Coverage

106

Total 500,153 549,889 592,304 657,023 686,279 697,371 610,784 649,361 698,605 740,508

Others 17,985 15,180 18,889 17,845 14,613 14,825 13,430 12,100 12,858 16,118

Public Bldgs. 36,179 39,718 42,902 49,766 50,960 50,462 46,016 50,087 57,648 56,394

Industrial 57,401 68,888 71,277 70,602 63,495 63,360 59,640 62,306 53,966 53,993

Commercial 101,929 111,825 117,779 128,577 145,780 158,281 146,235 158,280 178,241 197,987

Residential 286,659 314,278 341,457 390,233 411,432 410,444 345,463 366,588 395,892 416,016

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 114: The 2007-2009 RE Chronicle

CANORECO

LEGEND :

H Q HQ Location

Municipality

10 MVA Substation

NPC Substation

3 PH Backbone Line

Energized Coop System

107

N

PARACALE

BASUD

CAPALONGA

JOSEPANGANIBAN

LABO

SANLORENZO RUIZ (Imelda)

VINZONS

MERCEDES

SANTAELENA

DAET

Part ofMERCEDES

H Q

TALISAY

SANVICENTE

Page 115: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : October 23, 1975

II. DATE OF FIRST ENERGIZATION : August 4, 1976

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 51.0 72.9 87.9

Subsidy 42.3 70.5 74.4

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Lone District

1 Basud 29 29 29 29 100 0 6,900 4,893 5,129 5,361 78

2 Capalonga 22 22 22 22 100 0 5,400 3,334 3,563 3,683 68

3 Daet 25 25 25 25 100 0 23,000 21,541 22,244 22,962 99

4 Jose Panganiban 27 27 27 27 100 0 9,500 7,309 7,653 8,111 85

5 Labo 52 52 52 52 100 0 16,800 11,567 12,203 12,703 76

6 Mercedes 26 26 26 26 100 0 8,600 5,917 6,183 6,481 75

7 Paracale 27 27 27 27 100 0 8,700 6,718 7,100 7,485 86

8 San Lorenzo Ruiz (Imelda) 12 12 12 12 100 0 2,400 1,528 1,608 1,677 70

9 San Vicente 9 9 9 9 100 0 1,800 1,353 1,429 1,500 83

10 Santa Elena (19) 10 10 10 10 100 0 5,300 3,763 3,939 4,091 77

11 Talisay 15 15 15 15 100 0 4,400 3,703 3,847 3,986 91

12 Vinzons 19 19 19 19 100 0 7,800 4,808 5,018 5,240 67

Total 273 273 273 273 100 0 100,600 76,434 79,916 83,280 83

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 56,485 49,320 53,475 Residential 71,712 75,007 78,220

MWH Purchased 7,682 7,198 7,508 Commercial 3,326 3,389 3,467

MWH Sold 6,739 6,316 6,691 Industrial 40 37 34

Systems Loss (%) 12 12 10 Public Building 1,103 1,175 1,192

Peak Load (KW) 18,914 18,968 18,055 Others 253 308 367

Load Factor (%) 56 52 57 Total 76,434 79,916 83,280

Collection Efficiency (%) 91 92 92

Ave. Systems Rate (P/KWH) 8.38 7.81 7.99

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 31,886 34,233 36,813 42,913 44,725 44,252 43,383 44,943 47,134 50,621

Commercial 10,525 11,804 13,169 14,584 14,744 14,356 15,043 15,648 16,693 17,907

Industrial 2,130 4,214 7,314 2,903 2,314 2,269 8,913 13,324 4,829 4,199

Public Building 1,847 2,471 3,239 4,042 4,285 4,536 4,542 4,890 5,033 5,206

Others 537 1,104 1,505 2,000 1,918 2,382 2,675 2,058 2,108 2,355

Total 46,925 53,826 62,040 66,442 67,986 67,795 74,556 80,863 75,797 80,288

A

Legislative District

Engr. Lorenzo S. Canlas, Jr. Engr. Lorenzo S. Canlas, Jr.

Served

Mega Large

Mr. Amilo A. BarramedaMr. Jesus T. Fernandez, Jr.

Potential

MUNICIPALITIES

Unenerg.

76,201

Engr. Lorenzo S. Canlas, Jr.

Mega Large

Energized

CAMARINES NORTE ELECTRIC COOPERATIVE, INC. (CANORECO)Jose P.Rizal St., Daet, Camarines Norte

Tel. Nos. (054) 721-1483, 721-4295, 440-0071, 571-2228

2008 20092007

Atty. Godfrey Parale

Monthly Average

79,321 82,368

A A+

Mega Large

B A R A N G A Y S C O N N E C T I O N S

Coverage

108108

Page 116: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Generating Set

3 PH Backbone Line

Energized Coop System

G S

CASURECO I

109

CLAVERIA

Served byCLAVERIA MUNICIPAL SYSTEM

N

BURIAS IS. SANPASCUAL

G S

RAGAY

SIPOCOT

CABUSAO

LIBMANAN

LUPI

CAMALIGAN

PASACAO

SANFERNANDO

GAINZAPAMPLONA

H Q

Page 117: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : November 27, 1972

II. DATE OF FIRST ENERGIZATION : December 15, 1973

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 12.8 16.7 16.7 0.163

Subsidy 151.5 210.8 236.7

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District

1 Cabusao 9 9 9 9 100 0 3,500 2,960 3,077 3,205 92

2 Libmanan 75 75 75 75 100 0 18,000 13,812 14,184 14,786 82

3 Lupi 38 38 38 38 100 0 5,300 2,750 2,854 2,955 56

4 Pamplona 17 17 17 17 100 0 6,000 4,237 4,344 4,586 76

5 Pasacao 19 19 19 19 100 0 7,900 4,965 5,061 5,258 67

6 Ragay 38 38 38 38 100 0 9,800 5,877 6,104 6,469 66

7 San Fernando 22 22 22 22 100 0 5,600 3,679 3,767 3,951 71

8 Sipocot 46 46 46 46 100 0 11,600 8,102 8,303 8,574 74

Del Gallego 2 2 2 2 100 0 100 63 0Second District

9 Camaligan 13 13 13 13 100 0 3,900 3,089 3,162 3,279 84

10 Gainza 8 8 8 8 100 0 1,900 1,574 1,601 1,671 88First District, Masbate

11 San Pascual 22 8 9 22 100 0 8,200 64 64 1

Total 309 295 296 309 100 0 81,800 51,108 52,521 54,798 67

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 24,517 23,785 26,835 Residential 45,314 46,230 48,448

MWH Purchased 3,354 3,622 3,825 Commercial 2,493 2,427 2,343

MWH Sold 2,475 2,795 2,991 Industrial 57 53 53

Systems Loss (%) 26 22 21 Public Building 712 753 783

Peak Load (KW) 9,587 10,317 10,012 Others 2,532 3,058 3,171

Load Factor (%) 48 48 52 Total 51,108 52,521 54,798

Collection Efficiency (%) 92 94 94

Ave. Systems Rate (P/KWH) 9.91 8.51 8.97

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 17,009 18,030 20,313 22,088 20,275 21,175 18,536 17,737 20,482 23,218

Commercial 3,442 4,431 4,745 6,119 8,234 7,933 6,463 7,586 8,354 7,845

Industrial 4,006 2,774 3,578 3,653 3,059 2,707 2,044 1,899 1,915 1,817

Public Building 1,369 1,423 1,542 1,799 1,800 1,881 1,690 1,826 2,147 2,341

Others 1,657 1,276 1,533 1,858 870 848 754 650 646 668

Total 27,483 27,934 31,711 35,517 34,238 34,544 29,487 29,698 33,544 35,889

Location Project Name/Proponent Type

San Pascual LGU GenSet

Extra Large

52,991

Extra LargeExtra Large

2007

Mr. Miguel B. Cada

Engr. Josephus Paulo C. Motos (OIC)

E

Mr. Edgar A. Cancaida

Legislative DistrictPotential

MUNICIPALITIESB A R A N G A Y S C O N N E C T I O N S

CoverageServed

POWER PLANT

E E

Mr. Juan U. Rubio

Engr. Josephus Paulo C. Motos (OIC) Mr. Charito C. Mabitazan (PS/AGM)

Mr. Charito C. Mabitazan (PS/AGM)

Monthly Average

CAMARINES SUR I ELECTRIC COOPERATIVE, INC. (CASURECO I)Puro-Batia, Libmanan, Camarines Sur

Tel. Nos. (054) 451-2147, 451-2104, 451-2162; Fax No. (054) 451-2148

2008 2009

54,870 57,268

EnergizedUnenerg.

110

Page 118: The 2007-2009 RE Chronicle

CASURECO II

111

N

SIRUMA

CALABANGA

TINAMBAC

BOMBON

CANAMAN

PILI

MILAOR

MINALABAC

H QMAGARAO

NAGACITY

MH

MH

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

20 MVA Substation

Mini Hydro

3 PH Backbone Line

Energized Coop System

MH

Page 119: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 10, 1975II. DATE OF FIRST ENERGIZATION : December 27, 1977III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)

Residual Loan 51.3 51.7 51.3Subsidy 128.8 171.3 175.5

0.200

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Minalabac 25 25 25 25 100 0 8,600 4,038 6,445 6,629 77

Second District

2 Bombon 8 8 8 8 100 0 2,600 2,306 2,390 2,475 95 3 Calabanga 48 48 48 48 100 0 13,800 9,681 10,040 10,455 76 4 Canaman 24 24 24 24 100 0 5,800 5,054 5,179 5,322 92 5 Magarao 15 15 15 15 100 0 4,300 3,393 3,495 3,677 86 6 Milaor 20 20 20 20 100 0 4,600 3,863 3,992 4,138 90 7 Naga City 27 27 27 27 100 0 37,700 35,476 36,556 37,578 99 8 Pili 26 26 26 26 100 0 13,700 12,302 12,696 13,278 97

Third District9 Siruma 22 22 22 22 100 0 3,300 886 909 932 28

10 Tinambac 44 44 44 44 100 0 11,400 4,795 5,008 5,161 45 Total 259 259 259 259 100 0 105,800 81,794 86,710 89,645 85

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 119,782 106,326 114,139 Residential 75,520 80,234 83,198 MWH Purchased 16,784 17,496 18,863 Commercial 5,044 5,175 5,114 MWH Sold 13,190 14,044 15,932 Industrial 109 108 106 Systems Loss (%) 21 19 15 Public Building 883 927 956 Peak Load (KW) 36,370 38,120 40,934 Others 238 266 271 Load Factor (%) 63 63 63 Total 81,794 86,710 89,645 Collection Efficiency (%) 93 94 91 Ave. Systems Rate (P/KWH) 9.08 7.57 7.16

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 54,695 61,038 65,411 74,174 74,995 76,012 67,527 69,599 71,954 80,119 Commercial 39,705 43,922 45,400 49,295 51,347 52,701 54,342 55,912 63,340 78,699 Industrial 11,749 13,937 13,297 12,446 12,888 16,042 15,386 15,242 14,017 12,159 Public Building 10,173 10,515 11,275 12,636 12,041 11,869 11,766 12,876 14,446 13,244 Others 3,133 3,988 4,577 4,600 4,906 5,195 4,951 4,648 4,777 6,967 Total 119,455 133,400 139,960 153,151 156,177 161,820 153,972 158,277 168,534 191,188

Legislative DistrictPotential

MUNICIPALITIES/CITYUnenerg.

Pili Yabo/PROSAMAPI Coop.

CoverageEnergized

Mr. Rodelio A. Pasumbal (OIC)B A

Ms. Jane T. Barrameda (OIC) Ms. Jane T. Barrameda (OIC)C

CAMARINES SUR II ELECTRIC COOPERATIVE, INC. (CASURECO II)Brgy. Del Rosario, Naga City 4400

Tel Nos. (054) 473-0204 to 09, 473-0112; Fax No. (054) 473-0201

2008 2009Atty. Perfecto Nixon C. TaboraMr. Hilario D. Basmayor

2007Mr. Hilario D. Basmayor

Mega Large

B A R A N G A Y S C O N N E C T I O N S

POWER PLANTLocation Project Name/Proponent

71,660

Type

Mega Large Mega Large

Monthly Average

74,428 76,741

0.960

Mihi Hydro

Naga CityInarihan/Bicol Hydropower

Corp.Mini Hydro

Served

112

Page 120: The 2007-2009 RE Chronicle

N

CASURECO III

113

BULA

BAAO

IRIGACITY

BUHI

NABUA

BALATAN BATO

H QMH

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Mini Hydro

3 PH Backbone Line

Energized Coop System

MH

Page 121: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : December 2, 1975

II. DATE OF FIRST ENERGIZATION : October 23, 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 32.5 34.1 34.1

Subsidy 74.6 87.5 117.3

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Fourth District

1 Baao 30 30 30 30 100 0 9,600 6,625 6,769 6,953 72

2 Balatan 17 17 17 17 100 0 4,600 2,331 2,475 2,726 59

3 Bato 33 33 33 33 100 0 8,800 5,286 5,458 5,641 64

4 Buhi 38 38 38 38 100 0 13,900 8,059 8,242 8,508 61

5 Bula 33 33 33 33 100 0 11,800 6,535 6,742 6,929 59

6 Iriga City 36 36 36 36 100 0 18,200 16,314 16,778 17,259 95

7 Nabua 42 42 42 42 100 0 14,800 11,155 11,356 11,545 78

Total 229 229 229 229 100 0 81,700 56,305 57,820 59,561 73

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 36,359 31,328 36,360 Residential 52,677 54,140 55,383

MWH Purchased 5,336 5,530 6,022 Commercial 2,431 2,421 2,824

MWH Sold 3,812 4,173 4,502 Industrial 165 164 156

Systems Loss (%) 28 24 25 Public Building 872 924 933

Peak Load (KW) 13,860 13,941 15,747 Others 160 171 265

Load Factor (%) 53 54 52 Total 56,305 57,820 59,561

Collection Efficiency (%) 70 65 75

Ave. Systems Rate (P/KWH) 9.54 7.51 8.08

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 25,101 27,984 30,521 32,329 35,810 34,249 30,842 29,990 32,861 35,089

Commercial 5,069 5,555 5,711 5,817 6,553 6,728 7,342 7,220 8,847 10,261

Industrial 2,850 3,326 3,523 3,496 3,650 4,254 3,521 3,946 3,430 3,228

Public Building 1,542 1,792 1,883 2,168 2,768 3,241 3,304 3,365 3,861 4,201

Others 1,242 1,485 2,625 1,697 1,727 1,735 1,359 1,221 1,081 1,243

Total 35,804 40,142 44,263 45,507 50,507 50,206 46,368 45,742 50,080 54,022

Served

Extra Large

Legislative DistrictPotential

MUNICIPALITIES/CITYB A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.

62,266

E

Mr. Fabio F. Dinero, Jr.

Engr. Pedro M. Prestado, Jr.

E

Mr. Ronaldo Felix V. Alfelor

Mr. Joel I. Sergio (OIC) Mr. Claro M. Turiano (OIC)

Mr. Ronaldo Felix V. Alfelor

Extra Large Extra Large

56,074 58,728

CAMARINES SUR III ELECTRIC COOPERATIVE, INC. (CASURECO III)San Isidro, Iriga City 4431

Tel. Nos. (054) 299-2287, 299-1879, 299-5707; Telefax No. (054) 299-2382; E-mail: [email protected]; Website: www.casureco3.com

2008 20092007

E

Monthly Average

POWER PLANT

Location Project Name/Proponent Type

BuhiBarit HEP/Atty. Ramon I

Constancio Hydro 1.800

114

Page 122: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

Generating Set

Mini Hydro

3 PH Backbone Line

Energized Coop System

G S

MH

115

GARCHITORENALAGONOY

GOA

CARAMOAN

PRESENTACION (Parubcan)

SANJOSE

TIGAON

OCAMPO

SAGÑAY

AGUIRAGA IS.

MH

MH

G S

H Q

MH

Part ofSAN JOSE

Page 123: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : February 18, 1977

II. DATE OF FIRST ENERGIZATION : July 9, 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative) POWER PLANT

2007 2008 2009 Cap.(MW)

Residual Loan 114.5 114.6 129.5 0.600

Subsidy 113.8 172.7 190.5 3.100

0.100

0.350

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Second District

1 Ocampo 25 25 25 25 100 0 7,400 4,785 5,000 5,202 70

Third District

2 Caramoan 49 49 49 49 100 0 8,100 4,158 4,341 4,787 59

3 Garchitorena 23 23 23 23 100 0 4,700 1,237 1,299 1,408 30

4 Goa 34 34 34 34 100 0 9,900 7,327 7,597 7,792 79

5 Lagonoy 38 38 38 38 100 0 8,700 6,041 6,265 6,525 75

6 Presentacion (Parubcan) 18 18 18 18 100 0 3,300 1,921 2,054 2,091 63

7 Sagñay 19 19 19 19 100 0 5,400 2,906 3,044 3,194 59

8 San Jose 29 29 29 29 100 0 6,900 5,739 5,907 6,075 88

9 Tigaon 23 23 23 23 100 0 8,400 6,352 6,586 6,825 81

Outside Coverage Area 262 268 291

Total 258 258 258 258 100 0 62,800 40,728 42,361 44,190 70

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 17,059 16,696 18,624 Residential 38,421 39,922 40,784

MWH Purchased 2,259 2,528 2,777 Commercial 1,493 1,580 2,507

MWH Sold 1,801 2,046 2,286 Industrial 36 35 37

Systems Loss (%) 20 19 17 Public Building 632 656 691

Peak Load (KW) 6,757 6,668 7,021 Others 146 168 171

Load Factor (%) 46 52 54 Total 40,728 42,361 44,190

Collection Efficiency (%) 95 97 96

Ave. Systems Rate (P/KWH) 9.47 8.16 8.15

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 11,065 12,409 13,954 16,183 16,754 16,512 13,591 14,494 16,176 18,085

Commercial 2,464 2,830 3,041 3,396 3,428 3,547 3,103 3,394 4,103 4,784

Industrial 699 598 796 737 1,098 1,416 1,336 1,787 1,850 2,036

Public Building 998 1,180 1,375 1,609 1,694 1,740 1,558 1,688 2,060 2,278

Others 250 266 459 441 555 414 296 252 358 248

Total 15,476 17,283 19,625 22,366 23,529 23,629 19,884 21,615 24,547 27,431

Dendro Thermal

Served

Sagñay Coyaoyao

Presentacion EC

Legislative DistrictPotential

MUNICIPALITIES

Unenerg.

Large Large

Caramoan

EC

40,102

EC

Dr. Arnel P. Armea

Atty. Veronica T. Briones (Managing Consultant) Atty. Veronica T. Briones (Managing Consultant)

Dr. Arnel P. Armea

Mini-Hydro

CAMARINES SUR IV ELECTRIC COOPERATIVE, INC. (CASURECO IV)Talojongon, Tigaon, Camarines Sur

Tel. Nos. (054) 452-3083, 452-3715, 453-0191, 452-3899; 452-3441 to 42; Telefax No. (054) 452-3085

2008 20092007

Dr. Arnel P. Armea

Atty. Veronica T. Briones (Managing Consultant)

B

Mini Hydro

Location Project Name/Proponent Type

Lagonoy

Mini-Hydro

Monthly Average

41,986 43,815

B B

Large

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

116116

Page 124: The 2007-2009 RE Chronicle

N

ALECO

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

20 MVA Substation

Power Plant

Generating Set

3 PH Backbone Line

Energized Coop System

G S

P P

117

JOVELLAR

OAS

LIBON

POLANGUI

TIWI

MAL

ILIP

OT

SANTO DOMINGO (Libog)

CAMALIG

MANITO

RAPU-RAPU

DARAGA (Locsin)CITY of

LIGAO

PIODURAN

SAN MIGUEL IS.

GUINANAYAN IS.

BATAN IS.

CAGRARAY IS.

GUINOBATAN

CITY ofTABACO

MALINAO

LEGAZPICITY

G S

P P

P P

H Q

BACACAY

Page 125: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 9, 1972/May 13, 1991II. DATE OF FIRST ENERGIZATION : March 30, 1973

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2005 2009 Cap.(MW)

Residual Loan 86.6 96.3 95.8 275.690Subsidy 362.2 403.5 494.0 1.500

1.535

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District

1 Bacacay 56 56 56 56 100 0 12,400 9,283 9,354 9,739 79 2 Malilipot 18 18 18 18 100 0 6,200 5,524 5,332 5,540 89 3 Malinao 29 29 29 29 100 0 7,700 6,339 6,165 6,537 85 4 Santo Domingo (Libog) 23 23 23 23 100 0 5,800 5,252 5,280 5,483 95 5 City of Tabaco 47 47 47 47 100 0 22,700 19,712 20,651 21,797 96 6 Tiwi 25 25 25 25 100 0 9,700 9,246 9,319 9,624 99

Second District

7 Camalig 50 49 49 49 98 1 12,300 9,376 8,711 9,235 75 8 Daraga (Locsin) 54 53 53 53 98 1 23,200 22,207 20,756 21,795 94 9 Legazpi City 70 70 70 70 100 0 44,000 40,290 29,572 30,747 70

10 Manito 15 15 15 15 100 0 4,300 3,312 3,201 3,418 79 11 Rapu-Rapu 34 34 34 34 100 0 6,200 2,303 2,905 3,383 55

Third District

12 Guinobatan 44 44 44 44 100 0 15,000 10,938 12,335 12,875 86 13 Jovellar 23 23 23 23 100 0 3,600 1,142 1,877 1,892 53 14 Libon 47 47 47 47 100 0 14,000 5,766 8,240 8,414 60 15 City of Ligao 55 55 55 55 100 0 19,000 12,282 15,736 16,216 85 16 Oas 53 53 53 53 100 0 13,000 6,588 8,962 9,266 71 17 Pio Duran 33 33 33 33 100 0 9,400 3,645 3,927 4,034 43 18 Polangui 44 44 44 44 100 0 14,900 11,609 14,422 14,469 97

Total 720 718 718 718 99 2 243,400 184,814 186,745 194,464 80

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 116,519 110,027 122,201 Residential 172,701 175,493 183,612 MWH Purchased 20,345 22,752 24,761 Commercial 7,300 7,865 7,861 MWH Sold 15,322 16,989 18,657 Industrial 417 441 387 Systems Loss (%) 25 25 24 Public Building 1,600 1,718 1,699 Peak Load (KW) 50,484 51,208 56,393 Others 2,796 1,228 905 Load Factor (%) 55 61 60 Total 184,814 186,745 194,464 Collection Efficiency (%) 78 76 77 Ave. Systems Rate (P/KWH) 7.60 6.48 6.55

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 84,913 93,605 101,756 118,799 129,299 128,288 94,703 105,247 116,825 125,875 Commercial 23,455 25,244 26,656 28,409 38,956 49,048 38,207 43,876 49,062 54,736 Industrial 31,553 39,619 38,348 42,249 34,489 29,218 21,692 18,756 19,541 23,293 Public Building 13,720 14,903 15,322 17,200 17,016 16,482 12,714 13,697 16,359 16,878 Others 4,310 4,102 5,648 3,928 2,852 2,433 1,870 2,286 2,087 3,108 Total 157,951 177,473 187,730 210,585 222,613 225,470 169,186 183,862 203,874 223,890

Atty. Rodolfo B. Bonafe, Jr.

-Mr. Jose A. Zamora (PS)

Atty. Rodolfo B. Bonafe, Jr.Atty. Rodolfo B. Bonafe, Jr.

-181,914

Engr. Lorenzo S. Marcelo, Jr. (Head, NPC Mgmt. Engr. Lorenzo S. Marcelo, Jr. (Head, NPC Mgmt.

Mega Large Mega Large190,330 197,205

E E

Legislative DistrictPotential

MUNICIPALITIES/CITIESB A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

Manito GeothermalTiwi

Monthly Average

NPC-SPUG DieselRapu-rapuManito

Tiwi/AP Renewables Geothermal

POWER PLANTLocation Project Name/Proponent Type

ALBAY ELECTRIC COOPERATIVE, INC. (ALECO)W. Vinzons St., Albay District, Legazpi City

Tel. Nos. (052) 481-5555, 481-5021; Fax No. (052) 820-2668

2008 20092007

118

Engr. Alex M. Realosa (OIC) Engr. German P . Silva ( O & M Manager) Engr. German P. Silva ( O & M Manager)

Page 126: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

NPC Substation

3 PH Backbone Line

Energized Coop System

N

MATNOG

BULUSAN

MAGALLANESJUBAN

SORECO II

IROSINBULAN

SANTAMAGDALENA

CASIGURAN

H Q

119

Page 127: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : January 17, 1973II. DATE OF FIRST ENERGIZATION : August 1, 1975

III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009

Residual Loan 33.2 33.6 43.6Subsidy 51.4 72.6 79.0

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District

1 Casiguran 25 25 25 25 100 0 6,000 4,425 4,563 4,703 78 2 Magallanes 34 34 34 34 100 0 6,800 4,327 4,490 4,667 69

Second District3 Bulan 63 63 63 63 100 0 17,900 13,799 14,230 14,668 82 4 Bulusan 24 24 24 24 100 0 4,500 3,657 3,766 3,861 86 5 Irosin 28 28 28 28 100 0 10,000 8,661 8,857 9,094 91 6 Juban 25 25 25 25 100 0 5,800 4,024 4,181 4,324 75 7 Matnog 40 40 40 40 100 0 7,000 4,225 4,459 4,681 67 8 Santa Magdalena 14 14 14 14 100 0 3,200 2,639 2,706 2,759 86

Total 253 253 253 253 100 0 61,200 45,757 47,252 48,757 80

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 19,860 19,549 19,717 Residential 43,397 44,850 46,271 MWH Purchased 2,595 2,709 2,811 Commercial 1,266 1,274 1,306 MWH Sold 2,052 2,288 2,434 Industrial 61 63 63 Systems Loss (%) 21 15 13 Public Building 720 772 833 Peak Load (KW) 6,824 9,824 7,183 Others 313 293 284 Load Factor (%) 52 38 54 Total 45,757 47,252 48,757 Collection Efficiency (%) 89 90 95 Ave. Systems Rate (P/KWH) 9.68 8.55 8.10

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 13,704 14,769 15,644 18,045 19,655 19,943 16,488 17,373 18,806 20,334 Commercial 2,344 2,421 2,540 2,846 3,253 3,333 2,991 3,300 3,587 3,934 Industrial 1,243 1,407 1,409 2,092 2,378 2,559 2,303 2,278 3,054 2,796 Public Building 992 1,047 1,157 1,326 1,367 1,410 1,218 1,354 1,573 1,764 Others 5,455 1,397 579 556 472 479 417 323 432 382 Total 23,738 21,041 21,329 24,865 27,125 27,724 23,417 24,628 27,452 29,210

Mr. Rogelio C. Lee

43,20341,887

Mr. Roberto F. Fortes (OIC)E

Large

SORSOGON I ELECTRIC COOPERATIVE, INC. (SORECO I)Gulang-Gulang, Irosin, Sorsogon 4707

Tel. No. (056) 557-3279; Telefax No. (056) 557-3162; Fax. No. (056) 557-3289

2008 20092007Mr. Rogelio C. Lee

Mr. Roberto F. Fortes (OIC) Mr. Roberto F. Fortes Mr. Rogelio C. Lee

C BLarge

44,531Large

Monthly Average

Legislative District

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

PotentialMUNICIPALITIES

120120

Page 128: The 2007-2009 RE Chronicle

121

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Power Plant

Mini Hydro

3 PH Backbone Line

Energized Coop System

P PMH

N

GUBAT

BARCELONA

CITY ofSORSOGON

CASTILLA

PRIETODIAZBACON

PILAR

DONSOL

P P

H QMH

Page 129: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : April 14, 1977

II. DATE OF FIRST ENERGIZATION : June 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 9.4 9.4 9.4 0.400

Subsidy 79.0 85.4 109.9 150.000

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District

1 Castilla 34 34 34 34 100 0 9,700 6,547 6,865 7,242 75

2 Donsol 51 51 51 51 100 0 8,600 5,973 6,224 6,586 77

3 Pilar 49 49 49 49 100 0 12,400 8,322 8,735 9,184 74

4 City of Sorsogon 64 64 64 64 100 0 34,700 32,905 33,759 34,695 99 Second District

5 Barcelona 25 25 25 25 100 0 3,900 3,490 3,596 3,791 97

6 Gubat 42 42 42 42 100 0 11,500 10,693 10,967 11,347 99

7 Prieto Diaz 23 23 23 23 100 0 4,300 3,782 3,904 4,206 98

Total 288 288 288 288 100 0 85,100 71,712 74,050 77,051 91

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 33,249 32,201 35,016 Residential 68,224 70,482 73,455

MWH Purchased 4,675 5,095 5,274 Commercial 1,993 2,005 1,994

MWH Sold 3,678 4,014 4,289 Industrial 9 10 11

Systems Loss (%) 21 21 18 Public Building 1,262 1,303 1,349

Peak Load (KW) 11,403 12,742 12,406 Others 224 250 242

Load Factor (%) 56 55 58 Total 71,712 74,050 77,051

Collection Efficiency (%) 86 86 -

Ave. Systems Rate (P/KWH) 9.04 8.02 8.16

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 20,853 22,973 25,876 29,737 32,493 31,948 25,903 28,203 29,408 18,563

Commercial 7,151 7,703 8,517 9,323 9,586 9,554 8,292 9,807 11,670 7,098

Industrial 820 736 786 896 871 986 927 1,043 1,126 580

Public Building 2,413 2,738 3,201 4,077 4,323 4,416 3,901 4,547 5,318 3,364

Others 598 700 648 1,614 983 881 632 530 645 421

Total 31,835 34,850 39,028 45,647 48,257 47,784 39,655 44,130 48,167 30,026

Mr. Fernando O. Duran, Jr.

Mr. Jaime M. Marchan (OIC)

- --

Mr. Edwin B. Destajo

Atty. Owen B. Amor Engr. Romeo F. Cedino, Jr. (OIC)

Mr. Fernando O. Duran, Jr.

Legislative District

MUNICIPALITIES/CITY

-

B A R A N G A Y S

EnergizedUnenerg.

-

Coverage

City of Sorsogon

-

61,610

POWER PLANT

Location Project Name/Proponent Type

65,07963,369

SORSOGON II ELECTRIC COOPERATIVE, INC. (SORECO II)Buhatan, City of Sorsogon 4700

Tel. Nos. (056) 211-1331, 211-1434, 421-5244, 421-5165; Telefax No. (056) 421-5245 ; E-mail: [email protected]

2008 20092007

Monthly Average

Hydro

Potential

City of Sorsogon Cawayan HEP/SORECO II

C O N N E C T I O N S

BacMan Geothermal Power Plants/BacMan Geothermal

Inc.Geothermal

Served

122

Page 130: The 2007-2009 RE Chronicle

HQ Location

Municipality

Generating Set

Mini Hydro

3 PH Backbone Line

LEGEND :

H QEnergized Coop System

MH

G S

123

N

SAN ANDRES (Calolbon) VIRAC

SAN MIGUEL

BARAS

BATO

PANGANIBAN (Payo)

VIGA

BAGAMANOC

GIGMOTOCARAMORAN

PANDAN

G S

G S

G S

G S

MHH Q

Page 131: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : October 28, 1971II. DATE OF FIRST ENERGIZATION : April 1972

III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)

Residual Loan 31.3 31.5 45.7 2.240Subsidy 127.6 139.9 156.8 8.064

1.800

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Lone District

1 Bagamanoc 18 18 18 18 100 0 1,900 1,453 1,508 1,586 83 2 Baras 29 29 29 29 100 0 2,400 2,132 2,222 2,317 97 3 Bato 27 27 27 27 100 0 4,100 3,774 3,898 4,023 99 4 Caramoran 27 27 27 27 100 0 4,900 2,935 3,085 3,214 66 5 Gigmoto 9 9 9 9 100 0 1,400 1,208 1,268 1,330 95 6 Pandan 26 26 26 26 100 0 3,600 2,189 2,295 2,394 67 7 Panganiban (Payo) 23 23 23 23 100 0 1,800 1,508 1,568 1,611 90 8 San Andres (Calolbon) 38 38 38 38 100 0 6,400 5,538 5,750 5,919 92 9 San Miguel 24 24 24 24 100 0 2,500 2,153 2,280 2,351 94

10 Viga 31 31 31 31 100 0 3,700 2,814 2,927 3,036 82 11 Virac 63 63 63 63 100 0 14,800 13,835 14,325 14,776 99

Total 315 315 315 315 100 0 47,500 39,539 41,126 42,557 90

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 16,434 20,014 21,085 Residential 36,500 37,792 39,289 MWH Purchased 2,243 2,470 2,619 Commercial 1,800 1,943 1,895 MWH Sold 1,913 2,103 2,203 Industrial - - -Systems Loss (%) 14 14 14 Public Building 884 971 1,011 Peak Load (KW) - - - Others 355 420 362 Load Factor (%) - - - Total 39,539 41,126 42,557 Collection Efficiency (%) 95 98 98 Ave. Systems Rate (P/KWH) 8.59 9.52 9.57

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 11,267 12,623 12,741 15,270 14,858 15,969 14,545 15,347 16,641 17,503 Commercial 3,163 3,256 3,086 3,635 3,855 4,751 4,424 4,622 4,994 5,235 Industrial - - - - - - - - - -Public Building 1,951 2,253 2,239 2,835 2,697 2,588 2,551 2,612 3,095 3,176 Others 293 258 685 325 301 614 582 374 501 519 Total 16,674 18,390 18,751 22,065 21,711 23,921 22,102 22,955 25,231 26,433

Engr. Rodolfo F. Mendoza (OIC)Engr. Rodolfo F. Mendoza (OIC)A+

Large Large

FIRST CATANDUANES ELECTRIC COOPERATIVE, INC. (FICELCO)Marinawa, Bato, Catanduanes

Tel No. (052) 811-1324; 811-3166: 811-3164;Telefax No. (052) 811-0584; Fax No. (052) 811-1351

2008 2009

Mini Hydro

NPC-SPUG

2007Mr. Fidelito T. Soledad Mr. Rodolfo B. Vargas, Sr.Mr. Fidelito T. Soledad

Engr. Carlos T. Gianan III A+ A+

Large37,070

Location

38,252 39,334

Project Name/ProponentPOWER PLANT

Type

Legislative DistrictPotential

MUNICIPALITIESCoverage

EnergizedUnenerg.

C O N N E C T I O N SB A R A N G A Y SServed

Monthly Average

DieselNPC-SPUG Diesel/PB-110

Bato

Viga

Balongbong

124

Page 132: The 2007-2009 RE Chronicle

MASELCO

LEGEND :

H Q HQ Location

Municipality

Generating Set

3 PH Backbone Line

Energized Coop System

G S

125

N

AROROY

PLACER

ESPERANZA

CATAINGAN

MILAGROS

MANDAON

PIO V. CORPUZ

(Limbuhan(

MOBO

MASBATECITY

DIMAS

ALAN

G

USON

BALUD

BALENO

NARO IS.

LO-OC

G S

PALANAS

CAWAYAN

H Q

G SG S

G S

G S

G S

G S

G S

G S

Page 133: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : November 23, 1977II. DATE OF FIRST ENERGIZATION : May 12, 1979

III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)

Residual Loan 18.1 18.1 18.1 11.500Subsidy 180.3 275.8 296.6 0.060

0.215

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Second District

1 Aroroy 41 9 37 41 100 0 12,700 1,475 1,710 2,467 19 2 Baleno 24 17 24 24 100 0 4,300 1,164 1,431 1,553 36 3 Balud 32 24 30 32 100 0 6,500 1,000 1,156 1,278 20 4 Mandaon 26 11 24 26 100 0 6,800 919 1,031 1,581 23 5 Masbate City 30 21 28 30 100 0 15,600 11,099 11,939 12,523 80 6 Milagros 27 13 24 27 100 0 9,600 1,718 1,956 2,248 23 7 Mobo 29 17 27 29 100 0 6,000 2,671 2,847 3,064 51

Third District

8 Cataingan 36 25 36 36 100 0 10,000 1,872 2,368 3,042 30 9 Cawayan 37 30 37 37 100 0 11,300 1,211 1,530 1,702 15

10 Dimasalang 20 14 20 20 100 0 4,600 1,539 1,671 1,786 39 11 Esperanza 20 12 20 20 100 0 3,500 336 510 698 20 12 Palanas 24 24 24 24 100 0 5,300 1,344 1,448 1,520 29 13 Pio V. Corpuz (Limbuhan) 18 18 18 18 100 0 4,600 1,196 1,385 1,533 33 14 Placer 35 24 33 34 97 1 9,600 1,645 1,906 2,100 22 15 Uson 35 24 29 35 100 0 9,500 3,037 3,370 3,803 40

Total 434 283 411 433 99 1 119,900 32,226 36,258 40,898 34

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 22,441 24,411 23,320 Residential 30,178 34,137 38,664 MWH Purchased 3,730 3,979 4,373 Commercial 1,357 1,345 1,368 MWH Sold 2,877 3,169 3,203 Industrial 99 94 101 Systems Loss (%) 23 21 27 Public Building 538 627 711 Peak Load (KW) 8,760 9,440 10,180 Others 54 55 54 Load Factor (%) 58 58 59 Total 32,226 36,258 40,898 Collection Efficiency (%) 88 83 91 Ave. Systems Rate (P/KWH) 7.80 7.70 7.28

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 15,242 15,579 17,176 19,352 21,188 20,469 17,989 21,250 23,006 23,703 Commercial 4,368 4,420 4,618 4,895 5,605 6,070 5,679 6,463 7,063 6,934 Industrial 2,351 2,277 2,226 2,130 2,748 3,909 3,518 4,031 4,204 3,885 Public Building 1,132 1,348 1,611 2,019 2,904 2,226 2,673 3,116 3,610 3,767 Others 467 562 575 766 (34) (216) (176) (335) 142 143 Total 23,560 24,186 26,206 29,162 32,411 32,459 29,683 34,525 38,025 38,432

Cawayan NPC-SPUG Diesel

Mobo NPC-SPUG/PB 105 DieselPlacer NPC-SPUG Diesel

POWER PLANTLocation Project Name/Proponent Type

Dr. Elpidio C. LimMr. Eduardo N. Margallo

E D DLarge Large36,142 39,030

Large33,009

Dr. Elpidio C. LimMr. Eduardo N. Margallo Mr. Eduardo N. Margallo

Dr. Elpidio C. Lim

MASBATE ELECTRIC COOPERATIVE, INC. (MASELCO)Pinamarbuhan, Mobo, Masbate

Service Center (056) 333-2105, 333-8013; Telefax No. (056) 333-2360; 333-6006

2008 20092007

Legislative DistrictPotential

MUNICIPALITIES/CITY

Monthly Average

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

126

Page 134: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

Generating Set

3 PH Backbone Line

Energized Coop System

G S

N

SAN JACINTO

MONREAL

BATUAN

SAN FERNANDO

G S

H Q

127

Page 135: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : March 18, 1985

II. DATE OF FIRST ENERGIZATION : November 10, 1991

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 0.60 0.60 0.60 1.960

Subsidy 30.0 34.8 36.6

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District, Masbate

1 Batuan 14 8 14 14 100 0 2,600 396 597 641 25

2 Monreal 11 8 8 11 100 0 4,300 768 846 952 22

3 San Fernando 26 17 18 26 100 0 4,100 1,106 1,351 1,434 35

4 San Jacinto 21 13 19 21 100 0 5,300 2,293 2,120 2,315 44

Total 72 46 59 72 100 0 16,300 4,563 4,914 5,342 33

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 2,017 2,117 2,131 Residential 4,198 4,536 4,955

MWH Purchased 341 369 388 Commercial 283 285 285

MWH Sold 256 280 308 Industrial - - -

Systems Loss (%) 25 24 20 Public Building 56 67 76

Peak Load (KW) - - - Others 26 26 26

Load Factor (%) - - - Total 4,563 4,914 5,342

Collection Efficiency (%) 74 76 80

Ave. Systems Rate (P/KWH) 7.89 7.57 6.91

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 924 1,035 1,252 1,343 1,379 1,627 1,956 2,405 2,599 2,906

Commercial 243 239 296 258 219 260 349 452 528 554

Industrial - - - - - - - - - -

Public Building 42 48 58 55 64 73 99 116 146 175

Others 43 42 55 60 63 61 70 93 81 64

Total 1,252 1,364 1,661 1,716 1,725 2,021 2,474 3,066 3,354 3,699

Legislative DistrictPotential

MUNICIPALITIES

San Jacinto

Location

Coverage

B A R A N G A Y S

Energized

C O N N E C T I O N S

Diesel

Type

- Small

TICAO ISLAND ELECTRIC COOPERATIVE, INC. (TISELCO)Almonte St., San Jacinto, Masbate 5417

2008 2009

-

Small

E

2007

Mr. Rene C. Altarejos

Mr. Edgar G. Barrun (OIC)

Mr. Rene C. Altarejos

Mr. Edgar G. Barrun (OIC)

Mr. Rene C. Altarejos

Ms. Ma. Judee D. Almocera (OIC)

NPC-SPUG

POWER PLANT

D

4,563

Monthly Average

4,901

Unenerg.Served

Project Name/Proponent

4,624

128

Page 136: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Energized Other System

Headquarters

N

129

VRESCOManapla, NegrosOccidental

CAPELCOPanitan, Capiz

ILECO IIISara, Iloilo

ILECO IIPototan, Iloilo

CENECOBacolod City

NOCECOCity of Kabankalan

AKELCOLezo, Aklan

ANTECOSan Jose, Antique

Served byPanay Electric Co.

