TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition...

24
TEXAS TRANSPORTATION PLAN TxDOT Planning Conference June 5, 2014 Michelle Maggiore, P.E., CH2M HILL

Transcript of TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition...

Page 1: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

TEXAS TRANSPORTATION PLAN

TxDOT Planning Conference

June 5, 2014

Michelle Maggiore, P.E., CH2M HILL

Page 2: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

2

6

8

22

3 Performance-based planning – what is it?

How is performance-based planning addressed in the TTP?

TTP Needs and Investment Approaches

TTP 2040 Next Steps

1

2

3

4

Agenda

Page 3: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

All About Performance

The term performance has been “sprinkled” around

the transportation industry for some time.

MAP-21 establishes an outcome-driven approach

for highway investment, where states and

metropolitan planning organizations shall work to

measure, manage, and improve upon the

conditions and performance of transportation

assets.

How can we ensure that we invest wisely to

achieve performance goals over time?

3

Page 4: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

Performance-based Planning

Establish goals and objectives

Understand the to achieve those goals - needs are not

wishlists

Evaluate scenarios or investment strategies - we do not have

enough resources to reach “good or better” everywhere –

what can be sacrificed?

Develop recommend investment strategy and preferred

capital program allocation - not project-specific

Integrate findings into budget allocation and project

prioritization

Implement/ track implementation

Track performance - over time

4

Page 5: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

Performance Measures

5

Good Measures

Supported by existing resources

Important to decision-

makers and stakeholders

Influenced by agency

Suitable for context/

meet requirements

Support predictive capacity

Measures are the icing, not the cake

Page 6: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

The Texas Transportation Plan

Size and scope of the Texas transportation system:

– Existing conditions

– System goals and objectives

– Current and future demand

– Long-range transportation needs by mode

– Investment scenarios

Long-range transportation needs: costs to preserve,

maintain, and expand Texas’ transportation system to meet

good or better conditions over the Plan horizon (MAP-21-

compliant goals)

Plan investment scenarios: show tradeoffs among Plan goals

and objectives - we can’t do it all!

6

Page 7: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

TTP DRAFT Goal Areas – Summary

7

Maintain a Safe System Address

Congestion

Connect

Texas Communities

Become a Best-in-Class

State Agency

Infrastructure Condition

(State of good repair)

Congestion Reduction

Freight Mobility

System Reliability

Congestion Reduction

Environmental Sustainability

Reduced Project

Delivery Delays

Safety

Infrastructure

Condition

(State of good

repair)

Asset

Management (All modes)

Mobility and

Reliability (People &

Freight)

Multimodal

Connectivity (People &

Freight)

Stewardship Customer Service

Safety

DRAFT

TTP Goal Areas

Access to Service

(All modes)

2013-2017

Strategic Plan Goals

MAP-21

Goal Areas

Economic Vitality

Financial Sustainability

Page 8: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

Needs Assessment

Unconstrained multimodal needs serve as the basis for

investment approaches and MetroQuest Tool

Unconstrained needs by mode were developed to meet

TTP goals:

– Presented in $2014 constant dollars for the 25-year

horizon

– Consistent with MAP-21

– Developed using performance curves - can be reduced

when performance goals are reduced (e.g. capacity

needs)

15

Page 9: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

Total Needs

Highway/ Bridge/ ITS (TxDOT) – costs to achieve SGR on

NHS (bridge and pavement) and expand system to LOS C

> $15 billion annually

Freight/ aviation/ transit (non-TxDOT): > $5 billion annually

Total statewide multimodal needs: > $20 billion annually

24

+

Statewide multimodal needs for TxDOT and its transportation

partners cannot be achieved under our current revenue

forecast

The TTP explores alternatives using scenario planning and

performance-based budgeting

Page 10: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

This scenario is focused on investing in the existing State transportation system to achieve state-of-good-repair for highway, bridge, and transit assets. Deficient assets with respect to condition and/ or performance

(e.g., functional obsolescence) will be prioritized and addressed.

Investment Approach 1: System Preservation

9

Page 11: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

11

Investment

Area Approach 1 - Performance Goals Cost

Pavement Achieve and maintain SGR for existing State-owned

highways with proactive maintenance and capital

reinvestment

$108 B

Bridge/ Culvert Achieve and maintain state-of-good-repair for existing

State-owned bridges and culverts with proactive

maintenance and capital reinvestment

$42 B

ITS Maintain SGR for existing assets $2 B

Capacity Allow congestion to worsen $0

Transit Achieve and maintain SGR for existing assets and

existing service levels

$73 B

Safety/ Other Address any additional safety needs $5 B

Total Estimated Cost of Approach 1 (2014 $) $230 B

Page 12: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

This scenario is focused on addressing congestion in urban and suburban areas through strategic capacity enhancements, operational

improvements, and investments in multimodal facilities. Focus will be placed on increasing travel time reliability and on enhancing transit in the

fastest-growing areas.

