Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144,...
-
Upload
javion-osbun -
Category
Documents
-
view
217 -
download
0
Transcript of Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144,...
![Page 1: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/1.jpg)
Thanks for joining us. We’ll be starting soon.
• To join the teleconference, dial 1-888-858-2144, passcode 1517341#• To download handouts:
• Click the Handouts button at the top of the screen, right hand side.• The Handouts button looks like this:
• To ask a question:• We’ll stop periodically and ask if anyone on the phone or in the room has a
question.• You can also ask your question online
• Click the ‘Q&A’ tab at the top of the screen, type your question in the dialog box, then click ‘Ask’.
• If you need to provide feedback during the presentation, please click on the drop-down arrow next to the Feedback tool.
![Page 2: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/2.jpg)
FOREST PLAN REVISION
INYO NATIONAL FORESTMARCH 11 AND 13, 2013
![Page 3: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/3.jpg)
Meeting Goals
• Review the forest plan revision process
• Gather information on:• Current forest conditions • Trends in conditions • Drivers of forest change
![Page 4: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/4.jpg)
What is a Forest Plan?• Required for all national
forests/grasslands
• Provides broad, integrated management direction
• Programmatic, not site-specific
• Ten to fifteen year planning period
• All uses of the forest need to conform with plan direction
![Page 5: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/5.jpg)
The Inyo’s Forest Plan• Inyo’s Forest Plan was completed in
1988; multiple amendments
• Established management direction for forest resources such as wildlife, recreation, and timber
• Delineated geographic management areas and prescriptions
• All forest projects and activities need to conform with 1988 plan direction
![Page 6: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/6.jpg)
Why is the Plan being revised?• A lot has changed since 1988!
• Need to develop improved management direction based on new information and changing conditions
• Use results of 24 years of project implementation, other information
• Carry forward management direction that is still effective / valid; revise what is not
![Page 7: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/7.jpg)
What will the revised Plan include?• Five required plan components:
• Desired Conditions• Objectives• Suitability of Uses• Standards • Guidelines
• Other plan content such as:• Distinctive Roles and Contributions• Management Areas - Zones - Geographic Areas• Recommended Areas (e.g., Wilderness, Wild &
Scenic Rivers)• Priority Watersheds• Monitoring Program
![Page 8: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/8.jpg)
What won’t the Plan include?• Site-specific decisions or
actions, such as:
• Construct 5 miles of new trail from Bluebird Lake to Feather Falls
• Close Road #12S34 to motor vehicle use from April 1 – June 1 each year
• Conduct forest thinning on 125 acres immediately adjacent to the community of Forest Hill
![Page 9: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/9.jpg)
Assessment
Plan Revision
Monitoring
Three Phases to Revise a Forest Plan
![Page 10: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/10.jpg)
Multi-year process
2012• Develop
Inyo NF Collabor-ation Plan
2013
• Bioregional Assessment
• Inyo NF Assessment
• Begin identifying Need for Change
2014
• Complete Need for Change
• Develop and analyze Proposed Plan
2015 to 2016
• Public review of draft Plan and EIS
• Approve revised Plan
• Monitoring
![Page 11: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/11.jpg)
First Phase: Assessment
Social Conditions
Economic Conditions
Ecological Conditions
![Page 12: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/12.jpg)
Assessment Report• What is an assessment?
• Provides a source of information and context for plan revision
• To be conducted rapidly, using readily available information and existing data
• Identify knowledge or information gaps
• Conducted at two scales: forest-level and bioregional
• Draft Bioregional assessment to be available May 2013, final by August 2013
• Draft Forest-level assessment by October 2013, final by December 2013
![Page 13: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/13.jpg)
Assessment Topic Papers• Resource “topic paper” chapters will form the foundation
of the Inyo NF Assessment Report
Ch. 1: Ecosystem Condition (Terrestrial, Aquatic, Riparian Ecosystems)
Ch. 2: Air, Soil, and Water Resources
Ch. 3: System Drivers and Stressors (wildfire, climate change, insects and disease, etc.)
Ch. 4: Carbon stocks
Ch. 5: At-risk wildlife and plant species
Ch. 6: Social, Cultural, and Economic Conditions
Ch. 7: Ecosystem Services and Benefits (introduction only)
Ch. 8: Multiple Uses (Water, Range, Timber, Hunting/Fishing/Plant Collection)
Ch. 9: Recreation and Scenic Character
Ch. 10: Renewable and Nonrenewable Energy and Mineral Resources
Ch. 11: Infrastructure (roads, recreation facilities, public utilities, etc.)
Ch. 12: Areas of Tribal Importance
Ch. 13: Cultural & Historic Resources
Ch. 14: Land Status and Ownership
Ch. 15: Designated Areas (wilderness, wild and scenic rivers, research natural areas, inventoried roadless areas)
![Page 14: Thanks for joining us. We’ll be starting soon. To join the teleconference, dial 1-888-858-2144, passcode 1517341# To download handouts : Click the Handouts.](https://reader030.fdocuments.us/reader030/viewer/2022032611/56649cb15503460f94976efe/html5/thumbnails/14.jpg)
Next Steps• Spring 2013: Gather information on resource conditions
and trends; prepare topic papers for the assessment.
• Follow-up meeting/webinar April 4th, 2 - 4 pm and 5 – 7 pm
• Initial input on content of assessment topic papers due April 5th
• Public review of draft topic papers May-June (with some chapters available even sooner)
• October 2013: Draft Assessment Report released for public review
• December 2013: Final Assessment Report published
• Winter 2013: Initiate NEPA, identify need for change in current management direction.