GUIMELCOJordan, Guimaras

ILECO ITigbauan, Iloilo

Page 137: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

CONNECTIONS

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives :

1 Aklan 19 19 19 19 100 380 375 375 377 99 114,700 89,363 91,932 94,001 82

2 Antique 16 16 16 16 100 537 528 534 537 100 96,500 58,036 62,291 67,245 70

3 Capiz 17 17 17 17 100 473 473 473 473 100 143,900 103,398 107,645 113,252 79

4 Iloilo I 15 15 15 15 100 794 794 794 794 100 125,100 99,585 104,855 109,351 87

5 Iloilo II 15 15 15 15 100 587 578 578 587 100 127,700 75,244 79,309 83,284 65

6 Iloilo III 13 13 13 13 100 340 340 340 340 100 88,400 43,041 45,522 48,208 55

7 Guimaras 5 5 5 5 100 98 95 95 98 100 32,000 18,664 19,708 20,776 65

8 VRESCO 9 9 9 9 100 195 195 195 195 100 163,800 86,963 93,038 100,396 61

9 Central Negros 6 6 6 6 100 158 155 158 158 100 181,400 134,354 138,544 142,622 79

10 Negros Occidental 17 17 17 17 100 308 308 308 308 100 204,400 117,643 122,937 128,178 63

Total 132 132 132 132 100 3,870 3,841 3,850 3,867 99 1,277,900 826,291 865,781 907,313 71

REGION VIWESTERN VISAYAS REGION

ELECTRIC DISTRIBUTION UTILITIES

MUNICIPALITIES/CITIES BARANGAYS

CoverageEnergized

CoverageEnergized Served

Potential

130

Total 812,826 850,866 895,566 1,001,479 1,079,667 1,134,527 1,181,673 1,297,533 1,339,061 1,418,990

Others 16,395 17,041 18,330 19,364 19,489 20,891 21,470 21,122 30,352 21,005

Public Bldgs. 35,424 38,328 42,278 49,305 42,048 43,199 46,353 52,121 55,443 60,710

Industrial 170,689 177,446 179,653 198,673 150,082 159,053 173,199 204,701 219,001 235,073

Commercial 132,085 137,200 141,545 156,494 240,123 255,722 271,996 301,031 312,760 337,508

Residential 458,233 480,851 513,760 577,643 627,924 655,663 668,655 718,558 721,505 764,694

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 138: The 2007-2009 RE Chronicle

PANDANMAKATO

NUMANCIA

IBAJAY

NABAS

MALAY

BURUANGA

LIBERTAD

MALINAO

BALETE

NEW WASHINGTON

MADALAG

BATAN

LIBACAO

PART OF ANTIQUE

BORACAYISLAND

TANGALAN

BANGA

ALTAVAS

LEZOKALIBO

P P

P P

H Q

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Power Plant

3 PH Backbone Line

Energized Coop System

P P

N

131

P P

Page 139: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : April 25, 1972

II. DATE OF FIRST ENERGIZATION : April 16, 1974

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 456.2 530.6 638.6

Subsidy 67.8 109.7 113.2

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %Lone District

1 Altavas 14 14 14 14 100 0 4,900 3,952 4,087 4,217 86

2 Balete 10 9 9 10 100 0 5,200 3,288 3,385 3,310 64

3 Banga 30 30 30 30 100 0 7,000 6,700 6,789 6,975 99

4 Batan 20 20 20 20 100 0 6,000 4,111 4,355 4,416 74

5 Buruanga 15 15 15 15 100 0 3,300 2,041 2,184 2,162 66

6 Ibajay 35 34 34 34 97 1 8,700 7,330 7,480 7,564 87

7 Kalibo 16 16 16 16 100 0 16,200 15,677 15,690 16,121 99

8 Lezo 12 12 12 12 100 0 2,700 2,328 2,361 2,405 89

9 Libacao 24 24 24 24 100 0 5,700 1,876 1,945 1,927 34

10 Madalag 25 25 25 25 100 0 3,800 1,338 1,394 1,462 38

11 Makato 18 17 17 17 94 1 5,000 4,232 4,386 4,457 89

12 Malay 17 17 17 17 100 0 9,200 7,534 8,167 8,532 93

13 Malinao 23 22 22 22 96 1 5,200 3,562 3,685 3,698 71

14 Nabas 20 19 19 20 100 0 5,400 3,883 4,030 4,087 76

15 New Washington 16 16 16 16 100 0 8,100 7,650 7,785 8,063 99

16 Numancia 17 17 17 17 100 0 5,700 5,395 5,338 5,505 97

17 Tangalan 15 15 15 15 100 0 3,800 2,653 2,773 2,849 75 Lone District, Antique

18 Libertad 19 19 19 19 100 0 2,800 1,827 1,929 1,983 71

19 Pandan 34 34 34 34 100 0 6,000 3,986 4,169 4,268 71

2nd District, Capiz

Sapian

Total 380 375 375 377 99 3 114,700 89,363 91,932 94,001 82

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 68,770 72,670 94,519 Residential 81,974 84,460 86,187

MWH Purchased 11,883 11,937 13,784 Commercial 5,382 5,439 5,748

MWH Sold 10,247 10,394 12,224 Industrial 24 32 32

Systems Loss (%) 13 12 10 Public Building 1,603 1,649 1,680

Peak Load (KW) 28,826 31,087 33,479 Others 380 352 354

Load Factor (%) 56 53 56 Total 89,363 91,932 94,001

Collection Efficiency (%) 101 98 98

Ave. Systems Rate (P/KWH) 6.71 6.99 7.73

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2001* 2004 2005 2006 2007 2008 2009

Residential 33,736 30,456 37,081 44,742 49,613 52,642 54,285 56,551 55,286 60,204

Commercial 18,726 16,595 20,637 29,260 35,621 44,411 50,245 57,760 60,451 76,051

Industrial 791 786 1,017 1,216 940 592 471 805 926 1,139

Public Building 2,741 2,734 3,391 4,290 4,693 5,150 5,711 7,149 7,482 8,652

Others 776 476 502 1,117 1,113 876 868 700 589 641

Total 56,770 51,047 62,628 80,625 91,981 103,670 111,580 122,965 124,734 146,687 * 10 months

Type

MUNICIPALITIES

Monthly Average

B A R A N G A Y S

Legislative DistrictCoverage

EnergizedUnenerg.

Location

Mr. Wilfredo A. Ortiz (OIC)

Mega Large

96,943

Mr. Jose Carl C. Quimpo

Mr. Chito R. Peralta

101,948

A

Mega Large

A

Mr. Paterno I. Ibarreta

AKLAN ELECTRIC COOPERATIVE, INC. (AKELCO)Lezo, Aklan

Telefax No. (036) 265-8327; Fax Nos. (036) 265-7302, 268-4009

2008 20092007

105,995

Atty. Immanuel I. Sodusta

Mr. Chito R. Peralta

Potential

Mega Large

C O N N E C T I O N S

Served

A+

POWER PLANT

Project Name/Proponent

5.000

New Washington15MW Bunker Fuel/PPC Global

Business Power Corp. Diesel 12.600

New Washington5MW Bunker Fuel/PPC Global

Business Power Corp. Diesel

132

Page 140: The 2007-2009 RE Chronicle

P P

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Power Plant

Generating Set

3 PH Backbone Line

Energized Coop System

LEGEND :

H Q

G S

133

N CALUYA IS.SEMIRARA

G SP P

SIBALOM

SAN REMIGIO

SIBAY

VALDERRAMA

HAMTIC

ANINI-Y

SAN JOSE

BELISON

PATNONGON

BUGASONG

BARBAZA

LAUA-AN

TIBIAO

CULASI

SEBASTE

H Q

TOBIASFORNIER(DAO)

Page 141: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : December 10, 1972

II. DATE OF FIRST ENERGIZATION : January 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 9.4 9.4 27.0 0.590

Subsidy 70.3 103.8 106.3

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 Anini-y 23 23 23 23 100 0 4,200 2,679 2,827 3,077 73

2 Barbaza 39 38 39 39 100 0 3,900 2,158 2,243 2,367 61

3 Belison 11 11 11 11 100 0 2,600 2,320 2,409 2,506 96

4 Bugasong 27 26 26 27 100 0 6,200 2,952 3,141 3,370 54

5 Caluya Island 18 16 17 18 100 0 4,400 1,752 2,261 2,616 59

6 Culasi 44 43 43 44 100 0 7,200 5,011 5,301 5,622 78

7 Hamtic 47 47 47 47 100 0 8,400 5,513 5,947 6,431 77

8 Laua-an 40 37 40 40 100 0 5,100 2,227 2,349 2,543 50

9 Patnongon 36 36 36 36 100 0 6,900 3,637 3,876 4,312 62

10 San Jose 28 28 28 28 100 0 13,000 11,123 12,008 12,953 99

11 San Remigio 45 45 45 45 100 0 5,600 1,811 1,941 2,120 38

12 Sebaste 10 10 10 10 100 0 3,300 2,110 2,199 2,314 70

13 Sibalom 76 76 76 76 100 0 11,000 7,686 8,284 8,833 80

14 Tibiao 21 21 21 21 100 0 4,800 2,592 2,698 2,847 59

15 Tobias Fornier (Dao) 50 50 50 50 100 0 6,000 3,196 3,444 3,761 63

16 Valderrama 22 21 22 22 100 0 3,900 1,269 1,363 1,573 40

Total 537 528 534 537 100 0 96,500 58,036 62,291 67,245 70

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 25,929 29,264 36,725 Residential 54,917 58,937 63,778

MWH Purchased 4,736 4,763 5,399 Commercial 1,627 1,733 1,770

MWH Sold 4,186 4,205 4,773 Industrial 153 132 128

Systems Loss (%) 11 11 11 Public Building 1,256 1,394 1,455

Peak Load (KW) 12,080 12,741 13,916 Others 83 95 114

Load Factor (%) 54 51 53 Total 58,036 62,291 67,245

Collection Efficiency (%) 97 98 98

Ave. Systems Rate (P/KWH) 6.19 6.96 7.69

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 21,558 22,957 24,963 28,690 31,037 32,003 32,472 34,256 33,381 36,562

Commercial 4,088 4,322 4,773 5,209 5,856 7,073 7,522 8,199 8,329 11,092

Industrial 749 753 1,001 907 1,124 1,594 2,218 2,154 2,170 2,176

Public Building 2,528 2,683 2,857 3,678 4,307 4,267 4,843 5,454 6,411 7,218

Others 225 137 165 132 143 149 154 165 170 228

Total 29,148 30,852 33,759 38,616 42,466 45,085 47,209 50,228 50,461 57,276

66,189

Mr. Efren G. Esclavilla

Unenerg.Served

Extra LargeExtra Large

Engr. Ludovico D. Lim

Legislative DistrictPotential

ANTIQUE ELECTRIC COOPERATIVE, INC. (ANTECO)Brgy. Funda, San Jose, Antique

Tel Nos. (036) 540-8436, 540-9684, 540-9981; Fax No. (036) 540-9786

2008 20092007

MUNICIPALITIES

Monthly Average

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Mr. Vicente M. Painaga, Jr.

Engr. Ludovico D. Lim

A+

Extra Large

Type

Engr. Ludovico D. Lim

69,505 73,543

A+ A+

Mr. Efren G. Esclavilla

Caluya NPC-SPUG Diesel

POWER PLANT

Location Project Name/Proponent

134

Page 142: The 2007-2009 RE Chronicle

N

135

HQ Location

Municipality

10 MVA Substation

Power Plant

3 PH Backbone Line

Energized Coop System

LEGEND :

H Q

P P

5 MVA Substation

TAPAZ

JAMINDAN

PILAR

IVISAN

PANITAN

DUMARAO

CUARTERO

MA-AYON

SIGMA

SAPI-AN

PANAY

DUMALAG

PONTEVEDRA

DAO

PRESIDENTROXAS

MAMBUSAO

ROXAS CITY

P P H Q

Page 143: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : June 16, 1971

II. DATE OF FIRST ENERGIZATION : August 1973

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 866.1 1058.8 1,058.8 11.000

Subsidy 93.0 156.3 162.8

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Ma-ayon 32 32 32 32 100 0 6,800 3,849 4,074 4,241 62

2 Panay 42 42 42 42 100 0 8,400 6,089 6,259 6,465 77

3 Panitan 26 26 26 26 100 0 7,800 6,351 6,608 6,934 89

4 Pilar 24 24 24 24 100 0 8,100 4,431 4,561 4,751 59

5 Pontevedra 26 26 26 26 100 0 8,300 6,526 6,749 7,022 85

6 President Roxas 22 22 22 22 100 0 5,500 3,731 3,832 3,971 72

7 Roxas City 47 47 47 47 100 0 34,700 32,431 33,421 34,658 99

Second District

8 Cuartero 22 22 22 22 100 0 5,000 2,822 2,942 3,110 62

9 Dao 20 20 20 20 100 0 6,300 4,060 4,236 4,517 72

10 Dumalag 19 19 19 19 100 0 5,400 4,838 5,057 5,327 99

11 Dumarao 33 33 33 33 100 0 8,400 3,967 4,302 4,649 55

12 Ivisan 15 15 15 15 100 0 5,000 4,096 4,260 4,569 91

13 Jamindan 30 30 30 30 100 0 7,000 3,617 3,847 4,186 60

14 Mambusao 26 26 26 26 100 0 7,600 6,075 6,402 6,788 89

15 Sapi-an 10 10 10 10 100 0 4,700 2,751 2,888 3,097 66

16 Sigma 21 21 21 21 100 0 5,700 4,153 4,417 4,774 84

17 Tapaz 58 58 58 58 100 0 9,200 3,611 3,790 4,193 46

Total 473 473 473 473 100 0 143,900 103,398 107,645 113,252 79

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 60,910 61,620 89,085 Residential 97,070 101,681 107,223

MWH Purchased 11,534 11,503 11,887 Commercial 4,144 4,138 4,079

MWH Sold 9,882 10,014 10,248 Industrial 78 92 75

Systems Loss (%) 14 12 13 Public Building 1,516 1,401 1,368

Peak Load (KW) 29,986 34,727 32,837 Others 590 333 507

Load Factor (%) 53 45 50 Total 103,398 107,645 113,252

Collection Efficiency (%) 99 97 96

Ave. Systems Rate (P/KWH) 6.16 6.15 8.69

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 47,640 50,400 53,048 58,942 61,823 61,865 62,482 67,721 67,467 70,389

Commercial 23,497 25,484 24,900 26,858 27,303 22,271 24,809 31,770 32,790 32,391

Industrial 7,718 6,935 4,871 4,885 7,725 15,505 16,045 11,015 12,430 11,492

Public Building 3,273 3,280 3,722 4,381 5,385 5,911 6,121 6,428 6,513 7,531

Others 931 959 1,063 2,517 1,607 1,419 1,166 1,652 962 1,175

Total 83,059 87,058 87,604 97,583 103,843 106,971 110,623 118,586 120,162 122,978

Artech Phils.

A+

Diesel

Coverage

Location

Legislative District

MUNICIPALITIES/CITYB A R A N G A Y S C O N N E C T I O N S

Panitan

A+

110,625

Mega Large

Mr. Oscar AV. Acolentaba

114,988

Engr. Edgar D. Diaz

Mr. Oscar AV. Acolentaba

Engr. Edgar D. Diaz

Mega LargeMega Large

106,113

A+

CAPIZ ELECTRIC COOPERATIVE, INC. (CAPELCO)Brgy. Timpas, Panitan, Capiz 5815

Tel. Nos. (036) 634-0330, 634-0487, 634-0283 to 84;Telefax Nos. (036) 634-0282, 634-0264

2008 20092007

Monthly Average

Unenerg.Served

PotentialEnergized

Mr. Oscar AV. Acolentaba

Engr. Edgar D. Diaz

Project Name/Proponent

POWER PLANT

Type

136

Page 144: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

20 MVA Substation

3 PH Backbone Line

Energized Coop SystemEnergized Other System

137

Served by Panay Electric Co.

MAASIN

LEGANES

OTON

TUBUNGAN

IGBARAS

GUIMBAL

LEON

ALIMODIAN

SAN JOAQUIN

MIAGAO

TIGBAUAN

CABATUAN

H Q

SANTA. BARBARA

ILOILO CITY

PAVIA

SANMIGUEL

Page 145: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : June 10, 1971

II. DATE OF FIRST ENERGIZATION : November 26, 1974

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 28.3 28.3 28.3

Subsidy 67.5 99.7 107.1

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Guimbal 33 33 33 33 100 0 6,000 5,328 5,472 5,705 95

2 Igbaras 46 46 46 46 100 0 6,000 4,075 4,251 4,425 74

3 Miagao 119 119 119 119 100 0 12,500 10,486 10,867 11,280 90

4 Oton 37 37 37 37 100 0 14,400 12,743 13,428 13,951 97

5 San Joaquin 85 85 85 85 100 0 10,400 6,361 6,704 7,011 67

6 Tigbauan 52 52 52 52 100 0 11,000 9,528 9,983 10,304 94

7 Tubungan 48 48 48 48 100 0 4,000 2,779 2,910 3,008 75

Second District

8 Alimodian 51 51 51 51 100 0 6,900 4,824 5,310 5,595 81

9 Leganes 18 18 18 18 100 0 5,100 4,241 4,475 4,684 92

10 Leon 85 85 85 85 100 0 9,500 6,614 6,973 7,291 77

11 Pavia 18 18 18 18 100 0 8,100 7,079 7,555 7,982 99

12 San Miguel 24 24 24 24 100 0 4,500 3,796 3,927 4,069 90

13 Santa Barbara 60 60 60 60 100 0 10,000 9,014 9,482 9,925 99

Third District

14 Cabatuan 68 68 68 68 100 0 10,000 8,631 9,107 9,495 95

15 Maasin 50 50 50 50 100 0 6,700 4,086 4,411 4,626 69

Total 794 794 794 794 100 0 125,100 99,585 104,855 109,351 87

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 68,043 67,523 90,666 Residential 96,470 101,568 106,241

MWH Purchased 11,917 12,010 13,237 Commercial 1,466 1,603 1,680

MWH Sold 10,518 10,658 11,885 Industrial 178 187 199

Systems Loss (%) 11 11 10 Public Building 766 784 800

Peak Load (KW) 30,129 30,010 31,095 Others 705 713 431

Load Factor (%) 54 55 58 Total 99,585 104,855 109,351

Collection Efficiency (%) 100 99 100

Ave. Systems Rate (P/KWH) 6.47 6.34 7.63

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 49,564 54,435 60,221 67,264 73,562 78,368 78,793 84,695 83,859 91,236

Commercial 5,132 5,430 5,394 5,202 5,580 6,710 7,442 10,281 12,219 13,746

Industrial 18,935 20,721 21,176 21,621 23,114 23,436 25,792 26,471 26,836 32,018

Public Building 3,484 3,103 3,190 3,294 3,288 3,445 3,526 3,585 3,768 4,318

Others 783 824 1,015 1,068 1,090 1,159 1,128 1,190 1,212 1,308

Total 77,898 84,513 90,996 98,449 106,635 113,118 116,681 126,222 127,894 142,626

MUNICIPALITIES

Monthly Average

B A R A N G A Y S

Legislative DistrictCoverage

EnergizedUnenerg.

Engr. Wilfred L. Billena

Mega Large

107,639

Atty. Salvador P. Cabaluna III

Engr. Wilfred L. Billena

114,478

A+

Mega Large

A+

Atty. Salvador P. Cabaluna III

ILOILO I ELECTRIC COOPERATIVE, INC. (ILECO I)Brgy. Namucon, Tigbauan, Iloilo 5021

Tel. Nos. (033) 511-7822 to 25; Fax Nos. (033) 511-8852, 511-7824

2008 20092007

118,880

Atty. Salvador P. Cabaluna III

Engr. Wilfred L. Billena

Potential

Mega Large

C O N N E C T I O N S

Served

A+

138

Page 146: The 2007-2009 RE Chronicle

ILECO II

ILECO II

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Power Plant

3 PH Backbone Line

Energized Coop System

P P

139

N

DUMANGASZARRAGA

JANIUAY

LAMBUNAO

DUENAS

CALINOGCITY of PASSI

MINA

BINGAWAN

SAN ENRIQUE

NEW LUCENA

POTOTANBAROTAC NUEVO

DINGLE

BADIANGAN

P P

H Q

Page 147: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : October 18, 1975

II. DATE OF FIRST ENERGIZATION : September 12, 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 12.1 35.1 35.1.

Subsidy 71.0 100.7 107.0

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Second District

1 New Lucena 21 21 21 21 100 0 4,300 3,305 3,461 3,608 84

2 Zarraga 24 24 24 24 100 0 4,100 3,371 3,745 3,982 97

Third District

3 Badiangan 31 31 31 31 100 0 4,800 3,059 3,208 3,318 69

4 Bingawan 14 14 14 14 100 0 2,600 1,182 1,281 1,373 53

5 Calinog 59 52 52 59 100 0 10,600 4,891 5,243 5,542 52

6 Janiuay 60 59 59 60 100 0 11,800 6,001 6,324 6,602 56

7 Lambunao 73 72 72 73 100 0 13,400 5,941 6,382 6,818 51

8 Mina 22 22 22 22 100 0 3,900 2,785 2,930 3,065 79

9 Pototan 50 50 50 50 100 0 13,600 10,086 10,543 11,005 81

Fourth District

10 Barotac Nuevo 29 29 29 29 100 0 10,000 6,833 7,113 7,398 74

11 Dingle 33 33 33 33 100 0 8,400 5,224 5,452 5,780 69

12 Dueñas 47 47 47 47 100 0 6,700 3,814 4,029 4,236 63

13 Dumangas 45 45 45 45 100 0 12,300 8,896 9,200 9,565 78

14 City of Passi 51 51 51 51 100 0 15,000 7,069 7,460 7,842 52

15 San Enrique 28 28 28 28 100 0 6,200 2,787 2,938 3,150 51

Total 587 578 578 587 100 0 127,700 75,244 79,309 83,284 65

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 43,486 43,593 51,365 Residential 71,944 75,920 79,765

MWH Purchased 7,894 8,041 8,613 Commercial 2,388 2,408 2,483

MWH Sold 6,822 6,969 7,512 Industrial 46 55 60

Systems Loss (%) 13 13 13 Public Building 661 712 749

Peak Load (KW) 20,491 22,806 21,644 Others 205 214 227

Load Factor (%) 53 48 55 Total 75,244 79,309 83,284

Collection Efficiency (%) 95 94 96

Ave. Systems Rate (P/KWH) 6.37 6.26 6.84

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 31,922 35,282 39,532 43,205 49,333 53,518 55,439 60,102 60,516 64,969

Commercial 7,098 7,201 7,116 7,323 8,601 7,919 8,406 9,399 9,639 10,567

Industrial 4,823 5,057 4,275 4,698 4,103 3,563 4,097 4,491 5,281 5,668

Public Building 3,176 3,548 3,913 4,750 5,645 6,009 6,512 7,238 7,525 8,208

Others 2,054 2,254 2,415 858 878 743 679 630 665 735

Total 49,073 53,342 57,251 60,834 68,561 71,752 75,133 81,860 83,626 90,147

Mr. Rene C. Parco Mr. Rogelio P. Solania

Ms. Maesit Q. Gallo (OIC) Engr. Jose Redmond Eric S. Roquios (OIC)

ILOILO II ELECTRIC COOPERATIVE, INC. (ILECO II)Brgy. Cau-ayan, Pototan, Iloilo

Tel. Nos. (033) 529-8668, 529-8063, 357-1168; Fax Nos. 529-8064, 529-8981; E-mail: [email protected]

2008 20092007

Project Name/Proponent Type

Extra Large

Dingle

MUNICIPALITIES/CITY

Atty. Dennis T. Ventilacion

Mr. Ramon P. Apura, Sr.

A+ A+A+

Extra Large

Served

146.700DieselPanay DPP/SPC Power

Corporation

Extra Large

B A R A N G A Y S C O N N E C T I O N S

POWER PLANT

Location

Monthly Average

81,793 86,694

Potential

77,879

CoverageEnergized

Unenerg.Legislative District

140

Page 148: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

Power Plant

Generating Set

3 PH Backbone Line

Energized Coop System

G S

P P

141

N

ANILAO

BAROTAC VIEJO

SAN RAFAEL

SANDIONISIO

CONCEPCION

AJUY

BANATE

ESTANCIA

BATAD

SARA

NORTH GIGANTI

SOUTH GIGANTI

CALAGNAAN

SICOGON

PAN DE AZUCAR

MATANGABAN

IGBON

TAGUBANHAN

LEMERY

BALASAN

CARLES

P P

H Q

G S

Page 149: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : June 30, 1986

II. DATE OF FIRST ENERGIZATION : September 1986

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 23.9 29.9 56.6 32.000

Subsidy 50.6 65.3 71.4 0.326

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Fourth District

1 Anilao 21 21 21 21 100 0 4,800 2,273 2,389 2,513 52

2 Banate 18 18 18 18 100 0 5,900 3,804 3,979 4,120 70

Fifth District

3 Ajuy 34 34 34 34 100 0 9,900 4,524 4,854 5,159 52

4 Balasan 23 23 23 23 100 0 5,600 3,429 3,592 3,839 69

5 Barotac Viejo 26 26 26 26 100 0 7,900 3,551 3,821 4,059 51

6 Batad 24 24 24 24 100 0 3,700 2,084 2,208 2,348 63

7 Carles 33 33 33 33 100 0 11,700 3,164 3,387 3,633 31

8 Concepcion 25 25 25 25 100 0 7,500 2,472 2,596 2,821 38

9 Estancia 25 25 25 25 100 0 8,100 5,575 5,876 6,129 76

10 Lemery 31 31 31 31 100 0 5,100 2,315 2,464 2,638 52

11 San Dionisio 29 29 29 29 100 0 6,200 3,192 3,337 3,519 57

12 San Rafael 9 9 9 9 100 0 2,800 1,409 1,482 1,560 56

13 Sara 42 42 42 42 100 0 9,200 5,249 5,537 5,870 64

Total 340 340 340 340 100 0 88,400 43,041 45,522 48,208 55

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 23,843 25,065 29,854 Residential 41,271 43,678 46,317

MWH Purchased 4,289 4,405 4,621 Commercial 1,182 1,200 1,224

MWH Sold 3,769 3,848 4,051 Industrial 28 29 30

Systems Loss (%) 12 12 12 Public Building 477 526 547

Peak Load (KW) 11,355 11,827 11,631 Others 83 89 90

Load Factor (%) 52 51 54 Total 43,041 45,522 48,208

Collection Efficiency (%) 91 93 94

Ave. Systems Rate (P/KWH) 6.33 6.51 7.37

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 17,126 18,210 19,618 22,778 26,101 26,647 27,168 29,920 29,744 31,323

Commercial 3,246 3,510 3,662 3,866 3,930 3,820 3,857 4,135 4,313 5,011

Industrial 2,908 2,932 2,108 2,206 2,656 4,512 7,104 7,805 8,829 8,600

Public Building 1,516 1,614 1,791 1,947 2,171 2,419 2,712 3,037 2,904 3,314

Others 729 716 806 277 592 365 304 334 381 369

Total 25,525 26,982 27,985 31,074 35,450 37,764 41,145 45,231 46,171 48,617

NPC-SPUG Diesel

Type

Estancia PB 103/NPC Diesel

ILOILO III ELECTRIC COOPERATIVE, INC. (ILECO III)Brgy. Preciosa, Sara, Iloilo

Tel. Nos. (033) 392-0104, 392-0211, 329-0388; Telefax No. (033) 392-0202

2008 20092007

A

Large

Atty. Mateo B. Baldoza, Jr. Atty. Mateo B. Baldoza, Jr.

- Mr. Ed Adlao (PS) / Engr. Antonio P. Lazarraga (CMTL)

Mr. Azur D. Salcedo

Mr. Gil A. Altamira

A+ A+

Unenerg.Served

Large Large

B A R A N G A Y S C O N N E C T I O N S

POWER PLANT

Location Project Name/Proponent

Carles

Legislative District

Monthly Average

47,730 50,210

Potential

45,070

MUNICIPALITIES

CoverageEnergized

142

Page 150: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

Power Plant

3 PH Backbone Line

Energized Coop System

P P

PANODOLAN

NUEVAVALENCIA

NAMPOLOGAN

SIBUNAG

ILOILO

INGORE, LAPAZILOILO CITY

BUENAVISTA

JORDAN

SAN LORENZO

P PH Q

143

Page 151: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : June 29, 1979

II. DATE OF FIRST ENERGIZATION : April 1983

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 5.2 10.2 10.2

Subsidy 36.3 43.2 43.2

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 Buenavista 36 36 36 36 100 0 9,500 6,621 6,923 7,267 76

2 Jordan 14 14 14 14 100 0 6,500 4,294 4,493 4,747 73

3 Nueva Valencia 22 20 20 22 100 0 7,000 4,029 4,237 4,443 63

4 San Lorenzo 12 12 12 12 100 0 4,500 2,116 2,314 2,439 54

5 Sibunag 14 13 13 14 100 0 4,500 1,604 1,741 1,880 42

Total 98 95 95 98 100 0 32,000 18,664 19,708 20,776 65

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 9,870 12,121 11,997 Residential 17,450 18,479 19,519

MWH Purchased 1,464 1,445 1,560 Commercial 725 732 752

MWH Sold 1,208 1,208 1,315 Industrial 22 22 22

Systems Loss (%) 17 16 15 Public Building 326 332 338

Peak Load (KW) - - - Others 141 143 145

Load Factor (%) - - - Total 18,664 19,708 20,776

Collection Efficiency (%) 98 95 97

Ave. Systems Rate (P/KWH) 8.17 10.03 9.12

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 6,323 6,465 7,487 8,969 9,701 9,848 9,309 10,260 10,023 10,792

Commercial 1,058 1,053 1,143 1,202 1,429 1,479 1,383 1,480 1,631 1,839

Industrial 881 822 907 960 1,153 1,254 899 887 920 1,001

Public Building 630 690 790 984 1,145 1,205 846 1,801 1,856 2,071

Others 44 35 39 149 99 107 798 74 68 74

Total 8,936 9,065 10,366 12,264 13,527 13,893 13,235 14,502 14,498 15,777

3.400

A

Large Large

Guimaras Power Project/Trans-Asia

Diesel

POWER PLANT

Location

GUIMARAS ELECTRIC COOPERATIVE, INC. (GUIMELCO)San Miguel, Jordan, Guimaras

Tel. No. (033) 237-1682; Cel. No. (0917) 302-7866; (0916) 366-7298: Telefax Nos. (033) 581-3157, 237-1139; E-mail: [email protected]

2008 20092007

Served

B A R A N G A Y S C O N N E C T I O N S

Project Name/Proponent Type

Mr. Desiderio T. Gange

18,407

Mr. Alex S. Garganera

Ms. Remedios A. Garcia

Mr. Jereme G. Ronzales

Monthly Average

Ms. Remedios A. Garcia (OIC)

18,407

B

Potential

18,407

CoverageEnergized

Unenerg.

Ms. Remedios A. Garcia (OIC)

MUNICIPALITIES

Jordan

A

Large

Legislative District

144

Page 152: The 2007-2009 RE Chronicle

N

145

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

20 MVA Substation

3 PH Backbone Line

Energized Coop System

CENTRAL NEGROS

SAN JUAN

DAKU

TOBOSO

CALATRAVA

SAGAY CITY

CITY ofESCALANTE

CADIZ CITY

MOLOCABOC

DIUTAY

SAN CARLOS CITY

MANAPLA

ERMITA

ENRIQUE B.MAGALONA(Saravia)

CITY of VICTORIAS

H Q

Page 153: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : February 1, 1971

II. DATE OF FIRST ENERGIZATION : September 1966

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 743.0 1077.9 1,472.9

Subsidy 55.8 55.8 83.8

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District, Negros Occidental1 Calatrava 40 40 40 40 100 0 15,900 3,682 4,043 5,131 32

2 City of Escalante 21 21 21 21 100 0 16,800 8,485 8,986 9,792 58

3 San Carlos City 18 18 18 18 100 0 25,000 11,788 12,744 13,658 55

4 Toboso 9 9 9 9 100 0 8,600 2,801 3,033 3,232 38

Second District, Negros Occidental5 Cadiz City 22 22 22 22 100 0 30,000 17,975 19,387 20,655 69

6 Manapla 12 12 12 12 100 0 10,500 6,335 6,835 7,432 71

7 Sagay City 24 24 24 24 100 0 27,600 11,160 11,796 12,807 46

Third District, Negros Occidental8 Enrique B. Magalona (Saravia) 23 23 23 23 100 0 11,800 9,959 10,813 11,543 98

9 City of Victorias 26 26 26 26 100 0 17,600 14,778 15,401 16,146 92

Total 195 195 195 195 100 0 163,800 86,963 93,038 100,396 61

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 57,155 60,374 73,062 Residential 81,449 87,560 94,805

MWH Purchased 11,420 11,920 12,708 Commercial 3,284 3,246 3,307

MWH Sold 9,731 10,222 11,060 Industrial 81 89 91

Systems Loss (%) 14 14 13 Public Building 461 483 501

Peak Load (KW) 27,062 28,924 31,557 Others 1,688 1,660 1,692

Load Factor (%) 58 56 55 Total 86,963 93,038 100,396

Collection Efficiency (%) 95 95 95

Ave. Systems Rate (P/KWH) 5.87 5.91 6.61

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 40,492 42,236 44,429 49,574 54,179 56,817 57,335 61,364 62,738 66,822

Commercial 13,272 13,872 14,277 16,574 17,875 18,701 19,205 20,113 20,981 22,245

Industrial 18,434 15,037 16,648 16,435 19,965 17,353 18,075 24,577 27,709 31,957

Public Building 2,769 4,007 4,028 4,949 5,724 5,799 6,034 6,231 6,579 6,623

Others 3,585 3,683 4,053 4,237 4,900 4,352 4,290 4,483 4,661 5,070

Total 78,552 78,835 83,435 91,769 102,643 103,021 104,939 116,768 122,668 132,717

Mr. Armando Federico L. Valmayor

V-M-C RURAL ELECTRIC SERVICE COOPERATIVE, INC. (VRESCO)Crossing Tortosa, Manapla, Negros Occidental

Tel. Nos. (034) 717-0921, 718-2002, 717-0200; Cel. No. (0912) 885-0511; Telefax No. (034) 717-0511

2008 20092007

Engr. Eduardo B. Parrocho

101,436

A+

Mega LargeMega Large

90,944

A+

Mega Large

Unenerg.Served

Legislative District

MUNICIPALITIES/CITIESB A R A N G A Y S C O N N E C T I O N S

Monthly Average

Mr. Armando Federico L. Valmayor

Engr. Eduardo B. Parrocho

96,539

A+

Potential

Mr. Armando Federico L. Valmayor

Engr. Eduardo B. Parrocho

CoverageEnergized

146

Page 154: The 2007-2009 RE Chronicle

N

147

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

20 MVA Substation

30 MVA Substation

Power Plant

3 PH Backbone Line

LEGEND :

Energized Coop System

H Q

P P

SILAY CITY

BAGO CITY

CITY of TALISAY

MURCIA

SALVADOR BENEDICTO

BACOLOD CITYH Q

P P

Page 155: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : February 24, 1975

II. DATE OF FIRST ENERGIZATION : December 16, 1975

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 271.2 655.0 1,015.0

Subsidy 80.2 109.3 111.8

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District, Bacolod City

1 Bacolod City 61 61 61 61 100 0 95,500 90,939 93,205 94,752 99

First District, Negros Occidental

2 Salvador Benedicto* 7 4 7 7 100 0 3,600 241 479 786 22

Third District, Negros Occidental

3 Murcia 23 23 23 23 100 0 12,600 6,131 6,328 6,728 53

4 Silay City 16 16 16 16 100 0 22,900 13,618 13,983 14,439 63

5 City of Talisay 27 27 27 27 100 0 16,800 11,590 12,182 12,700 76 Fourth District, Negros Occidental

6 Bago City 24 24 24 24 100 0 30,000 11,835 12,367 13,217 44

Total 158 155 158 158 100 0 181,400 134,354 138,544 142,622 79

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 208,855 204,625 247,869 Residential 124,409 128,386 132,329

MWH Purchased 46,148 47,558 49,147 Commercial 9,367 9,534 9,686

MWH Sold 40,647 42,090 43,534 Industrial 79 113 93

Systems Loss (%) 12 11 11 Public Building - - -

Peak Load (KW) 107,063 110,310 110,356 Others 499 511 514

Load Factor (%) 59 59 61 Total 134,354 138,544 142,622

Collection Efficiency (%) 94 94 96

Ave. Systems Rate (P/KWH) 5.14 4.86 5.69

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 154,644 162,491 167,884 186,572 201,260 210,873 216,483 233,867 239,020 249,210

Commercial 43,942 46,804 46,102 46,184 118,176 126,431 130,601 138,465 141,668 142,181

Industrial 102,748 110,459 114,640 118,601 73,011 76,805 83,081 108,343 117,286 124,129

Public Building 11,286 11,757 12,417 13,591 1,109 - - - - -

Others 4,295 4,997 5,032 5,182 5,292 6,860 6,970 7,092 7,105 6,891

Total 316,915 336,508 346,075 370,130 398,848 420,968 437,135 487,767 505,079 522,411

* With Provisional Franchise, NEC Res. No. 4 s. 1976

MUNICIPALITIES/CITIES

Monthly Average

B A R A N G A Y S

Legislative DistrictCoverage

EnergizedUnenerg.

CENTRAL NEGROS ELECTRIC COOPERATIVE, INC. (CENECO)Cor. Gonzaga & Mabini Sts., Bacolod City

Tel. Nos. (034) 435-3640 to 50; Fax No. (034) 435-4079, 433-2533

2008 20092007

Potential

Mega Large

C O N N E C T I O N S

Served

POWER PLANT

Location Project Name/Proponent Type

Bago CityNorthern Negros

GPP/PNOC

122,922

Mr. Erlo S. Sajo (CMT)

133,681

Atty. Edward M. Gasambelo

Mr. Sulpicio C. Lagarde, Jr.

A+

Geothermal 49.000

Mr. Roberto L. Montelibano

128,092

A+

Mega Large

A+

Atty. Vicente D. Sabornay

Engr. Edwin M. Montemayor (OIC) Mr. Eddie A. Adlao (PS)

Mega Large

148

Page 156: The 2007-2009 RE Chronicle

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

LEGEND :

H QEnergized Coop System

149

N

PULUPANDAN

VALLADOLID

SAN ENRIQUE LA CARLOTA CITY

LA CASTELLANA

HINIGARAN MOISESPADILLA(Magallon)

ISABELABINALBAGAN

CITY ofHIMAMAYLAN

CITY ofKABANKALAN

ILOG

CAUAYAN

CANDONI

CITY of SIPALAY

HINOBA-AN (Asia)

PONTEVEDRA

H Q

Page 157: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : February 25, 1978

II. DATE OF FIRST ENERGIZATION : January 1979

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 9.3 9.3 9.3

Subsidy 56.4 56.4 101.5

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Fourth District, Negros Occidental

1 La Carlota City 14 14 14 14 100 0 12,000 9,695 10,094 10,446 87

2 Pontevedra 20 20 20 20 100 0 8,900 6,501 6,823 7,106 80

3 Pulupandan 20 20 20 20 100 0 5,500 4,760 5,000 5,099 93

4 San Enrique 10 10 10 10 100 0 4,800 3,832 3,993 4,097 85

5 Valladolid 16 16 16 16 100 0 7,000 5,784 6,043 6,245 89

Fifth District, Negros Occidental

6 Binalbagan 16 16 16 16 100 0 12,400 8,436 8,690 8,960 72

7 City of Himamaylan 19 19 19 19 100 0 18,800 10,747 11,127 11,567 62

8 Hinigaran 24 24 24 24 100 0 16,000 11,057 11,487 11,887 74

9 Isabela 30 30 30 30 100 0 10,300 5,560 5,757 5,978 58

10 La Castellana 13 13 13 13 100 0 12,600 5,007 5,313 5,567 44

11 Moises Padilla (Magallon) 15 15 15 15 100 0 7,300 2,029 2,090 2,182 30

Sixth District, Negros Occidental

12 Candoni 9 9 9 9 100 0 4,200 1,598 1,692 1,787 43

13 Cauayan 25 25 25 25 100 0 18,900 7,383 7,728 8,226 44

14 Hinoba-an (Asia) 13 13 13 13 100 0 10,700 5,006 5,372 5,660 53

15 Ilog 15 15 15 15 100 0 9,900 5,959 6,162 6,402 65

16 City of Kabankalan 32 32 32 32 100 0 31,900 17,848 18,760 19,747 62

17 City of Sipalay 17 17 17 17 100 0 13,200 6,441 6,806 7,222 55

Total 308 308 308 308 100 0 204,400 117,643 122,937 128,178 63

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 65,132 71,709 79,409 Residential 112,139 117,095 122,016

MWH Purchased 12,500 13,430 13,161 Commercial 3,576 3,800 3,898

MWH Sold 11,117 11,981 11,646 Industrial 23 16 16

Systems Loss (%) 11 11 11 Public Building 1,619 1,719 1,800

Peak Load (KW) 31,210 34,220 32,571 Others 286 307 448

Load Factor (%) 55 54 55 Total 117,643 122,937 128,178

Collection Efficiency (%) 104 103 101

Ave. Systems Rate (P/KWH) 5.86 5.99 6.82

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 55,228 57,919 59,497 66,907 71,316 73,083 74,889 79,822 79,471 83,187

Commercial 12,026 12,929 13,541 14,816 15,751 16,907 18,526 19,429 20,739 22,385

Industrial 12,702 13,944 13,010 27,144 16,290 14,439 15,417 18,153 16,614 16,893

Public Building 4,021 4,912 6,179 7,441 8,581 8,994 10,048 11,198 12,405 12,775

Others 2,973 2,960 3,240 3,827 3,775 4,862 5,113 4,802 14,539 4,514

Total 86,950 92,664 95,467 120,135 115,714 118,285 123,993 133,404 143,768 139,754

NEGROS OCCIDENTAL ELECTRIC COOPERATIVE, INC. (NOCECO)Naga, City of Kabankalan, Negros Occidental

Tel Nos. (034) 746-9117, 471-2229, 471-2339, 471-2746, 746-9255; Fax No. (034) 471-2829; E-mail: [email protected]

2008 20092007

Unenerg.Served

MUNICIPALITIES/CITIES

Legislative DistrictPotential

C O N N E C T I O N S

139,213

- -

- -

Mr. John Peter Z. Millan

Engr. Lamberto M. Canlas

Mr. John Peter Z. Millan

Engr. Lamberto M. Canlas

Mr. John Peter Z. Millan

Engr. Lamberto M. Canlas

-

Monthly Average

134,341

-

123,590

B A R A N G A Y S

CoverageEnergized

150

Page 158: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Energized Other System

Headquarters

151

BANELCOBantayan, Cebu

PROSIELCOLarena, Siquijor

Served byVisayan Electric Co., Inc.

Served byMactan Electric Co., Inc.

Served byBohol Light Co., Inc.