Investment Approach 2: Metropolitan Mobility

10

Page 13: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

13

Investment

Area Approach 2 - Performance Goals Cost

Pavement Achieve and maintain SGR for the Interstate system

with proactive maintenance and capital reinvestment

$83 B

Bridge/ Culvert Achieve and maintain state-of-fair-repair for existing

State-owned bridges and culverts with proactive

maintenance and capital reinvestment; achieve SGR

on Interstate system

$39 B

ITS Maintain SGR for existing assets and deploy new ITS

in metropolitan areas

$14 B

Capacity Ensure LOS D or better in metropolitan areas $235 B

Transit Achieve and maintain SGR for existing and new

assets in metro areas; expand beyond existing

service levels

$96 B

Safety/ Other Address any additional safety needs as well as bike

and pedestrian needs statewide

$8

Total Estimated Cost of Approach 2 (2014 $) $475 B

Page 14: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

This scenario is focused on rural investment to facilitate the movement of goods and services and support Texas industry. Focus will be placed on improving interregional connectivity, specifically along primary freight

corridors identified in the TFMP and between economic activity centers, and on providing rural residents with access to goods and services.

Investment Approach 3: Connectivity & Freight Mobility

11

Page 15: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

15

Investment

Area Approach 3 - Performance Goals Cost to

Achieve

Pavement Achieve and maintain SGR for the Primary Freight

Network with proactive maintenance and capital

reinvestment

$93 B

Bridge/ Culvert Achieve and maintain state-of-fair-repair for existing

State-owned bridges and culverts with proactive

maintenance and capital reinvestment; achieve SGR

on Primary Freight Network

$36 B

ITS Maintain SGR for existing assets $2 B

Capacity Eliminate freight bottlenecks (LOS C or better on

Primary Freight Network)

$246 B

Transit Achieve and maintain SGR for existing and new

assets in rural areas; expand beyond existing service

levels and add intercity passenger rail

$74 B

Safety/ Other Address any additional safety needs as well as bike

and pedestrian needs statewide and Primary Freight

Network rumble strips

$9 B

Total Estimated Cost of Approach 3 (2014 $) $460 B

Page 16: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

16

Page 17: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

17

Page 18: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

18

Page 19: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

19

Page 20: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

20

Page 21: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

21

Page 22: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

TTP 2040 Next Steps

We need your on-going input:

– Stakeholder and Public Meetings-June 9 through August 5

– Summarize Stakeholder and Public Meeting Outcomes-

August 5 through August 29

– Draft 2040 TTP and Public Hearing – September

– Final Plan/ Plan adoption (Fall 2014)

25

Page 23: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

Outreach Round 2 – Schedule

Week 1: 6/9-12 • Bryan TxDOT District Office

• SE Texas Regional Planning

Commission (Beaumont)

• Houston TxDOT District Office

• Lufkin TxDOT District Office

Week 2: 6/16-18 • San Angelo Visitors Center

• Odessa TxDOT District Office

• El Paso Multi-Purpose Center

Week 3: 6/24-26 • Atlanta TxDOT

District Office

• Paris Junior

College

• Tyler TxDOT

District Office

Week 4: 7/7-10 • DalTrans Transportation Management Center

• Wichita Falls Transit Center

• Fort Worth TxDOT District Office

• Brownwood TxDOT District Office

Week 5: 7/14-17 • Laredo TxDOT District Office

• Pharr TxDOT District Office

• Corpus Christi TxDOT District Office

• City of Victoria

Week 6: 7/22 • Waco Transit

Center

Week 7: 7/28-30 • T&P Depot (Abilene)

• Childress City Auditorium

• Amarillo TxDOT District Office

• Lubbock TxDOT District Office

Week 8: 8/4-5 • San Antonio TxDOT District Office

• Austin TxDOT District Office

7

Page 24: TEXAS TRANSPORTATION PLAN · 2017. 1. 4. · Delivery Delays Safety Infrastructure Condition repair) Asset Management (All modes) Mobility and Reliability (People & Freight) Multimodal

THANK YOU!

Michelle Maggiore – CH2M HILL