BOHECO IIJagna, Bohol

BOHECO ITubigon, Bohol

NORECO IIDumaguete City

CEBECO IDumanjug, Cebu

NORECO IBindoy, Negros Oriental

CEBECO IIIToledo City

CELCOPoro, Cebu

CEBECO IICity of BogoN

Page 159: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Negros Oriental I 11 11 11 11 100 285 285 285 285 100 115,100 43,415 45,779 49,104 43

2 Negros Oriental II 14 14 14 14 100 272 271 272 272 100 152,500 98,352 102,689 106,879 70

3 Bantayan 3 3 3 3 100 49 49 49 49 100 30,200 17,498 18,072 18,694 62

4 Cebu I 18 18 18 18 100 366 366 366 366 100 139,400 79,224 85,445 91,282 65

5 Cebu II 13 13 13 13 100 323 323 323 323 100 141,900 100,555 105,674 111,189 78

6 Cebu III 5 5 5 5 100 134 134 134 134 100 82,100 57,776 60,890 64,062 78

7 Siquijor 6 6 6 6 100 134 134 134 134 100 19,800 15,286 16,093 17,080 86

8 Camotes 4 4 4 4 100 56 56 56 56 100 21,400 11,484 12,044 12,615 59

9 Bohol I 26 26 26 26 100 603 603 603 603 100 124,700 106,079 113,858 121,717 98

10 Bohol II 21 21 21 21 100 491 491 491 491 100 124,500 81,262 86,153 90,116 72

Total 121 121 121 121 100 2,713 2,712 2,713 2,713 100 951,600 610,931 646,697 682,738 72

REGION VII

ServedPotential

CENTRAL VISAYAS REGION

ELECTRIC DISTRIBUTION

UTILITIES

MUNICIPALITIES/CITIES BARANGAYS

CoverageEnergized

CONNECTIONS

CoverageEnergized

152

Total 421,594 447,329 467,398 528,427 571,425 636,000 668,578 728,768 786,105 816,489

Others 13,893 14,495 15,789 17,836 26,977 31,421 31,867 37,141 39,130 42,469

Public Bldgs. 19,680 22,105 24,292 29,143 32,513 34,596 37,277 41,255 44,604 49,381

Industrial 98,387 99,459 91,965 100,012 98,105 127,550 143,232 157,456 184,945 168,443

Commercial 87,062 93,719 100,391 111,628 122,509 139,447 146,819 158,448 168,651 179,815

Residential 202,572 217,551 234,961 269,808 291,321 302,986 309,383 334,468 348,775 376,381

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 160: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

Energized Coop System

153

N

BAIS CITY

MANJUYOD

AYUNGON

CITY of GUIHULNGAN

LA LIBERTAD

JIMALALUD

TAYASAN

VALLEHERMOSO

MABINAY

CANLAON CITY

H Q

BINDOY(Payabon)

Page 161: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : June 14, 1972

II. DATE OF FIRST ENERGIZATION : April 10, 1978

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 15.6 20.8 49.4

Subsidy 55.7 81.7 88.0

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Ayungon 24 24 24 24 100 0 9,200 3,530 3,715 3,877 42

2 Bindoy (Payabon) 22 22 22 22 100 0 8,100 4,223 4,419 4,547 56

3 Canlaon City 12 12 12 12 100 0 10,600 3,767 3,975 4,309 41

4 City of Guihulngan 33 33 33 33 100 0 19,000 5,998 6,297 6,694 35

5 Jimalalud 28 28 28 28 100 0 6,000 1,625 1,723 1,883 31

6 La Libertad 29 29 29 29 100 0 8,000 2,227 2,437 2,616 33

7 Manjuyod 27 27 27 27 100 0 8,600 4,310 4,591 4,930 57

8 Tayasan 28 28 28 28 100 0 7,000 2,370 2,485 2,749 39

9 Vallehermoso 15 15 15 15 100 0 7,700 2,295 2,399 2,517 33

Second District

10 Bais City 35 35 35 35 100 0 15,700 8,065 8,447 9,252 59

11 Mabinay 32 32 32 32 100 0 15,200 5,005 5,291 5,730 38

Total 285 285 285 285 100 0 115,100 43,415 45,779 49,104 43

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 16,940 20,433 23,117 Residential 40,961 43,260 46,499

MWH Purchased 3,305 3,421 3,596 Commercial 1,178 1,195 1,267

MWH Sold 2,825 2,957 3,128 Industrial 298 304 282

Systems Loss (%) 14 13 13 Public Building 772 817 849

Peak Load (KW) 9,020 9,923 9,975 Others 206 203 207

Load Factor (%) 50 47 49 Total 43,415 45,779 49,104

Collection Efficiency (%) 96 95 96

Ave. Systems Rate (P/KWH) 6.00 6.91 7.39

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 12,836 13,979 14,322 16,647 18,448 18,622 18,281 20,108 20,623 21,356

Commercial 2,292 2,640 2,414 2,883 3,445 3,616 4,133 4,578 4,928 5,286

Industrial 2,678 2,829 2,830 3,302 3,604 4,206 3,442 3,934 4,058 4,562

Public Building 2,682 3,141 3,362 3,562 3,723 3,591 3,590 3,837 4,216 4,572

Others 1,074 1,244 1,340 1,560 1,847 1,877 1,422 1,438 1,661 1,765

Total 21,562 23,833 24,268 27,954 31,067 31,912 30,868 33,895 35,486 37,541

Monthly Average

43,551

Mr. Angelito A. Carriaga

A+

Extra Large

41,516

MUNICIPALITIES/CITIES

Legislative District

45,898

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

Potential

A+

Extra Large Extra Large

Engr. Anito A. Mercado Engr. Anito A. Mercado

Mr. Edmund G. Nochefranca (OIC)Mr. Angelito A. Carriaga

A+

Engr. Anito A. Mercado

NEGROS ORIENTAL I ELECTRIC COOPERATIVE, INC. (NORECO I)Tinaogan, Bindoy, Negros Oriental 6209

Tel Nos. (035) 405-3055; Telefax No. (035) 405-3001; Cell. No. 0912-515-0291

2008 20092007

154

Page 162: The 2007-2009 RE Chronicle

N

LEGEND :

HQ Location

Municipality

Below 5 MVA Substation

5 MVA Substation

10 MVA Substation

20 MVA Substation

Power Plant

3 PH Backbone Line

Energized Coop SystemH Q

P P

155

SANTA CATALINA

BASAY

APO ISLAND

CITY ofBAYAWAN(Tulong)

SIATON

DUMAGUETE CITY

AMLAN(Ayuquitan)

ZAMBOANGUITA

BACONG

SIBULAN

SAN JOSE

VALENCIA(Luzurriaga)

DAUIN

PAMPLONA

CITY of TANJAY

P P

P P H Q

Page 163: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : April 2, 1977

II. DATE OF FIRST ENERGIZATION : December 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 0.1 0.1 0.1

Subsidy 42.5 42.5 42.5

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Second District

1 Amlan (Ayuquitan) 8 8 8 8 100 0 4,200 2,955 3,099 3,222 77

2 Dumaguete City 30 30 30 30 100 0 30,900 28,802 29,773 30,858 99

3 Pamplona 16 15 16 16 100 0 7,400 2,817 3,024 3,173 43

4 San Jose 14 14 14 14 100 0 3,500 2,954 3,067 3,160 90

6 City of Tanjay 24 24 24 24 100 0 16,000 11,051 11,336 11,649 73

Third District

7 Bacong 22 22 22 22 100 0 5,900 5,484 5,683 5,880 99

8 Basay 10 10 10 10 100 0 4,800 1,555 1,704 1,840 38

9 City of Bayawan (Tulong) 28 28 28 28 100 0 23,000 6,923 7,425 7,901 34

10 Dauin 23 23 23 23 100 0 4,800 4,317 4,566 4,759 99

11 Siaton 26 26 26 26 100 0 14,600 7,536 7,809 8,028 55

12 Santa Catalina 22 22 22 22 100 0 15,300 5,382 5,621 5,792 38

13 Valencia (Luzurriaga) 24 24 24 24 100 0 6,900 6,200 6,477 6,816 99

14 Zamboanguita 10 10 10 10 100 0 5,200 3,461 3,660 3,821 73

Total 272 271 272 272 100 0 152,500 98,352 102,689 106,879 70

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 77,542 80,153 99,977 Residential 89,478 93,526 97,447

MWH Purchased 15,884 16,775 17,488 Commercial 7,461 7,672 7,876

MWH Sold 13,906 14,536 15,532 Industrial 95 100 96

Systems Loss (%) 12 13 11 Public Building 873 933 985

Peak Load (KW) 38,190 40,733 40,652 Others 445 458 475

Load Factor (%) 57 56 59 Total 98,352 102,689 106,879

Collection Efficiency (%) 91 91 91

Ave. Systems Rate (P/KWH) 5.58 5.51 6.44

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 48,699 51,236 53,758 62,077 67,643 72,262 76,514 82,106 84,892 90,021

Commercial 30,945 32,073 32,636 36,921 36,683 37,703 40,640 43,339 46,311 48,412

Industrial 8,228 9,687 10,251 10,248 6,077 3,870 4,074 4,522 4,977 5,993

Public Building 5,593 6,281 6,713 7,614 7,519 7,992 8,806 9,743 9,978 10,960

Others 4,753 4,793 5,237 6,199 13,973 21,463 22,246 27,158 28,271 31,003

Total 98,218 104,070 108,595 123,059 131,895 143,290 152,280 166,868 174,429 186,389

-

NEGROS ORIENTAL II ELECTRIC COOPERATIVE, INC. (NORECO II)Real St., Dumaguete City

Tel. Nos. (035) 422-7469, 225-8275, 225-1648, 225-4514, 225-0721; Telefax No. (035) 225-4783; Fax No. (035) 4229982; E-mail: [email protected]

2008 20092007

MUNICIPALITIES/CITIES

Coverage

Mr. Felix G. Gaudiel, Jr.

Engr. Ephraim T. Taclob

- -

Mr. Felix G. Gaudiel, Jr. Mr. Felix G. Gaudiel, Jr.

Engr. Ephraim T. Taclob Engr. Ephraim T. Taclob

PotentialUnenerg.

0.800

-

B A R A N G A Y S C O N N E C T I O N S

--

Valencia Geothermal

Type

AmlanAmlan HEP/ICS Renewables Inc.

Hydro

192.500

Palinpinon-Tongonan Geothermal Power

Plant/Green Core Geothermal Inc.

Project Name/Proponent

Monthly Average

85,325 88,52582,360

Energized

POWER PLANT

Location

Legislative District

Served

156

5 Sibulan 15 15 15 15 100 0 10,000 8,915 9,445 9,980 99

Page 164: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

Generating Set

3 PH Backbone Lines

Energized Coop System

G S

N

BANTAYAN

SANTA FE

MADRIDEJOS

G S

G S

G S

G S

G S

G S

KINATARKAN ISLET

GILANTAGAAN ISLET

BOTIGUES ISLET

DOONG ISLET

LIPAYRAN ISLET

HILOTONGAN ISLET

G S

H Q

157

Page 165: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : September 29, 1978

II. DATE OF FIRST ENERGIZATION : December 1983

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 16.1 31.1 31.1 4.326

Subsidy 9.6 15.6 18.9 0.263

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Fourth District, Cebu1 Bantayan 25 25 25 25 100 0 17,100 10,101 10,404 10,736 63

2 Madridejos 14 14 14 14 100 0 7,300 4,270 4,399 4,543 62

3 Santa Fe 10 10 10 10 100 0 5,800 3,127 3,269 3,415 59

Total 49 49 49 49 100 0 30,200 17,498 18,072 18,694 62

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 9,383 9,703 10,426 Residential 15,364 16,186 16,782

MWH Purchased 1,279 1,301 1,437 Commercial 1,486 1,503 1,515

MWH Sold 1,125 1,175 1,294 Industrial 25 26 27

Systems Loss (%) 12 9 10 Public Building 317 318 328

Peak Load (KW) 3,400 3,791 3,260 Others 306 39 42

Load Factor (%) 52 47 60 Total 17,498 18,072 18,694

Collection Efficiency (%) 101 101 101

Ave. Systems Rate (P/KWH) 8.34 8.26 8.06

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 6,481 6,715 6,507 6,538 6,446 6,738 6,695 7,094 7,284 8,215

Commercial 1,701 1,788 1,800 2,390 3,570 3,843 3,819 4,262 4,519 4,811

Industrial 701 496 350 422 661 930 1,311 1,472 1,580 1,780

Public Building 260 302 298 354 450 472 465 504 547 561

Others 298 258 277 232 169 169 164 169 166 163

Total 9,441 9,559 9,232 9,936 11,297 12,152 12,454 13,501 14,096 15,530

Ms. Maria Neriza S. Gigante

Mr. Oscar T. Seares Mr. Oscar T. Seares

BANTAYAN ISLAND ELECTRIC COOPERATIVE, INC. (BANELCO)Balintawak, Bantigue, Bantayan, Cebu

Tel. No. (032) 352-5205; Fax No. (SOTELCO) (032) 460-9112; 460-9281

2008 20092007

Legislative DistrictPotential

MUNICIPALITIES

Medium

Coverage

Atty. Samson Troy K. Layese

Mr. Oscar T. Seares

A+

Atty. Samson Troy K. Layese

Medium

A+

Medium

B A R A N G A Y S C O N N E C T I O N S

A+

Santa Fe

Served

POWER PLANT

Location Project Name/Proponent Type

NPC-SPUG Diesel

Monthly Average

18,520 19,14217,946

Bantayan NPC-SPUG Diesel

EnergizedUnenerg.

158

Page 166: The 2007-2009 RE Chronicle

HQ Location

Municipality

Below 5 MVA Substation

5 MVA Substation

10 MVA Substation

Mini Hydro

3PH Backbone Line

LEGEND :

H QEnergized Coop System

MH

N

159

SANTANDER

SAMBOAN

ALEGRIA

MALABUYOC

GINATILAN

DUMANJUGRONDA

BARILI

ALCANTARA

SIBONGA

ARGAO

DALAGUETE

ALCOY

BOLJOON

OSLOB

CITY ofCARCAR

BADIAN

MOALBOAL

ZARAGOZA

MHMH

MH

H Q

Page 167: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : April 22, 1972

II. DATE OF FIRST ENERGIZATION : July 1976

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M): (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 15.3 15.3 15.3 0.500

Subsidy 68.8 93.6 117.6 0.500

0.720

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 City of Carcar 15 15 15 15 100 0 22,500 15,604 16,437 17,217 77

2 Sibonga 25 25 25 25 100 0 9,600 5,351 5,640 6,004 63

Second District

3 Alcantara 9 9 9 9 100 0 2,900 1,455 1,637 1,755 61

4 Alcoy 8 8 8 8 100 0 3,400 1,540 1,651 1,740 51

5 Alegria 9 9 9 9 100 0 5,200 1,957 2,123 2,275 44

6 Argao 45 45 45 45 100 0 15,200 9,487 9,943 10,401 68

7 Badian 29 29 29 29 100 0 7,600 3,349 3,761 4,206 55

8 Boljoon 11 11 11 11 100 0 3,300 1,788 1,859 2,007 61

9 Dalaguete 33 33 33 33 100 0 14,000 7,150 8,575 9,105 65

10 Dumanjug 37 37 37 37 100 0 10,000 5,204 5,700 6,244 62

11 Ginatilan 14 14 14 14 100 0 3,500 1,781 1,892 2,007 57

12 Malabuyoc 14 14 14 14 100 0 4,300 1,905 2,031 2,139 50

13 Moalboal 15 15 15 15 100 0 5,900 3,966 4,286 4,640 79

14 Oslob 21 21 21 21 100 0 5,600 3,427 3,612 4,243 76

15 Ronda 14 14 14 14 100 0 4,200 2,388 2,491 2,603 62

16 Samboan 15 15 15 15 100 0 4,200 2,632 2,813 2,958 70

17 Santander 10 10 10 10 100 0 3,500 2,519 2,715 2,950 84

Third District

18 Barili 42 42 42 42 100 0 14,500 7,721 8,279 8,788 61

Total 366 366 366 366 100 0 139,400 79,224 85,445 91,282 65

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 44,625 44,763 54,860 Residential 68,035 74,181 80,558

MWH Purchased 8,968 9,099 9,529 Commercial 8,857 8,808 8,093

MWH Sold 8,088 8,215 8,606 Industrial 11 15 26

Systems Loss (%) 9 9 9 Public Building 2,079 2,188 2,327

Peak Load (KW) 21,967 23,515 25,924 Others 242 253 278

Load Factor (%) 56 53 50 Total 79,224 85,445 91,282

Collection Efficiency (%) 101 106 105

Ave. Systems Rate (P/KWH) 5.52 5.45 6.37

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 29,684 32,215 35,122 40,184 43,642 45,253 46,608 50,174 51,616 55,754

Commercial 15,050 16,657 18,750 19,436 20,563 23,126 24,725 25,976 25,927 26,388

Industrial 10,769 9,611 9,041 9,641 10,005 11,912 12,544 12,542 11,740 10,965

Public Building 1,970 2,198 2,659 3,563 5,058 5,701 6,130 6,979 7,673 8,535

Others 884 941 989 1,059 1,120 1,169 1,219 1,387 1,622 1,632

Total 58,357 61,622 66,561 73,883 80,388 87,161 91,226 97,058 98,578 103,274

Badian

Mantayupan/CEBECO I Mini Hydro

Basak/CEBECO I Mini Hydro

Barili

Ms. Marlou M. Rendon Ms. Marlou M. Rendon

CEBU I ELECTRIC COOPERATIVE, INC. (CEBECO I)Bito-on, Dumanjug, Cebu

Tel. No. (032) 471-9297; Telefax Nos. (032) 471-9002; 471-9313

2008 20092007

A+

Extra Large

Engr. Mariano Y. Blanco, Jr.

Ms. Marlou M. Rendon

Extra Large Extra Large

A+ A+

Engr. Mariano Y. Blanco, Jr. Engr. Mariano Y. Blanco, Jr.

POWER PLANT

Location Project Name/Proponent Type

Served

Legislative DistrictPotential

MUNICIPALITIES

Matutinao/CEBECO I Mini Hydro

Monthly Average

77,060 81,08970,480

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.

160

Page 168: The 2007-2009 RE Chronicle

LEGEND :

HQ Location

Municipality

Below 5MVA Substation

10 MVA Substation

20 MVA Substation

NPC Substation

3 PH Backbone Line

Energized Coop System

H Q

161

N

DAANBANTAYAN

MEDELLIN

SAN REMIGIO

TABOGON

CITY ofBOGO

BORBON

TABUELAN

SOGOD

CATMONTUBURAN

COMPOSTELA

DANAO CITY

CARMEN

H Q

Page 169: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : December 28, 1977

II. DATE OF FIRST ENERGIZATION : May 1980

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 21.1 31.1 31.1

Subsidy 38.4 71.8 79.1

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Third District

1 Tuburan 54 54 54 54 100 0 13,000 8,012 8,405 8,809 68

Fourth District

2 City of Bogo 29 29 29 29 100 0 16,100 13,534 14,278 14,936 93

3 Daanbantayan 20 20 20 20 100 0 17,000 9,934 10,406 10,859 64

4 Medellin 19 19 19 19 100 0 10,900 6,566 6,811 7,116 65

5 San Remigio 27 27 27 27 100 0 11,000 7,791 8,245 8,716 79

6 Tabogon 25 25 25 25 100 0 7,000 4,727 5,013 5,326 76

7 Tabuelan 12 12 12 12 100 0 4,900 3,063 3,258 3,506 72

Fifth District

8 Borbon 19 19 19 19 100 0 7,200 4,369 4,639 4,833 67

9 Carmen 21 21 21 21 100 0 9,400 6,654 6,887 7,414 79

10 Catmon 20 20 20 20 100 0 6,300 4,437 4,744 5,042 80

11 Compostela 17 17 17 17 100 0 8,100 7,298 7,602 8,017 99

12 Danao City 42 42 42 42 100 0 24,100 20,292 21,218 22,212 92

13 Sogod 18 18 18 18 100 0 6,900 3,878 4,168 4,403 64

Total 323 323 323 323 100 0 141,900 100,555 105,674 111,189 78

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 64,579 73,290 92,496 Residential 90,802 95,713 101,115

MWH Purchased 13,777 15,777 17,002 Commercial 7,245 7,296 7,306

MWH Sold 12,417 14,356 15,573 Industrial 50 49 49

Systems Loss (%) 10 9 8 Public Building 1,875 1,995 2,058

Peak Load (KW) 36,709 37,335 41,556 Others 583 621 661

Load Factor (%) 51 58 56 Total 100,555 105,674 111,189

Collection Efficiency (%) 98 98 98

Ave. Systems Rate (P/KWH) 5.20 5.11 5.94

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 39,038 41,646 45,530 52,514 54,779 54,823 55,285 59,563 61,587 64,886

Commercial 16,337 18,052 20,783 23,254 25,807 29,941 30,886 33,152 34,743 37,751

Industrial 39,083 34,865 25,892 32,932 30,888 40,956 46,776 49,638 68,443 75,997

Public Building 2,280 2,483 2,794 3,257 3,646 4,007 4,204 4,777 5,430 6,091

Others 1,591 1,509 1,673 1,824 3,304 1,950 1,885 1,875 2,003 2,150

Total 98,329 98,555 96,672 113,781 118,424 131,678 139,036 149,005 172,206 186,875

CEBU II ELECTRIC COOPERATIVE, INC. (CEBECO II)Malingin, City of Bogo, Cebu

Tel. Nos. (032) 521-2154, 434-8555; Telefax No. (032) 251-2154

2008 20092007

Mrs. Armida J. Caguitla

Engr. Peter Allan B. Seneres

A+ A+

Mrs. Armida J. Caguitla Mrs. Armida J. Caguitla

Engr. Peter Allan B. Señeres Engr. Peter Allan B. Señeres

Mega Large Mega Large

A+

Mega Large

Served

Legislative DistrictPotential

MUNICIPALITIES/CITY

Monthly Average

103,159 107,87598,830

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.

162

Page 170: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

10 MVA Substation

15 MVA Substation

Power Plant

3 PH Backbone Line

Energized Other SystemEnergized Coop System

P P

163

N

Served by Mactan Electric Co., Inc.

CEBU CITY

LILOAN

CONSOLACION

MANDAUE CITY

MINGLANILLA

TALISAYCITY

CITY ofNAGA

SANFERNANDO LAPU-LAPU CITY

CORDOVAServed by Visayan Electric Co., Inc.

ASTURIAS

PINAMUNGAHAN

TOLEDO CITY

BALAMBAN

P P

P P

ALOGUINSAN

H Q

OLANGO ISLAND

Page 171: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : September 27, 1979

II. DATE OF FIRST ENERGIZATION : December 1980

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 207.9 248.7 248.7 88.800

Subsidy 38.4 58.0 63.0 45.800

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Third District1 Aloguinsan 15 15 15 15 100 0 6,000 3,364 3,507 3,661 61

2 Asturias 27 27 27 27 100 0 10,000 5,965 6,275 6,597 66

3 Balamban 28 28 28 28 100 0 15,000 10,964 11,782 12,551 84

4 Pinamungahan 26 26 26 26 100 0 13,000 8,008 8,359 8,677 67

5 Toledo City 38 38 38 38 100 0

Cebu City (4) 38,100 29,475 30,967 32,576 86

Talisay City (1)

Minglanilla (2)

Total 134 134 134 134 100 0 82,100 57,776 60,890 64,062 78

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 42,141 43,037 45,928 Residential 53,064 56,028 59,227

MWH Purchased 10,711 11,765 9,844 Commercial 3,963 4,063 3,956

MWH Sold 10,007 11,138 9,421 Industrial 20 21 21

Systems Loss (%) 6 5 4 Public Building 589 630 693

Peak Load (KW) 27,064 32,381 36,816 Others 140 148 165

Load Factor (%) 54 50 37 Total 57,776 60,890 64,062

Collection Efficiency (%) 102 101 103

Ave. Systems Rate (P/KWH) 4.21 3.86 4.88

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 19,466 21,388 23,093 26,443 28,296 29,939 29,619 32,364 35,315 39,585

Commercial 7,707 8,471 8,887 9,585 9,921 10,425 10,251 11,229 12,764 14,051

Industrial 26,408 31,423 31,957 29,219 32,350 54,054 60,855 69,669 78,224 51,216

Public Building 2,761 3,066 3,194 3,599 4,146 4,367 4,705 4,903 5,353 6,003

Others 1,515 1,736 1,736 1,775 1,868 1,840 1,821 1,923 2,004 2,196

Total 57,857 66,084 68,867 70,621 76,582 100,626 107,251 120,088 133,660 113,051

CEBU III ELECTRIC COOPERATIVE, INC. (CEBECO III)Luray II, Toledo City, Cebu

Tel. Nos. (032) 322-5754, 367-9111, 467-8298; Fax. No. (032) 467-9682

2008 20092007

Mr. Tereso B. Lebumfacil

Engr. Jevy Q. Buenasilda

A+ A+

Mr. Tereso B. Lebumfacil Mr. Tereso B. Lebumfacil

Engr. Jevy Q. Buenasilda Engr. Jevy Q. Buenasilda

Legislative DistrictPotential

MUNICIPALITIES/CITIES

A+

Extra Large

Toledo CityToledo Power Corp/Atlas

Consolidated Mining & Dev't Corp.

Unenerg.Served

Coal

Extra Large Extra Large

POWER PLANT

Location Project Name/Proponent Type

Monthly Average

55,439 57,68253,289

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Diesel

164

Page 172: The 2007-2009 RE Chronicle

N

HQ Location

Municipality

Generating Set

3 PH Backbone Line

LEGEND :

H QEnergized Coop System

G S

PROSIELCO

165

ENRIQUEVILLANUEVA

LARENA

MARIA

SAN JUAN

SIQUIJOR

LAZI

G S G S

H Q

Page 173: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : December 29, 1977

II. DATE OF FIRST ENERGIZATION : October 1983

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 4.9 5.6 5.6 6.920

Subsidy 10.9 16.4 16.4

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District1 Enrique Villanueva 14 14 14 14 100 0 1,300 1,082 1,145 1,261 97

2 Larena 23 23 23 23 100 0 3,200 2,878 3,011 3,151 98

3 Lazi 18 18 18 18 100 0 4,400 2,621 2,774 2,979 68

4 Maria 22 22 22 22 100 0 2,900 2,122 2,257 2,398 83

5 San Juan 15 15 15 15 100 0 2,900 2,074 2,189 2,327 80

6 Siquijor 42 42 42 42 100 0 5,100 4,509 4,717 4,964 97

Total 134 134 134 134 100 0 19,800 15,286 16,093 17,080 86

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 8,243 8,509 9,084 Residential 12,893 13,652 14,596

MWH Purchased 969 988 1,036 Commercial 1,473 1,474 1,459

MWH Sold 870 888 949 Industrial 121 134 143

Systems Loss (%) 10 10 8 Public Building 519 544 579

Peak Load (KW) 2,835 2,970 3,130 Others 280 289 303

Load Factor (%) 47 46 45 Total 15,286 16,093 17,080

Collection Efficiency (%) 101 100 100

Ave. Systems Rate (P/KWH) 9.48 9.58 9.57

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 3,598 3,842 3,979 4,142 4,644 4,958 4,832 5,424 5,397 5,863

Commercial 1,250 1,419 1,438 1,389 1,289 1,485 1,487 1,662 1,711 1,805

Industrial 335 308 310 237 221 243 240 262 287 330

Public Building 669 742 846 956 1,031 1,136 1,325 1,500 1,603 1,666

Others 328 379 454 604 1,091 1,225 1,412 1,588 1,657 1,727

Total 6,180 6,690 7,027 7,328 8,276 9,048 9,296 10,436 10,655 11,391

PROVINCE OF SIQUIJOR ELECTRIC COOPERATIVE, INC. (PROSIELCO)Nonoc, Larena, Siquijor Island

Tel No. (035) 484-1137; Telefax No. (035) 377-2065

2008 20092007

Atty. Ray Rene T. Buac

Ms. Laureen B. Malolot

A+ A+

Mr. Patrocino C. Vega Mr. Gerald A. Dominguez

Ms. Laureen B. Malolot Ms. Laureen B. Malolot

A+

Medium

B A R A N G A Y S C O N N E C T I O N S

Medium

Siquijor

Medium

NPC-SPUG Diesel/PB-113/PB-116

MUNICIPALITIES

Coverage Unenerg.

Project Name/Proponent

Served

Type

Monthly Average

14,693 15,72814,026

Energized

POWER PLANT

Location

Legislative DistrictPotential

166

Page 174: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

Generating Set

3 PH Backbone Line

Energized Coop System

G S

PILAR

TUDELA

SAN FRANCISCO

PORO

G S

G S

H Q

167

Page 175: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : November 8, 1978

II. DATE OF FIRST ENERGIZATION : January 1984

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 7.2 7.2 10.9 2.748

Subsidy 11.0 15.5 15.5 0.576

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Fifth District, Cebu1 Poro 17 17 17 17 100 0 5,400 3,327 3,461 3,597 67

2 San Francisco 15 15 15 15 100 0 10,400 4,728 4,969 5,219 50

3 Tudela 11 11 11 11 100 0 2,700 1,643 1,713 1,798 67

4 Pilar 13 13 13 13 100 0 2,900 1,786 1,901 2,001 69

Total 56 56 56 56 100 0 21,400 11,484 12,044 12,615 59

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 4,388 4,529 4,973 Residential 10,250 10,739 11,254

MWH Purchased 520 535 585 Commercial 817 860 895

MWH Sold 474 488 536 Industrial 25 23 16

Systems Loss (%) 8 8 8 Public Building 362 390 411

Peak Load (KW) 1,675 1,905 1,880 Others 30 32 39

Load Factor (%) 42 38 43 Total 11,484 12,044 12,615

Collection Efficiency (%) 102 100 100

Ave. Systems Rate (P/KWH) 9.25 9.27 9.28

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 2,053 2,366 2,403 2,727 3,049 2,999 3,028 3,469 3,467 3,786

Commercial 589 640 676 749 930 1,292 1,260 1,408 1,538 1,815

Industrial 123 151 141 138 167 193 179 213 208 126

Public Building 196 236 237 304 364 402 466 539 586 631

Others 114 126 134 130 130 121 87 64 63 72

Total 3,075 3,519 3,591 4,048 4,640 5,007 5,020 5,693 5,862 6,430

Diesel

Monthly Average

ServedPotentialUnenerg.

C O N N E C T I O N S

Pilar NPC-SPUG

Mr. Eulalio B. Luchavez

Mr. Rolando B. Camaso

11,694

A+

Medium

Legislative District

MUNICIPALITIES

CoverageEnergized

B A R A N G A Y S

Poro NPC-SPUG Diesel

POWER PLANT

A+

Type

12,58011,961

Location Project Name/Proponent

A+

Medium Medium

Mr. Christopher G. Pleños

Mr. Rolando B. Camaso Mr. Rolando B. Camaso

Mr. Eulalio B. Luchavez

CAMOTES ELECTRIC COOPERATIVE, INC. (CELCO)Western Poblacion, Poro, Camotes Island, Cebu

Tel. No. (032) 497-0273; Telefax No. (032) 497-0272

2008 20092007

168

Page 176: The 2007-2009 RE Chronicle

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Power Plant

Generating Set

Mini Hydro

3 PH Backbone Line

LEGEND :

H Q

Energized Coop SystemEnergized Other System

MH

P P

G S

169

LOON

TUBIGON

INABANGA

CALAPE

SAN ISIDRO

CATIGBIAN

CLARIN

MARIBOJOC

CARMEN

BALILIHANCORTES

BATUAN

CORELLA

BACLAYON

BILAR

SIKATUNA

LOBOCDIMIAO

LOAY

ALBURQUERQUE

TAGBILARAN CITY

DAUIS

PANGLAO

CABILAO IS.

Served by Bohol Light Co., Inc.

SAGBAYAN (Borja)

LILA

ANTEQUERA

SEVILLA

HAMBUNGAN IS.CUAMING IS.

BATASAN IS.

UBAY IS.

PANGAPASAN IS.

MOCABOC IS.

BAGONGBANWA IS.

BILANGBILANGAN IS.

MANTATAO IS.

PANGANGANIS.

BALICASAG IS.PAMICALAN IS.

P P

P P

P P

P P

P PP P

P P

P PP P P P

P PP P

G S

G S

G S

G S

G S

P P

P P

MH

H Q

N

MH

G S

Page 177: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 11, 1971

II. DATE OF FIRST ENERGIZATION : December 30, 1974

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative) POWER PLANT

2007 2008 2009 Cap.(MW)

Residual Loan 30.4 30.4 50.4

Subsidy 19.4 62.6 68.0

5.000

0.106

0.038

0.056

0.291

0.120

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Alburquerque 11 11 11 11 100 0 2,200 1,872 1,946 2,140 97

2 Antequera 21 21 21 21 100 0 3,400 2,983 3,221 3,390 99

3 Baclayon 17 17 17 17 100 0 4,000 3,328 3,507 3,946 99

4 Balilihan 31 31 31 31 100 0 3,800 2,793 3,020 3,408 90

5 Calape 33 33 33 33 100 0 8,000 6,628 7,422 7,920 99

6 Catigbian 22 22 22 22 100 0 4,500 3,897 4,083 4,328 96

7 Corella 8 8 8 8 100 0 1,900 1,586 1,739 1,891 99

8 Cortes 14 14 14 14 100 0 3,600 3,134 3,307 3,573 99

9 Dauis 12 12 12 12 100 0 8,500 7,058 7,769 8,352 98

10 Loon 67 67 67 67 100 0 9,800 8,673 9,076 9,549 97

11 Maribojoc 22 22 22 22 100 0 4,700 4,183 4,390 4,689 99

12 Panglao 10 10 10 10 100 0 6,500 5,231 5,907 6,343 98

13 Sikatuna 10 10 10 10 100 0 1,400 1,129 1,244 1,346 96

14 Tubigon 34 34 34 34 100 0 11,100 10,102 10,565 11,028 99

Second District

15 Clarin 24 24 24 24 100 0 4,800 4,232 4,433 4,761 99

16 Inabanga 50 50 50 50 100 0 8,700 7,902 8,170 8,427 97

17 Sagbayan (Borja) 24 24 24 24 100 0 4,900 4,039 4,283 4,848 99

18 San Isidro 12 12 12 12 100 0 2,100 1,795 1,899 2,024 96

Third District

19 Batuan 15 15 15 15 100 0 2,600 2,022 2,336 2,488 96

20 Bilar 19 19 19 19 100 0 3,600 3,093 3,288 3,485 97

21 Carmen 29 29 29 29 100 0 9,500 7,651 8,706 9,191 97

22 Dimiao 35 35 35 35 100 0 3,000 2,576 2,752 2,949 98

23 Loay 24 24 24 24 100 0 4,100 3,586 3,770 4,083 99

24 Lila 18 18 18 18 100 0 2,500 2,218 2,348 2,481 99

25 Loboc 28 28 28 28 100 0 3,500 2,931 3,121 3,416 98

26 Sevilla 13 13 13 13 100 0 2,000 1,437 1,556 1,661 83

Total 603 603 603 603 100 0 124,700 106,079 113,858 121,717 98

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 43,415 43,260 54,033 Residential 98,117 99,396 106,881

MWH Purchased 7,521 8,051 8,965 Commercial 5,510 5,450 5,385

MWH Sold 6,988 7,475 8,295 Industrial 31 29 27

Systems Loss (%) 7 7 7 Public Building 2,055 2,246 2,399

Peak Load (KW) 20,392 21,988 23,696 Others 366 6,737 7,025

Load Factor (%) 51 50 52 Total 106,079 113,858 121,717

Collection Efficiency (%) 101 101 102

Ave. Systems Rate (P/KWH) 6.21 5.79 6.51

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 24,044 26,086 29,417 33,353 37,332 39,508 40,134 43,896 46,297 51,056

Commercial 7,538 7,828 8,391 8,946 12,538 19,279 20,593 23,986 27,468 30,065

Industrial 7,117 7,019 7,798 10,151 9,635 7,259 9,930 11,036 10,366 12,131

Public Building 1,459 1,674 1,948 2,510 2,853 3,135 3,492 3,958 4,565 5,231

Others 2,855 3,069 3,428 3,886 2,814 979 976 979 1,010 1,052

Total 43,013 45,676 50,982 58,846 65,173 70,161 75,125 83,855 89,706 99,535

1.200

Balilihan Janopol Mini Hydro

Loboc HEP/Sta. Clara Int'l Mini HydroBalilihan

Monthly Average

116,223

Engr. Carlos B. Itable

A+

Mega Large

109,087

MUNICIPALITIES

Legislative District

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

Potential

A+

Project Name/Proponent

Mega Large Mega Large

Engr. Jeremias A. Boligao Engr. Jeremias A. Boligao

Engr. Carlos B. ItableEngr. Carlos B. Itable

A+

121,328

Engr. Jeremias A. Boligao

BOHOL I ELECTRIC COOPERATIVE, INC. (BOHECO I)Cabulijan, Tubigon, Bohol

Tel. Nos. (038) 508-8115 to 16, 508-0084 to 85, 237-2205, 508-8096; Telefax No. (038) 508-8095

2008 20092007

Type

GenSet

BOHECO I

GenSet

BOHECO I GenSet

GenSet

GenSet

BOHECO I

Loon BOHECO I

Baclayon BOHECO I

Tubigon

Location

Loboc

Inabanga

Panglao

170

Page 178: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

Below 5 MVA Substation

5 MVA Substation

10 MVA Substation

NPC Substation

3 PH Backbone Line

Energized Coop System

171

BUENAVISTA

TALIBONBIEN UNIDO

DANAO

DAGOHOYALICIA

PILAR

MABINI

CANDIJAY

ANDA

DUERO

VALENCIA

PRES. CARLOS P.GARCIA (PITOGO)

TRINIDAD

UBAY

SAN MIGUEL

GUINDULMAN

JAGNA

SIERRABULLONES

GARCIA HERNANDEZ

JETAFE

H Q

Page 179: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 13, 1978

II. DATE OF FIRST ENERGIZATION : March 1980

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 14.3 47.6 78.2

Subsidy 44.5 79.2 81.2

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Second District

1 Bien Unido 15 15 15 15 100 0 4,800 1,561 1,637 1,706 36

2 Buenavista 35 35 35 35 100 0 5,700 2,317 2,473 2,597 46

3 Dagohoy 15 15 15 15 100 0 3,700 2,498 2,681 2,803 76

4 Danao 17 17 17 17 100 0 3,700 1,534 1,623 1,804 49

5 Jetafe 24 24 24 24 100 0 5,800 1,728 1,876 1,975 34

6 San Miguel 18 18 18 18 100 0 4,500 2,883 3,218 3,447 77

7 Talibon 25 25 25 25 100 0 11,800 7,118 7,498 7,846 66

8 Trinidad 20 20 20 20 100 0 5,600 3,583 3,888 4,134 74

9 Ubay 44 44 44 44 100 0 13,100 8,569 9,296 9,925 76

10 Pres. Carlos P. Garcia 23 23 23 23 100 0 4,500 1,758 1,829 1,898 42

(Pitogo)

Third District

11 Alicia 15 15 15 15 100 0 4,700 3,240 3,478 3,660 78

12 Anda 16 16 16 16 100 0 3,900 2,776 2,888 2,989 77

13 Candijay 21 21 21 21 100 0 6,600 5,039 5,253 5,440 82

14 Duero 21 21 21 21 100 0 3,800 3,314 3,519 3,622 95

15 Garcia Hernandez 30 30 30 30 100 0 5,200 4,679 4,900 5,039 97

16 Guindulman 19 19 19 19 100 0 6,600 5,993 6,300 6,533 99

17 Jagna 33 33 33 33 100 0 8,400 7,739 8,039 8,266 98

18 Mabini 22 22 22 22 100 0 5,800 3,713 3,921 4,116 71

19 Pilar 21 21 21 21 100 0 5,500 3,045 3,237 3,394 62

20 Sierra Bullones 22 22 22 22 100 0 5,500 3,885 4,115 4,285 78

21 Valencia 35 35 35 35 100 0 5,300 4,290 4,484 4,637 87

Total 491 491 491 491 100 0 124,500 81,262 86,153 90,116 72

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 26,593 27,742 33,135 Residential 72,599 77,486 81,326

MWH Purchased 4,579 4,820 5,275 Commercial 3,953 3,853 3,896

MWH Sold 4,031 4,286 4,706 Industrial 207 218 233

Systems Loss (%) 12 11 11 Public Building 1,736 1,806 1,861

Peak Load (KW) 13,158 14,192 14,633 Others 2,767 2,790 2,800

Load Factor (%) 48 47 49 Total 81,262 86,153 90,116

Collection Efficiency (%) 100 99 96

Ave. Systems Rate (P/KWH) 6.60 6.47 7.04

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 16,673 18,078 20,830 25,183 27,040 27,885 28,387 30,270 32,297 35,859

Commercial 3,653 4,151 4,616 6,075 7,765 8,735 9,025 8,856 8,742 9,431

Industrial 2,945 3,070 3,395 3,722 4,497 3,926 3,881 4,168 5,062 5,343

Public Building 1,810 1,982 2,241 3,424 3,723 3,791 4,094 4,515 4,653 5,131

Others 481 440 521 567 660 627 635 560 673 709

Total 25,562 27,721 31,603 38,971 43,684 44,965 46,022 48,369 51,427 56,473

Engr. Carlos B. Itable

BOHOL II ELECTRIC COOPERATIVE, INC. (BOHECO II)Cantagay, Jagna, Bohol

Tel. Nos. (038) 238-2215, 238-2541, 238-2483; Telefax No. (038) 531-0023; Fax No. (038) 531-0053; E-mail: [email protected]

2008 20092007

Extra Large

A+

Extra Large

Mr. Wilfredo J. Lingatong

Engr. Carlos B. Itable

A+ A+

Mr. Baltazar Federico C. Liao Mr. Mariano Ll. Salas

Engr. Carlos B. Itable

Legislative DistrictPotential

MUNICIPALITIES

Extra Large

Monthly Average

83,676 87,40779,738

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

172

Page 180: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Headquarters

Energized Other System

173

N

NORSAMELCOBobon, Northern Samar

SAMELCO ICalbayog City

SAMELCO IIParanas, SamarBILECO

Naval, Biliran

LEYECO IIITunga, Leyte

LEYECO VOrmoc City

LEYECO IITacloban City

LEYECO IVHilongos, Leyte

SOLECOCity of Maasin

ESAMELCOCity of Borongan

DORELCOTolosa, Leyte

Served byMaripipi Multi PurposeCooperative, Inc.

Served byHilabaan Fishermen Multi Purpose Coop.

Page 181: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

CONNECTIONS

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Leyte I 13 13 13 13 100 499 495 497 498 99 76,400 54,286 56,414 58,160 76

2 Leyte II 3 3 3 3 100 196 196 196 196 100 57,300 49,018 51,867 54,641 95

3 Leyte III 9 9 9 9 100 285 285 285 285 100 49,200 29,163 30,888 31,973 65

4 Leyte IV 6 6 6 6 100 245 243 243 245 100 56,600 50,035 52,849 55,032 97

5 Leyte V 12 12 12 12 100 414 414 414 414 100 116,700 85,811 89,760 92,624 79

6 Southern Leyte 19 19 19 19 100 500 483 485 500 100 85,000 60,688 63,819 66,974 79

7 Biliran 7 7 7 7 100 117 117 117 117 100 28,400 20,901 21,998 23,121 81

8 Northern Samar 24 24 24 24 100 569 515 557 569 100 106,100 43,497 47,377 49,908 47

9 Samar I 10 10 10 10 100 427 379 385 414 97 59,500 38,966 41,837 43,230 73

10 Samar II 16 16 16 16 100 524 492 516 520 99 78,600 43,497 45,703 49,280 63

11 Eastern Samar 23 23 23 23 100 596 532 538 563 94 75,400 39,444 43,195 45,096 60

Total 142 142 142 142 100 4,372 4,151 4,233 4,321 99 789,200 515,306 545,707 570,039 72

ELECTRIC DISTRIBUTION UTILITIES

MUNICIPALITIES/CITIES BARANGAYS

Coverage

REGION VIII

EnergizedCoverage

Energized ServedPotential

EASTERN VISAYAS REGION

174

Total 343,633 360,384 391,753 437,945 481,638 491,755 490,416 551,720 578,500 625,722

Others 9,614 10,361 11,636 11,726 12,689 13,843 11,015 11,763 10,762 11,651

Public Bldgs. 15,503 20,032 29,548 34,930 37,853 37,672 38,695 44,450 48,748 52,745

Industrial 62,968 64,056 63,507 72,972 78,953 75,263 78,964 93,286 96,103 111,557

Commercial 47,792 48,557 51,390 55,998 62,645 68,456 70,788 77,794 84,411 91,702

Residential 207,756 217,378 235,672 262,319 289,499 296,521 290,954 324,427 338,476 358,067

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 182: The 2007-2009 RE Chronicle

N

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

LEGEND :

H Q

Energized Coop System

175

MAHAPLAG

MACARTHUR

TANAUAN

TOLOSA

BURAUEN

JULITA

ABUYOG

DAGAMI

TABON-TABON

LA PAZ

JAVIER(Bugho)

H Q

DULAG

MAYORGA

Page 183: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : November 14, 1970/December 3, 1970

II. DATE OF FIRST ENERGIZATION : July 2, 1973

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 219.9 225.0 253.5

Subsidy 18.2 40.8 44.2

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Tanauan 54 54 54 54 100 0 9,800 8,185 8,425 8,665 88

2 Tolosa 15 15 15 15 100 0 4,100 3,739 3,817 3,893 95

Second District

3 Burauen 77 75 76 76 99 1 10,200 6,267 6,675 6,836 67

4 Dagami 65 65 65 65 100 0 6,300 3,972 4,094 4,200 67

5 Dulag 45 45 45 45 100 0 8,400 6,494 6,714 6,908 82

6 Julita 26 26 26 26 100 0 3,600 3,098 3,145 3,205 89

7 La Paz 35 34 35 35 100 0 3,800 2,855 2,950 3,030 80

8 MacArthur 31 31 31 31 100 0 3,600 2,781 2,883 3,015 84

9 Mayorga 16 16 16 16 100 0 2,700 1,489 1,597 1,682 62

10 Tabontabon 16 16 16 16 100 0 1,800 1,394 1,465 1,532 85

Fifth District

11 Abuyog 63 63 63 63 100 0 11,500 7,170 7,469 7,798 68

12 Javier (Bugho) 28 28 28 28 100 0 4,900 3,422 3,551 3,659 75

13 Mahaplag 28 27 27 28 100 0 5,700 3,420 3,629 3,737 66

Total 499 495 497 498 99 1 76,400 54,286 56,414 58,160 76

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 21,313 22,868 27,519 Residential 51,849 53,802 55,508

MWH Purchased 4,066 4,211 4,619 Commercial 1,579 1,582 1,579

MWH Sold 3,339 3,555 3,903 Industrial 2 3 2

Systems Loss (%) 18 15 15 Public Building 557 681 704

Peak Load (KW) 10,715 11,348 11,242 Others 299 346 367

Load Factor (%) 52 51 56 Total 54,286 56,414 58,160

Collection Efficiency (%) 98 96 95

Ave. Systems Rate (P/KWH) 6.38 6.43 7.05

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 16,754 17,757 18,281 19,651 21,697 22,467 22,367 23,411 25,221 26,148

Commercial 2,024 2,106 2,734 3,187 3,598 4,387 4,680 5,061 5,470 6,957

Industrial 1,788 1,108 1,178 1,281 2,943 1,435 1,987 9,158 9,034 10,430

Public Building 363 425 550 1,201 1,632 1,687 1,805 1,937 2,319 2,610

Others 291 260 256 455 581 541 468 502 612 695

Total 21,220 21,656 22,999 25,775 30,451 30,517 31,307 40,069 42,656 46,840

DON ORESTES ROMUALDEZ ELECTRIC COOPERATIVE, INC. (DORELCO / LEYECO I)Brgy. San Roque, Tolosa, Leyte

Tel. Nos. (053) 322-7118 to 19, 322-7103; Telefax No. (053) 322-7101

2008 20092007

B

Extra Large

Mr. Percival M. Maballo Mr. Valentino V. Adolfo

Atty. Emmanuel P. Saño Atty. Emmanuel P. Saño

Mr. Edilberto G. Bagueros

Atty. Emmanuel P. Saño

A A

Served

Extra Large Extra Large

B A R A N G A Y S C O N N E C T I O N S

51,368

Legislative DistrictPotential

Monthly Average

55,56053,024

MUNICIPALITIES

CoverageEnergized

Unenerg.

176

Page 184: The 2007-2009 RE Chronicle

N

H QEnergized Coop SystemHQ Location

Municipality

10 MVA Substation

12 MVA Substation

15 MVA Substation

3 PH Backbone Line

177

PALO

BABATNGON

TACLOBAN CITY

H Q

LEGEND :

Page 185: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : October 26, 1975

II. DATE OF FIRST ENERGIZATION : June 1974

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 19.4 19.4 19.4

Subsidy 22.6 36.1 42.6

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Babatngon 25 25 25 25 100 0 4,500 2,409 2,652 2,843 63

2 Palo 33 33 33 33 100 0 10,200 8,071 8,659 9,312 91

3 Tacloban City 138 138 138 138 100 0 42,600 38,538 40,556 42,486 99

Total 196 196 196 196 100 0 57,300 49,018 51,867 54,641 95

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 63,839 65,771 84,897 Residential 43,305 46,023 48,551

MWH Purchased 13,470 14,060 15,597 Commercial 4,431 4,518 4,700

MWH Sold 11,627 12,254 13,737 Industrial 688 686 710

Systems Loss (%) 13 12 11 Public Building 498 529 551

Peak Load (KW) 32,908 32,080 34,553 Others 96 111 129

Load Factor (%) 56 60 62 Total 49,018 51,867 54,641

Collection Efficiency (%) 93 94 96

Ave. Systems Rate (P/KWH) 5.49 5.37 6.18

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 43,110 44,063 48,375 51,881 54,764 53,901 55,756 59,988 61,804 66,760

Commercial 19,309 18,555 17,988 19,209 20,447 20,184 21,461 23,054 24,375 25,913

Industrial 29,944 29,906 27,906 32,306 34,448 35,010 37,108 39,301 43,431 53,492

Public Building 603 3,575 10,725 11,656 12,191 11,150 11,729 12,791 13,434 14,715

Others 3,227 3,280 3,444 4,359 5,920 6,440 4,170 4,390 4,007 3,969

Total 96,193 99,379 108,438 119,411 127,769 126,685 130,224 139,524 147,051 164,849

LEYTE II ELECTRIC COOPERATIVE, INC. (LEYECO II)Real St., Sagkahan District, Tacloban City, Leyte

Tel. Nos. (053) 321-4292, 321-1493, 321-2629, 321-2809, 321-8384; Fax No. (053) 325-7199 ; E-mail: [email protected]

2008 20092007

A+

Extra Large

Engr. Reynaldo L. Galapon (Acting Pres.) Mr. Rolando G. Hidalgo

Atty. Jerry Gwen L. Conde Atty. Jerry Gwen L. Conde

Engr. Reynaldo L. Galapon (Acting Pres.)

Atty. Jerry Gwen L. Conde

A+ A+

Served

Extra Large Extra Large

B A R A N G A Y S C O N N E C T I O N S

54,605

Legislative DistrictPotential

Monthly Average

52,07249,555

MUNICIPALITIES/CITY

CoverageEnergized

Unenerg.

178

Page 186: The 2007-2009 RE Chronicle

N

LEGEND :

HQ Location

Municipality

Below 5 MVA Substation

3 PH Backbone Line

H QEnergized Coop System

179

SANMIGUEL

ALANGALANG

SANTA FE

CAPOOCAN

BARUGO

PASTRANA

JARO

CARIGARA H Q

TUNGA

Page 187: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : October 30, 1975

II. DATE OF FIRST ENERGIZATION : June 18, 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 1.7 1.7 4.6

Subsidy 17.0 32.4 32.6

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Alangalang 54 54 54 54 100 0 8,900 4,973 5,264 5,502 62

2 San Miguel 21 21 21 21 100 0 3,200 1,840 1,931 1,984 62

3 Santa Fe 20 20 20 20 100 0 3,200 1,858 1,990 2,068 65

Second District

4 Barugo 37 37 37 37 100 0 5,800 3,833 4,075 4,204 72

5 Capoocan 21 21 21 21 100 0 5,900 3,242 3,417 3,523 60

6 Carigara 49 49 49 49 100 0 9,500 6,373 6,630 6,830 72

7 Jaro 46 46 46 46 100 0 8,100 4,426 4,792 4,979 61

8 Pastrana 29 29 29 29 100 0 3,100 1,621 1,750 1,806 58

9 Tunga 8 8 8 8 100 0 1,500 997 1,039 1,077 72

Total 285 285 285 285 100 0 49,200 29,163 30,888 31,973 65

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 10,756 10,898 13,058 Residential 27,440 29,278 30,350

MWH Purchased 1,911 1,970 2,123 Commercial 1,121 962 946

MWH Sold 1,593 1,595 1,720 Industrial 143 146 157

Systems Loss (%) 16 19 19 Public Building 364 404 422

Peak Load (KW) 5,273 5,884 7,910 Others 95 98 98

Load Factor (%) 50 46 7 Total 29,163 30,888 31,973

Collection Efficiency (%) 93 93 92

Ave. Systems Rate (P/KWH) 6.75 6.83 7.59

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 9,378 10,170 10,650 11,967 13,752 13,233 12,889 14,500 14,396 15,329

Commercial 1,001 1,198 1,551 1,879 2,245 2,199 2,090 2,086 2,044 2,259

Industrial 473 527 567 594 624 675 836 1,060 1,149 1,340

Public Building 446 542 667 904 920 921 961 1,151 1,230 1,368

Others 266 257 279 316 343 314 302 324 324 338

Total 11,564 12,694 13,714 15,660 17,884 17,341 17,078 19,121 19,143 20,634

Coverage

Monthly Average

MUNICIPALITIES

Potential

C O N N E C T I O N S

Legislative District

31,118

Ms. Lolita N. Cadapan (OIC)

BC

Large

Ms. Lolita N. Cadapan (OIC) Ms. Lerma G. Esquibel (OIC)

EnergizedUnenerg.

32,932

Served

Large Large

B

B A R A N G A Y S

32,238

Engr. Alejandro L. Lantajo

LEYTE III ELECTRIC COOPERATIVE, INC. (LEYECO III)Brgy. San Roque, Tunga, Leyte

Tel Nos. (053) 323-1265, 331-8506, 331-8509; Fax No. (053) 331-8522

2008 20092007

Mr. Juanito Fallorina, Jr. Mr. Juanito Fallorina, Jr.

180

Page 188: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

Below 5MVA Substation

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

Energized Coop System

181

CITY ofBAYBAY

INOPACAN

HINDANG

MATALOM

HILONGOS

BATO

H Q

Page 189: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : November 7, 1975

II. DATE OF FIRST ENERGIZATION : December 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 6.2 14.8 18.5

Subsidy 15.9 33.2 33.2

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Fifth District

1 Bato 32 32 32 32 100 0 7,100 5,798 6,127 6,396 90

2 City of Baybay 92 92 92 92 100 0 21,400 19,194 20,272 21,007 98

3 Hilongos 51 50 50 51 100 0 12,700 11,439 12,073 12,644 99

4 Hindang 20 20 20 20 100 0 4,700 4,240 4,430 4,612 98

5 Inopacan 20 19 19 20 100 0 4,200 3,849 4,021 4,194 99

6 Matalom 30 30 30 30 100 0 6,500 5,515 5,926 6,179 95

Total 245 243 243 245 100 0 56,600 50,035 52,849 55,032 97

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 18,787 21,681 22,894 Residential 45,285 48,010 50,107

MWH Purchased 3,336 3,417 3,695 Commercial 3,246 3,381 3,447

MWH Sold 2,860 2,957 3,218 Industrial 295 307 314

Systems Loss (%) 14 13 13 Public Building 976 1,029 1,038

Peak Load (KW) - - - Others 233 122 126

Load Factor (%) - - - Total 50,035 52,849 55,032

Collection Efficiency (%) 99 98 100

Ave. Systems Rate (P/KWH) 6.57 7.33 7.11

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 12,877 13,474 15,003 17,064 18,844 20,165 19,809 21,129 21,625 23,101

Commercial 3,980 4,006 4,478 5,249 5,795 6,223 6,381 6,977 7,524 8,269

Industrial 827 832 804 1,030 1,212 1,350 1,552 1,661 1,590 1,963

Public Building 3,301 2,979 3,039 3,235 3,516 3,963 3,869 4,082 4,305 4,791

Others 83 108 245 306 364 400 474 473 442 498

Total 21,068 21,399 23,569 26,884 29,731 32,100 32,085 34,322 35,486 38,622

LEYTE IV ELECTRIC COOPERATIVE, INC. (LEYECO IV)Brgy. Lamak, Hilongos, Leyte

Tel Nos. (053) 567-9348 to 49; Fax No. (053) 567-9661

2008 20092007

A+

Large

Engr. Ernesto G. Paredes Mr. Carlito P. Suba-an

Ms. Helen B. Ybañez Ms. Helen B. Ybañez

Engr. Ernesto G. Paredes

Ms. Helen B. Ybañez (OIC)

A+ A+

Served

Extra Large Extra Large

B A R A N G A Y S C O N N E C T I O N S

51,389

Legislative DistrictPotential

Monthly Average

49,53547,271

MUNICIPALITIES

CoverageEnergized

Unenerg.

182

Page 190: The 2007-2009 RE Chronicle

LEYECO VLEYECO V

N

183

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

20 MVA Substation

Power Plant

3 PH Backbone Line

Energized Coop System

P P

MERIDA

KANANGA

TABANGO

LEYTE

VILLABA

ORMOC CITY

ALBUERA

ISABEL

PALOMPON

H Q

P P

CALUBIAN

SANISIDRO

MATAG-OB

Page 191: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : December 21, 1977

II. DATE OF FIRST ENERGIZATION : June 1979

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 45.9 46.1 46.1

Subsidy 28.5 45.9 61.5

610.180

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Third District1 Calubian 53 53 53 53 100 0 6,100 3,259 3,429 3,605 59

2 Leyte 30 30 30 30 100 0 7,600 2,673 2,855 3,027 40

3 San Isidro 19 19 19 19 100 0 6,300 2,349 2,539 2,661 42

4 Tabango 13 13 13 13 100 0 6,800 2,923 3,068 3,203 47

5 Villaba 35 35 35 35 100 0 7,800 4,593 4,835 4,985 64

Fourth District6 Albuera 16 16 16 16 100 0 7,400 6,722 7,014 7,198 97

7 Isabel 24 24 24 24 100 0 8,300 7,288 7,568 7,789 94

8 Kananga (23) 21 21 21 21 100 0 8,500 6,865 7,124 7,355 87

9 Matag-ob 21 21 21 21 100 0 3,800 2,325 2,422 2,509 66

10 Merida 22 22 22 22 100 0 5,500 3,955 4,126 4,295 78

11 Ormoc City 110 110 110 110 100 0 37,600 34,571 36,073 36,978 99

12 Palompon 50 50 50 50 100 0 11,000 8,288 8,707 9,019 82

Total 414 414 414 414 100 0 116,700 85,811 89,760 92,624 79

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 46,969 47,982 60,948 Residential 81,733 85,437 88,187

MWH Purchased 9,893 10,242 10,938 Commercial 1,889 2,063 2,085

MWH Sold 8,558 8,785 9,541 Industrial 819 791 798

Systems Loss (%) 13 14 13 Public Building 946 1,013 1,085

Peak Load (KW) 25,963 24,962 25,784 Others 424 456 469

Load Factor (%) 52 56 58 Total 85,811 89,760 92,624

Collection Efficiency (%) 99 100 100

Ave. Systems Rate (P/KWH) 5.49 5.46 6.39

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 40,546 41,503 45,004 50,041 54,056 55,227 54,363 58,467 60,441 64,764

Commercial 4,208 3,989 4,337 4,743 5,263 5,657 5,922 6,452 6,964 7,405

Industrial 23,745 23,991 26,909 29,214 31,034 28,817 28,584 30,893 30,623 33,955

Public Building 856 1,145 1,751 2,969 3,266 3,044 3,672 5,189 5,615 6,294

Others 3,187 3,704 3,549 2,506 1,532 1,665 1,649 1,690 1,774 2,073

Total 72,542 74,332 81,550 89,473 95,151 94,410 94,190 102,691 105,417 114,491

LEYTE V ELECTRIC COOPERATIVE, INC. (LEYECO V)Brgy. San Pablo, Ormoc City, Leyte 6541

Tel. Nos. (053) 561-0579, 561-4111, 561-4668; Telefax Nos. (053) 255-7211, 561-4075

2008 20092007

Mr. Jovenal R. Alesna

A+

Extra Large

Mr. Wilfredo P. Madjus

A+

Project Name/Proponent

Mr. Joselito P. YapMr. Lamitz T. Pañares

Type

Palinpinon-Tongonan GPP/ Green Core Geothermal, Inc. Geothermal

112.500

Mr. Jovenal R. Alesna Engr. Juanito E. Jorda (OIC)

A+

EnergizedUnenerg.

POWER PLANT

Location

Legislative District

Mega Large Mega Large

B A R A N G A Y S C O N N E C T I O N S

87,039

Potential

Tongonan II&III/PNOC

Kananga

Served

Monthly Average

84,27481,148

MUNICIPALITIES/CITY

Coverage

184

Page 192: The 2007-2009 RE Chronicle

SOLECO

N

LEGEND :

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Generating Set

Mini Hydro

3 PH Backbone Line

Energized Coop System

H Q

G S

MH

185

CITY ofMAASIN

TOMASOPPUS

BONTOC

SAN FRANCISCO

LIMASAWA

LIBAGON

MALITBOG

LILOAN

PINTUYAN

HINUNANGAN

SOGOD

SILAGO

ANAHAWAN

HINUNDAYAN

H Q

MH

G S

SAINTBERNARD

SAN JUAN(Cabalian)

LILOAN

PADREBURGOS

MACROHON

SAN RICARDO

Page 193: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 27, 1971

II. DATE OF FIRST ENERGIZATION : February 1976

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 7.5 7.5 12.5 0.326

Subsidy 45.5 68.0 68.0 0.810

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 Anahawan 14 14 14 14 100 0 1,700 1,188 1,236 1,285 76

2 Bontoc 40 39 39 40 100 0 6,500 3,195 3,357 3,523 54

3 Hinunangan 40 39 39 40 100 0 5,900 3,774 3,935 4,172 71

4 Hinundayan 17 17 17 17 100 0 2,600 1,893 1,978 2,058 79

5 Libagon 14 14 14 14 100 0 3,000 2,007 2,093 2,161 72

6 Liloan 24 23 23 24 100 0 4,700 3,365 3,583 3,787 81

7 Limasawa 6 6 6 6 100 0 1,200 909 936 961 80

8 City of Maasin 70 70 70 70 100 0 17,100 14,884 15,510 16,163 95

9 Macrohon 30 30 30 30 100 0 5,400 4,059 4,246 4,423 82

10 Malitbog 37 36 36 37 100 0 4,500 2,897 3,046 3,190 71

11 Padre Burgos 11 11 11 11 100 0 2,200 1,761 1,858 1,946 88

12 Pintuyan 23 23 23 23 100 0 2,300 1,847 1,904 1,951 85

13 Saint Bernard 30 30 30 30 100 0 5,400 3,706 4,004 4,332 80

14 San Francisco 22 22 22 22 100 0 2,500 2,087 2,193 2,274 91

15 San Juan (Cabalian) 18 18 18 18 100 0 3,200 2,364 2,441 2,512 79

16 San Ricardo 15 10 10 15 100 0 2,100 1,039 1,091 1,261 60

17 Silago 15 12 14 15 100 0 2,400 1,673 1,874 1,987 83

18 Sogod 45 40 40 45 100 0 8,800 5,833 6,218 6,566 75

19 Tomas Oppus 29 29 29 29 100 0 3,500 2,207 2,316 2,422 69

Total 500 483 485 500 100 0 85,000 60,688 63,819 66,974 79

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 23,028 26,198 31,620 Residential 57,658 60,485 63,402

MWH Purchased 4,915 5,112 5,347 Commercial 1,357 1,524 1,679

MWH Sold 4,213 4,438 4,645 Industrial 3 2 2

Systems Loss (%) 14 13 13 Public Building 1,587 1,727 1,808

Peak Load (KW) 12,066 12,666 13,167 Others 83 81 83

Load Factor (%) 56 55 56 Total 60,688 63,819 66,974

Collection Efficiency (%) 94 99 100

Ave. Systems Rate (P/KWH) 5.47 5.90 6.81

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 21,616 22,805 25,656 28,780 31,576 33,803 33,719 36,885 38,751 39,932

Commercial 3,793 4,016 4,403 4,968 6,136 7,003 7,482 8,175 8,561 9,273

Industrial 413 341 408 353 409 598 558 524 449 553

Public Building 2,158 2,583 2,999 3,412 3,713 3,913 4,317 4,552 5,054 5,534

Others 214 229 279 331 350 380 403 419 440 452

Total 28,194 29,974 33,745 37,844 42,184 45,697 46,479 50,555 53,255 55,744

Henabian/SOLECO Mini Hydro

POWER PLANT

Location Project Name/Proponent Type

SOUTHERN LEYTE ELECTRIC COOPERATIVE, INC. (SOLECO)Nasaug, City of Maasin, Southern Leyte

Telefax No. (053) 570-9823; Fax No. (053) 381-2144; E-mail: [email protected]

2008 20092007

A+

Extra Large

Mr. Peregrino P. Regis Mr. Peregrino P. Regis

Mr. Rosello S. Gerong Mr. Rosello S. Gerong

Mr. Peregrino P. Regis

Mr. Rosello S. Gerong

A+ A+

Served

Extra Large Extra Large

B A R A N G A Y S C O N N E C T I O N S

62,400

Limasawa NPC-SPUG Diesel

Saint Bernard

Legislative DistrictPotential

Monthly Average

60,07157,815

MUNICIPALITIES/CITY

CoverageEnergized

Unenerg.

186

Page 194: The 2007-2009 RE Chronicle

LEGEND :

Energized Other System

HQ Location

Municipality

5 MVA Substation

3 PH Backbone Line

Energized Coop System

H Q

N

MARIPIPI

BILIRAN

NAVAL

CABUCGAYAN

CAIBIRAN

KAWAYAN

HIGATANGAN IS.

ALMERIACULABA

H Q

187

Served byMaripipi Multi PurposeCooperative, Inc.

Page 195: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : July 6, 1973

II. DATE OF FIRST ENERGIZATION : August 1983

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative) POWER PLANT

2007 2008 2009 Location Project Name/Proponent Cap.(MW)

Residual Loan 7.6 26.2 44.7 Biliran 0.326

Subsidy 26.4 34.1 36.2

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 Almeria 13 13 13 13 100 0 3,100 2,443 2,558 2,723 88

2 Biliran 11 11 11 11 100 0 2,900 2,116 2,218 2,330 80

3 Cabucgayan 13 13 13 13 100 0 3,800 2,455 2,581 2,684 71

4 Caibiran 17 17 17 17 100 0 4,200 2,447 2,575 2,696 64

5 Culaba 17 17 17 17 100 0 2,400 1,527 1,625 1,703 71

6 Kawayan 20 20 20 20 100 0 3,700 2,689 2,800 2,921 79

7 Naval 26 26 26 26 100 0 8,300 7,224 7,641 8,064 97

Total 117 117 117 117 100 0 28,400 20,901 21,998 23,121 81

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 8,781 10,013 12,234 Residential 19,775 20,843 21,909

MWH Purchased 1,552 1,609 1,746 Commercial 615 626 655

MWH Sold 1,303 1,363 1,485 Industrial - - -

Systems Loss (%) 15 14 14 Public Building 477 494 518

Peak Load (KW) 3,941 4,186 4,338 Others 34 35 39

Load Factor (%) 54 53 55 Total 20,901 21,998 23,121

Collection Efficiency (%) 104 97 97

Ave. Systems Rate (P/KWH) 6.74 7.34 8.24

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 6,717 7,561 7,995 9,099 10,189 10,614 10,509 11,694 12,204 13,397

Commercial 1,147 1,253 1,372 1,483 1,597 1,737 1,945 2,106 2,179 2,294

Industrial 12 9 - - - - - - - -

Public Building 799 989 1,190 1,409 1,514 1,526 1,534 1,657 1,795 1,934

Others 64 63 95 126 159 157 161 174 183 194

Total 8,739 9,875 10,652 12,117 13,460 14,034 14,149 15,631 16,361 17,819

BILIRAN ELECTRIC COOPERATIVE, INC. (BILECO)Caray-caray, Naval, Biliran

Tel. Nos. (053) 500-9041 to 42; 500-9744; Telefax No. (053) 500-9039; Fax No.(053) 500-9040; E-mail: [email protected]

2008 20092007

A

Medium

Mr. Leonardo V. Madeja, Jr. Mr. Leonardo V. Madeja, Jr.

Mr. Marlon B. Roa Mr. Marlon B. Roa

Mr. Sammy A. Sale

Mr. Marlon B. Roa

A+ A+

Served

Large Large

B A R A N G A Y S C O N N E C T I O N S

22,670

Type

NPC-SPUG Diesel

Legislative DistrictPotential

Monthly Average

21,69120,719

MUNICIPALITIES

CoverageEnergized

Unenerg.

188

Page 196: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

Below 5 MVA Substation

5 MVA Substation

Generating Set

3 PH Backbone Line

Energized Coop System

G S

NORSAMELCO

N

189

SAN VICENTE

CAPUL

SAN ANTONIO

G SG S

VICTORIA

MONDRAGON

LAS NAVAS

MAPANAS

LAPINIG

BIRI

PALAPAG

GAMAY

CATUBIG

LOPEDE VEGA

SILVINO LOBOS

CATARMANSANJOSE

BOBON

ROSARIO

SAN ISIDRO

PAM

BU

JAN

SANJUAN

CABAUN

G S

G S

H Q

LAVEZARES

SANROQUE

LAOANG

ALLEN

Page 197: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : October 1, 1977

II. DATE OF FIRST ENERGIZATION : August 11, 1980

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 23.8 23.8 23.8 0.576

Subsidy 149.8 200.5 229.0 0.326

0.263

0.489

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %First District

1 Allen 20 20 20 20 100 0 4,300 3,044 3,230 3,354 78

2 Biri 8 8 8 8 100 0 1,800 470 513 526 29

3 Bobon 18 18 18 18 100 0 3,500 1,853 2,019 2,087 60

4 Capul 12 12 12 12 100 0 2,200 529 571 636 29

5 Catarman 55 55 55 55 100 0 14,600 9,532 10,094 10,411 71

6 Lavezares 26 26 26 26 100 0 5,100 2,050 2,202 2,511 49

7 Lope de Vega* 22 22 22 22 100 0 2,500 506 583 641 26

8 Mondragon 24 24 24 24 100 0 6,000 2,379 2,535 2,640 44

9 Rosario 11 11 11 11 100 0 1,800 770 831 853 47

10 San Antonio 10 10 10 10 100 0 1,600 763 798 829 52

11 San Isidro 14 14 14 14 100 0 4,800 2,579 2,749 2,846 59

12 San Jose 16 16 16 16 100 0 2,900 1,620 1,716 1,753 60

13 San Vicente 7 7 7 7 100 0 1,200 232 320 322 27

14 Victoria 16 16 16 16 100 0 2,400 1,187 1,355 1,397 58 Second District

15 Catubig 47 44 47 47 100 0 5,700 2,031 2,508 2,694 47

16 Gamay 26 25 26 26 100 0 4,500 1,460 1,582 1,743 39

17 Laoang 56 43 52 56 100 0 11,600 4,437 4,733 4,978 43

18 Lapinig 15 15 15 15 100 0 2,300 704 930 948 41

19 Las Navas 53 33 53 53 100 0 6,200 641 781 1,028 17

20 Mapanas 13 13 13 13 100 0 2,300 514 538 572 25

21 Palapag 32 32 32 32 100 0 6,500 2,717 2,907 3,056 47

22 Pambujan 26 26 26 26 100 0 5,400 1,707 1,970 2,080 39

23 San Roque 16 14 16 16 100 0 4,200 1,760 1,900 1,991 47

24 Silvino Lobos 26 11 18 26 100 0 2,700 12 12 12 0

Total 569 515 557 569 100 0 106,100 43,497 47,377 49,908 47

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 17,562 22,826 23,702 Residential 40,840 44,673 47,153

MWH Purchased 3,716 4,180 4,530 Commercial 1,844 1,854 1,858

MWH Sold 3,064 3,537 3,611 Industrial 5 6 11

Systems Loss (%) 17 15 20 Public Building 719 746 787

Peak Load (KW) 8,499 9,529 9,783 Others 89 98 99

Load Factor (%) 60 60 63 Total 43,497 47,377 49,908

Collection Efficiency (%) 84 83 81

Ave. Systems Rate (P/KWH) 5.73 6.45 6.56

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 15,979 16,747 17,750 20,109 22,632 23,621 17,682 25,618 29,094 30,424

Commercial 3,075 3,564 4,312 4,538 5,141 5,646 4,664 6,608 7,308 7,331

Industrial 102 120 169 180 183 166 335 463 1,402 1,106

Public Building 1,578 1,862 2,293 2,714 3,078 3,487 2,742 3,903 5,228 4,849

Others 112 126 696 413 215 178 (71) 171 (583) (381)

Total 20,846 22,419 25,220 27,954 31,249 33,097 25,352 36,763 42,449 43,329

* With Provisional Franchise, NEC Res. No. 4 s. 1976

NORTHERN SAMAR ELECTRIC COOPERATIVE, INC. (NORSAMELCO)Brgy. Magsaysay, Bobon, Northern Samar

Fax No. (055) 251-8163; Cel. Nos. (0917) 361-9744, (0920) 910-6364

2008 20092007

Type

Diesel

E

Large

NPC-SPUG

NPC-SPUG Diesel

- E

Engr. Salvador G. Hernandez Engr. Salvador G. Hernandez

Mr. Danilo D. Anaviso

Engr. Salvador G. Hernandez

Mr. Danilo D. Anaviso Mr. Danilo D. Anaviso

Legislative District

- Large

B A R A N G A Y S C O N N E C T I O N S

46,839

POWER PLANT

Location Project Name/Proponent

Capul

Monthly Average

44,51341,154

MUNICIPALITIES

CoverageEnergized

Unenerg.

San Vicente

PotentialServed

San Antonio NPC-SPUG Diesel

Biri NPC-SPUG Diesel

190

Page 198: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

Generating Set

Mini Hydro

3 PH Backbone Line

Energized Coop System

G S

MH

191

LIBUCAN

ALMAGRO

TAGAPUL-AN

MATUGUINAO

SAN JORGE

GANDARA

CALBAYOG CITY

OQUENDO

CAMANDAG

SANTO NIÑO

PAGSANGHAN

G S

G S

G S

MH

TARANGNAN

TINAMBACAN

SANTAMARGARITA

H Q

Page 199: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : February 27, 1974

II. DATE OF FIRST ENERGIZATION : November 1974

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative) POWER PLANT

2007 2008 2009 Cap.(MW)

Residual Loan 25.2 37.1 37.1 0.326

Subsidy 86.3 103.5 105.0 0.217

0.263

1.080

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District1 Almagro 23 13 15 15 65 8 2,200 375 436 449 20

2 Calbayog City 86 84 83 85 99 1 16,650 17,485 18,034

Oquendo 46 45 45 45 98 1 32,000 4,119 4,566 4,667 92

Tinambacan 25 25 25 25 100 0 6,198 6,579 6,756

3 Gandara 69 60 62 69 100 0 6,200 3,065 3,444 3,619 58

4 Matuguinao 20 17 17 20 100 0 1,100 237 339 379 34

5 Pagsanghan 13 13 13 13 100 0 1,600 1,226 1,292 1,338 84

6 San Jorge 41 28 31 41 100 0 2,800 1,477 1,639 1,717 61

7 Santa Margarita 36 34 34 34 94 2 4,700 3,305 3,493 3,604 77

8 Santo Niño 13 12 12 13 100 0 2,700 295 301 307 11

9 Tagapul-an 14 8 8 14 100 0 1,800 365 399 409 23

10 Tarangnan 41 40 40 40 98 1 4,400 1,654 1,864 1,951 44

Total 427 379 385 414 97 13 59,500 38,966 41,837 43,230 73

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 16,834 18,070 22,072 Residential 34,115 36,906 38,175

MWH Purchased 3,611 3,744 3,878 Commercial 1,411 1,471 1,570

MWH Sold 3,150 3,248 3,330 Industrial 2 2 2

Systems Loss (%) 12 12 13 Public Building 432 452 475

Peak Load (KW) 8,836 8,788 8,980 Others 3,006 3,006 3,008

Load Factor (%) 56 58 59 Total 38,966 41,837 43,230

Collection Efficiency (%) 90 96 94

Ave. Systems Rate (P/KWH) 5.34 5.56 6.63

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 11,496 12,358 12,483 14,800 17,141 17,997 17,908 20,620 21,093 21,006

Commercial 3,607 4,005 4,131 4,387 4,684 4,921 5,486 6,121 6,564 7,318

Industrial 4,246 5,254 3,968 5,388 5,522 5,812 6,497 6,849 7,002 7,143

Public Building 1,311 1,436 1,602 2,092 2,669 2,725 2,618 3,211 3,376 3,491

Others 616 692 739 818 993 1,080 906 1,001 946 1,003

Total 21,276 23,745 22,923 27,485 31,009 32,535 33,415 37,802 38,981 39,961

NPC-SPUG Diesel

Tagapul-an

ServedPotential

B A R A N G A Y S

Monthly Average

Ms. Placida P. Balios (OIC)

AB

Large

MUNICIPALITIES/CITY

40,920

Ton-ok/SAMELCO I

Large

C O N N E C T I O N S

38,651

Mini Hydro

Diesel

NPC-SPUG

NPC-SPUG

42,079

Diesel

Project Name/Proponent TypeLocation

Almagro

Legislative District

Calbayog City

CoverageEnergized

Unenerg.

Sto. Niño

Mr. Reynaldo A. Lim

Ms. Placida P. Balios (OIC)

Large

Mr. Reynaldo A. Lim

Ms. Placida P. Balios (OIC)

Mr. Reynaldo A. Lim

B

SAMAR I ELECTRIC COOPERATIVE, INC. (SAMELCO I)Brgy. Carayman, Calbayog City, Samar

Tel Nos. (055) 209-8212 to 16; Telefax No. (055) 209-8211; Hotline: (055) 209-2661, 533-9757

2008 20092007

192

Page 200: The 2007-2009 RE Chronicle

N

SAMELCO IILEGEND :

H Q HQ Location

Municipality

5 MVA Substation

Generating Set

3 PH Backbone Line

Energized Coop System

G S

193

BASEY

CALBIGA

CITY of CATBALOGAN

HINABANGAN

MOTIONG

TALALORA

(WRIGHT)PARANAS

PINABACDAO

SANTA RITA

VILLAREAL

SAN JOSEDE BUAN

G S

H Q

MARABUT

SAN SEBASTIANZUMARRAGA

Page 201: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 23, 1975

II. DATE OF FIRST ENERGIZATION : December 1975

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 1.8 1.8 14.1 0.589

Subsidy 144.6 181.3 188.2

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Second District

1 Basey 51 49 50 51 100 0 9,400 5,226 5,443 6,527 69

2 Calbiga 41 33 41 41 100 0 4,000 2,237 2,369 2,545 64

3 City of Catbalogan 57 50 50 53 93 4 18,300 14,098 14,556 15,141 83

4 Daram 58 58 58 58 100 0 7,600 2,712 2,923 3,373 44

5 Hinabangan 21 21 21 21 100 0 2,600 1,280 1,353 1,505 58

6 Jiabong 34 34 34 34 100 0 3,300 1,802 1,906 2,009 61

7 Marabut 24 24 24 24 100 0 2,800 1,689 1,775 1,845 66

8 Motiong 30 29 30 30 100 0 2,800 1,327 1,452 1,585 57

9 Paranas (Wright) 44 41 44 44 100 0 6,000 3,384 3,530 3,684 61

10 Pinabacdao 24 19 24 24 100 0 2,800 1,464 1,579 1,675 60

11 San Jose de Buan 14 8 14 14 100 0 1,300 184 204 241 19

12 San Sebastian 14 14 14 14 100 0 1,400 807 845 883 63

13 Santa Rita 38 38 38 38 100 0 6,500 2,888 3,136 3,338 51

14 Talalora 11 11 11 11 100 0 1,400 678 723 841 60

15 Villareal 38 38 38 38 100 0 5,100 2,466 2,604 2,736 54

16 Zumarraga 25 25 25 25 100 0 3,300 1,255 1,305 1,352 41

Total 524 492 516 520 99 4 78,600 43,497 45,703 49,280 63

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 21,175 21,491 25,705 Residential 37,669 39,711 43,189

MWH Purchased 3,784 3,864 4,124 Commercial 1,071 1,159 1,207

MWH Sold 3,203 3,291 3,527 Industrial 6 - -

Systems Loss (%) 14 14 14 Public Building 414 512 636

Peak Load (KW) 8,877 9,204 9,600 Others 4,337 4,321 4,248

Load Factor (%) 58 58 59 Total 43,497 45,703 49,280

Collection Efficiency (%) 98 96 96

Ave. Systems Rate (P/KWH) 6.61 6.53 7.29

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 15,267 16,092 17,888 20,137 22,556 22,823 22,989 25,183 25,662 27,237

Commercial 3,583 3,595 3,659 3,778 4,739 7,134 7,012 6,805 8,976 9,746

Industrial 1,067 1,656 1,267 2,190 1,778 302 303 1,823 - -

Public Building 2,851 2,976 3,031 3,387 3,223 3,053 3,196 3,216 3,471 3,915

Others 762 866 1,085 1,123 1,221 1,436 1,385 1,405 1,388 1,428

Total 23,530 25,185 26,930 30,615 33,516 34,748 34,885 38,432 39,497 42,326

SAMAR II ELECTRIC COOPERATIVE, INC. (SAMELCO II)Brgy. Arado, Paranas, Samar

Tel. Nos. Cat SC (055) 356-0002, 356-1451; Paranas (055) 356-0541; Telefax No. (055) 251-5645; Fax No. (055) 356-1003

2008 20092007

A+

Extra Large

Ms. Deborah T. Marco Mr. Nicolas A. Mendova

Mr. Ponciano R. Rosales Mr. Ponciano R. Rosales

Mr. Alfonso F. Quilapio

Mr. Ponciano R. Rosales

A+ A+

Served

Extra Large Extra Large

B A R A N G A Y S C O N N E C T I O N S

53,206

POWER PLANT

Location Project Name/Proponent Type

Legislative DistrictPotential

Monthly Average

50,55647,786

MUNICIPALITIES

CoverageEnergized

Unenerg.

Zumarraga NPC-SPUG Diesel

194

Page 202: The 2007-2009 RE Chronicle

LEGEND :

HQ Location

Municipality

5 MVA Substation

3 PH Backbone Line

Energized Coop System

H Q

Energized Other System

195

N

MASLOG

BALANGIGA

GUIUAN

MERCEDES

MAYDOLONG

CITY ofBORONGAN

SAN POLICARPIO

JIPAPAD

SAN VICENTE IS.

GIPORLOS

HERNANI

LLORENTE

TAFT

CAN-AVID

DOLORES

ORAS

ARTECHE

LAWA-AN

GENERAL MACARTHUR

ANDO

DIVINUBO IS.

SULANGAN IS.

MANICANI IS.

SULU-AN IS.HAMONHON IS.

H Q

STA. MONICA

HILABAAN

Served by Hilabaan Fishermen'sMulti-Purpose Coop.

SULAT

SAN JULIAN

QUINAPONDANSALCEDO

Page 203: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : December 9, 1977

II. DATE OF FIRST ENERGIZATION : June 26, 1981

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 207.8 261.1 270.1

Subsidy 157.7 187.1 190.1

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 Arteche 20 11 11 11 55 9 2,600 700 837 882 34

2 Balangiga 13 12 12 13 100 0 2,100 1,253 1,352 1,411 67

3 Balangkayan 15 13 13 15 100 0 1,600 885 957 1,003 63

4 City of Borongan 61 61 61 61 100 0 11,200 9,197 9,701 10,050 90

5 Can-Avid 28 22 22 26 93 2 3,500 1,268 1,419 1,489 43

6 Dolores 45 30 30 31 69 14 6,600 2,164 2,463 2,577 39

7 General MacArthur 30 30 30 30 100 0 2,100 932 987 1,031 49

8 Giporlos 18 16 17 18 100 0 2,000 992 1,098 1,157 58

9 Guiuan 60 58 58 60 100 0 7,800 4,616 4,934 5,171 66

10 Hernani 13 13 13 13 100 0 1,500 776 818 859 57

11 Jipapad 13 8 8 8 62 5 1,300 13 13 13 1

12 Lawa-an 16 16 16 16 100 0 2,000 1,370 1,447 1,495 75

13 Llorente 33 32 32 33 100 0 3,900 1,919 2,148 2,249 58

14 Maslog 12 6 6 12 100 0 800 12 12 12 2

15 Maydolong 20 17 19 20 100 0 2,300 1,358 1,494 1,572 68

16 Mercedes 16 16 16 16 100 0 900 460 550 593 66

17 Oras 42 37 37 40 95 2 6,300 2,230 2,681 2,813 45

18 Quinapondan 25 23 23 25 100 0 2,300 1,098 1,265 1,343 58

19 Salcedo 41 40 41 41 100 0 3,400 1,589 1,903 2,024 60

20 San Julian 16 16 16 16 100 0 2,500 1,701 1,780 1,820 73

21 San Policarpio 17 15 16 16 94 1 2,500 1,078 1,173 1,250 50

22 Sulat 18 17 17 18 100 0 2,900 1,949 2,078 2,129 73

23 Taft 24 23 24 24 100 0 3,300 1,884 2,085 2,153 65

Total 596 532 538 563 94 33 75,400 39,444 43,195 45,096 60

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 20,743 22,145 25,657 Residential 37,157 40,804 42,584

MWH Purchased 3,740 3,886 4,099 Commercial 1,218 1,219 1,265

MWH Sold 3,068 3,184 3,426 Industrial 114 112 112

Systems Loss (%) 17 17 16 Public Building 617 688 755

Peak Load (KW) - - - Others 338 372 380

Load Factor (%) - - - Total 39,444 43,195 45,096

Collection Efficiency (%) 94 96 93

Ave. Systems Rate (P/KWH) 6.76 6.96 7.49

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 14,016 14,848 16,587 18,790 22,292 22,671 22,963 26,932 28,185 29,969

Commercial 2,065 2,270 2,425 2,577 3,001 3,365 3,665 4,349 4,446 4,937

Industrial 351 312 331 436 799 1,099 1,204 1,554 1,423 1,575

Public Building 1,237 1,520 1,701 1,951 2,131 2,203 2,252 2,761 2,921 3,244

Others 792 776 969 973 1,010 1,251 1,168 1,214 1,229 1,382

Total 18,461 19,726 22,013 24,727 29,233 30,590 31,252 36,810 38,204 41,107

Legislative DistrictCoverage

Monthly Average

Engr. Nerio T. Aberia, Jr.

CC

Large

MUNICIPALITIES

PotentialEnergized

Unenerg.

41,953

Served

B A R A N G A Y S

Large

C O N N E C T I O N S

EASTERN SAMAR ELECTRIC COOPERATIVE, INC. (ESAMELCO)Brgy. Cabong, City of Borongan, Eastern Samar

Tel. No. (055) 261-2014; Fax Nos. (055) 261-2391, 560-0013

2008 20092007

36,754

Mr. Francisco S. De Paz

Large

Mr. James S. Hupp

B

Dr. Aniceto N. Quintua

Ms. Marilen Q. Reyes (OIC) Ms. Marilen Q. Reyes (OIC)

40,210

196

Page 204: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Headquarters

N

ZAMSURECO IPagadian City

197

ZAMBOANGA SUR IIIpil, Zamboanga Sibugay

ZANECODipolog City

ZAMCELCOZamboanga City

Page 205: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

CONNECTIONS

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Zamboanga Norte 23 23 23 23 100 585 557 574 584 99 156,000 71,371 75,257 78,617 50

2 Zamboanga Sur I 25 25 25 25 100 628 589 624 627 99 173,900 76,475 80,947 84,812 49

3 Zamboanga Sur II 23 23 23 23 100 558 510 526 557 99 153,400 75,195 79,940 84,074 55

4 Zamboanga City 1 1 1 1 100 94 94 94 94 100 131,200 109,779 114,081 118,352 90

Total 72 72 72 72 100 1,865 1,750 1,818 1,862 99 614,500 332,820 350,225 365,855 60

EnergizedPotential

REGION IX

ZAMBOANGA PENINSULA REGION

MUNICIPALITIES/CITIES BARANGAYS

CoverageServed

ELECTRIC DISTRIBUTION UTILITIES

EnergizedCoverage

198

Total 480,444 508,401 543,514 588,755 636,122 624,232 620,195 672,240 698,022 721,235

Others 12,567 13,442 14,484 15,614 16,494 16,633 17,370 17,467 17,994 18,527

Public Bldgs. 31,380 33,964 38,610 41,610 44,899 45,432 47,520 54,356 56,554 59,159

Industrial 130,178 131,258 138,186 142,021 147,999 139,698 139,776 150,329 156,323 149,529

Commercial 117,041 123,022 128,463 136,273 142,035 138,840 137,877 149,032 157,540 171,548

Residential 189,278 206,715 223,771 253,237 284,695 283,628 277,652 301,056 309,611 322,472

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 206: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

Energized Coop System

N

199

SERGIO OSMENA, SR.

DAPITANCITY

MUTIA

SIAYAN

SINDANGAN

LABASONLILOY

TAMPILISAN

SALUG

JOSEDALMAN(PONOT)

PRES.MANUEL A.

ROXAS

PIÑAN(New Piñan)

RIZAL

LALIBERTAD

BACUNGAN(Leon T. Postigo)

GUTALAC

KALAWIT

GODOD

KATIPUNANMANUKAN

POLANCO

DIPOLOG CITY

SIBUTAD

H Q

Page 207: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 23, 1972

II. DATE OF FIRST ENERGIZATION : September 1978

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 1.4 12.5 52.0

Subsidy 153.5 193.4 208.7

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Dapitan City 50 49 49 49 98 1 14,500 7,325 7,678 8,079 56

2 La Libertad 13 13 13 13 100 0 1,600 965 989 1,006 63

3 Mutia 16 16 16 16 100 0 2,000 1,136 1,178 1,201 60

4 Piñan (New Piñan) 22 22 22 22 100 0 3,800 1,848 1,978 2,046 54

5 Polanco 30 30 30 30 100 0 7,300 3,901 4,108 4,322 59

6 Rizal (22) 21 21 21 21 100 0 3,200 1,798 1,864 1,906 60

7 Sergio Osmeña, Sr. 39 34 36 39 100 0 5,800 1,125 1,218 1,356 23

8 Sibutad 16 16 16 16 100 0 3,300 1,684 1,730 1,757 53

Second District

9 Dipolog City 21 21 21 21 100 0 21,300 17,731 18,608 19,615 92

10 Jose Dalman (Ponot) 18 16 18 18 100 0 4,900 1,132 1,286 1,415 29

11 Katipunan 30 30 30 30 100 0 8,000 2,572 2,744 2,890 36

12 Manukan 22 22 22 22 100 0 6,800 2,113 2,229 2,381 35

13 Pres. Manuel A. Roxas 31 28 29 31 100 0 7,100 1,679 1,791 1,874 26

14 Siayan 22 19 22 22 100 0 7,000 881 974 1,048 15

15 Sindangan 52 49 52 52 100 0 17,100 7,577 7,975 8,352 49

Third District

16 Bacungan (Leon T. Postigo) 18 17 17 18 100 0 4,100 1,509 1,601 1,676 41

17 Godod 17 15 16 17 100 0 3,200 655 712 725 23

18 Gutalac 33 26 30 33 100 0 6,000 1,524 1,676 1,817 30

19 Kalawit 14 13 14 14 100 0 4,500 965 1,064 1,091 24

20 Labason 20 20 20 20 100 0 7,100 3,837 3,974 4,020 57

21 Liloy 37 37 37 37 100 0 7,200 4,879 5,109 5,192 72

22 Salug 23 23 23 23 100 0 6,100 2,740 2,856 2,905 48

23 Tampilisan 20 20 20 20 100 0 4,100 1,795 1,915 1,943 47

Total 585 557 574 584 99 1 156,000 71,371 75,257 78,617 50

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 42,772 47,436 53,338 Residential 64,509 68,113 71,229

MWH Purchased 10,294 11,226 11,895 Commercial 3,674 3,846 3,961

MWH Sold 8,970 9,574 10,139 Industrial 479 473 496

Systems Loss (%) 13 14 14 Public Building 2,275 2,381 2,484

Peak Load (KW) 25,421 26,814 27,338 Others 434 444 447

Load Factor (%) 55 57 60 Total 71,371 75,257 78,617

Collection Efficiency (%) 95 100 94

Ave. Systems Rate (P/KWH) 4.77 4.95 5.26

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 37,588 41,828 44,499 51,669 59,175 59,156 60,435 63,789 67,303 69,378

Commercial 9,704 10,458 10,333 11,570 12,994 13,357 14,022 15,216 16,442 16,489

Industrial 13,918 14,985 14,882 16,476 16,652 16,896 17,805 17,744 18,901 23,251

Public Building 3,329 3,685 3,819 4,562 6,519 6,791 7,496 8,754 9,794 10,233

Others 1,006 1,089 1,126 1,241 1,369 1,576 1,880 2,141 2,445 2,320

Total 65,545 72,045 74,659 85,518 96,709 97,776 101,638 107,644 114,885 121,671

Mega Large Mega Large

Monthly Average

86,203 89,69982,329

B A R A N G A Y S C O N N E C T I O N S

CoverageServed

Legislative DistrictPotential

MUNICIPALITIES/CITIESEnergized

Unenerg.

B B

Mr. Dolfuss Duhaylungsod Mr. Dolfuss Duhaylungsod

Mr. Adelmo P. Laput Mr. Adelmo P. Laput

A

Mega Large

Mr. Levy E. Lagutin

Mr. Adelmo P. Laput

ZAMBOANGA DEL NORTE ELECTRIC COOPERATIVE, INC. (ZANECO)Gen. Luna St., Dipolog City, Zamboanga Del Norte

Tel. Nos. (065) 212-3444 to 47, 212-9756; Fax No. (065) 212-2335

2008 20092007

200

Page 208: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

Below 5MVA Substation

10 MVA Substation

3 PH Backbone Line

Energized Coop System

PITOGO

TABINA

VINCENZOA. SAGUN

201

JOSEFINA

MIDSALIP

MAHAYAG

PAGADIAN CITY

MARGOSATUBIG

DINAS

SAN PABLO

SANMIGUEL

LAPUYAN

DUMALINAO

RAMONMAGSAYSAY

(Liargo)

SOMINOT(Don MarianoMarcos)

MOLAVEDON VICTORIANO CHIONGBIAN(Don Mariano Marcos)MISAMIS OCCIDENTAL

DUMINGAG

TAMBULIG

AURORA

TIGBAO

TUKURAN

LABANGAN

DIMATALING

GUIPOS

H Q

N

Page 209: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 25, 1972

II. DATE OF FIRST ENERGIZATION : August 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 2.1 26.2 26.2

Subsidy 169.7 261.6 273.5

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Aurora (44) 41 41 41 41 100 0 9,100 4,889 5,135 5,366 59

2 Dumingag 44 39 44 44 100 0 9,500 2,551 2,854 3,101 33

3 Josefina 14 14 14 14 100 0 1,900 692 767 795 42

4 Labangan 25 24 24 24 96 1 7,700 3,494 3,626 3,744 49

5 Mahayag 29 29 29 29 100 0 9,600 3,966 4,178 4,382 46

6 Midsalip 33 30 33 33 100 0 6,500 1,564 1,639 1,684 26

7 Molave 25 25 25 25 100 0 10,000 5,733 6,076 6,307 63

8 Pagadian City 54 53 54 54 100 0 32,200 21,750 22,572 23,544 73

9 Ramon Magsaysay (Liargo) 27 25 27 27 100 0 5,200 2,178 2,324 2,470 48

10 Sominot (Don Mariano Marcos) 18 17 18 18 100 0 3,300 853 896 976 30

11 Tambulig 31 31 31 31 100 0 7,000 2,966 3,147 3,242 46

12 Tukuran (25) 24 20 24 24 100 0 7,400 3,546 3,617 3,769 51

Second District

13 Dimataling 24 24 24 24 100 0 5,800 1,660 1,783 1,862 32

14 Dinas 30 28 30 30 100 0 7,100 2,072 2,202 2,298 32

15 Dumalinao 30 29 30 30 100 0 5,800 3,504 3,649 3,750 65

16 Guipos 17 16 17 17 100 0 4,100 1,630 1,767 1,863 45

17 Lapuyan 26 24 26 26 100 0 5,500 1,174 1,342 1,477 27

18 Margosatubig 17 17 17 17 100 0 7,800 3,263 3,482 3,610 46

19 Pitogo 15 13 15 15 100 0 4,700 1,444 1,627 1,733 37

20 San Miguel 18 15 16 18 100 0 3,400 1,841 1,934 2,068 61

21 San Pablo 28 20 27 28 100 0 5,300 1,600 1,710 1,895 36

22 Tabina 15 15 15 15 100 0 4,900 1,724 1,914 2,012 41

23 Tigbao 18 18 18 18 100 0 3,800 879 944 979 26

24 Vincenzo A. Sagun 14 12 14 14 100 0 4,300 1,163 1,334 1,419 33

Second District, Misamis Occidental

25 Don Victoriano Chiongbian 11 10 11 11 100 0 2,000 339 428 466 23

(Don Mariano Marcos)

Total 628 589 624 627 99 1 173,900 76,475 80,947 84,812 49

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 50,169 52,330 60,292 Residential 65,074 69,534 72,976

MWH Purchased 11,061 11,435 12,360 Commercial 5,493 5,579 5,697

MWH Sold 9,619 10,001 10,907 Industrial 193 188 199

Systems Loss (%) 13 13 12 Public Building 2,408 2,614 2,783

Peak Load (KW) 24,029 25,804 27,680 Others 3,307 3,032 3,157

Load Factor (%) 63 61 61 Total 76,475 80,947 84,812

Collection Efficiency (%) 101 100 102

Ave. Systems Rate (P/KWH) 5.22 5.23 5.53

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 34,796 37,735 40,458 44,661 50,605 48,934 47,930 53,385 56,443 58,478

Commercial 19,904 21,125 21,792 23,637 24,079 24,073 24,275 28,595 28,743 35,281

Industrial 12,026 12,391 13,218 14,964 13,260 14,186 14,117 14,437 14,862 15,654

Public Building 7,073 7,743 8,375 9,256 9,820 9,913 9,561 10,601 11,125 12,080

Others 4,493 5,199 6,056 7,135 7,277 7,507 8,371 8,412 8,839 9,395

Total 78,292 84,193 89,899 99,653 105,041 104,614 104,254 115,430 120,012 130,888

ZAMBOANGA DEL SUR I ELECTRIC COOPERATIVE, INC. (ZAMSURECO I)J.S. Alano St., Pagadian City

Tel. Nos. (062) 215-2737 to 38, 215-1708; Telefax No. (062) 214-2635; Fax No. (062) 214-1880; E-mail: [email protected]/[email protected]

2008 20092007

A+

Mega Large

Ms. Cheryl B. Dayondon Ms. Cheryl B. Dayondon

Mr. Jose Raul A. Saniel Mr. Jose Raul A. Saniel

Mr. Rogelio C. Mabanag

Mr. Jose Raul A. Saniel

A+ A+

Unenerg.Served

Mega Large Mega Large

B A R A N G A Y S C O N N E C T I O N S

Legislative District

Monthly Average

76,461 79,319

Potential

72,604

MUNICIPALITIES/CITY

CoverageEnergized

202

Page 210: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

3 PH Backbone Line

Energized Coop System

203

N

SIBUCO

TITAY

OLUTANGA

PAYAO

MABUHAY

BAYOG LAKEWOOD

SIAY

KUMALARANG

NAGABALIGUIAN

TUNGAWAN

SIRAWAI

SIOCON

ALICIA

TALUSAN

MALANGAS

BUUG

DIPLAHAN

Tapped at ZAMCELCO Distribution

ROSELLERLIM

KABASALAN

IMELDA

I P I L

Part ofZAMBOANGA

DEL SUR

Part of ZAMBOANGA DEL NORTE

VITALI

H Q

Page 211: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 8, 1980

II. DATE OF FIRST ENERGIZATION : November 1981

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 26.2 43.2 102.1

Subsidy 154.4 209.9 229.4

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Second District

1 Bayog 28 27 28 28 100 0 5,900 2,200 2,316 2,458 42

2 Kumalarang 18 17 18 18 100 0 5,600 1,713 1,818 1,912 34

3 Lakewood 14 13 13 13 93 1 3,600 1,451 1,497 1,549 43

First District, Zamboanga Sibugay

4 Alicia 27 27 27 27 100 0 6,700 2,144 2,475 2,625 39

5 Buug 27 27 27 27 100 0 7,600 5,318 5,569 5,773 76

6 Diplahan 22 22 22 22 100 0 5,400 3,325 3,543 3,777 70

7 Imelda 18 18 18 18 100 0 4,800 2,627 2,812 2,972 62

8 Mabuhay 18 18 18 18 100 0 5,600 823 941 1,150 21

9 Malangas 25 25 25 25 100 0 6,700 3,301 3,428 3,575 53

10 Olutanga 19 19 19 19 100 0 5,100 1,874 1,969 2,042 40

11 Payao 29 29 29 29 100 0 6,100 2,137 2,325 2,494 41

12 Talusan 14 14 14 14 100 0 4,100 803 909 975 24

Second District, Zamboanga Sibugay

13 Ipil 28 28 28 28 100 0 15,100 13,556 14,296 15,060 99

14 Kabasalan 29 29 29 29 100 0 8,400 6,146 6,402 6,584 78

15 Roseller Lim 26 26 26 26 100 0 7,700 3,413 3,717 3,916 51

16 Naga 23 23 23 23 100 0 7,900 5,316 5,537 5,680 72

17 Siay 29 29 29 29 100 0 7,400 4,421 4,648 4,858 66

18 Titay 30 28 30 30 100 0 8,900 4,716 5,184 5,475 62

19 Tungawan 25 25 25 25 100 0 7,500 2,763 3,059 3,262 43

Third District, Zamboanga del Norte

20 Baliguian 17 14 14 17 100 0 3,300 659 679 720 22

21 Sibuco 28 11 18 28 100 0 5,200 639 793 832 16

22 Siocon 26 24 25 26 100 0 6,900 3,103 3,155 3,334 48

23 Sirawai 34 13 17 34 100 0 3,500 837 848 903 26

2nd District, Zamboanga City

Zamboanga City 4 4 4 4 100 0 4,400 1,910 2,020 2,148 49

Total 558 510 526 557 99 1 153,400 75,195 79,940 84,074 55

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 29,618 31,426 35,658 Residential 66,668 71,398 75,448

MWH Purchased 6,422 6,848 7,199 Commercial 5,386 5,259 5,219

MWH Sold 5,533 5,897 6,199 Industrial 631 728 705

Systems Loss (%) 14 14 14 Public Building 2,012 2,159 2,322

Peak Load (KW) 16,492 16,983 18,232 Others 498 396 380

Load Factor (%) 53 55 54 Total 75,195 79,940 84,074

Collection Efficiency (%) 92 95 97

Ave. Systems Rate (P/KWH) 5.35 5.33 5.75

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 20,619 21,561 23,443 27,337 31,508 32,028 31,709 34,990 37,382 39,507

Commercial 9,890 10,367 10,451 11,310 11,189 9,964 9,800 10,162 10,352 10,763

Industrial 10,400 10,362 10,171 10,917 13,610 15,076 14,516 15,334 16,866 17,361

Public Building 1,440 1,764 2,537 2,852 3,165 3,432 4,217 4,752 5,177 5,805

Others 674 714 640 642 786 1,190 959 1,153 985 950

Total 43,023 44,768 47,242 53,058 60,257 61,690 61,201 66,391 70,762 74,386

Pangi, Ipil, Zamboanga Sibugay

Telefax No. (062) 333-2416; Fax Nos. (062) 333-5643, 333-2212

2008 20092007

A+

Extra Large

Mr. Ricardo O. Calonge, Jr. Mr. Jeric S. Kagaoan

Engr. Jesus Y. Castro Engr. Jesus Y. Castro

Mr. Rogelio A. Gomez

Engr. Jesus Y. Castro

A+ A+

Unenerg.Served

Extra Large Extra Large

B A R A N G A Y S C O N N E C T I O N S

Legislative District

Monthly Average

87,343 91,037

Potential

82,505

MUNICIPALITIES

CoverageEnergized

204

ZAMBOANGA DEL SUR II ELECTRIC COOPERATIVE, INC. (ZAMSURECO II)

Page 212: The 2007-2009 RE Chronicle

N

LEGEND :

HQ Location

City

5 MVA Substation

10 MVA Substation

20 MVA Substation

Power Plant

3 PH Backbone Line

Energized Coop System

H Q

P P

205

ZAMBOANGA CITY

SACOL IS.

TICTAUAN IS.

P P

H Q

GS Generating Set

G S

Page 213: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : February 23, 1974

II. DATE OF FIRST ENERGIZATION : April 1974

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 880.1 1347.9 1,959.9

Subsidy 20.4 38.9 38.9

0.163

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Zamboanga City (98) 37 37 37 37 100 0 66,100 61,452 63,499 65,543 99

Second District

Zamboanga City 57 57 57 57 100 0 65,100 48,327 50,582 52,809 81

94 94 94 94 100 0 131,200 109,779 114,081 118,352 90

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 142,453 147,948 158,187 Residential 100,154 104,428 108,330

MWH Purchased 38,394 38,982 39,558 Commercial 7,768 7,831 8,144

MWH Sold 31,898 32,697 32,858 Industrial 177 176 175

Systems Loss (%) 17 16 17 Public Building 1,149 1,125 1,176

Peak Load (KW) 79,072 80,199 81,382 Others 531 521 527

Load Factor (%) 67 67 67 Total 109,779 114,081 118,352

Collection Efficiency (%) 97 98 98

Ave. Systems Rate (P/KWH) 4.47 4.52 4.81

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 96,275 105,591 115,371 129,570 143,407 143,510 137,578 148,892 148,483 155,109

Commercial 77,543 81,072 85,887 89,756 93,774 91,446 89,780 95,059 102,003 109,015

Industrial 93,834 93,520 99,915 99,664 104,477 93,541 93,338 102,814 105,694 93,263

Public Building 19,538 20,772 23,879 24,940 25,394 25,295 26,246 30,249 30,458 31,041

Others 6,394 6,440 6,662 6,596 7,062 6,360 6,160 5,761 5,725 5,862

Total 293,584 307,395 331,714 350,526 374,114 360,152 353,102 382,775 392,363 394,290

Putik Complex, Zamboanga City

Tel. Nos. (062) 991-2117, 991-1588, 991-0594, 993-2873; Telefax No. (062) 992-4130; Fax No. (062) 991-3877; E-mail: [email protected]

2008 20092007

Monthly Average

B

EnergizedUnenerg.

Mega Large

Project Name/Proponent

Mega Large

C

ServedPotential

Total

B

Mega Large

100,031

CITY

CoverageLegislative District

POWER PLANT

96,906

Western Mindanao Power Corp./Alsons/Tomen

113.000

Engr. Reinerio R. Ramos

Mr. Gilbert R. Alvarez Mr. Rolando G. Gregorio

Engr. Reinerio R. Ramos Engr. Reinerio R. Ramos

Mr. Luciano O. Arquiza

C O N N E C T I O N SB A R A N G A Y S

Sacol NPC-SPUG Diesel

102,973

Diesel

TypeLocation

Zamboanga City

206

ZAMBOANGA CITY ELECTRIC COOPERATIVE, INC. (ZAMCELCO)

Page 214: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Energized Other System

Headquarters

N

207

Served byCagayan Electric Power & Light Co., Inc.

CAMELCOMambajao, Camiguin

MOELCI ICalamba, Misamis Occidental

MORESCO IIMedina, Misamis Oriental

MOELCI IIOzamis City

MORESCO ILaguindingan, Misamis Oriental

FIBECOMaramag, Bukidnon

BUSECOManolo Fortich, Bukidnon

LANECOTubod, Lanao del Norte

Served byIligan Light & Power, Inc.

Served byZAMSURECO I

Page 215: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

CONNECTIONS

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Misamis Occ. I 8 8 8 8 100 227 227 227 227 100 46,600 39,362 41,053 42,831 92

2 Misamis Occ. II 8 8 8 8 100 253 253 253 253 100 69,900 62,177 64,323 66,127 95

3 Misamis Or. I 10 10 10 10 100 155 155 155 155 100 63,200 50,143 53,028 56,804 90

4 Misamis Or. II 12 12 12 12 100 269 269 269 269 100 78,400 45,931 48,034 50,570 65

5 Bukidnon I 13 13 13 13 100 303 302 302 302 99 139,800 90,546 95,421 99,578 71

6 Bukidnon II 10 10 10 10 100 171 170 171 171 100 93,200 58,913 63,469 66,877 72

7 Camiguin 5 5 5 5 100 58 58 58 58 100 16,700 12,758 13,042 13,320 80

8 Lanao Norte 19 19 19 19 100 407 333 334 343 84 90,700 62,929 65,325 67,986 75

Total 85 85 85 85 100 1,843 1,767 1,769 1,778 96 598,500 422,759 443,695 464,093 78

CoverageEnergized

CoverageEnergized

PotentialServed

REGION XNORTHERN MINDANAO REGION

ELECTRIC DISTRIBUTION UTILITIES

MUNICIPALITIES/CITIES BARANGAYS

208

Total 313,369 349,042 371,881 411,217 455,908 477,298 478,210 514,446 542,930 575,888

Others 9,961 11,924 12,321 15,391 20,145 19,203 15,022 16,653 18,021 20,378

Public Bldgs. 16,011 18,188 19,721 23,188 24,342 24,163 25,268 27,949 29,621 31,762

Industrial 65,799 79,112 82,246 86,650 96,094 113,580 116,671 127,960 136,223 148,709

Commercial 68,485 74,844 80,445 88,036 92,967 95,953 96,660 104,057 110,659 117,160

Residential 153,113 164,974 177,148 197,952 222,361 224,399 224,589 237,827 248,406 257,879

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 216: The 2007-2009 RE Chronicle

N

HQ Location

Municipality

5 MVA Substation

3 PH Backbone Line

H Q

LEGEND :

Energized Coop System

209

BALIANGAO PLARIDEL

SAPANGDALAGA

CONCEPCION

CALAMBA

LOPEZ JAENA

ALORAN

OROQUIETA CITY

H Q

Page 217: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 18, 1972

II. DATE OF FIRST ENERGIZATION : June 1978

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 13.7 25.8 37.8

Subsidy 44.0 44.0 58.1

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Aloran 38 38 38 38 100 0 5,200 4,599 4,867 5,112 98

2 Baliangao 15 15 15 15 100 0 3,100 2,665 2,811 2,892 93

3 Calamba 19 19 19 19 100 0 5,000 4,476 4,720 4,876 98

4 Concepcion 18 18 18 18 100 0 1,500 322 333 515 34

5 Lopez Jaena 28 28 28 28 100 0 4,600 3,247 3,365 3,537 77

6 Oroquieta City 47 47 47 47 100 0 15,100 14,071 14,561 15,084 99

7 Plaridel 33 33 33 33 100 0 8,100 7,378 7,696 8,030 99

8 Sapang Dalaga 28 28 28 28 100 0 3,900 2,604 2,700 2,785 71

First District, Zamboanga del Norte

Rizal 1 1 1 1 100 0 100

Total 227 227 227 227 100 0 46,600 39,362 41,053 42,831 92

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 15,926 17,051 19,129 Residential 36,358 38,008 39,687

MWH Purchased 3,197 3,307 3,565 Commercial 1,925 1,930 1,977

MWH Sold 2,779 2,909 3,147 Industrial 105 102 105

Systems Loss (%) 12 11 11 Public Building 929 956 980

Peak Load (KW) 7,340 7,653 - Others 45 57 82

Load Factor (%) 60 59 - Total 39,362 41,053 42,831

Collection Efficiency (%) 96 96 96

Ave. Systems Rate (P/KWH) 5.73 5.86 6.08

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 12,642 13,619 14,766 16,017 17,664 17,728 17,702 18,567 19,081 20,190

Commercial 4,259 4,703 4,674 5,262 5,418 5,574 5,604 6,584 7,130 7,823

Industrial 1,448 1,708 1,970 2,229 3,157 3,290 3,444 4,104 4,291 5,083

Public Building 1,672 2,005 2,237 2,511 2,859 2,878 2,971 3,259 3,581 3,821

Others 805 912 983 993 851 809 821 828 829 843

Total 20,826 22,947 24,630 27,012 29,949 30,279 30,542 33,342 34,912 37,760

Monthly Average

44,90043,271

B A R A N G A Y S C O N N E C T I O N S

Coverage

included in Concepcion

EnergizedUnenerg.

Large

A+

46,249

Served

A+A+

MUNICIPALITIES/CITY

Legislative DistrictPotential

Mr. Hurlito L. Paderanga Mr. Hurlito L. Paderanga

Mr. Noel B. Dumalagan Mr. Noel B. Dumalagan

Large Large

Mr. Hurlito L. Paderanga

Mr. Noel B. Dumalagan

MISAMIS OCCIDENTAL I ELECTRIC COOPERATIVE, INC. (MOELCI I)Macamiguing, Calamba, Misamis Occidental

Tel. No. (088) 271-3660, 271-3346; Fax No. (088) 271-3661

2008 20092007

210

Page 218: The 2007-2009 RE Chronicle

N

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

LEGEND :

Energized Coop System

211

BONIFACIO

OZAMIS CITY

TUDELA

CLARIN

SINACABAN

JIMENEZ

PANAON

TANGUB CITY

H Q

Page 219: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : June 2, 1976

II. DATE OF FIRST ENERGIZATION : September 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 23.9 23.9 23.9

Subsidy 47.8 64.9 65.2

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Jimenez 24 24 24 24 100 0 5,900 5,376 5,598 5,826 99

2 Panaon 16 16 16 16 100 0 2,400 2,138 2,223 2,289 95

Second District

3 Bonifacio 28 28 28 28 100 0 6,000 3,849 4,051 4,281 71

4 Clarin 29 29 29 29 100 0 6,600 6,056 6,299 6,558 99

5 Ozamis City 51 51 51 51 100 0 28,800 27,485 28,100 28,535 99

6 Sinacaban 17 17 17 17 100 0 3,800 3,535 3,666 3,782 99

7 Tangub City 55 55 55 55 100 0 11,000 8,954 9,323 9,638 88

8 Tudela 33 33 33 33 100 0 5,400 4,784 5,063 5,218 97

Total 253 253 253 253 100 0 69,900 62,177 64,323 66,127 95

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 41,116 43,314 46,565 Residential 58,446 60,667 62,444

MWH Purchased 9,005 9,570 9,900 Commercial 2,317 2,221 2,235

MWH Sold 7,685 8,243 8,874 Industrial 96 98 97

Systems Loss (%) 14 12 9 Public Building 1,119 1,102 1,131

Peak Load (KW) 22,324 23,202 23,352 Others 199 235 220

Load Factor (%) 55 56 58 Total 62,177 64,323 66,127

Collection Efficiency (%) 103 94 92

Ave. Systems Rate (P/KWH) 5.35 5.25 5.25

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 28,347 30,571 30,902 35,914 40,605 40,892 40,776 42,782 44,861 47,746

Commercial 15,865 17,615 18,414 21,704 23,299 24,922 25,012 26,738 28,118 29,324

Industrial 8,006 13,622 15,234 15,171 9,413 10,133 9,287 9,369 10,951 12,540

Public Building 3,627 4,099 4,356 5,691 5,531 5,221 5,721 6,021 6,109 6,399

Others 725 662 644 567 7,950 9,189 5,833 7,315 8,875 10,473

Total 56,570 66,569 69,550 79,047 86,799 90,358 86,629 92,225 98,914 106,482

MISAMIS OCCIDENTAL II ELECTRIC COOPERATIVE, INC. (MOELCI II)Don Anselco Bernad Ave., Bitoon, Ozamis City

Tel. No. (088) 521-1881; Telefax No. (088) 521-1461; E-mail: [email protected]

2008 20092007

Engr. Eddie L. Caluna

Mr. Jemilo L. Pelimer

Extra Large Extra Large

Mr. Mario Genis B. Sarigumba Mr. Mario Genis B. Sarigumba

Mr. Jemilo L. Pelimer Mr. Jemilo L. Pelimer

B A R A N G A Y S C O N N E C T I O N S

Legislative District

A+

Extra Large

A+ A+

Monthly Average

57,817 59,358

Potential

55,831

MUNICIPALITIES/CITIES

CoverageEnergized

Unenerg.Served

212

Page 220: The 2007-2009 RE Chronicle

N

213

LAGUINDINGANA

LUBIJ

ID

OPOLCAGAYAN DE ORO CITY

LUGAIT

MANTICAO

INITAO

NAAWAN

TALAKAG

JASAAN

TAGOLOAN

VILLANUEVA

PART OF BUKIDNON

CITY ofEL SALVADOR

H Q

GITAGUM

LIBERTAD

Served byCagayan Electric Power & Light Co.

H Q HQ Location

Municipality

Below 5 MVA Substation

10 MVA Substation

3 PH Backbone Line

Energized Coop System

Energized Other System

LEGEND :

Page 221: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 21, 1968 / February 1, 1971

II. DATE OF FIRST ENERGIZATION : September 21, 1971

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 42.3 76.6 117.2

Subsidy 70.8 92.2 104.1

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District, Bukidnon

Talakag 17 17 17 17 100 0 5,600 2,713 2,967 3,229 58

Baungon 1 1 1 1 100 0 300 102 103 106 35

Second District

1 Alubijid 16 16 16 16 100 0 5,200 3,921 4,230 4,495 86

2 City of El Salvador 15 15 15 15 100 0 8,000 6,927 7,354 7,989 99

3 Gitagum 11 11 11 11 100 0 2,800 2,401 2,479 2,579 92

4 Initao 16 16 16 16 100 0 5,900 4,927 5,087 5,315 90

5 Laguindingan 11 11 11 11 100 0 4,200 3,383 3,735 3,990 95

6 Libertad 9 9 9 9 100 0 2,300 1,868 1,945 2,087 91

7 Lugait 8 8 8 8 100 0 3,300 2,798 2,893 3,062 93

8 Manticao 13 13 13 13 100 0 5,300 3,454 3,578 3,814 72

9 Naawan 10 10 10 10 100 0 3,400 2,910 3,044 3,306 97

10 Opol 14 14 14 14 100 0 10,300 9,065 9,560 10,217 99

First District, Cagayan de Oro City

Cagayan de Oro City 14 14 14 14 100 0 6,600 5,627 6,005 6,557 99

First District, Lanao del Norte

Iligan City (Hindang) 47 48 58

Total 155 155 155 155 100 0 63,200 50,143 53,028 56,804 90

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 38,696 41,246 47,399 Residential 46,461 47,467 51,123

MWH Purchased 7,695 8,074 8,517 Commercial 2,154 2,251 2,303

MWH Sold 7,130 7,526 7,979 Industrial 23 22 22

Systems Loss (%) 6 6 6 Public Building 1,072 1,093 1,123

Peak Load (KW) 16,869 19,020 19,470 Others 433 2,195 2,233

Load Factor (%) 62 58 60 Total 50,143 53,028 56,804

Collection Efficiency (%) 100 100 106

Ave. Systems Rate (P/KWH) 5.43 5.48 5.94

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 23,335 25,187 27,572 30,890 33,828 32,465 31,904 33,944 35,103 36,255

Commercial 11,727 12,972 13,909 12,571 13,152 16,689 16,574 17,424 18,760 19,966

Industrial 19,697 22,156 21,834 22,903 25,111 25,710 25,338 28,418 30,525 33,235

Public Building 1,668 1,935 2,180 2,356 2,528 2,522 2,561 2,629 2,682 2,776

Others 2,239 2,596 2,950 3,253 3,237 3,029 3,133 3,146 3,239 3,522

Total 58,666 64,846 68,445 71,973 77,856 80,415 79,510 85,561 90,309 95,754

Legislative DistrictPotential

MUNICIPALITIES/CITIES

Extra Large

CoverageEnergized

Unenerg.

48,129

B A R A N G A Y S C O N N E C T I O N S

Monthly Average

50,856

Extra Large

A+

Extra Large

Served

54,942

Mr. Pedrito H. Baculio

Engr. Julie B. Real

A+ A+

Mr. Pedrito H. Baculio Mr. Bernard R. Benavides

Engr. Julie B. Real Engr. Julie B. Real

MISAMIS ORIENTAL I RURAL ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO I)Laguindingan, Misamis Oriental 9019

Telefax No.(088) 282-2234; 583-0617; A29-E-mail: [email protected], moresco-webgate.ph

2008 20092007

214

Page 222: The 2007-2009 RE Chronicle

N

LEGEND :

Energized Coop System

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

215

CLAVERIA

MEDINA

BALINGASAG

GINGOOG CITY

SUGBONGCOGON

KINOGUITAN

SALAY

LAGONGLONG

TALISAYAN

BALINGOAN

BINUANGAN

JASAAN

H QMAGSAYSAY (Linugos)

Page 223: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : October 1, 1976

II. DATE OF FIRST ENERGIZATION : June 26, 1978

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 18.6 54.3 72.8

Subsidy 79.9 109.1 111.3

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Balingasag 30 30 30 30 100 0 11,800 7,210 7,475 7,865 67

2 Balingoan 9 9 9 9 100 0 1,800 1,362 1,395 1,465 81

3 Binuangan 8 8 8 8 100 0 1,400 988 1,007 1,028 73

4 Gingoog City 79 79 79 79 100 0 23,300 13,519 14,253 15,092 65

5 Kinoguitan 15 15 15 15 100 0 2,400 1,591 1,634 1,694 71

6 Lagonglong 10 10 10 10 100 0 3,800 2,109 2,359 2,452 65

7 Magsaysay (Linugos) 25 25 25 25 100 0 5,600 2,534 2,635 2,778 50

8 Medina 19 19 19 19 100 0 5,900 4,392 4,612 4,870 83

9 Salay 18 18 18 18 100 0 4,600 3,509 3,585 3,726 81

10 Sugbongcogon 10 10 10 10 100 0 1,600 1,194 1,233 1,285 80

11 Talisayan 18 18 18 18 100 0 4,500 3,301 3,386 3,535 79

Second District

12 Claveria 24 24 24 24 100 0 9,100 3,005 3,224 3,512 39

Jasaan 4 4 4 4 100 0 2,600 1,217 1,236 1,268 49

Total 269 269 269 269 100 0 78,400 45,931 48,034 50,570 65

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 29,511 30,211 35,091 Residential 42,587 44,602 47,032

MWH Purchased 6,911 6,689 7,188 Commercial 1,835 1,865 1,900

MWH Sold 6,043 5,834 6,340 Industrial 310 321 348

Systems Loss (%) 12 12 11 Public Building 1,026 1,080 1,128

Peak Load (KW) 15,687 15,776 18,123 Others 173 166 162

Load Factor (%) 60 58 54 Total 45,931 48,034 50,570

Collection Efficiency (%) 93 93 97

Ave. Systems Rate (P/KWH) 4.88 5.18 5.54

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 19,563 21,776 23,005 23,719 27,871 30,275 29,906 31,651 32,522 33,032

Commercial 3,194 3,500 3,492 3,820 5,310 5,330 4,960 4,995 5,265 5,314

Industrial 15,421 19,524 20,723 22,239 26,329 30,169 31,280 31,956 28,161 33,178

Public Building 1,790 1,891 2,010 1,886 2,167 2,478 2,610 2,673 2,848 3,079

Others 605 599 504 738 1,077 1,395 1,137 1,244 1,208 1,474

Total 40,573 47,290 49,734 52,402 62,754 69,647 69,893 72,519 70,004 76,077

Monthly Average

60,160 63,38757,524

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

Legislative DistrictPotential

MUNICIPALITIES/CITY

Extra Large Extra LargeExtra Large

Mr. Eriel F. Sison

Engr. Amado B. Ke-e

A+ A+

Mr. Eriel F. Sison Mr. Antonio P. Reyes, Sr.

Engr. Amado B. Ke-e Engr. Amado B. Ke-e

A+

MISAMIS ORIENTAL II ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO II)Medina, Misamis Oriental

Tel. No. (088) 331-2407; Telefax No. (088) 331-2076; 331-2771

2008 20092007

216

Page 224: The 2007-2009 RE Chronicle

FIBECO

N

217

CITY ofVALENCIA

MARAMAG

QUEZON

PANGANTUCAN

KALILANGAN

SAN FERNANDO

DAMULOG

KIBAWE

KITAOTAO

DANGCAGAN

DON CARLOS

KADINGILAN

WAO

TALAKAG

BUMBARAN

Part ofLANAO SUR

Served byBumbaran Municipal System

P P

H Q

MH

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Power Plant

Mini Hydro

3 PH Backbone Line

Energized Coop System

P P

Energized Other System

MH

Page 225: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 13, 1972

II. DATE OF FIRST ENERGIZATION : November 1978

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 1.6 7.9 35.1 255.000

Subsidy 79.8 116.1 134.1 0.800

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Kalilangan 14 14 14 14 100 0 6,700 3,857 4,043 4,129 62

2 Pangantucan 19 19 19 19 100 0 9,500 4,620 4,960 5,202 55

Talakag 1 1 1 1 100 0 800 126 134 140 18

Second District

3 San Fernando 24 24 24 24 100 0 8,900 3,045 3,305 3,472 39

4 City of Valencia (31) 30 30 30 30 100 0 31,900 25,584 26,714 27,806 87

City of Malaybalay 1 1 1 1 100 0 300 156 159 172 57

Third District

5 Damulog 17 16 16 16 94 1 4,500 1,985 2,076 2,162 48

6 Dangcagan 14 14 14 14 100 0 4,200 2,916 3,024 3,155 75

7 Don Carlos 29 29 29 29 100 0 12,300 8,643 8,958 9,303 76

8 Kadingilan 17 17 17 17 100 0 5,700 3,095 3,288 3,416 60

9 Kibawe 23 23 23 23 100 0 7,300 3,929 4,153 4,326 59

10 Kitaotao 35 35 35 35 100 0 5,700 3,997 4,234 4,424 78

11 Maramag 20 20 20 20 100 0 16,700 13,007 13,749 14,465 87

12 Quezon 31 31 31 31 100 0 18,300 10,570 11,289 11,823 65

First District, Lanao Sur

13 Wao 26 26 26 26 100 0 6,300 4,565 4,862 5,081 81

Bumbaran 2 2 2 2 100 0 500 323 333 347 69

First District, Davao City

Davao City 200 128 140 155 78

Total 303 302 302 302 99 1 139,800 90,546 95,421 99,578 71

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 44,396 46,451 50,082 Residential 80,173 84,796 88,538

MWH Purchased 8,996 9,550 10,024 Commercial 7,280 7,316 7,345

MWH Sold 7,860 8,379 8,741 Industrial 307 319 335

Systems Loss (%) 12 12 12 Public Building 2,320 2,380 2,612

Peak Load (KW) 22,926 25,761 24,057 Others 466 610 748

Load Factor (%) 54 51 57 Total 90,546 95,421 99,578

Collection Efficiency (%) 97 97 99

Ave. Systems Rate (P/KWH) 5.65 5.54 5.73

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 27,457 28,589 31,228 35,039 37,717 37,835 37,705 40,627 41,895 45,071

Commercial 15,256 16,626 19,363 21,936 21,821 18,269 18,206 19,551 20,363 21,668

Industrial 9,436 9,255 8,312 7,842 13,363 20,410 21,992 27,944 32,097 31,563

Public Building 2,735 2,807 3,347 4,216 4,299 4,092 3,943 4,144 4,028 4,332

Others 2,067 2,128 1,360 3,011 3,277 2,430 2,024 2,054 2,170 2,261

Total 56,951 59,405 63,610 72,044 80,477 83,036 83,870 94,320 100,553 104,895

City of Valencia Mountain View Mini Hydro

Maramag Pulangi 4/NPC Hydro

FIRST BUKIDNON ELECTRIC COOPERATIVE, INC. (FIBECO)Anahawon, Maramag, Bukidnon

Tel. No. (088) 356-1026; Telefax No. (088) 356-1025, Fax No. (088) 356-1018; Cel. No. (0912) 711-8291

2008 20092007

A+

Mega Large

Arch. Raul L. Alkuino Arch. Raul L. Alkuino

Engr. Renato S. Cortezano (OIC) Engr. Renato S. Cortezano (OIC)

Mr. George J. Ares

Engr. Daniel A. Tangara (OIC)

A+ A+

Unenerg.Served

Mega Large Mega Large

B A R A N G A Y S C O N N E C T I O N S

POWER PLANT

Location Project Name/Proponent Type

Legislative District

Monthly Average

99,409 104,354

Potential

94,053

MUNICIPALITIES/CITIES

CoverageEnergized

218

Page 226: The 2007-2009 RE Chronicle

N

219

LEGEND :

H Q HQ Location

Municipality

10 MVA Substation

Mini Hydro

3 PH Backbone Line

Energized Coop System

MH

MALITBOG

IMPASUG-ONG

SUMILAO

CABANGLASAN

CITY ofMALAYBALAY

MANOLO FORTICH

LIBONA

BAUNGON

LANTAPAN

TALAKAG

H Q

MH

MH

Page 227: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : July 26, 1977

II. DATE OF FIRST ENERGIZATION : June 29, 1979

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 142.2 288.4 449.3 1.600

Subsidy 34.5 56.3 57.3

7.000

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District1 Baungon (16) 15 15 15 15 100 0 5,600 2,176 2,114 2,135 38

2 Libona 14 14 14 14 100 0 7,300 4,417 4,348 4,671 64

3 Malitbog 11 11 11 11 100 0 4,100 1,296 1,256 1,251 31

4 Manolo Fortich 22 22 22 22 100 0 16,600 12,989 13,577 13,943 84

5 Sumilao 10 10 10 10 100 0 3,900 2,443 2,185 2,323 60

6 Talakag (29) 11 10 11 11 100 0 4,200 452 582 756 18

Second District7 Cabanglasan 15 15 15 15 100 0 7,100 4,336 4,396 4,183 59

8 Impasug-ong 13 13 13 13 100 0 6,000 3,079 2,962 2,888 48

9 Lantapan 14 14 14 14 100 0 9,300 5,186 5,688 6,124 66

10 City of Malaybalay (46) 45 45 45 45 100 0 28,100 22,056 25,815 28,034 99

City of Valencia 1 1 1 1 100 0 1,000 483 546 569 57

Total 171 170 171 171 100 0 93,200 58,913 63,469 66,877 72

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 31,472 34,766 39,468 Residential 54,178 57,425 61,065

MWH Purchased 7,303 7,949 8,467 Commercial 3,098 3,308 3,740

MWH Sold 6,252 7,170 7,502 Industrial 380 365 368

Systems Loss (%) 14 10 11 Public Building 1,140 1,234 1,548

Peak Load (KW) 17,518 18,339 19,545 Others 117 1,137 156

Load Factor (%) 57 59 59 Total 58,913 63,469 66,877

Collection Efficiency (%) 92 91 92

Ave. Systems Rate (P/KWH) 5.03 4.85 5.26

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 17,596 19,517 21,485 24,174 27,094 27,344 29,224 31,286 35,441 34,864

Commercial 11,127 11,998 13,026 14,439 14,494 15,116 16,247 18,107 20,092 21,642

Industrial 7,565 8,173 9,239 10,514 12,215 16,063 17,999 19,002 23,372 25,768

Public Building 2,312 2,880 2,928 3,335 3,429 3,536 3,874 5,390 6,195 6,662

Others 2,363 2,747 3,155 3,736 2,389 1,368 1,163 1,242 944 1,085

Total 40,963 45,315 49,833 56,198 59,621 63,428 68,507 75,027 86,044 90,021

Agusan HEP/ /First Generation Holdings

Hydro

Legislative DistrictPotential

ServedMUNICIPALITIES/CITY

Monthly Average

61,684 65,92255,995

POWER PLANT

Location

CoverageEnergized

Unenerg.

Baungon

Extra Large Extra LargeExtra Large

B A R A N G A Y S C O N N E C T I O N S

Project Name/Proponent Type

Bubunawan/BPC Inc. Mini Hydro

Manolo Fortich

Mr. Edgar R. Masongsong

A+A+ A+

Mr. Edgar R. MasongsongMr. Edgar R. Masongsong

Mr. Bonifacio B. Ebueza Mr. Bonifacio B. EbuezaMr. Bonifacio B. Ebueza

BUKIDNON II ELECTRIC COOPERATIVE, INC. (BUSECO)Manolo Fortich, Bukidnon

2008 2009

Tel. Nos. (088) 230-2248, 230-2001; 230-2001; Telefax No. (088) 230-2240; 221-3314; Website: http://www.buseco.com.ph

2007

220

Page 228: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

3 PH Backbone Line

Energized Coop System

MAMBAJAO

GUINSILIBAN

MAHINOG

CATARMAN

SAGAY

H Q

221

Page 229: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : December 28, 1977

II. DATE OF FIRST ENERGIZATION : September 1983

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 8.4 8.7 8.7

Subsidy 52.3 65.2 74.5

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 Catarman 14 14 14 14 100 0 3,500 2,489 2,518 2,546 73

2 Guinsiliban 7 7 7 7 100 0 1,100 741 773 809 74

3 Mahinog 13 13 13 13 100 0 2,800 2,015 2,055 2,116 76

4 Mambajao 15 15 15 15 100 0 7,000 5,910 6,049 6,194 88

5 Sagay 9 9 9 9 100 0 2,300 1,603 1,647 1,655 72

Total 58 58 58 58 100 0 16,700 12,758 13,042 13,320 80

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 6,352 7,466 8,365 Residential 11,643 11,874 12,134

MWH Purchased 1,135 1,199 1,261 Commercial 651 667 660

MWH Sold 972 1,027 1,079 Industrial - - -

Systems Loss (%) 14 14 14 Public Building 407 437 459

Peak Load (KW) 3,111 3,281 3,382 Others 57 64 67

Load Factor (%) 50 50 51 Total 12,758 13,042 13,320

Collection Efficiency (%) 100 100 100

Ave. Systems Rate (P/KWH) 6.54 7.27 7.75

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 4,779 5,187 5,763 6,581 7,056 7,183 6,863 7,231 7,515 7,776

Commercial 1,902 1,904 1,889 1,987 2,175 2,586 2,634 2,812 3,091 3,318

Industrial - - - - - - - - - -

Public Building 588 717 816 972 1,161 1,260 1,291 1,408 1,521 1,655

Others 438 505 562 614 412 258 242 213 199 201

Total 7,707 8,313 9,030 10,154 10,803 11,287 11,030 11,664 12,326 12,950

Monthly Average

11,915 12,25811,552

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

Legislative DistrictPotential

MUNICIPALITIES

Medium MediumMedium

Mr. Teodoro N. Banaag

Mr. Adrian A. Ebcas

A A+

Mr. Francisco V. Aguilar Mr. Francisco V. Aguilar

Mr. Adrian A. Ebcas Mr. Adrian A. Ebcas

A+

CAMIGUIN ELECTRIC COOPERATIVE, INC. (CAMELCO)Capitol Hills, Pandan, Mambajao, Camiguin Province

Tel. Nos. (088) 387-0113 to 14, 387-6019, 387-9963, 387-0963; Fax No. (088) 387-1227

2008 20092007

222

Page 230: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

Energized Coop System

Energized Other System

Served by Iligan Light & Power, Inc.

223

BACOLOD

MAIGO

KAUSWAGAN

POONAPIAGAPO

MATUNGAO

LINAMON

TAGOLOAN

ILIGAN CITY

TANGCAL

KOLAMBUGAN

MUNAI

MAGSAYSAY

TUBODBAROY

SALVADOR

LALA

NUNUNGANSAPAD

KAPATAGAN

SULTAN NAGADIMAPORO(KAROMATAN)

H Q

Page 231: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 27, 1972

II. DATE OF FIRST ENERGIZATION : December 1974

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 47.2 64.4 180.3

Subsidy 79.9 98.9 109.5

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Bacolod 16 16 16 16 100 0 3,900 3,508 3,673 3,859 99

2 Baroy 23 23 23 23 100 0 4,800 4,490 4,619 4,768 99

3 Kauswagan 13 13 13 13 100 0 3,900 3,630 3,716 3,841 98

4 Kolambugan 26 24 24 26 100 0 6,300 5,595 5,730 5,876 93

5 Linamon 8 8 8 8 100 0 3,300 3,061 3,139 3,264 99

6 Maigo 13 13 13 13 100 0 3,800 3,535 3,637 3,751 99

7 Tubod 24 24 24 24 100 0 9,800 8,708 9,217 9,547 97

Second District

8 Kapatagan 33 33 33 33 100 0 8,900 7,724 7,963 8,194 92

9 Lala 27 27 27 27 100 0 11,800 10,294 10,705 11,248 95

10 Magsaysay 24 15 15 15 63 9 2,300 1,108 1,163 1,238 54

11 Matungao 12 12 12 12 100 0 1,900 667 690 722 38

12 Munai* 26 11 12 12 46 14 3,300 226 236 254 8

13 Nunungan** 25 1 1 1 4 24 2,500 1 1 1 0

14 Poona Piagapo* 26 16 16 16 62 10 3,300 296 314 328 10

15 Salvador 25 25 25 25 100 0 3,500 2,184 2,257 2,389 68

16 Sapad 17 15 15 16 94 1 3,100 1,785 1,852 1,976 64

17 Sultan Naga Dimaporo (Karomatan) 37 37 37 37 100 0 8,700 4,170 4,413 4,661 54

18 Tagoloan** 7 6 6 7 100 0 1,700 1 1 1 0

19 Tangcal 18 7 7 12 67 6 1,200 340 343 360 30

Baloi 3 3 3 3 100 0 2,000 1,241 1,280 1,320 66 First District, Zamboanga del Sur

Aurora 3 3 3 3 100 0 600 316 376 388 65

Tukuran 1 1 1 1 100 0 100 49 -

Total 407 333 334 343 84 64 90,700 62,929 65,325 67,986 75

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 24,738 25,338 27,447 Residential 56,720 58,856 61,636

MWH Purchased 4,635 4,646 4,845 Commercial 3,162 3,228 3,210

MWH Sold 4,149 4,156 4,329 Industrial 367 345 338

Systems Loss (%) 10 10 10 Public Building 1,319 1,475 1,519

Peak Load (KW) 11,394 11,490 11,559 Others 1,361 1,421 1,283

Load Factor (%) 56 55 57 Total 62,929 65,325 67,986

Collection Efficiency (%) 102 105 103

Ave. Systems Rate (P/KWH) 5.96 6.10 6.34

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 19,394 20,528 22,427 25,618 30,525 30,676 30,509 31,739 31,988 32,945

Commercial 5,155 5,526 5,678 6,317 7,298 7,467 7,423 7,846 7,840 8,105

Industrial 4,226 4,674 4,934 5,752 6,505 7,804 7,331 7,167 6,826 7,342

Public Building 1,619 1,854 1,847 2,221 2,368 2,176 2,297 2,425 2,657 3,038

Others 719 1,775 2,163 2,479 953 725 669 611 557 519

Total 31,113 34,357 37,049 42,387 47,648 48,849 48,229 49,788 49,868 51,949

* With Provisional Franchise, NEC. Res. No. 4 s. 1976

**Not included in the EC's Certificate of Franchise

LANAO DEL NORTE ELECTRIC COOPERATIVE, INC. (LANECO)9209 Tubod, Lanao Del Norte, Mindanao

Tel. Nos. (063) 341-5231, 495-0016; Fax No. (063) 341-5210

2008 20092007

A+

Extra Large

Mr. Lydon L. Abucay Mr. Reinario B. Bihag

Engr. Resnol C. Torres Engr. Resnol C. Torres

Mr. Lydon L. Abucay

Engr. Resnol C. Torres

A+ A+

Unenerg.Served

Extra Large Mega Large

B A R A N G A Y S C O N N E C T I O N S

Legislative District

Monthly Average

60,762 63,256

Potential

59,082

MUNICIPALITIES

CoverageEnergized

224

Page 232: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Energized Other System

Headquarters

N

225

DANECOMontevista, Compostela Valley

SARANGANI ISLAND

DASURECOCity of Digos

Served byDavao Light & Power Co., Inc.

DORECOCity of Mati

Page 233: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Davao Oriental 11 11 11 11 100 183 183 183 183 100 97,900 67,858 71,229 74,354 76

2 Davao Norte 18 18 18 18 100 374 374 374 374 100 245,200 131,278 137,054 141,443 58

3 Davao Sur 15 15 15 15 100 337 334 334 337 100 184,800 91,887 95,396 99,005 54

DAVAO REGIONREGION XI

ELECTRIC DISTRIBUTION UTILITIES

MUNICIPALITIES/CITIES BARANGAYS

ServedPotentialCoverage

EnergizedCoverage

CONNECTIONS

Energized

226

Total 294,149 329,074 350,198 378,798 418,780 424,302 426,811 461,517 487,535 538,099

Others 7,228 8,526 10,371 13,149 11,678 9,658 9,664 8,340 7,487 9,654

Public Bldgs. 12,696 12,633 13,128 15,230 16,451 16,244 17,030 17,810 20,595 23,203

Industrial 112,102 128,789 123,241 111,493 133,193 147,821 142,999 152,693 159,746 178,523

Commercial 38,677 43,168 49,706 52,951 53,661 58,238 63,373 68,986 75,639 86,232

Residential 123,446 135,958 153,752 185,975 203,797 192,341 193,745 213,688 224,068 240,487

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Total 44 44 44 44 100 894 891 891 894 100 527,900 291,023 303,679 314,802 60

Page 234: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

Below 5 MVA Substation

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

Energized Coop System

227

N

SAN ISIDRO

LUPONTARRAGONA

BAGANGA

BANAY-BANAY

GOVERNORGENEROSO

CARAGA

MANAY

CATEEL

BOSTON

CITY of MATIH Q

Page 235: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION :December 30, 1977

II. DATE OF FIRST ENERGIZATION : June 1979

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 7.7 12.7 19.9

Subsidy 85.7 112.7 112.7

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Baganga 18 18 18 18 100 0 9,200 4,972 5,198 5,375 58

2 Boston 8 8 8 8 100 0 2,100 1,108 1,157 1,220 58

3 Caraga 17 17 17 17 100 0 7,100 2,100 2,217 2,351 33

4 Cateel 16 16 16 16 100 0 6,100 3,539 3,738 3,974 65

5 Manay 17 17 17 17 100 0 7,800 3,409 3,564 3,675 47

6 Tarragona 10 10 10 10 100 0 4,800 1,530 1,680 1,797 37

Second District

7 Banaybanay 14 14 14 14 100 0 7,700 7,164 7,420 7,641 99

8 Governor Generoso 20 20 20 20 100 0 9,100 6,018 6,415 6,708 74

9 Lupon 21 21 21 21 100 0 12,100 10,392 10,864 11,319 94

10 City of Mati 26 26 26 26 100 0 25,200 22,860 24,026 25,138 99

11 San Isidro 16 16 16 16 100 0 6,700 4,766 4,950 5,156 77

Total 183 183 183 183 100 0 97,900 67,858 71,229 74,354 76

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 24,810 30,475 32,892 Residential 56,773 58,798 61,498

MWH Purchased 4,863 5,580 6,714 Commercial 6,015 7,368 6,266

MWH Sold 4,520 5,215 6,082 Industrial 196 130 141

Systems Loss (%) 7 6 9 Public Building 1,528 1,669 1,860

Peak Load (KW) 12,865 13,941 15,662 Others 3,346 3,264 4,589

Load Factor (%) 52 55 59 Total 67,858 71,229 74,354

Collection Efficiency (%) 106 96 99

Ave. Systems Rate (P/KWH) 5.49 5.84 5.41

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 17,565 18,019 18,976 20,730 25,983 25,400 25,280 27,509 30,132 33,314

Commercial 9,741 11,155 13,241 14,320 8,522 9,632 11,931 9,282 12,164 14,695

Industrial 14,162 16,137 13,767 13,304 13,997 13,974 13,331 13,339 14,489 17,607

Public Building 3,370 3,581 3,981 4,661 4,599 3,892 4,266 3,118 4,626 5,707

Others 864 1,144 1,225 1,346 1,397 1,152 1,263 990 1,168 1,661

Total 45,702 50,036 51,190 54,361 54,498 54,050 56,071 54,238 62,579 72,984

Monthly Average

MUNICIPALITIES

Potential

54,413

Legislative District

Served

Extra Large Extra Large

Engr. Gregory A. Dukil

A+

B A R A N G A Y S

A+A+

Extra Large

57,317

DAVAO ORIENTAL ELECTRIC COOPERATIVE, INC. (DORECO)Madang Hi-Way, City of Mati, Davao Oriental

Tel. Nos. (087) 388-3263, 388-3127, 811-4210 to 11; Telefax Nos. (087) 388-3310, 338-3112; E-mail: [email protected]

2008 20092007

Mr. Villanueva P. Olea Mr. Luisito S. Gregorio

54,157

Coverage

Engr. Gregory A. Dukil

Mr. Villanueva P. Olea

EnergizedUnenerg.

C O N N E C T I O N S

Engr. Gregory A. Dukil

228

Page 236: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

12 MVA Substation

20 MVA Substation

Power Plant

Generating Set

3 PH Backbone Line

Energized Coop System

Energized Other System

G S

P P

229

N

SAMAL

BABAK

PANTUKAN

MABINI(Doña Alicia)

MARAGUSAN(SAN MARIANO)

CARMEN

PANABO

NEW BATAAN

SANTO TOMAS

NEW CORELLA

KAPALONG

MAWAB

MONKAYO

LAAK(SAN VICENTE)

Served by Davao LightPower Co. Inc.

TALICUD ISLAND

MACO

CITY ofTAGUM

NABUNTURAN

COMPOSTELA

TALAINGOD

MONTEVISTA

ISLAND GARDENCITY OF SAMAL

P P

H Q

G S

KAPUTIAN

ASUNCION (Saug)

DUJALI

SAN ISIDRO

Page 237: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION :September 24, 1971

II. DATE OF FIRST ENERGIZATION : June 16, 1975

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 1123.5 1496.9 1856.9

Subsidy 118.1 161.4 163.9

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District, Compostela Valley

1 Compostela 16 16 16 16 100 0 14,700 9,643 9,950 10,198 69

2 Maragusan (San Mariano) 24 24 24 24 100 0 11,000 4,721 5,023 5,137 47

3 Monkayo 21 21 21 21 100 0 20,500 9,059 9,318 9,511 46

4 Montevista 20 20 20 20 100 0 7,900 4,330 4,523 4,629 59

5 New Bataan 14 14 14 14 100 0 10,100 4,504 4,688 4,811 48

Second District, Compostela Valley

6 Mabini (Doña Alicia) 11 11 11 11 100 0 7,600 3,039 3,145 3,249 43

7 Maco 37 37 37 37 100 0 15,600 7,295 7,538 7,866 50

8 Mawab 11 11 11 11 100 0 7,600 4,373 4,463 4,567 60

9 Nabunturan 28 28 28 28 100 0 14,500 10,443 10,809 11,110 77

10 Pantukan 13 13 13 13 100 0 14,800 5,318 5,594 6,013 41

11 Laak (San Vicente) 40 40 40 40 100 0 14,200 3,909 4,263 4,399 31

First District

12 Asuncion (Saug) 20 20 20 20 100 0 14,000 5,021 5,187 5,341 38

13 Kapalong 14 14 14 14 100 0 15,800 5,410 5,760 6,022 38

14 New Corella 20 20 20 20 100 0 10,300 4,256 4,454 4,577 44

15 Talaingod 3 3 3 3 100 0 584 605 617

16 San Isidro 13 13 13 13 100 0 1,875 1,967 2,023

Second District

18 Island Garden City of Samal

Babak 16 16 16 16 100 0 3,265 3,494 3,841

Kaputian 15 15 15 15 100 0 19,100 1,888 2,042 2,152 44

Samal 15 15 15 15 100 0 2,180 2,321 2,502

Total 374 374 374 374 100 0 245,200 131,278 137,054 141,443 58

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 114,988 118,083 134,095 Residential 113,272 118,226 121,728

MWH Purchased 24,698 26,236 28,590 Commercial 9,447 9,237 9,668

MWH Sold 21,671 22,527 24,587 Industrial 695 544 607

Systems Loss (%) 12 14 14 Public Building 2,634 3,006 3,096

Peak Load (KW) 57,986 61,420 68,877 Others 5,230 6,041 6,344

Load Factor (%) 58 59 57 Total 131,278 137,054 141,443

Collection Efficiency (%) 95 95 95

Ave. Systems Rate (P/KWH) 5.31 5.24 5.45

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 66,054 73,246 85,421 108,701 115,065 103,325 106,427 119,950 126,468 133,918

Commercial 17,855 20,264 24,250 25,650 31,024 33,820 36,915 44,570 47,675 53,911

Industrial 61,580 71,610 64,351 50,491 65,077 79,215 76,945 81,364 81,391 91,266

Public Building 6,780 6,234 6,063 6,970 7,798 8,260 8,879 10,781 11,891 13,178

Others 2,356 2,702 3,542 6,563 3,893 3,865 4,003 3,391 2,896 2,775

Total 154,625 174,056 183,627 198,375 222,857 228,485 233,169 260,056 270,321 295,048

Diesel 0.326Island Garden

City of SamalNPC-SPUG

Unenerg.Served

Monthly Average

145,891 149,817

Potential

141,997

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

TypeProject Name/Proponent

100.000

Mr. Edgardo D. Savellano, CPA, MPA

Mega Large Mega Large

Mr. Antonio C. Sebumpan Mr. Dean C. Briz

Mr. Edgardo D. Savellano, CPA, MPA Mr. Allan L. Laniba (OIC)

2007

Mr. Geronimo O. Balana

Legislative District

MUNICIPALITIES/CITIES

A+ A+A+

Mega Large

POWER PLANT

Location

69 3,800

DieselPower Barge 118/Therma

Marine, Inc.Maco

DAVAO DEL NORTE ELECTRIC COOPERATIVE, INC. (DANECO)Km. 100 Montevista, Compostela Valley/Tipaz District, Tagum City

Tel. Nos. (084) 400-1146, 218-4313; Telefax No. (084) 400-1129; Fax Nos. (084) 400-1128; 400-2719; E-mail: [email protected]

2008 2009

230

17 City of Tagum 23 23 23 23 100 0 43,700 40,165 41,910 42,878 99

Page 238: The 2007-2009 RE Chronicle

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

20 MVA Substation

Generating Set

3 PH Backbone Line

LEGEND :

H Q

Energized Coop System

Energized Other System

G S

231

N

Served byDavao Light Power Co., Inc.

DAVAO CITY

KIBLAWAN

MALALAG

SANTAMARIA

SANTA CRUZ

PADADAMATANAO

HAGONOY

BANSALAN

SULOP

MALITA

JOSE ABADSANTOS(Trinidad)

SARANGANI

G S

DONMARCELINO

MAGSAYSAY CITY of DIGOS

G S

H Q

Page 239: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : June 1, 1975

II. DATE OF FIRST ENERGIZATION : November 1975

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 40.6 60.6 60.6 0.423

Subsidy 101.4 129.0 135.1 0.326

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Bansalan 25 25 25 25 100 0 12,600 8,790 9,045 9,372 74

2 City of Digos 26 26 26 26 100 0 30,400 27,071 28,114 29,251 96

3 Hagonoy 21 21 21 21 100 0 10,700 6,622 6,887 7,127 67

4 Magsaysay 22 22 22 22 100 0 10,500 5,488 5,637 5,859 56

5 Matanao 33 33 33 33 100 0 11,400 6,322 6,607 6,910 61

6 Padada 17 17 17 17 100 0 6,200 5,713 5,920 6,042 97

7 Santa Cruz 18 18 18 18 100 0 16,400 9,821 10,180 10,537 64

Second District

8 Don Marcelino 15 15 15 15 100 0 8,100 980 1,030 1,081 13

9 Jose Abad Santos (Trinidad) 26 26 26 26 100 0 13,900 579 623 660 5

10 Kiblawan 30 30 30 30 100 0 10,000 2,927 3,055 3,176 32

11 Malalag 15 15 15 15 100 0 8,100 3,918 4,087 4,238 52

12 Malita 30 30 30 30 100 0 24,400 6,477 6,754 7,013 29

13 Sarangani 12 9 9 12 100 0 4,400 418 447 465 11

14 Santa Maria 22 22 22 22 100 0 11,100 3,698 3,840 3,983 36

15 Sulop 25 25 25 25 100 0 6,600 3,063 3,170 3,291 50

Total 337 334 334 337 100 0 184,800 91,887 95,396 99,005 54

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 59,346 65,209 74,132 Residential 80,558 83,908 86,265

MWH Purchased 13,430 14,012 15,415 Commercial 5,136 5,262 5,366

MWH Sold 12,269 12,886 14,172 Industrial 334 346 373

Systems Loss (%) 8 8 7 Public Building 1,797 1,894 2,008

Peak Load (KW) 32,971 35,404 37,390 Others 4,062 3,986 4,993

Load Factor (%) 56 54 56 Total 91,887 95,396 99,005

Collection Efficiency (%) 97 96 97

Ave. Systems Rate (P/KWH) 4.84 5.06 5.23

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 39,827 44,693 49,355 56,544 62,749 63,616 62,038 66,229 67,468 73,255

Commercial 11,081 11,749 12,215 12,981 14,114 14,786 14,527 15,134 15,800 17,626

Industrial 36,360 41,042 45,123 47,698 54,119 54,632 52,723 57,990 63,866 69,650

Public Building 2,546 2,818 3,084 3,599 4,054 4,091 3,885 3,911 4,078 4,318

Others 4,008 4,680 5,604 5,240 6,388 4,641 4,398 3,959 3,423 5,218

Total 93,822 104,982 115,381 126,062 141,424 141,766 137,571 147,223 154,635 170,067

Legislative DistrictPotential

MUNICIPALITIES/CITYC O N N E C T I O N S

Mega Large

Jose Abad Santos

Diesel

Unenerg.Served

Sarangani NPC-SPUG

83,425

Diesel

Project Name/Proponent Type

Mega Large Mega Large

Monthly Average

77,997

B A R A N G A Y S

CoverageEnergized

POWER PLANT

Location

80,223

NPC-SPUG

Atty. Artemio A. Tajon

Engr. Jesus P. dela Victoria

A+ A+

Atty. Leonardo Suario Atty. Rodolfo A. Escovilla

Engr. Jesus P. dela Victoria Engr. Jesus P. dela Victoria

A+

DAVAO DEL SUR ELECTRIC COOPERATIVE, INC. (DASURECO)Cogon, City of Digos, Davao del Sur

Tel Nos. (082) 553-2643, 553-2463, 553-2563, 570-0236; Fax. No. (082) 553-3589; E-mail: [email protected]

2008 20092007

232

Page 240: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Headquarters

N

233

COTELCOMatalam, North Cotabato

SUKELCOCity of Tacurong

SOCOTECO ICity of Koronadal

SOCOTECO IIGeneral Santos City

Page 241: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

CONNECTIONS

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 No. Cotabato 18 12 12 18 100 543 331 342 540 99 219,000 88,325 93,775 127,655 58

2 So. Cotabato I 10 10 10 10 100 172 172 172 172 100 143,700 73,041 76,267 79,506 55

3 So. Cotabato II 10 10 10 10 100 204 193 196 204 100 241,600 115,829 118,801 122,407 51

4 Sultan Kudarat 17 17 17 17 100 307 283 287 305 99 145,600 52,430 54,893 57,250 39

Total 55 49 49 55 100 1,226 979 997 1,221 99 749,900 329,625 343,736 386,818 52

CoverageEnergized

PotentialServed

REGION XIISOCCSKSARGEN

ELECTRIC DISTRIBUTION UTILITIES

MUNICIPALITIES/CITIES BARANGAYS

CoverageEnergized

234

Total 510,090 559,157 591,070 657,724 722,406 725,092 745,065 791,802 817,641 865,480

Others 5,093 5,972 7,169 9,181 7,933 8,593 9,268 9,501 9,854 10,406

Public Bldgs. 18,344 19,860 22,059 24,649 30,510 31,757 35,841 39,153 40,377 43,979

Industrial 168,792 183,165 189,365 212,165 219,292 216,756 219,404 225,981 236,636 244,162

Commercial 104,029 113,135 118,910 130,205 153,190 159,159 164,547 177,723 182,862 196,755

Residential 213,832 237,025 253,567 281,524 311,482 308,827 316,005 339,444 347,912 370,178

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 242: The 2007-2009 RE Chronicle
Page 243: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 16, 1972

II. DATE OF FIRST ENERGIZATION : July 16, 1979

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 40.5 58.6 88.6

Subsidy 114.4 142.3 210.8

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Banisilan 20 16 19 20 100 0 8,000 2,141 2,254 2,518 31

2 Carmen 28 28 28 28 100 0 10,300 4,934 5,148 5,355 52

3 Kabacan 24 22 22 22 92 2 13,900 10,553 10,982 11,439 82

P-Palma Area*

4 Alamada 17 17 100 0 9,900 2,433 25

5 Aleosan 19 18 95 1 5,900 1,294 22

6 Libungan 20 20 100 0 9,100 4,096 45

7 Midsayap 57 57 100 0 23,900 12,425 52

8 Pigkawayan 40 40 100 0 11,500 5,300 46

9 Pikit 42 42 100 0 15,400 3,378 22

Second District

10 Antipas 13 13 13 13 100 0 4,400 2,857 3,017 3,174 72

11 Arakan 28 23 26 28 100 0 7,700 2,122 2,500 2,807 36

12 City of Kidapawan 40 40 40 40 100 0 26,600 23,967 25,263 26,304 99

13 Magpet 32 32 32 32 100 0 8,700 3,688 3,985 4,214 48

14 Makilala 38 38 38 38 100 0 14,100 10,465 11,128 11,832 84

15 Matalam 34 34 34 34 100 0 13,500 7,276 7,899 8,499 63

16 M'lang 37 37 37 37 100 0 17,500 11,229 11,898 12,344 71

17 President Roxas 25 20 25 25 100 0 9,200 3,637 3,976 4,213 46

18 Tulunan 29 28 28 29 100 0 9,400 5,456 5,725 6,030 64

Total 543 331 342 540 99 3 219,000 88,325 93,775 127,655 58

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 48,147 51,744 57,638 Residential 73,617 79,217 112,890

MWH Purchased 10,588 11,105 11,230 Commercial 7,766 7,922 8,108

MWH Sold 9,015 9,512 10,100 Industrial 269 274 276

Systems Loss (%) 14 14 14 Public Building 1,932 2,067 2,299

Peak Load (KW) 24,845 26,627 35,241 Others 4,741 4,295 4,082

Load Factor (%) 58 57 46 Total 88,325 93,775 127,655

Collection Efficiency (%) 94 95 94

Ave. Systems Rate (P/KWH) 5.34 5.44 5.71

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 27,763 30,849 33,722 38,240 43,989 45,961 47,254 49,741 52,925 56,018

Commercial 14,217 12,021 13,113 14,530 24,654 25,820 25,269 25,369 25,799 27,399

Industrial 13,332 19,441 22,828 28,163 21,248 19,269 20,777 21,138 23,291 25,443

Public Building 3,414 2,484 2,638 2,884 5,721 6,423 8,528 9,373 9,583 9,899

Others 1,286 1,434 1,483 3,191 1,645 1,694 1,865 2,558 2,550 2,446

Total 60,012 66,229 73,784 87,008 97,258 99,166 103,693 108,179 114,148 121,205

*Transferred from MAGELCO

Type

City of KidapawanMindanao I & II (Mt.

Apo)/PNOCGeothermal

Mr. Alejandro Q. Collados Mr. Alejandro Q. Collados

108.480

POWER PLANT

NORTH COTABATO ELECTRIC COOPERATIVE, INC. (COTELCO)Manubuan, Matalam, Cotabato

Tel Nos. (064) 392-1034, 288-1448, 288-5264, 288-1617; Telefax No. (064) 392-1032; E-mail: [email protected]; Website: www.cotelconet.com

2008 20092007

Mr. Rudy S. Caoagdan

Mr. Alejandro Q. Collados

Mega Large Mega Large

A+

Mega Large

A+ A+

Mr. Rudy S. Caoagdan Mr. Rudy S. Caoagdan

Served

Legislative DistrictPotential

MUNICIPALITIES/CITYEnergized

Unenerg.

Monthly Average

91,136 96,23786,128

B A R A N G A Y S C O N N E C T I O N S

Coverage

Location Project Name/Proponent

236

Page 244: The 2007-2009 RE Chronicle

N

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

20 MVA Substation

LEGEND :

H QEnergized Coop System

237

Part of SULTAN KUDARAT

T'BOLI

TAMPAKAN

NORALA

LUTAYAN

TANTANGAN

SANTONIÑO

BANGA

CITY of KORONADAL

SURALLAH

LAKE SEBU

H Q

Page 245: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 31, 1971

II. DATE OF FIRST ENERGIZATION : June 12, 1978

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 41.7 54.8 68.2

Subsidy 42.3 63.1 71.1

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District, Sultan Kudarat

1 Lutayan 11 11 11 11 100 0 9,200 1,878 1,966 2,104 23

First District

2 Tampakan 14 14 14 14 100 0 8,400 4,123 4,328 4,525 54

Second District

3 Banga 22 22 22 22 100 0 17,600 9,034 9,369 9,743 55

4 City of Koronadal 27 27 27 27 100 0 34,200 27,567 28,875 29,880 87

5 Lake Sebu 19 19 19 19 100 0 13,800 1,889 2,019 2,133 15

6 Norala 14 14 14 14 100 0 10,400 5,216 5,420 5,616 54

7 Santo Niño 10 10 10 10 100 0 9,200 5,284 5,443 5,653 61

8 Surallah 17 17 17 17 100 0 17,100 10,176 10,538 11,003 64

9 Tantangan 13 13 13 13 100 0 8,300 4,425 4,637 4,781 58

10 T'boli 25 25 25 25 100 0 15,500 3,449 3,672 4,068 26

Solar (NRE)

Total 172 172 172 172 100 0 143,700 73,041 76,267 79,506 55

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 52,108 53,951 61,369 Residential 65,116 68,113 70,987

MWH Purchased 12,041 12,261 13,316 Commercial 5,515 5,701 5,873

MWH Sold 10,776 10,874 11,817 Industrial 146 139 140

Systems Loss (%) 10 11 11 Public Building 1,320 1,371 1,462

Peak Load (KW) 28,687 27,820 31,603 Others 944 943 1,044

Load Factor (%) 57 60 58 Total 73,041 76,267 79,506

Collection Efficiency (%) 98 99 99

Ave. Systems Rate (P/KWH) 4.84 4.96 5.19

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 40,688 44,587 48,321 53,911 58,408 56,383 57,879 64,114 64,709 69,581

Commercial 18,317 23,318 25,084 32,992 38,895 39,645 39,830 42,327 42,381 46,444

Industrial 15,753 15,852 16,664 14,831 11,888 8,591 10,364 14,002 14,209 15,409

Public Building 3,369 4,053 4,652 5,287 6,505 6,751 7,207 8,424 8,657 9,954

Others 327 338 434 474 508 418 405 439 528 417

Total 78,454 88,148 95,155 107,495 116,204 111,788 115,685 129,306 130,484 141,805

SOUTH COTABATO I ELECTRIC COOPERATIVE, INC. (SOCOTECO I)Matulas, City of Koronadal, South Cotabato

Tel. Nos. (083) 228-2701, 228-4399, 228-2528, 228-5057, 228-5059 to 60; Fax No. (083) 228-3690; E-mail: info@socoteco_1.com

2007

Mr. Teotico E. Peliño

Mr. Santiago Tudio Mr. Santiago Tudio Mr. Santiago Tudio

2008 2009

Mr. Virgilio S. De Leon Mr. Floro D. Calixton, Jr.

A+

Monthly Average

B A R A N G A Y S

Legislative District

MUNICIPALITIES/CITY

A+ A+

Mega Large

77,382 79,698

Mega Large

74,700

Mega Large

C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

Potential

238

Page 246: The 2007-2009 RE Chronicle

N

SOCOTECO II

LEGEND :

H Q HQ Location

Municipality

Below 5 MVA Substation

5 MVA Substation

10 MVA Substation

20 MVA Substation

NPC Substation

Power Plant

3 PH Backbone Line

Energized Coop System

P P

239

MALAPATAN

TUPI

MAITUM

MAASIM

KIAMBA

MALUNGON

GLAN

GEN. SANTOSCITY (Dadiangas)

ALABEL

Part of SO. COTABATO

POLOMOLOKP P

H Q

Page 247: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 7, 1977

II. DATE OF FIRST ENERGIZATION : September 1978

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 7.5 49.5 49.5

Subsidy 39.2 82.2 95.7

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District, Sarangani1 Alabel 12 11 11 12 100 0 14,000 4,416 4,483 4,643 33

2 Glan 31 27 29 31 100 0 19,000 5,199 4,813 4,938 26

3 Kiamba 19 18 19 19 100 0 10,400 4,676 4,767 4,845 47

4 Maasim 16 15 15 16 100 0 9,000 2,609 2,980 3,062 34

5 Maitum 19 17 17 19 100 0 8,000 2,922 2,696 2,784 35

6 Malapatan 12 10 10 12 100 0 12,500 2,951 3,004 3,064 25

7 Malungon 31 31 31 31 100 0 21,700 4,672 5,242 5,412 25

First District8 Gen. Santos City (Dadiangas) 26 26 26 26 100 0 105,400 68,392 70,390 72,651 69

9 Polomolok 23 23 23 23 100 0 28,000 14,517 14,839 15,286 55

10 Tupi 15 15 15 15 100 0 13,600 5,475 5,587 5,722 42

Total 204 193 196 204 100 0 241,600 115,829 118,801 122,407 51

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 168,745 180,685 204,434 Residential 102,534 105,221 108,499

MWH Purchased 45,016 46,863 49,356 Commercial 5,974 6,224 6,506

MWH Sold 38,634 40,053 41,793 Industrial 188 190 195

Systems Loss (%) 14 15 15 Public Building 1,980 2,027 2,068

Peak Load (KW) 94,049 97,419 104,166 Others 5,153 5,139 5,139

Load Factor (%) 66 66 65 Total 115,829 118,801 122,407

Collection Efficiency (%) 95 95 97

Ave. Systems Rate (P/KWH) 4.37 4.51 4.89

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 114,515 125,477 133,465 146,558 161,221 159,515 164,035 178,194 180,297 190,948

Commercial 65,344 70,999 73,231 75,034 81,542 85,688 91,497 99,543 99,976 106,362

Industrial 119,232 126,227 125,537 142,765 156,433 159,262 158,352 161,851 175,628 177,043

Public Building 9,836 11,263 12,609 14,094 15,547 15,877 17,360 18,561 19,080 20,894

Others 3,080 3,793 4,829 5,048 5,278 5,790 6,441 5,454 5,654 6,269

Total 312,007 337,759 349,671 383,499 420,022 426,132 437,685 463,603 480,635 501,516

A+

Type

AlabelGen Santos

(SPPC)/Alsons/TomenDiesel

Mr. Marfenio Y. Tan

Engr. Rodolfo G. Ocat

A

POWER PLANT

Ms. Vivien B. Yap Dr. Apolinario B. Hatulan

Mega Large

A

Engr. Rodolfo G. Ocat Engr. Rodolfo G. Ocat

SOUTH COTABATO II ELECTRIC COOPERATIVE, INC. (SOCOTECO II)Jose P. Catolico Avenue, Lagao, General Santos City, South Cotabato

Tel. Nos. (083) 553-5848 to 50, 552-4313, 301-4567 to 68, 554-6894; 552-3964; Fax No. (083) 552-4856; E-mail: [email protected]

2008 20092007

Legislative DistrictPotential

MUNICIPALITIES/CITY

Mega Large

Location Project Name/Proponent

Mega Large

59.000

Monthly Average

115,527 119,215112,217

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

240

Page 248: The 2007-2009 RE Chronicle

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

Generating Set

3 PH Backbone Line

LEGEND :

H Q

Energized Coop System

G S

241

N

PALIMBANG

GEN. S.K.PENDATUN

BULUANCITY ofTACURONG

KALAMANSIG

LEBAK

Part of MAGUINDANAO

DATU PAGLAS

COLUMBIOPRESIDENTQUIRINO

ESPERANZA

ISULAN

BAGUMBAYAN

LAMBAYONG(Mariano Marcos)

SEN. NINOY AQUINO

G S

H Q

G S

PAGLAT

MANGUDADATU

PANDAG

G SG S

Page 249: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : November 4, 1975

II. DATE OF FIRST ENERGIZATION : December 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 30.9 31.5 43.5 5.267

Subsidy 85.0 108.1 123.5 0.326

0.054

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Columbio 16 15 16 16 100 0 4,900 1,127 1,255 1,378 28

2 Isulan 17 17 17 17 100 0 16,500 10,982 11,444 11,839 72

3 Lambayong (Mariano Marcos) 26 26 26 26 100 0 11,500 5,749 5,978 6,229 54

4 President Quirino 19 19 19 19 100 0 7,500 3,704 3,903 4,100 55

5 City of Tacurong 20 20 20 20 100 0 17,200 14,115 14,597 14,993 87

Second District

6 Bagumbayan 19 19 19 19 100 0 12,000 3,588 3,835 4,096 34

7 Esperanza 19 19 19 19 100 0 10,700 5,502 5,725 5,933 55

8 Kalamansig 15 15 15 15 100 0 10,000 1,309 1,323 1,326 13

9 Lebak 27 27 27 27 100 0 16,000 3,175 3,202 3,215 20

10 Palimbang 40 29 31 40 100 0 9,900 206 236 332 3

11 Sen. Ninoy Aquino 20 19 20 20 100 0 6,800 771 977 1,093 16

Second District, Maguindanao

12 Buluan 7 5 5 7 100 0

13 Mangudadatu 8 7 7 8 100 0

14 Pandag 8 8 8 8 100 0

15 Datu Paglas 23 21 21 23 100 0 4,500 525 606 767 17

16 Gen. S. K. Pendatun 19 15 15 19 100 0 6,500 384 401 418 6

17 Paglat 4 2 2 2 50 2 68 85 116

Total 307 283 287 305 99 2 145,600 52,430 54,893 57,250 39

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 39,211 39,772 45,909 Residential 46,425 48,689 50,612

MWH Purchased 8,933 8,700 9,758 Commercial 3,196 3,314 3,466

MWH Sold 7,559 7,698 8,413 Industrial 368 176 176

Systems Loss (%) 15 12 14 Public Bldg. 930 960 985

Peak Load (KW) 22,068 21,666 23,011 Others 1,511 1,754 2,011

Load Factor (%) 55 55 58 Total 52,430 54,893 57,250

Collection Efficiency (%) 95 97 96

Ave. Systems Rate (P/KWH) 5.19 5.17 5.46

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 30,866 36,112 38,059 42,815 47,864 46,968 46,837 47,395 49,981 53,631

Commercial 6,151 6,797 7,482 7,649 8,098 8,006 7,951 10,484 14,706 16,550

Industrial 20,475 21,645 24,336 26,406 29,723 29,635 29,911 28,990 23,508 26,267

Public Building 1,725 2,060 2,160 2,384 2,736 2,706 2,746 2,795 3,057 3,232

Others 400 407 423 468 502 691 557 1,050 1,122 1,274

Total 59,617 67,021 72,460 79,722 88,922 88,006 88,002 90,714 92,374 100,954

SULTAN KUDARAT ELECTRIC COOPERATIVE, INC. (SUKELCO)National Highway, Tacurong City, Sultan Kudarat

Tel. Nos. (064) 477-0326 to 27, 200-3155 to 56; Telefax No. (064) 200-3156

2008 20092007

Mr. Demetrio O. Jerez

A+A

Mr. Cecilio C. Mejia

Mr. Demetrio O. Jerez

Mr. Cecilio C. Mejia

Mr. Demetrio O. Jerez

A+

Mr. Cecilio C. Mejia

Legislative DistrictPotential

MUNICIPALITIES/CITY

Mega Large

Sen. Ninoy Aquino NPC-SPUG

Mega Large

Diesel/PB 111

Extra Large

NPC-SPUG

POWER PLANT

Kalamansig

59,474 61,67156,888

Location Project Name/Proponent Type

Diesel

Served

12 1,225

B A R A N G A Y S C O N N E C T I O N S

Palimbang NPC-SPUG Diesel

Coverage

Monthly Average

EnergizedUnenerg.

1,415 1,326 11,600

242

Page 250: The 2007-2009 RE Chronicle

LEGEND :

Energized Other SystemHeadquarters

Energized Coop System

243

TAWELCOBongao, Tawi-Tawi

N

LASURECOMarawi City

Served byCotabato LightPower Co., Inc.

MAGELCODatu Odin Sinsuat(Dinaig), Maguindanao

SIASELCOSiasi, Sulu

SULECOJolo, Sulu

TURTLE ISLAND

Served bySUKELCO

CASELCOMapun, Tawi-tawi

Served byFIBECO

Served byBASELCO

BASELCOCity of Isabela

Served byBumbaranElectric System

Page 251: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

CONNECTIONS

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Tawi-Tawi 9 9 9 9 100 186 178 179 186 100 68,700 8,952 9,312 10,202 15

2 Siasi 2 2 2 2 100 66 58 61 66 100 15,000 2,816 3,117 3,218 21

3 Sulu 16 16 16 16 100 330 246 253 330 100 99,400 20,072 20,889 21,490 22

4 Basilan 14 14 14 14 100 269 266 266 269 100 74,600 27,997 29,673 31,194 42

5 Cagayan de Sulu 2 2 2 2 100 17 9 14 14 82 5,900 1,185 1,415 1,418 24

6 Lanao Sur 41 40 41 41 100 1,173 970 1,031 1,173 100 145,300 51,731 56,357 56,357 39

7 Maguindanao 30 33 33 30 100 381 451 499 360 94 141,400 40,761 43,128 19,419 14

Total 114 116 117 114 100 2,422 2,178 2,303 2,398 99 550,300 153,514 163,891 143,298 26

ARMMAUTONOMOUS REGION IN MUSLIM MINDANAO

CoverageEnergized

CoverageEnergized

PotentialServed

ELECTRIC DISTRIBUTION

UTILITIES

MUNICIPALITIES/CITIES BARANGAYS

244

Total 85,342 79,139 83,225 87,349 87,566 127,090 109,513 88,597 69,435 177,089

Others 2,107 1,694 1,588 1,789 1,584 2,165 1,479 1,261 957 2,116

Public Bldgs. 5,540 5,070 5,610 6,405 6,634 7,800 6,982 6,852 6,882 9,806

Industrial 11,125 9,746 8,446 7,405 7,152 11,688 11,790 9,897 4,969 4,914

Commercial 13,888 14,802 16,718 17,182 16,371 19,303 18,238 15,802 12,234 17,206

Residential 52,682 47,827 50,863 54,568 55,825 86,134 71,024 54,785 44,393 143,047

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 252: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

Below 5 MVA Substation

Generating Set

3 PH Backbone Line

Energized Coop System

G S

N

245

BONGAO

SIMUNUL

TANDUBAS

SOUTH UBIAN

SAPA-SAPA

LANGUYAN

PANGLIMASUGALA(Balimbing)

SIBUTU IS.

G S

G S

G S

G S

G S

G SG S

H Q

KANG TIPAYAN DAKULA IS.

KANG TIPAYAN IS.CATCATAN IS. HANICOLAT IS.

BUBUAN IS.SUGBAY IS.

TUMBAGAAN IS.

TANDOBAN IS.

SAHARAH IS.

MANTABUAN IS.

BATLUNGAN IS.SUAN IS.

LUPA IS.

BANARAN IS.

BILATAN IS.

MANOK MANKAW IS.

SANGA-SANGA

TUMINDAO IS.

BASUN BAKULA IS.

G S

SITANGKAI

Page 253: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : January 25, 1975

II. DATE OF FIRST ENERGIZATION : September 1976

III. ELECTRIC COOPERATIVE OFFICIALS :

President :Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 9.0 10.0 13.5 6.588

Subsidy 45.8 61.7 63.8 0.726

0.258

0.500

0.531

0.440

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 Bongao 35 33 33 35 100 0 13,500 5,918 6,212 6,571 49

2 Panglima Sugala (Balimbing) 17 16 16 17 100 0 7,700 634 638 646 8

3 Languyan 20 19 19 20 100 0 9,700 400 400 400 4

4 Sapa-sapa 23 22 22 23 100 0 6,100 430 430 430 7

5 Simunul 15 15 15 15 100 0 7,400 589 614 670 9

6 Sitangkai 9 9 9 9 100 0 12,200 29 29 217 8

7 Sibutu 16 14 15 16 100 0 421 446 716

8 South Ubian 31 30 30 31 100 0 6,300 250 250 250 4

9 Tandubas 20 20 20 20 100 0 5,800 281 293 302 5

Total 186 178 179 186 100 0 68,700 8,952 9,312 10,202 15

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 6,079 6,516 6,447 Residential 8,241 8,361 9,322

MWH Purchased 1,278 1,326 1,234 Commercial 512 735 641

MWH Sold 721 778 761 Industrial - - -

Systems Loss (%) 43 41 38 Public Building 167 184 196

Peak Load (KW) - - - Others 32 32 43

Load Factor (%) - - - Total 8,952 9,312 10,202

Collection Efficiency (%) 46 39 44

Ave. Systems Rate (P/KWH) 8.43 8.38 8.47

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 2,527 1,847 3,468 3,996 4,510 4,396 5,127 3,330 4,944 5,137

Commercial 1,075 802 2,116 2,427 2,499 2,112 2,947 2,448 3,390 3,065

Industrial - - - - - - - - - -

Public Building 375 295 576 695 697 525 789 595 839 774

Others 47 24 75 126 159 107 111 117 158 157

Total 4,024 2,968 6,235 7,244 7,865 7,140 8,974 6,490 9,331 9,133

Project Name/Proponent

Tubig-Boh, Bongao, Tawi-Tawi

Tel. No. (068) 268-1304; Telefax No. (068) 268-1363

2008 20092007

Mr. Romeo S. Taup Mr. Ibnotalib Nasirin Mr. Ibnotalib Nasirin

- Small

9,539

ASEC Lorenzo R. Reyes (PS) Mr. Hector N. Tabilisma (PS/AGM)Engr. Sergio A. Bautista (PS/AGM)-

POWER PLANT

-

-

E

Balimbing NPC-SPUG

Diesel

Diesel

Tandubas

Location Type

Diesel/PB-108Bongao NPC-SPUG

Diesel

Potential

C O N N E C T I O N S

Energized

Simunul NPC-SPUG Diesel

Diesel

Monthly Average

Unenerg.Served

Sibutu NPC-SPUG

Legislative DistrictCoverage

8,305

MUNICIPALITIES

8,691

Sitangkai NPC-SPUG

B A R A N G A Y S

NPC-SPUG

246

TAWI-TAWI ELECTRIC COOPERATIVE, INC. (TAWELCO)

Page 254: The 2007-2009 RE Chronicle

N

LEGEND :

H Q HQ Location

Municipality

NPC Substation

Generating Set

Solar Home System

3 PH Backbone Line

Energized Coop System

SHS

G S

247

P A N D A M I

S I A S I

SHS

SHS

H Q G S

Page 255: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : February 25, 1991

II. DATE OF FIRST ENERGIZATION : November 1991

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan - - - 2.640

Subsidy 29.0 33.8 37.1

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Second District, Sulu

1 Siasi 50 42 45 50 100 0 11,200 2,746 2,957 3,058 27

2 Pandami 16 16 16 16 100 0 3,800 70 160 160 4

Total 66 58 61 66 100 0 15,000 2,816 3,117 3,218 21

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 993 1,055 1,244 Residential 2,336 2,661 2,754

MWH Purchased 133 141 165 Commercial 186 179 187

MWH Sold 113 122 144 Industrial 4 4 4

Systems Loss (%) 15 13 12 Public Building 47 46 46

Peak Load (KW) 460 480 485 Others 243 227 227

Load Factor (%) 40 40 46 Total 2,816 3,117 3,218

Collection Efficiency (%) 83 88 86

Ave. Systems Rate (P/KWH) 8.81 8.65 8.63

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 752 637 959 927 940 851 672 780 897 1,100

Commercial 237 124 125 118 139 199 244 247 217 251

Industrial 406 111 107 116 166 171 151 176 188 196

Public Building 33 17 16 33 34 50 51 58 69 79

Others 47 40 23 40 51 62 86 92 93 103

Total 1,475 929 1,230 1,234 1,330 1,333 1,204 1,353 1,464 1,729

SIASI ELECTRIC COOPERATIVE, INC. (SIASELCO)Poblacion, Siasi, Sulu

2008 20092007

D

Small

Imam Suudi Dandun

Mr. Attha I. Anuddin

B B

Imam Suudi Dandun Imam Suudi Dandun

Mr. Attha I. Anuddin Mr. Attha I. Anuddin

Served

Legislative District

MUNICIPALITIES

Small Small

POWER PLANT

Location Project Name/Proponent Type

Monthly Average

NDA

Potential

NDA

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.

Siasi NPC-SPUG Diesel

248

Page 256: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

Below 5 MVA Substation

Generating Set

3 PH Backbone Line

Energized Coop System

249

N

KALINGALANCALUANG

PATA

LUGUS

TAPUL

JOLO

PANGUTARAN

PATIKUL

LUUKOLDPANAMAO

INDANAN

HADJI PANGLIMA TAHIL (Marunggas)

TALIPAOMAIMBUNG

PANGLIMAESTINO

(NEW PANAMAO)PARANG

H Q

G S

OMAR

CAPUAL ISLANDTALAYAN ISLAND

G S

Page 257: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : February 24, 1973

II. DATE OF FIRST ENERGIZATION : August 1975

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 4.3 14.7 14.7 8.440

Subsidy 83.5 91.1 118.7 0.229

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Hadji Panglima Tahil (Marunggas) 5 5 5 5 100 0 1,000

2 Indanan 34 22 22 34 100 0 10,100 2,645 2,797 2,887 29

3 Jolo 8 8 8 8 100 0 16,800 11,299 11,581 11,797 70

4 Patikul 30 24 24 30 100 0 6,500 4,401 4,653 4,893 75

5 Parang 40 32 32 40 100 0 10,400 520 545 553 5

6 Maimbung 27 18 18 27 100 0 4,700 426 449 451 10

7 Talipao 52 39 41 52 100 0 13,900 405 479 493 4

8 Pangutaran 16 15 16 16 100 0 5,000

Second District

9 Luuk 12 7 9 12 100 0

10 Omar 8 6 6 8 100 0 7,400 239 248 279 4

11 Old Panamao 31 19 19 31 100 0 6,800 79 79 79 1

12 Panglima Estino (New Panamao) 12 7 7 12 100 0 4,000 58 58 58 1

13 Lugus 17 14 14 17 100 0 3,500

14 Pata 14 14 14 14 100 0 2,200

15 Tapul 15 12 14 15 100 0 2,800

16 Kalingalan Caluang 9 4 4 9 100 0 4,300

Total 330 246 253 330 100 0 99,400 20,072 20,889 21,490 22

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 11,394 13,588 15,436 Residential 18,660 19,498 20,030

MWH Purchased 2,554 2,614 2,852 Commercial 1,091 1,066 1,120

MWH Sold 1,364 1,763 1,958 Industrial - - -

Systems Loss (%) 46 32 30 Public Building 294 299 313

Peak Load (KW) 5,974 6,081 6,901 Others 27 26 27

Load Factor (%) 59 59 57 Total 20,072 20,889 21,490

Collection Efficiency (%) 52 48 43

Ave. Systems Rate (P/KWH) 8.35 7.71 7.88

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 8,405 7,961 8,460 8,387 10,598 11,762 9,694 10,622 12,946 15,746

Commercial 2,760 3,320 3,298 3,181 2,916 3,288 2,491 2,799 3,274 3,815

Industrial 3,631 2,426 1,341 3 - - - - - -

Public Building 1,823 1,477 1,375 1,562 1,894 2,264 1,918 2,565 2,850 3,555

Others 525 433 283 260 301 547 248 384 323 381

Total 17,144 15,617 14,757 13,393 15,709 17,861 14,351 16,370 19,393 23,497

E

MUNICIPALITIES

18,037

Energized

Medium

Jolo

Unenerg.

Luuk

NPC-SPUG

Legislative District

-

C O N N E C T I O N S

Diesel/Genset

NPC-SPUG Diesel

Monthly Average

Hadji Rogelio T. Asaali

Ms. Peraida T. Akalal

18,602 19,050

B A R A N G A Y S

Project Name/Proponent TypeLocation

Coverage

Hadji Rogelio T. Asaali

Ms. Peraida T. Akalal

ServedPotential

-

POWER PLANT

Hadji Rogelio T. Asaali

Ms. Peraida T. Akalal

E

Large

Bus-Bus St., Jolo, Sulu 7400

Tel. No. (085) 341-8911 loc. 2124/2743; Cel. Nos. 0918-6757019

2008 20092007

250

SULU ELECTRIC COOPERATIVE, INC. (SULECO)

Page 258: The 2007-2009 RE Chronicle

LEGEND :

H QEnergized Coop System

HQ Location

Municipality

Below 5 MVA Substation

7.2 MVA Substation

Generating Set

Mini Hydro

3 PH Backbone Line

G S

MH

251

TONGKIL, SULU

MALUSO

LANTAWAN

TABUAN-LASA

CITY ofISABELA

CITY ofLAMITAN

TUBURAN

TIPO-TIPO

MHG S

H Q

NAKBAR

HADJI MOHAMMAD AJUL

AL-BARKA

UNGKAYA PUKAN

HADJIIMUHTAMAD

MH

SUMISIP

Page 259: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : May 24, 1975

II. DATE OF FIRST ENERGIZATION : February 1976

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 10.3 10.3 10.3 12.422

Subsidy 81.7 81.9 99.2 0.680

0.270

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 City of Isabela 45 45 45 45 100 0 15,800 14,052 14,654 15,258 97

2 City of Lamitan 45 44 44 45 100 0 12,600 7,614 8,129 8,693 69

3 Lantawan 25 25 25 25 100 0

4 Hadji Muhtamad 10 10 10 10 100 0 5,900 849 1,070 1,146 19

5 Maluso 20 20 20 20 100 0 6,700 2,684 2,855 2,980 44

6 Sumisip 29 40 40 29 100 0 11,100 839 893 974 9

7 Tabuan-Lasa (Sumisip) 12 12 100 0

8 Tipo-Tipo 11 11 11 11 100 0

9 Al-Barka 16 16 16 16 100 0 10,400 962 1,002 1,016 10

10 Ungkaya Pukan 12 12 12 12 100 0

11 Tuburan 10 10 10 10 100 0

12 Akbar 9 9 9 9 100 0 9,100 997 1,070 1,127 12

13 Hadji Mohammad Ajul 11 10 10 11 100 0

Second District, Sulu

14 Tongkil 14 14 14 14 100 0 3,000

Total 269 266 266 269 100 0 74,600 27,997 29,673 31,194 42

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 13,482 13,854 15,070 Residential 26,365 28,023 29,523

MWH Purchased 2,254 2,338 2,524 Commercial 1,056 1,065 1,072

MWH Sold 1,719 1,760 1,910 Industrial 6 8 8

Systems Loss (%) 23 24 24 Public Building 255 283 297

Peak Load (KW) 6,500 7,200 7,200 Others 315 294 294

Load Factor (%) 48 44 48 Total 27,997 29,673 31,194

Collection Efficiency (%) 72 70 67

Ave. Systems Rate (P/KWH) 7.84 7.87 7.89

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 9,404 10,148 9,676 11,108 11,985 12,330 12,324 13,957 14,217 15,020

Commercial 2,317 2,282 2,286 2,537 2,787 3,302 3,329 3,560 3,557 3,764

Industrial 393 602 574 705 635 576 542 1,135 1,281 1,439

Public Building 1,134 1,086 1,200 1,395 1,363 1,280 1,434 1,726 1,803 2,390

Others 201 205 220 317 290 258 206 251 258 310

Total 13,449 14,323 13,956 16,062 17,060 17,746 17,835 20,629 21,116 22,923

Mr. Abdulgappar B. LatipMr. Ismael J. Basa

Isabela City, Zamboanga Peninsula

Tel. No. (062) 200-7907; Fax No. (062) 200-7905

2008 20092007

Fr. Alfredo E. Oyao-

MUNICIPALITIES/CITY

Location Project Name/Proponent Type

29,988

Legislative DistrictPotential

Mr. Ismael J. Basa

E

Large

28,546

Fr. Alfredo E. Oyao Fr. Alfredo E. Oyao-

POWER PLANT

31,226

- -

Lamitan Balactasan/BASELCO Mini Hydro

NPC-SPUG Diesel/PB-119

Kumalarang/BASELCOLantawan

City of Isabela

Mini Hydro

Monthly Average

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

252

BASILAN ELECTRIC COOPERATIVE, INC. (BASELCO)

Page 260: The 2007-2009 RE Chronicle

N

HQ Location

Municipality

Generator Substation

3 PH Backbone Line

LEGEND :

H QEnergized Coop System

(CAGAYAN DE TAWI-TAWI)MAPUN

TURTLE ISLAND

TURTLE ISLANDS

G S

H Q

253

G S

Page 261: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : April 4, 1975

II. DATE OF FIRST ENERGIZATION : August 1976

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 0.03 0.03 1.020

Subsidy 12.1 12.1 12.1

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District, Tawi-tawi

1 Mapun 15 7 12 12 80 3 5,100

(Cagayan de Tawi-Tawi) 1,418

2 Turtle Islands 2 2 2 2 100 0 800

Total 17 9 14 14 82 3 5,900 1,185 1,415 1,418 24

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 325 Residential 1,275

MWH Purchased N 53 N Commercial N 32 N

MWH Sold 35 Industrial D 1 D

Systems Loss (%) D 34 D Public Building A 28 A

Peak Load (KW) - Others 79

Load Factor (%) A - A Total 1,185 1,415 1,418

Collection Efficiency (%) -

Ave. Systems Rate (P/KWH) 9.22

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 234 204 223 236 194 164 189 157

Commercial 12 14 36 36 25 13 6 10

Industrial - - - - - - - -

Public Building 26 26 26 34 19 10 8 7

Others 8 6 10 8 5 2 2 2

Total 280 250 295 314 243 189 205 NDA 176 NDA

NDA - No Data Available

EnergizedUnenerg.

24

-

Location

POWER PLANT

-

Type

PotentialServed

Project Name/Proponent

NDA

CAGAYAN DE SULU ELECTRIC COOPERATIVE, INC. (CASELCO)Mapun, Tawi-Tawi

Tel No. (098) 199-0195

2008 2009

Engr. Edgar R. Billiones

Engr. Julian J. Lim, Jr.

Engr. Edgar R. Billiones Engr. Edgar R. Billiones

2007

Ms. Lolita Zaldivar Ms. Lolita Zaldivar

-

Coverage

C O N N E C T I O N SB A R A N G A Y S

NPC-SPUG

-

-

-

Monthly Average

Diesel

NDA

MUNICIPALITIES

NDA

1,185 1,415

Legislative District

Mapun

254

Page 262: The 2007-2009 RE Chronicle

255

N

PIAGAPO

MARANTAO

TUGAYA

BACOLOD-KALAWI(Bacolod Grande)

MADAMBA

BINIDAYAN

PAGAYAWAN(Tatarikan)

PUALAS

BAYANGCALANOGAS

TUBARANSULTAN GUMANDER

BALABAGAN

MAROGONG

BUTIG

LUMBATAN

LUMBA-BAYABAO (Maguing)

BUBONG

BUADIPOSO-BUNTONG

MARAWICITY

BALOI

Part of LANAO DEL NORTE

BALINDONG (Watu)

MASIU

TAGOLOAN II

LUMBAYANAGUE

SULTANDUMALONDONG

PANTAR

KAPAI

PANTAO RAGAT

TARAKA

TAMPARAN

DITSAAN-RAMAIN

MULONDO

MALABANG

KAPATAGAN

GANASSI

POONABAYABAO(Gata)

MADALUM

SAGUIARAN

MAGUING

H QP P P PP P

LUMBACA UNAYAN

MH

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

20 MVA Substation

Power Plant

Mini Hydro

3 PH Backbone Line

Energized Coop System

P PMH

Page 263: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : September 7, 1971

II. DATE OF FIRST ENERGIZATION : August 1973

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 22.2 32.4 42.4 80.000

Subsidy 227.1 270.7 382.9 180.000

1.500

158.100

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Buadiposo-Buntong 33 30 30 33 100 0 2,300 629 629 629 27

2 Bubong 36 33 34 36 100 0 3,300 1,080 1,080 1,080 33

3 Ditsaan-Ramain 34 33 34 34 100 0 3,300 1,143 1,158 1,158 35

4 Kapai 20 15 15 20 100 0 2,900 389 389 389 13

5 Lumba-Bayabao (Maguing) 38 37 37 38 100 0 4,100 785 966 966 24

6 Maguing 34 30 33 34 100 0 3,200 881 1,021 1,021 32

7 Marantao 34 31 33 34 100 0 4,300 2,102 2,407 2,407 56

8 Marawi City 96 96 96 96 100 0 24,200 13,102 18,858 18,858 78

9 Masiu 35 34 34 35 100 0 4,200 1,267 1,267 1,267 30

10 Mulondo 26 25 25 26 100 0 2,100 630 880 880 42

11 Piagapo 37 33 33 37 100 0 4,200 1,064 1,066 1,066 25

12 Poona Bayabao (Gata) 25 18 25 25 100 0 3,000 1,069 1,069 1,069 36

13 Saguiaran 30 26 28 30 100 0 3,900 1,070 1,344 1,344 34

14 Tagoloan II 19 4 7 19 100 0 1,500 150 150 150 10

15 Tamparan 44 44 44 44 100 0 3,500 1,221 1,221 1,221 35

16 Taraka 43 27 37 43 100 0 3,300 835 1,172 1,172 36

Second District

17 Bacolod-Kalawi (Bacolod Grande) 26 24 26 26 100 0 3,100 871 816 816 26

18 Balabagan 27 20 20 27 100 0 4,300 1,683 1,845 1,845 43

19 Balindong (Watu) 38 38 38 38 100 0 4,300 1,888 1,888 1,888 44

20 Bayang 49 44 44 49 100 0 3,700 830 730 730 20

21 Binidayan 26 20 22 26 100 0 3,200 892 677 677 21

22 Butig 16 13 13 16 100 0 2,800 714 756 756 27

23 Calanogas 17 10 15 17 100 0 1,700 620 340 340 20

24 Ganassi 32 32 32 32 100 0 3,300 1,465 1,226 1,226 37

25 Kapatagan 15 7 8 15 100 0 1,300 909 248 248 19

26 Lumbatan 20 18 19 20 100 0 3,000 1,025 1,128 1,128 38

27 Lumbaca-Unayan 9 7 8 9 100 0 233 356 356

28 Lumbayanague 22 17 22 22 100 0 2,200 874 407 407 19

29 Madalum 37 20 20 37 100 0 3,200 550 475 475 15

30 Madamba 24 13 23 24 100 0 2,700 460 460 460 17

31 Malabang 37 29 30 37 100 0 5,900 3,537 2,894 2,894 49

32 Marogong 24 5 5 24 100 0 2,800 117 553 553 20

33 Pagayawan (Tatarikan) 18 15 15 18 100 0 1,700 693 456 456 27

34 Pualas 23 21 22 23 100 0 1,400 961 568 568 41

35 Sultan Dumalondong 7 4 4 7 100 0 1,900 247 384 384 20

36 Sultan Gumander 19 12 14 19 100 0 2,100 849 729 729 35

37 Tubaran 21 13 14 21 100 0 1,900 720 473 473 25

38 Tugaya 23 23 23 23 100 0 3,500 1,036 1,131 1,131 32

Second District, Lanao del Norte

39 Baloi (21) 18 16 16 18 100 0 6,000 1,758 1,758 1,758 29

40 Pantao Ragat 20 20 20 20 100 0 3,400 770 770 770 23

41 Pantar 21 13 13 21 100 0 2,600 612 612 612 24

Total 1,173 970 1,031 1,173 100 0 145,300 51,731 56,357 56,357 39

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 52,404 Residential 52609

MWH Purchased N N 11,989 Commercial N N 1855

MWH Sold 9,317 Industrial D D 55

Systems Loss (%) D D 22 Public Building A A 182

Peak Load (KW) 59,326 Others 1656

Load Factor (%) A A 28 Total 51,731 56,357 56357

Collection Efficiency (%) 34

Ave. Systems Rate (P/KWH) 5.62

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 7,613 22,076 9,433 101,707

Commercial 729 1,186 517 5,361

Industrial 469 869 274 1,371

Public Building 370 1,126 406 2,245

Others 338 523 212 1,116

Total 9,519 NDA NDA NDA NDA 25,780 10,842 NDA NDA 111,800

NDA - No Data Available

Mr. Ameroddin Sarangani

POWER PLANT

Mr. Salipada S. Tamano, Ph. D.

Sultan Ashary P. Maongco (PS/AGM)

-

46,185

Sultan Ashary P. Maongco (PS/AGM)

46,185

-

Saguiaran Agus 2/NPC Hydro

Mr. Ameroddin Sarangani

Sultan Ashary P. Maongco

HydroMarawi City

Location Project Name/Proponent Type

Baloi Agus 4/NPC Hydro

Malabang Matling Ind'l Corp. Mini Hydro

LANAO DEL SUR ELECTRIC COOPERATIVE, INC. (LASURECO) Marawi City, Lanao del Sur

Tel Nos. (063) 352-0313, 352-0045, 352-0381; Fax Nos. (063) 221-5764 to 65

2008 20092007

Served

- E

- Large

Unenerg. Potential

46,185

C O N N E C T I O N S

Agus 1/NPC

Legislative District

MUNICIPALITIES/CITY

Monthly Average

EnergizedCoverage

B A R A N G A Y S

256

Page 264: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

10 MVA Substation

12.5 MVA Substation

3 PH Backbone Line

Energized Coop System

Energized Other System

257

PAGALUNGAN

COTABATO CITY

KABUNTALAN(TUMBAO)

Served byCotabato Light &Power Co., Inc.

UPI

SOUTH UPI

AMPATUAN

TALAYAN

DATU PIANG

SULTAN SABARONGIS(Lambayong)

PARANG

MATANOG

SHARIFF AGUAK (MAGANOY)

BULDONBARIRA

MAMASAPANO

DATU ODINSINSUAT(DINAIG)

SULTANKUDARAT (Nuling)

TALITAY

PAGAG

AWAN

H Q

PARANG

DATUABDULLAHSANGKI

RAJAHBUAYANDATU

UNSAY

DATU SAUDIAMPATUAN

SULTANMASTURA

GUINDULUNGANDATU BLAH T.SINSUAT

N

DATU ANGGALMIDTIMBANG

NORTHERNKABUNTALAN

DATU SALIDO

SHARIFFSAYDONAMUSTAPHA

DATU HOFFERAMPATUAN

Page 265: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : September 4, 1975

II. DATE OF FIRST ENERGIZATION : March 1976

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 2.2 2.7 16.1

Subsidy 110.1 192.4 237.5

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Barira 11 7 10 11 100 0 4,100 85 179 226 6

2 Buldon 15 9 11 13 87 2 6,100 374 429 465 8

3 Datu Odin Sinsuat(Dinaig)(34) 21 16 20 21 100 0 9,300 1,491 1,525 1,626 17

4 Kabuntalan (Tumbao) 17 13 13 16 94 1

5 Northern Kabuntalan 11 9 9 10 91 1

6 Matanog 8 5 6 8 100 0 4,300 233 318 320 7

7 Upi 23 23 23 23 100 0

8 Datu Blah T. Sinsuat 12 9 9 10 83 2

9 Parang 23 20 23 23 100 0 14,000 5,640 5,694 5,717 41

10 Sultan Kudarat (Nuling) (39) 22 17 19 21 95 1

11 Sultan Mastura 12 13 12 12 100 0

Second District 0

12 Ampatuan 11 10 10 11 100 0 7,500 1,201 1,391 1,506 20

13 Datu Abdullah Sangki 10 9 10 10 100 0

14 Datu Piang 15 16 18 15 100 0 15,400 1,748 1,802 1,877 12

15 Datu Saudi Ampatuan 8 11 12 8 100 0

16 Datu Unsay 8 3 2 4 50 4

17 Guindulungan 11 6 7 9 82 2

18 Mamasapano 14 16 16 14 100 0 4,500 453 484 506 11

19 Pagagawan 11 9 11 11 100 0

20 Pagalungan 12 7 11 12 100 0

21 Rajah Buayan 11 10 11 11 100 0

22 Shariff Aguak (Maganoy) 13 14 19 13 100 0

23 South Upi 11 8 9 9 82 2 6,400 320 327 333 5

24 Sultan sa Barongis (Lambayong) 12 9 12 12 100 0 7,900 355 657 657 8

25 Talayan 15 9 11 11 73 4 7,500 884 924 998 13

26 Talitay 9 4 7 9 100 0

27 Datu Anggal Midtimbang 7 6 6 7 100 0

28 Datu Hoffer Ampatuan 9 8 89 1

29 Shariff Saydona Mustapha 12 11 92 1

30 Datu Salido 7 7 100 0

First District, Cotabato*

4 Alamada 16 16 2,011 2,406

5 Aleosan 16 17 1,128 1,071

6 Libungan 20 20 3,435 3,509

7 Midsayap 47 47 10,035 9,934

8 Pigkawayan 37 40 3,940 4,831

9 Pikit 27 32 2,894 2,945

Total 381 451 499 360 94 21 141,400 40,761 43,128 19,419 14

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

Gross Revenue (P'000) 27,864 9,477 8,350 Residential 35,444 39,297 17,942

MWH Purchased 7,129 3,970 2,425 Commercial 3,955 2,866 1,010

MWH Sold 4,862 1,632 1,144 Industrial 418 297 131

Systems Loss (%) 31 58 52 Public Building 825 559 324

Peak Load (KW) 17,547 - - Others 119 109 12

Load Factor (%) 56 - - Total 40,761 43,128 19,419

Collection Efficiency (%) 85 - 57

Ave. Systems Rate (P/KWH) 5.73 5.81 7.30

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

Monthly Average

44,136

EnergizedUnenerg.

42,419

MUNICIPALITIES

Legislative DistrictPotential

11,100 518 518 516

Engr. Edgardo D. Dafilmoto

-

-

Ms. Delia B. Sotelo (OIC)

- D

- Extra Large

5

B A R A N G A Y S C O N N E C T I O N S

CoverageServed

Awang, Datu Odin Sinsuat, Maguindanao

Tel./Fax No. (064) 431-0362

2008 20092007

9956 924 879 11,100

Mr. Maydu P. Wawa

45,197

Mr. Maydu P. Wawa Hji Tumagantang Zainal (Vice Pres)

Ms. Delia B. Sotelo (OIC)

91,003 716 676 11,300

161,819 1,721 1,661 11,700

6225 173 163 3,900

13667 650 639 5,300

258

2007 2008 2009 2007 2008 2009**

2000 2001 2002 2003 2004 2005 2006 2007 2008** 2009***

Commercial 6,758 8,260 8,857 8,883 8,005 9,203 8,704 6,748 1,786

Industrial 6,226 6,607 6,424 6,581 6,351 10,072 10,823 8,586 3,500

Residential 23,747 27,030 28,077 29,914 27,597 34,554 33,585 26,096 11,232

Public Building 1,779 2,169 2,417 2,686 2,628 2,546 2,376 1,908 1,314

Others 941 986 977 1,038 779 666 614 417 123

Total 39,451 45,052 46,752 49,102 45,360 57,041 56,102 43,755 17,955

*** Incomplete data

* Transferred to COTELCO

** Does not include Area III (Palma Area)

MAGUINDANAO ELECTRIC COOPERATIVE, INC. (MAGELCO)

Page 266: The 2007-2009 RE Chronicle

Energized Coop System

LEGEND :

Headquarters

N

259

SURSECO IICity of Tandag

SURNECOSurigao City

ANECOButuan City

SURSECO ICity of Bislig

ASELCOSan Francisco, Agusan del Sur

DIELCOSan Jose, Dinagat Islands SIARELCO

Dapa, Surigao del Norte

Page 267: The 2007-2009 RE Chronicle

I. STATUS OF ENERGIZATION (Cumulative):

2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %

A. Electric Cooperatives:

1 Agusan Norte 12 12 12 12 100 252 252 252 252 100 121,500 104,438 108,189 111,884 92

2 Agusan Sur 14 14 14 14 100 314 297 297 314 100 115,200 70,358 72,735 75,956 66

3 Surigao Norte 12 12 12 12 100 203 203 203 203 100 60,500 50,806 52,947 55,006 91

4 Siargao 9 9 9 9 100 132 132 132 132 100 21,900 19,482 20,342 21,327 97

5 Dinagat 7 7 7 7 100 100 99 100 100 100 22,700 12,028 13,374 14,588 64

6 Surigao Sur I 5 5 5 5 100 112 112 112 112 100 59,600 51,788 55,319 56,811 95

7 Surigao Sur II 14 14 14 14 100 197 190 195 195 99 59,000 46,929 49,956 52,232 89

Total 73 73 73 73 100 1,310 1,285 1,291 1,308 99 460,400 355,829 372,862 387,804 84

ELECTRIC DISTRIBUTION UTILITIES

MUNICIPALITIES/CITIES BARANGAYS

CARAGA

ServedCoverage Potential

EnergizedCoverage

Energized

CONNECTIONS

260

Total 290,069 306,308 326,851 366,916 401,209 400,968 408,975 427,677 442,045 514,510

Others 5,492 6,283 6,676 9,257 7,734 7,735 7,342 8,666 11,978 17,644

Public Bldgs. 17,385 19,279 21,533 25,051 27,408 27,153 29,029 31,630 32,117 37,164

Industrial 86,814 86,213 91,900 102,342 108,383 106,137 112,054 109,786 113,053 143,739

Commercial 47,309 50,530 52,679 56,817 61,791 63,918 67,571 72,465 74,776 86,407

Residential 133,069 144,003 154,063 173,449 195,893 196,025 192,979 205,130 210,121 229,556

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):

Page 268: The 2007-2009 RE Chronicle

ANECO

HQ Location

Municipality

5 MVA Substation

7.5 MVA Substation

10 MVA Substation

NPC Substation

Power Plant

3PH Backbone Line

LEGEND :

H QEnergized Coop System

P P

261

N

TUBAY

CITY ofCABADBARAN

BUENAVISTA

MAGALLANES

KITCHARAO

JABONGA

SANTIAGO

CARMEN

REMEDIOS T.ROMUALDEZ

LAS NIEVES

BUTUAN CITY

NASIPIT

P P H Q

Page 269: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : February 12, 1977

II. DATE OF FIRST ENERGIZATION : December 12, 1977

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan - 37.2 97.7

Subsidy 24.4 54.1 59.3

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Butuan City 86 86 86 86 100 0 62,400 58,419 60,372 62,365 99

2 Las Nieves 20 20 20 20 100 0 4,400 2,370 2,456 2,607 59

Second District

3 Buenavista 25 25 25 25 100 0 10,300 7,901 8,172 8,439 82

4 City of Cabadbaran 31 31 31 31 100 0 12,700 11,602 12,118 12,620 99

5 Carmen 8 8 8 8 100 0 3,400 2,839 2,886 2,953 87

6 Jabonga 15 15 15 15 100 0 4,200 2,977 3,094 3,193 76

7 Kitcharao 11 11 11 11 100 0 2,900 2,335 2,481 2,591 89

8 Magallanes 8 8 8 8 100 0 4,000 3,742 3,814 3,910 98

9 Nasipit 19 19 19 19 100 0 7,300 5,969 6,075 6,168 84

10 Remedios T. Romualdez 8 8 8 8 100 0 2,700 2,071 2,169 2,253 83

11 Santiago 8 8 8 8 100 0 3,600 2,144 2,279 2,408 67

12 Tubay 13 13 13 13 100 0 3,600 2,069 2,273 2,377 66

Total 252 252 252 252 100 0 121,500 104,438 108,189 111,884 92

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 95,066 95,176 107,309 Residential 97,873 101,533 104,773

MWH Purchased 20,874 21,147 23,201 Commercial 4,430 4,466 4,757

MWH Sold 17,878 18,157 19,866 Industrial 834 865 862

Systems Loss (%) 14 14 14 Public Building 1,047 1,070 1,243

Peak Load (KW) 47,249 46,869 50,174 Others 254 255 249

Load Factor (%) 61 62 63 Total 104,438 108,189 111,884

Collection Efficiency (%) 95 96 95

Ave. Systems Rate (P/KWH) 5.32 5.24 5.40

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 57,711 63,497 68,478 76,349 84,950 85,641 83,331 88,139 90,601 96,591

Commercial 16,593 17,452 17,679 18,652 19,729 19,147 19,408 20,351 20,910 23,357

Industrial 75,228 73,916 79,103 88,346 94,611 92,504 95,849 91,825 93,086 99,478

Public Building 7,344 7,951 8,713 9,566 10,236 9,942 10,460 10,481 10,243 11,462

Others 2,714 2,932 2,705 2,712 2,720 2,766 2,834 3,744 3,038 7,505

Total 159,590 165,748 176,678 195,625 212,246 210,000 211,882 214,540 217,878 238,393

Monthly Average

99,815

C O N N E C T I O N S

Arch. Horacio T. Santos

102,943

A+ A+

Mega Large Mega Large

EnergizedUnenerg.

Served

POWER PLANT

Location Project Name/Proponent Type

Nasipit Diesel 100.000Power Barge

117/Therma Marine, Inc.

Mr. Dioscoro P. Boco

Legislative DistrictPotential

96,277

B A R A N G A Y S

A+

Mega Large

MUNICIPALITIES/CITY

Coverage

Mr. Dioscoro P. Boco

Arch. Horacio T. Santos

AGUSAN DEL NORTE ELECTRIC COOPERATIVE, INC. (ANECO)Km. 2 J.C. Aquino Avenue, Butuan City, Agusan Norte

Tel. Nos. (085) 341-7935, 342-1790, 341-5138 to 39; Telefax Nos. (085) 342-6000, 341-3870; E-mail: [email protected]

2008 20092007

Mr. Dioscoro P. Boco

Arch. Horacio T. Santos

262

Page 270: The 2007-2009 RE Chronicle

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

LEGEND :

H Q

Energized Coop System

263

N

ESPERANZA

LA PAZ

SIBAGAT

SANFRANCISCO

BUNAW AN

TRENTO

VERUELA

SANTA JOSEFA

ROSARIO

TALACOGON

SAN LUIS

LORETO

PROSPERIDAD

CITY ofBAYUGAN

H Q

Page 271: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 26, 1977

II. DATE OF FIRST ENERGIZATION : December 22, 1979

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 5.8 35.8 57.3

Subsidy 85.8 107.8 107.8

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 City of Bayugan 43 43 43 43 100 0 19,300 15,329 15,788 16,304 84

2 Bunawan 10 9 9 10 100 0 5,500 3,242 3,390 3,606 66

3 Esperanza 47 47 47 47 100 0 9,100 4,353 4,519 4,751 52

4 La Paz 15 12 12 15 100 0 4,300 1,444 1,497 1,615 38

5 Loreto 17 16 16 17 100 0 6,400 2,019 2,116 2,210 35

6 Prosperidad 32 32 32 32 100 0 14,600 10,416 10,682 11,054 76

7 Rosario 11 11 11 11 100 0 5,900 3,586 3,715 3,929 67

8 San Francisco 27 27 27 27 100 0 12,000 10,726 11,016 11,383 95

9 San Luis 25 20 20 25 100 0 5,300 2,065 2,176 2,384 45

10 Santa Josefa 11 11 11 11 100 0 4,600 2,480 2,573 2,683 58

11 Sibagat 24 20 20 24 100 0 5,900 2,627 2,667 2,851 48

12 Talacogon 16 14 14 16 100 0 6,300 3,895 4,062 4,283 68

13 Trento 16 16 16 16 100 0 8,600 5,838 6,022 6,254 73

14 Veruela 20 19 19 20 100 0 7,400 2,338 2,512 2,649 36

Total 314 297 297 314 100 0 115,200 70,358 72,735 75,956 66

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 26,350 26,887 37,429 Residential 61,605 63,748 66,844

MWH Purchased 6,254 5,676 7,728 Commercial 4,412 4,513 4,613

MWH Sold 5,343 4,910 6,640 Industrial 142 143 146

Systems Loss (%) 14 13 14 Public Building 1,808 1,899 1,961

Peak Load (KW) 16,365 17,230 19,336 Others 2,391 2,432 2,392

Load Factor (%) 52 45 55 Total 70,358 72,735 75,956

Collection Efficiency (%) 97 96 96

Ave. Systems Rate (P/KWH) 4.93 5.48 5.64

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 20,420 21,495 22,783 26,088 30,353 29,427 29,616 31,997 28,475 35,603

Commercial 5,991 7,466 8,494 9,105 9,952 10,397 11,258 12,546 11,644 15,743

Industrial 4,740 5,261 5,440 5,961 6,297 8,540 11,115 11,894 11,940 19,091

Public Building 3,209 3,737 4,263 5,089 5,527 5,581 5,910 6,896 6,177 8,124

Others 564 795 1,192 3,026 814 1,338 1,161 779 689 1,113

Total 34,924 38,754 42,172 49,269 52,943 55,283 59,060 64,112 58,925 79,674

AGUSAN DEL SUR ELECTRIC COOPERATIVE, INC. (ASELCO)San Isidro, San Francisco, Agusan Del Sur

Tel. No. (085) 343-8456; Telefax No. (085) 839-2275; E-mail: [email protected]

2008 20092007

MUNICIPALITIES

A+

Extra Large

56,847

Mr. Expectacion P. Guay Mr. Romeo S. Castulo

Mr. Ursulo E. Anuta

Mr. Expectacion P. Guay

Mr. Ursulo E. Anuta

Served

A+ A+

Extra Large Extra Large

PotentialLegislative District

Monthly Average

Mr. Francisco L. Suarez, Jr. (OIC)

58,863 61,652

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.

264

Page 272: The 2007-2009 RE Chronicle

LEGEND :

H QEnergized Coop System

HQ Location

Municipality

5 MVA Substation

10 MVA Substation

NPC Substation

Generating Set

3 PH Backbone LineG S

265

N

CLAVER

MAINIT

SISON

SURIGAOCITY

ALEGRIA

GIGAQUITTUBOD

BACUAG

PLACER

TAGANA-AN

HikdopIsland

MALIMONO

SAN FRANCISCO (ANAO-AON)

G S

H Q

Page 273: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : September 24, 1977

II. DATE OF FIRST ENERGIZATION : June 1978

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 82.1 86.8 209.9 0.326

Subsidy 27.7 43.6 43.9

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Second District

1 Alegria 12 12 12 12 100 0 2,700 1,795 1,855 1,888 70

2 Bacuag 9 9 9 9 100 0 2,600 1,998 2,035 2,083 80

3 Claver 14 14 14 14 100 0 3,500 3,084 3,287 3,401 97

4 Gigaquit 13 13 13 13 100 0 3,400 2,184 2,220 2,266 67

5 Mainit 21 21 21 21 100 0 5,000 3,073 3,142 3,408 68

6 Malimono 14 14 14 14 100 0 3,400 3,207 3,261 3,337 98

7 Placer 20 20 20 20 100 0 4,600 3,765 3,905 4,036 88

8 San Francisco (Anao-aon) 11 11 11 11 100 0 2,400 2,183 2,245 2,307 96

9 Sison 12 12 12 12 100 0 2,100 1,940 1,996 2,046 97

10 Surigao City 54 54 54 54 100 0 25,400 23,264 24,197 25,312 99

11 Tagana-an 14 14 14 14 100 0 3,100 2,282 2,677 2,762 89

12 Tubod 9 9 9 9 100 0 2,300 2,031 2,127 2,160 94

Total 203 203 203 203 100 0 60,500 50,806 52,947 55,006 91

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 31,442 33,288 42,221 Residential 43,448 45,321 47,004

MWH Purchased 7,028 7,528 9,061 Commercial 3,854 3,918 4,300

MWH Sold 5,663 6,115 7,798 Industrial 75 74 79

Systems Loss (%) 19 18 13 Public Building 1,159 1,178 1,257

Peak Load (KW) 16,850 17,436 17,579 Others 2,270 2,456 2,366

Load Factor (%) 57 59 71 Total 50,806 52,947 55,006

Collection Efficiency (%) 96 96 99

Ave. Systems Rate (P/KWH) 5.55 5.44 5.41

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 23,928 25,900 27,401 31,204 34,887 35,319 34,997 37,365 39,954 42,805

Commercial 11,200 12,398 13,039 14,452 16,090 18,135 18,850 20,159 21,820 25,077

Industrial 2,396 3,098 3,122 3,327 2,823 2,405 2,792 3,113 3,712 16,988

Public Building 3,252 3,581 4,031 4,694 5,181 5,129 5,220 6,097 6,656 7,490

Others 886 1,034 1,319 1,570 1,557 1,503 1,351 1,224 1,240 1,216

Total 41,662 46,011 48,912 55,247 60,538 62,491 63,210 67,958 73,382 93,576

Monthly Average

54,057 55,77553,167

MUNICIPALITIES/CITY

CoverageEnergized

Unenerg.Served

Legislative District

B A R A N G A Y S

Extra Large Extra Large

Location Project Name/Proponent

Surigao City(Hikdop Is.) NPC-SPUG

Extra Large

C O N N E C T I O N S

Engr. Danilo Z. Escalante

B A+

Mr. Greg C. Gorgod Mr. Jose D. Montederamos

Engr. Danilo Z. Escalante Engr. Danilo Z. Escalante

B

Mr. Luis D. Catubigan

Potential

POWER PLANT

Type

Diesel

SURIGAO DEL NORTE ELECTRIC COOPERATIVE, INC. (SURNECO)01308 Narciso Corner, Espina St., Surigao City

Tel. Nos. (086) 826-0429, 826-5456, 826-0499; Telefax No. (086) 826-2148; e-mail: [email protected]

2008 20092007

266

Page 274: The 2007-2009 RE Chronicle

SIARELCO

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

Submarine Cable

3 PH Backbone Line

Energized Coop System

267

N

DAPA

DEL CARMEN

GENERAL LUNA

SAN BENITO

SAN ISIDRO

PILAR

SURNECO

CASULIAN IS.

SAN MIGUEL

69/34.5 KV

BUCASGRANDEISLAND

MIDDLEBUCAS IS.

EASTBUCAS IS.

SOCORRO

BARANGAY CAGDIANAO

SANTAMONICA(Sapao)

BURGOS

H Q

Page 275: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : September 8, 1979

II. DATE OF FIRST ENERGIZATION : January 16, 1985

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 3.2 3.7 3.7

Subsidy 40.9 48.4 48.4

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Burgos 6 6 6 6 100 0 900 787 832 866 96

2 Dapa 29 29 29 29 100 0 5,200 4,675 4,880 5,133 99

3 Del Carmen 20 20 20 20 100 0 3,000 2,646 2,789 2,972 99

4 General Luna 19 19 19 19 100 0 2,900 2,584 2,730 2,885 99

5 Pilar 15 15 15 15 100 0 2,000 1,781 1,827 1,875 94

6 San Benito 6 6 6 6 100 0 1,100 942 970 1,019 93

7 San Isidro 12 12 12 12 100 0 1,300 1,183 1,221 1,274 98

8 Santa Monica (Sapao) 11 11 11 11 100 0 1,900 1,715 1,772 1,820 96

9 Socorro 14 14 14 14 100 0 3,600 3,169 3,321 3,483 97

Total 132 132 132 132 100 0 21,900 19,482 20,342 21,327 97

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 5,141 5,773 6,512 Residential 18,427 19,131 20,055

MWH Purchased 820 884 952 Commercial 414 451 520

MWH Sold 758 819 900 Industrial - - -

Systems Loss (%) 7 7 5 Public Building 506 553 625

Peak Load (KW) 2,298 2,458 2,516 Others 135 207 127

Load Factor (%) 49 49 52 Total 19,482 20,342 21,327

Collection Efficiency (%) 100 100 100

Ave. Systems Rate (P/KWH) 6.78 7.05 7.23

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 3,115 3,521 3,858 4,879 5,533 5,724 5,691 6,134 6,519 6,902

Commercial 537 530 588 721 939 1,263 1,529 1,906 2,147 2,574

Industrial 234 161 - - - - - - - -

Public Building 264 342 378 423 491 553 674 755 862 1,031

Others 380 415 226 299 351 310 301 303 300 299

Total 4,530 4,969 5,050 6,322 7,314 7,850 8,195 9,098 9,828 10,806

A+

Medium

17,352

Legislative District

MUNICIPALITIES

Monthly Average

Mr. Sergio C. Dagooc

18,088 18,872

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

Potential

Mr. Joseph E. Cometa Mr. Sanny D. Seco

Mr. Sergio C. Dagooc

A+ A+

Medium Large

Mr. Edelito C. Sangco

Mr. Sergio C. Dagooc

SIARGAO ELECTRIC COOPERATIVE, INC. (SIARELCO)Catabaan, Dapa, Surigao del Norte

Tel No. (086) 826-7555 to 56; E-mail: [email protected]

2008 20092007

268

Page 276: The 2007-2009 RE Chronicle

LEGEND :

H Q

Energized Coop System

HQ Location

Municipality

Generating Set

3 PH Backbone Line

G S

269

N

CAGDIANAO

LORETO

BASILISA (Rizal)

SANJOSE

DINAGAT

TUBAJON

LIBJO(ALBOR)

G S

G S

KAYOGA IS.

PUYO IS.

HINUBONG IS.

HANAO IS.

KANIHAAN IS.

KAYABANGAN IS.

KANHANUZA IS.

KOTKOT IS.

MACARMAR IS.

LINIS IS.

SIBANAG IS.

KAPAQUIAN IS.

CAG-ILAN IS.DANAOAN IS.

AWASAN IS.

HIKDOP IS.

HANIGAD IS.NONOC IS.

SIBALE IS.

H Q

Page 277: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : August 29, 1990

II. DATE OF FIRST ENERGIZATION : November 1990

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009 Cap.(MW)

Residual Loan 5.1 8.1 8.1 3.422

Subsidy 66.1 89.9 91.1 0.940

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Lone District

1 Basilisa (Rizal) 27 27 27 27 100 0 5,600 1,989 2,183 2,384 43

2 Cagdianao 14 13 14 14 100 0 2,700 1,545 1,800 2,058 76

3 Dinagat 12 12 12 12 100 0 2,100 1,156 1,232 1,300 62

4 Libjo (Albor) 16 16 16 16 100 0 3,500 1,629 1,852 2,021 58

5 Loreto 10 10 10 10 100 0 1,800 1,035 1,151 1,253 70

6 San Jose 12 12 12 12 100 0 5,600 4,016 4,279 4,541 81

7 Tubajon 9 9 9 9 100 0 1,400 658 877 1,031 74

Total 100 99 100 100 100 0 22,700 12,028 13,374 14,588 64

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 2,992 3,343 3,969 Residential 11,327 12,597 13,679

MWH Purchased 391 448 515 Commercial 324 361 408

MWH Sold 360 416 484 Industrial - - -

Systems Loss (%) 7 7 5 Public Building 334 372 454

Peak Load (KW) 1,400 1,400 1,860 Others 43 44 47

Load Factor (%) 38 44 38 Total 12,028 13,374 14,588

Collection Efficiency (%) 99 98 99

Ave. Systems Rate (P/KWH) 8.30 8.03 8.20

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 1,632 1,688 1,828 2,164 2,557 2,780 3,100 3,217 3,651 4,254

Commercial 309 324 312 282 329 469 594 627 767 807

Industrial - - - - - - - - - -

Public Building 188 175 193 216 247 262 301 330 421 591

Others 104 121 116 88 119 144 139 149 155 156

Total 2,233 2,308 2,449 2,750 3,252 3,655 4,134 4,323 4,994 5,808

A+

Medium Medium

12,751

Diesel

Mr. Sonny D. Seco

Mr. Sergio C. Dagooc (OIC)

A+

Medium

Diesel

Mr. Sergio C. Dagooc (OIC)

Mr. Sonny D. Seco

Mr. Sergio C. Dagooc (OIC)

13,887

Mr. Sonny D. Seco

Legislative DistrictPotential

A+

Loreto

MUNICIPALITIES

DINAGAT ISLANDS ELECTRIC COOPERATIVE, INC. (DIELCO)Justiniana, San Jose, Dinagat Islands

Tel. No. (086) 826-8189, 826-8324; Fax Nos. (086) 826-5331, 826-5454

2008 20092007

Monthly Average

B A R A N G A Y S C O N N E C T I O N S

CoverageEnergized

Unenerg.Served

NPC-SPUG

11,499

POWER PLANT

Location Project Name/Proponent Type

Dinagat NPC-SPUG

270

Page 278: The 2007-2009 RE Chronicle

LEGEND :

H Q HQ Location

Municipality

5 MVA Substation

3 PH Backbone Line

Energized Coop System

271

N

HINATUAN

LINGIG

CITY ofBISLIG

BAROBO

TAGBINA

H Q

Page 279: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : July 20, 1971

II. DATE OF FIRST ENERGIZATION : October 1, 1974

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 221.4 263.9 335.9

Subsidy 34.4 46.4 49.0

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

Second District

1 Barobo 21 21 21 21 100 0 9,400 7,798 8,588 8,907 99

2 City of Bislig 24 24 24 24 100 0 30,100 27,754 28,903 29,483 99

3 Hinatuan 24 24 24 24 100 0 7,300 5,585 6,166 6,340 87

4 Lingig 18 18 18 18 100 0 5,800 4,726 5,227 5,423 94

5 Tagbina 25 25 25 25 100 0 7,000 5,925 6,435 6,658 95

Total 112 112 112 112 100 0 59,600 51,788 55,319 56,811 95

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 17,746 19,106 21,602 Residential 47,695 51,703 53,371

MWH Purchased 3,402 3,641 3,934 Commercial 3,038 2,674 2,442

MWH Sold 2,918 3,189 3,483 Industrial 5 4 3

Systems Loss (%) 14 12 11 Public Building 922 826 886

Peak Load (KW) 8,607 9,475 9,499 Others 128 112 109

Load Factor (%) 54 53 57 Total 51,788 55,319 56,811

Collection Efficiency (%) 95 96 96

Ave. Systems Rate (P/KWH) 6.08 5.99 6.20

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 14,901 15,476 15,785 17,145 19,977 19,771 18,961 19,223 17,573 18,327

Commercial 8,303 7,729 7,865 8,488 8,612 8,223 8,684 9,479 9,155 9,752

Industrial 2,761 2,269 2,378 2,556 2,461 528 1,008 1,552 2,783 4,245

Public Building 1,280 1,456 1,657 2,409 2,948 2,754 2,967 3,233 3,265 3,384

Others 389 474 536 572 749 749 756 1,533 5,486 6,082

Total 27,634 27,404 28,221 31,170 34,747 32,025 32,376 35,020 38,262 41,790

A+

Extra Large

ServedPotential

MUNICIPALITIES/CITY

Coverage

C O N N E C T I O N S

Unenerg.

Mr. Raul K. Salazar

Atty. Edwin M. Malazarte

Mr. Crispo M. Jabagat, Sr.

Atty. Edwin M. Malazarte

Monthly Average

Energized

46,277

Legislative District

B A R A N G A Y S

Mr. Crispo M. Jabagat, Sr.

Atty. Edwin M. Malazarte

47,126 47,126

Extra Large

A+

Extra Large

A+

San Fernando, City of Bislig

Tel. Nos. (086) 628-2211 to 13, 853-6100; Fax No. (086) 853-6096, 628-2212

2008 20092007

272

SURIGAO DEL SUR I ELECTRIC COOPERATIVE, INC. (SURSECO I)

Page 280: The 2007-2009 RE Chronicle

HQ Location

Municipality

Below 5 MVA Substation

5 MVA Substation

10 MVA Substation

3 PH Backbone Line

Energized Coops System

LEGEND :

H Q

273

CORTES

CAGWAIT

MARIHATAG

TAGO

MADRID

BAYABAS

CANTILAN

CARRASCAL

CARMEN

LANUZA

CITY ofTANDAG

SAN MIGUEL

H Q

SAN AGUSTIN

LIANGA

N

Page 281: The 2007-2009 RE Chronicle

I. DATE OF INCORPORATION AND REGISTRATION : September 10, 1979

II. DATE OF FIRST ENERGIZATION : November 10, 1983

III. ELECTRIC COOPERATIVE OFFICIALS :

President :

Gen. Manager :

IV. CATEGORY

CLASSIFICATION

V. TOTAL MEMBERSHIP

VI. STATUS OF RELEASES (P'M) : (Cumulative)

2007 2008 2009

Residual Loan 79.6 103.4 143.6

Subsidy 44.6 72.8 74.2

VII. STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

First District

1 Bayabas 7 7 7 7 100 0 1,500 1,019 1,101 1,167 78

2 Cagwait 11 11 11 11 100 0 3,700 3,226 3,394 3,541 96

3 Cantilan 17 16 16 16 94 1 5,600 5,178 5,384 5,588 99

4 Carmen 8 8 8 8 100 0 1,900 1,596 1,662 1,731 91

5 Carrascal 14 13 14 14 100 0 2,600 2,155 2,381 2,556 98

6 Cortes 12 12 12 12 100 0 3,000 2,500 2,629 2,745 92

7 Lanuza 13 11 13 13 100 0 2,000 1,735 1,823 1,906 95

8 Lianga 13 13 13 13 100 0 5,300 3,740 4,106 4,317 81

9 Madrid 14 14 14 14 100 0 3,400 3,148 3,250 3,340 98

10 Marihatag 12 12 12 12 100 0 3,300 1,792 1,895 2,006 61

11 San Agustin 13 13 13 13 100 0 3,000 2,055 2,295 2,381 79

12 San Miguel 18 15 17 17 94 1 5,600 3,142 3,397 3,593 64

13 Tago 24 24 24 24 100 0 6,000 4,670 5,100 5,334 89

14 City of Tandag 21 21 21 21 100 0 12,100 10,973 11,539 12,027 99

Total 197 190 195 195 99 2 59,000 46,929 49,956 52,232 89

VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)

2007 2008 2009 2007 2008 2009

Gross Revenue (P'000) 16,191 19,174 22,645 Residential 43,158 46,106 48,274

MWH Purchased 3,058 3,636 4,143 Commercial 2,421 2,459 2,482

MWH Sold 2,719 3,231 3,705 Industrial 48 51 54

Systems Loss (%) 11 11 10 Public Building 1,166 1,190 1,264

Peak Load (KW) 7,663 9,315 10,699 Others 136 150 158

Load Factor (%) 55 53 53 Total 46,929 49,956 52,232

Collection Efficiency (%) 97 97 97

Ave. Systems Rate (P/KWH) 5.96 5.93 6.11

X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Residential 11,362 12,426 13,930 15,620 17,637 17,362 17,283 19,055 23,348 25,074

Commercial 4,376 4,631 4,702 5,117 6,140 6,284 7,248 7,397 8,333 9,097

Industrial 1,455 1,508 1,857 2,152 2,191 2,161 1,290 1,402 1,532 3,937

Public Building 1,848 2,037 2,298 2,654 2,778 2,932 3,497 3,838 4,493 5,082

Others 455 512 582 990 1,424 924 800 934 1,070 1,273

Total 19,496 21,114 23,369 26,533 30,170 29,663 30,118 32,626 38,776 44,463

Mr. Jose A. Trugillo

City of Tandag, Surigao del Sur

Tel No. (086) 211-3031; Telefax No. (086) 211-3553; E-mail: [email protected]

2008 20092007

Mr. Jose A. Trugillo Mr. Jose A. Trugillo

Engr. Iglorio R. Hinayon

EnergizedUnenerg.

50,167

Served

Large Large

A+

B A R A N G A Y S

50,16750,322

Engr. Iglorio R. Hinayon

A+A+

Large

Engr. Iglorio R. Hinayon

Coverage

Monthly Average

MUNICIPALITIES

Potential

C O N N E C T I O N S

Legislative District

274

SURIGAO DEL SUR II ELECTRIC COOPERATIVE, INC. (SURSECO II)

Page 282: The 2007-2009 RE Chronicle
Page 283: The 2007-2009 RE Chronicle

STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 % 2007 2008 2009 %

A. PRIVATE INVESTOR-OWNED UTILITIES

1. MERALCO 111 111 111 111 100 4,322 4,254 4,261 4,268 99 54 2. LUECO 3 3 3 3 100 84 84 84 84 100 - 3. DECORP 6 6 6 6 100 154 154 154 154 100 - 4. TEI 1 1 1 1 100 70 70 70 70 100 - 5 CELCOR 1 1 1 1 100 87 87 87 87 100 -

6. AEC 1 1 1 1 100 35 35 35 35 100 - 7. SFELAPCO 2 2 2 2 100 63 62 62 63 100 - 8. IEES 1 1 1 1 100 26 26 26 26 100 - 9. PECO 1 1 1 1 100 180 180 180 180 100 -

10. VECO 8 8 8 8 100 232 232 232 232 100 - 11. MECO 2 2 2 2 100 43 43 43 43 100 - 12. PES Bohol 1 1 1 1 100 15 15 15 15 100 - 13. CEPALCO 4 4 4 4 100 96 96 96 96 100 - 14. ILPI 1 1 1 1 100 44 44 44 44 100 - 15. DLPC 5 5 5 5 100 266 263 266 266 100 - 16. COLIGHT 1 1 1 1 100 68 67 67 68 100 -

Sub Total 149 149 149 149 100 5,785 5,712 5,722 5,731 99 54

B. LOCAL GOVERNMENT UTILITIES

1. PANTABANGAN 1 1 1 1 100 9 9 9 9 100 - 2. OLONGAPO CITY 1 1 1 1 100 17 17 17 17 100 - 3. BAUAN 1 1 1 1 100 40 40 40 40 100 - 4. BANTON 1 1 1 1 100 17 17 17 17 100 - 5. CONCEPCION 1 1 1 1 100 9 9 9 9 100 - 6. CORCUERA 1 1 1 1 100 15 15 15 15 100 - 7. CLAVERIA 1 1 1 1 100 22 2 2 22 100 - 8. BUMBARAN 1 1 1 1 100 17 9 10 10 59 7

Sub Total 8 8 8 8 100 146 118 119 139 95 7

C. OTHERS

1. WESTERN COMMAND (AFP) 1 1 1 1 100 1 1 1 1 100 - 2. TONGONAN (PNOC) - - - - - 2 2 2 2 100 - 3. MMPC 1 1 1 1 100 15 15 15 15 100 - 4. HFMPC - - - - - 1 1 1 1 100 -

2 2 2 2 100 19 19 19 19 100 - 159 159 159 159 100 5,950 5,849 5,860 5,889 99 61

EnergizedUnenerg.

CITIES/MUNICIPALITIES

CoverageEnergized

TOTAL

SUMMARY

OTHER ELECTRIC DISTRIBUTION UTILITIES

Sub Total

MUNICIPALITIES/CITYB A R A N G A Y S

Coverage

275

Page 284: The 2007-2009 RE Chronicle

STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 %

1. Bulacan 569 568 569 569 1002. Pampanga 20 20 20 20 1003. Cavite 830 828 830 830 1004. Laguna 510 488 488 490 965. Batangas 164 160 160 164 1006. Rizal 188 187 188 188 1007. Quezon 347 310 312 313 888. NCR 1,694 1,693 1,694 1,694 100

4,322 4,254 4,261 4,268 99

Bulacan

1 Angat 16 16 16 16 100 2 Balagtas (Bigaa) 9 9 9 9 100 3 Baliuag 27 27 27 27 100 4 Bocaue 19 19 19 19 100 5 Bulacan 14 14 14 14 100 6 Bustos 14 14 14 14 100 7 Calumpit 29 29 29 29 100 8 Guiguinto 14 14 14 14 100 9 Hagonoy 26 26 26 26 100

10 City of Malolos 51 51 51 51 100 11 Marilao 16 16 16 16 100 12 City of Meycauayan 26 26 26 26 100 13 Norzagaray 13 12 13 13 100 14 Obando 11 11 11 11 100 15 Pandi 22 22 22 22 100 16 Paombong 14 14 14 14 100 17 Plaridel 19 19 19 19 100 18 Pulilan 19 19 19 19 100 19 Remedios Trinidad 8 8 8 8 100 20 San Ildefonso 36 36 36 36 100 21 City of San Jose del Monte 59 59 59 59 100 22 San Miguel 49 49 49 49 100 23 San Rafael 34 34 34 34 100 24 Sta. Maria 24 24 24 24 100

569 568 569 569 100

Energized

Total

Total

Other Electric Distribution Utilities

CoveragePROVINCES/CITIES/

MUNICIPALITIES

B A R A N G A Y S

Manila Electric Company (MERALCO)

276

Page 285: The 2007-2009 RE Chronicle

STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 %Energized

Other Electric Distribution Utilities

CoveragePROVINCES/CITIES/

MUNICIPALITIES

B A R A N G A Y S

Manila Electric Company (MERALCO)

Pampanga

Apalit 3 3 3 3 100 Candaba 16 16 16 16 100 San Simon 1 1 1 1 100

20 20 20 20 100

Cavite

1 Alfonso 32 32 32 32 100 2 Amadeo 26 26 26 26 100 3 Bacoor 73 73 73 73 100 4 Carmona 14 14 14 14 100 5 Cavite City 84 84 84 84 100 6 Dasmariñas 75 73 75 75 100 7 Gen. Aguinaldo 14 14 14 14 100 8 Gen. Alvarez 27 27 27 27 100 9 Gen. Trias 33 33 33 33 100

10 Imus 97 97 97 97 100 11 Indang 36 36 36 36 100 12 Kawit 23 23 23 23 100 13 Magallanes 16 16 16 16 100 14 Maragondon 27 27 27 27 100 15 Mendez-Nunez 24 24 24 24 100 16 Naic 30 30 30 30 100 17 Noveleta 16 16 16 16 100 18 Rosario 20 20 20 20 100 19 Silang 64 64 64 64 100 20 Tagaytay City 35 35 35 35 100 21 Tanza 41 41 41 41 100 22 Ternate 10 10 10 10 100 23 Trece Martires City 13 13 13 13 100

830 828 830 830 100 Total

Total

277

Page 286: The 2007-2009 RE Chronicle

STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 %Energized

Other Electric Distribution Utilities

CoveragePROVINCES/CITIES/

MUNICIPALITIES

B A R A N G A Y S

Manila Electric Company (MERALCO)

Laguna

1 Alaminos 15 15 15 15 100 2 Bay 16 16 16 16 100 3 Binan 24 24 24 24 100 4 Cabuyao 18 18 18 18 100 5 City of Calamba 54 54 54 54 100 6 Calauan 17 17 17 17 100 7 Liliw 33 28 28 28 85 8 Los Banos 14 14 14 14 100 9 Luisiana 23 23 23 23 100

10 Magdalena* 23 18 18 18 78 11 Majayjay* 40 29 29 30 75 12 Nagcarlan 52 52 52 52 100 13 Pila 17 17 17 17 100 14 Rizal 11 11 11 11 100 15 San Pablo City 80 80 80 80 100 16 San Pedro 20 20 20 20 100 17 Sta. Cruz 26 25 25 26 100 18 City of Santa Rosa 18 18 18 18 100 19 Victoria 9 9 9 9 100

*adjusted

510 488 488 490 96

Batangas

1 Batangas City 105 101 101 105 100 2 San Pascual 29 29 29 29 100 3 Sto. Tomas 30 30 30 30 100

164 160 160 164 100

Rizal

1 Angono 10 10 10 10 100 2 City of Antipolo 16 16 16 16 100 3 Baras 10 10 10 10 100 4 Binangonan 40 39 40 40 100 5 Cainta 7 7 7 7 100 6 Cardona 18 18 18 18 100 7 Jala-Jala 11 11 11 11 100 8 Montalban (Rodriguez) 11 11 11 11 100 9 Morong 8 8 8 8 100

10 Pililla 9 9 9 9 100 11 San Mateo 15 15 15 15 100 12 Tanay 19 19 19 19 100 13 Taytay 5 5 5 5 100 14 Teresa 9 9 9 9 100

188 187 188 188 100 Total

Total

Total

278

Page 287: The 2007-2009 RE Chronicle

STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 %Energized

Other Electric Distribution Utilities

CoveragePROVINCES/CITIES/

MUNICIPALITIES

B A R A N G A Y S

Manila Electric Company (MERALCO)

Quezon

1 Candelaria 25 25 25 25 100 2 Dolores 16 16 16 16 100 3 Lucban 32 32 32 32 100 4 Lucena City 33 33 33 33 100 5 Mauban* 40 22 21 21 53 6 Pagbilao 27 22 25 25 93 7 Sampaloc 14 9 9 10 71 8 San Antonio 20 20 20 20 100 9 Sariaya 43 43 43 43 100

10 City of Tayabas 66 57 57 57 86 11 Tiaong 31 31 31 31 100

*adjusted

347 310 312 313 90

National Capital Region

1 Caloocan City 188 188 188 188 100 2 City of Las Pinas 20 20 20 20 100 3 City of Makati 33 33 33 33 100 4 City of Malabon 21 21 21 21 100 5 City of Mandaluyong 27 27 27 27 100 6 City of Manila 897 897 897 897 100 7 City of Marikina 15 14 15 15 100 8 City of Muntinlupa 9 9 9 9 100 9 City of Navotas 14 14 14 14 100

10 City of Paranaque 16 16 16 16 100 11 Pasay City 201 201 201 201 100 12 City of Pasig 30 30 30 30 100 13 Pateros 10 10 10 10 100 14 Quezon City 142 142 142 142 100 15 City of San Juan 21 21 21 21 100 16 Taguig City 18 18 18 18 100 17 City of Valenzuela 32 32 32 32 100

1,694 1,693 1,694 1,694 100 Total

Total

279

Page 288: The 2007-2009 RE Chronicle

STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 %

La Union Electric Company, Inc. (LUECO) 1 City of San Fernando (59) 45 45 45 45 1002 Bauang (39) 32 32 32 32 1003 San Juan (41) 7 7 7 7 100

84 84 84 84 100

Dagupan Electric Corp. (DECORP) 1 Calasiao 24 24 24 24 100(Pangasinan) 2 Dagupan City 31 31 31 31 100

3 San Fabian (34) 26 26 26 26 1004 San Jacinto (19) 16 16 16 16 1005 Sta. Barbara 29 29 29 29 1006 Manaoag 26 26 26 26 100

San Carlos City 2 2 2 2 100154 154 154 154 100

Tarlac Electric, Inc. (TEI) 1 City of Tarlac (76) 70 70 70 70 100

Cabanatuan Electric Corp. (CELCOR) 1 Cabanatuan City (89) 87 87 87 87 100 (Nueva Ecija)

Angeles Electric Company (AEC) 1 Angeles City 33 33 33 33 100 (Pampanga) 2 San Fernando City 2 2 2 2 100

35 35 35 35 100

San Fernando Electric Light 1 City of San Fernando (35) 33 32 32 33 100 & Power Company (SFELAPCO) 2 Floridablanca (33) 30 30 30 30 100 (Pampanga) 63 62 62 63 100

Ibaan Electric & Engineering 1 Ibaan 26 26 26 26 100 System, Inc. (IEES)(Batangas)

Panay Electric Company (PECO) 1 Iloilo City 180 180 180 180 100 (Iloilo)

Visayan Electric Company (VECO) 1 Cebu City 80 80 80 80 100 (Cebu) 2 Consolacion 21 21 21 21 100

3 Liloan 14 14 14 14 100 4 Mandaue City 27 27 27 27 100 5 City of Naga 28 28 28 28 100 6 San Fernando 21 21 21 21 100 7 City of Talisay 22 22 22 22 100 8 Minglanilla 19 19 19 19 100

232 232 232 232 100

Mactan Electric Company (MECO) 1 Lapu-Lapu City 30 30 30 30 100 (Cebu) 2 Cordoba 13 13 13 13 100

43 43 43 43 100

Provincial Electric System, Province of 1 Tagbilaran City 15 15 15 15 100 Bohol (PES Bohol)

Cagayan Electric Power & 1 Cagayan de Oro City (80) 66 66 66 66 100 Light Company (CEPALCO) 2 Jasaan (15) 11 11 11 11 100 (Misamis Oriental) 3 Tagoloan 10 10 10 10 100

4 Villanueva 9 9 9 9 100 96 96 96 96 100

Iligan Light & Power Company, Inc. (ILPI) 1 Iligan City 44 44 44 44 100 (Lanao del Norte)

Davao Light & Power Company, Inc. 1 Davao City 182 179 182 182 100 (DLPC) 2 Carmen 20 20 20 20 100 (Davao del Sur) 3 City of Panabo 40 40 40 40 100

4 Sto. Tomas 19 19 19 19 100 5 Braulio E. Dujali 5 5 5 5 100

266 263 266 266 100

Cotabato Light & Power Company, Inc. 1 Cotabato City 37 36 36 37 100 (COLIGHT) Sultan Kudarat 18 18 18 18 100 (Maguindanao) Datu Odin Sinsuat (Dinaig) 13 13 13 13 100

68 67 67 68 100

Total

Total

Total

Total

Total

CoverageEnergized

Other Electric Distribution Utilities

Total

Total

Total

B A R A N G A Y SEDUs MUNICIPALITIES/CITIES

Total

Private Investor-Owned Utilities (PIOUs)

280

Page 289: The 2007-2009 RE Chronicle

STATUS OF ENERGIZATION : (Cumulative)

2007 2008 2009 %

Pantabangan Electric System (PAMES) 1 Pantabangan 9 9 9 9 100(Nueva Ecija)

Public Utilities Department- 1 Olongapo City 17 17 17 17 100Olongapo City (PUD-Olongapo)(Zambales)

Bauan Electric Light System (BELS) 1 Bauan 40 40 40 40 100(Batangas)

Banton Electric System 1 Banton 17 17 17 17 100(Romblon)

Concepcion Electric System 1 Concepcion 9 9 9 9 100(Romblon)

Corcuera Electric System 1 Corcuera 15 15 15 15 100(Romblon)

Claveria Municipal Electric System* 1 Claveria 22 2 2 22 100(Masbate)

Bumbaran Municipal Electric System 1 Bumbaran 17 9 10 10 59(Lanao del Sur)

Western Command - AFP* 1 Kalayaan 1 1 1 1 100(Palawan)

Tongonan Geo-Thermal (PNOC) Kananga 2 2 2 2 100(Kananga, Leyte)

Maripipi Multi Purpose Coop., Inc. (MMPC) 1 Maripipi 15 15 15 15 100(Biliran)

Hilabaan Fishermen's Multi Purpose 1 Dolores 1 1 1 1 100Coop. (HFMPC) (Eastern Samar)

CITY/MUNICIPALITY

Other Electric Distribution Utilities

LGU-Owned Utilities/Other Electric System

LGUs/Others Coverage EnergizedB A R A N G A Y S

281

Page 290: The 2007-2009 RE Chronicle
Page 291: The 2007-2009 RE Chronicle
Page 292: The 2007-2009 RE Chronicle
Page 293: The 2007-2009 RE Chronicle
Page 294: The 2007-2009 RE Chronicle
Page 295: The 2007-2009 RE Chronicle
Page 296: The 2007-2009 RE Chronicle
Page 297: The 2007-2009 RE Chronicle
Page 298: The 2007-2009 RE Chronicle
Page 299: The 2007-2009 RE Chronicle
Page 300: The 2007-2009 RE Chronicle
Page 301: The 2007-2009 RE Chronicle
Page 302: The 2007-2009 RE Chronicle
Page 303: The 2007-2009 RE Chronicle
Page 304: The 2007-2009 RE Chronicle
Page 305: The 2007-2009 RE Chronicle
Page 306: The 2007-2009 RE Chronicle

NEA ORGANIZATIONAL

STRUCTURE

INFORMATION TECHNOLOGY &

COMMUNICATION SERVICES

DEPARTMENT

Roderick N. PaduaOversight

OFFICE OF THE DEPUTY ADMINISTRATOR FOR

CORPORATE RESOURCES & FINANCIAL SERVICES

Mariano T. Cuenco

FINANCE SERVICES

DEPARTMENT

Sonia B. San DiegoDirector

ACCOUNTS MANAGEMENT &

GUARANTEEDEPARTMENT

Leila B. BonifacioDirector

HUMAN RESOURCES &

ADMINISTRATIONDEPARTMENT

Diana M. San LuisDirector

ENGINEERINGDEPARTMENT

Jose H. Seguban,Jr.Director

INSTITUTIONAL DEVELOPMENTDEPARTMENT

Milagros E. QuinajonDirector

Information Technology &

System Development

Division

Shirley J. SalvadorManager

Database Management

& Program Control Division

Ana Rosa D. Papa

Manager

Financial Services &

Accounting Division

Adelina A. Gabon

Manager

Financial Planning &

Control Division

Milagros A. RoblesManager

Treasury Division

Benita T. CuencoManager

Accounts Servicing Division

Lida E. Dela Merced

Manager

Accounts Management

Division

Rosie M. AlamilloManager

Human Resources

Management Division

Angelina M. Ramos

Manager

General Services Division

M.F. Carandang/ E.L. Morales

Manager

Technical Operations

Division

Ferdinand P. Villareal

Manager

Systems Planning& Evaluation

Division

Enrique J. DiamanteManager

Power Development &

Utilization Division

Wilfredo O. BucsitManager

Organization & Management Development

Division

Nora I. RiveraManager

Training & Development

Services Division

Diosdado A. Corsiga

Manager

EDU Consumer Development &

ProtectionDivision

Arnel P. GalarpeManager

Electric Cooperative

Financial Management Audit Division

Isidro E. EdquilaManager

Electric Cooperative Operations

Systems Audit Division

Nixon R. BautistaManager

OFFICE OF THE DEPUTY ADMINISTRATOR FOR FIELD

OPERATIONS/MANAGEMENT ASSISTANCE GROUP

Edilberto I. Bassig

OFFICE OF THE DEPUTY ADMINISTRATOR FOR ELECTRIC DISTRIBUTION UTILITIES SERVICES

Edgardo R. Piamonte

OFFICE OF THE DEPUTY ADMINISTRATOR FOR

LEGAL SERVICES

John Joseph M. Magtuloy

CORPORATE PLANNING OFFICE

Roderick N. PaduaDirector

PUBLIC AFFAIRS OFFICE

Judith T. AlferezDirector

OFFICE OF THE ADMINISTRATOR

Edita S. BuenoAdministrator

BOARD OF ADMINISTRATORS

Office of the Corporate Secretary

Nollie B. Alamillo

Internal Audit & Quality Standards

Management Office

Consolacion E. BalderasDirector

Finance & Special Audit Division

Judy B. ArcillaManager

System Audit & Quality Standards

Division

Jane A. BuenoManager

ELECTRIC COOPERATIVES AUDIT

DEPARTMENT

Veronica B. CruzDirector

Hon. Jose Rene D. Almendras - Chairman (July 2010 – Present)Hon. Jose C. Ibazeta - Chairman (March 2010-June 2010)Hon. Angelo T. Reyes - Chairman (August 2007-March 2010)Hon. Wilfred L. Billena - MemberHon. Jose Victor E. Lobrigo - MemberHon. Joseph D. Khonghun - MemberHon. Edita S. Bueno - Ex-Officio Member

Strategic Planning Division

Francisco A. Caymo

Manager

Rural Electrification

Project Planning & Development

Division

Roderick N. PaduaConcurrent OIC

MAG-Supervisory & Assessment

OfficeAdolben A. Flores

Director

MAG-MINDANAO Team

Benedicto B. PeraltaDirector

MAG-VISACOL Team

Paulino T. LopezDirector

MAG-LUZON Team

Rogelio B. Bernal

Director

MAG-FIT Team

Eddie A. AdlaoDirector

Legal Services

May M. JarangueDirector

Legal Services

Omar M. MayoDirector

Legal Services

Xerxes D. AdzuaraDirector

Page 307: The 2007-2009 RE Chronicle

Editorial Box

Our Advisers . . .

EDITA S. BUENOAdministrator

MARIANO T. CUENCODeputy Administrator for Corporate Resources and Financial Services

RODERICK N. PADUAOversight, Information Technology and Communication Services Department

Our Team . . .

ANA ROSA D. PAPAManager

RHINA H. ANGUE JUSTINO S. CALVEZ EDWIN A. CONCEPCION

DEMOSTHENES EREÑO IRENE C. MARTIN GINA T. QUINDO

LEILANI L. RICO RENATO L. SUBIJANO NIELMA E. VERZOSA

Administrative Staff

BENEDICTO R. DE CHAVEZ JULIET A. OMBROG JONATHAN C. GARCIA

MARC MICHEL C. PELONE DENNIS P. SANTOS JOSEPH M. TRIUNFO

Special thanks to the following :

PUBLIC AFFAIRS OFFICE ENGINEERING DEPARTMENT

INSTITUTIONAL DEVELOPMENT DEPARTMENTHUMAN RESOURCES AND ADMINISTRATION DEPARTMENTACCOUNTS MANAGEMENT AND GUARANTEE DEPARTMENT

INFORMATION TECHNOLOGY AND SYSTEMS DEVELOPMENT DIVISION

For questions and inquiries, please contact :

Database Management and Program Control Division (DMPCD)Telefax No. 928-03-26

Email Address : [email protected]

Page 308: The 2007-2009 RE Chronicle