TETLPVolumeNo1

download TETLPVolumeNo1

of 627

Transcript of TETLPVolumeNo1

  • 8/6/2019 TETLPVolumeNo1

    1/626

    Table of ContentsTariff Eighth Revised Volume No. 1

    Part 1 Table of ContentsPart 2 Preliminary StatementPart 3 Maps

    1. System Map2. Access Zone "STX"3. Access Zone "ETX"4. Access Zone "WLA"5. Access Zone "ELA"6. Market Zone "1"7. Market Zone "2"8. Market Zone "3"

    Part 4 Statements of Rates1. Rate Schedule CDS2. Rate Schedule FT-13. Rate Schedule SCT

    4. Rate Schedule IT-15. Rate Schedules LLFT and LLIT6. Rate Schedules VKFT and VKIT

    Texas Eastern Transmission, LPEighth Revised Volume No. 1

  • 8/6/2019 TETLPVolumeNo1

    2/626

    7. Rate Schedule MLS-18. Rate Schedule PAL9. Rate Schedule SS-110. Rate Schedule FSS-111. Rate Schedule ISS-112. Individual Certificated Transportation Rate Schedules13. Rate Schedule SS14. Notice of Rate Change Adjustments15. Negotiated Rates16. Percentages for Applicable Shrinkage17. Effective Base Electric Power Cost Units

    Part 5 Rate Schedules1. Rate Schedule CDS2. Rate Schedule FT-13. Rate Schedule SCT4. Rate Schedule IT-15. Rate Schedule LLFT6. Rate Schedule LLIT7. Rate Schedule VKFT8. Rate Schedule VKIT9. Rate Schedule MLS-110. Rate Schedule TABS-111. Rate Schedule TABS-2

    Texas Eastern Transmission, LPEighth Revised Volume No. 1

  • 8/6/2019 TETLPVolumeNo1

    3/626

    12. Rate Schedule MBA13. Rate Schedule PAL14. Rate Schedule SS-115. Rate Schedule FSS-116. Rate Schedule ISS-117. Rate Schedule FTS18. Rate Schedule FTS-219. Rate Schedule FTS-420. Rate Schedule FTS-521. Rate Schedule FTS-722. Rate Schedule FTS-823. Rate Schedule SS

    Part 6 General Terms and Conditions1. Definitions2. Electronic Communications3. Procedures for Contracting for and Abandonment of Service

    3.1 - 3.2. Request for Service - Submission3.3 Credit Evaluation3.4 Reserved for Future Use3.5 - 3.10. Request for Service - Processing3.11 Allocation of Available Firm Capacity3.12 Execution of Service Agreements and Amendments3.13 Pregranted Abandonmnent and Right of First Refusal

    Texas Eastern Transmission, LPEighth Revised Volume No. 1

  • 8/6/2019 TETLPVolumeNo1

    4/626

    3.14 Capacity Release3.15 Reserved for Future Use3.16 Off-system Pipeline Capacity3.17 Extension of Service Agreements3.18 Materially Non-Conforming Agreements

    4. Scheduling of Services and Curtailment of Services4.1 Scheduling of Storage and Transportation Services4.2 Capacity Curtailment and Interruption Procedures4.3 Action Alerts and Operational Flow Orders

    5. Quality of Gas6. Pressure7. Measurement & Measurement Equipment8. Imbalance Resolution Procedures9. Segment Capacity Entitlements10. Billing and Payment11. Fees and Construction of New Facilities12. Possession of Gas13. Warranty of Title to Gas14. Points of Receipt and Points of Delivery15. Periodic Rate Adjustments16. Standards of Conduct Compliance Procedures17. Force Majeure18. Allocation of Receipts and Deliveries

    Texas Eastern Transmission, LPEighth Revised Volume No. 1

  • 8/6/2019 TETLPVolumeNo1

    5/626

    19. Joint Obligations20. Non-discriminatory Waiver of Tariff Provisions21. Modification22. Termination for Default23. Governmental Regulation24. Descriptive Headings25. Assignments26. Article VI Adjustment27. North American Energy Standards Board28. Discount Terms29. Negotiated Rates30. Segmentation, Point Rights, and Related Scheduling

    Part 7 Form of Service Agreements1. CDS Service Agreement

    1.1 Exhibit A for CDS Service Agreement1.2 Exhibit B for CDS Service Agreement1.3 Exhibit C for CDS Service Agreement1.4 Exhibit D for CDS Service Agreement

    2. FT-1 Service Agreement2.1 Exhibit A for FT-1 Service Agreement2.2 Exhibit B for FT-1 Service Agreement2.3 Exhibit C for FT-1 Service Agreement2.4 Exhibit D for FT-1 Service Agreement

    Texas Eastern Transmission, LPEighth Revised Volume No. 1

  • 8/6/2019 TETLPVolumeNo1

    6/626

    3. SCT Service Agreement3.1 Exhibit A for SCT Service Agreement3.2 Exhibit B for SCT Service Agreement3.3 Exhibit C for SCT Service Agreement3.4 Exhibit D for SCT Service Agreement

    4. IT-1 Service Agreement5. LLFT Service Agreement

    5.1 Exhibit A for LLFT Service Agreement5.2 Exhibit B for LLFT Service Agreement5.3 Exhibit C for LLFT Service Agreement

    6. LLIT Service Agreement7. VKFT Service Agreement

    7.1 Exhibit A for VKFT Service Agreement7.2 Exhibit B for VKFT Service Agreement7.3 Exhibit C for VKFT Service Agreement

    8. VKIT Service Agreement9. MLS-1 Service Agreement

    9.1 Exhibit A for MLS-1 Service Agreement9.2 Exhibit B for MLS-1 Service Agreement9.3 Exhibit C for MLS-1 Service Agreement

    10. TABS-1 Service Agreement11. TABS-2 Service Agreement12. MBA Service Agreement

    Texas Eastern Transmission, LPEighth Revised Volume No. 1

  • 8/6/2019 TETLPVolumeNo1

    7/626

    12.1 Exhibit A for MBA Service Agreement13. PAL Service Agreement

    13.1 Exhibit A for PAL Service Agreement14. SS-1 Service Agreement

    14.1 Exhibit A for SS-1 Service Agreement14.2 Exhibit B for SS-1 Service Agreement14.3 Exhibit C for SS-1 Service Agreement

    15. FSS Service Agreement15.1 Exhibit A for FSS Service Agreement

    16. ISS-1 Service Agreement17. FTS Service Agreement18. FTS-2 Service Agreement19. FTS-4 Service Agreement20. FTS-5 Service Agreement21. FTS-7 Service Agreement22. FTS-8 Service Agreement23. SS Service Agreement

    23.1 Exhibit A for SS Service Agreement24. LINK System Agreement25. Capacity Release Umbrella Agreement

    25.1 Capacity Release Addendum - CDS, FT-1, SCT, SS-1 and

    FSS-125.2 Capacity Release Addendum - MLS-1, LLFT, and VKFT

    Texas Eastern Transmission, LPEighth Revised Volume No. 1

  • 8/6/2019 TETLPVolumeNo1

    8/626

    26. Multiple Shipper Option AgreementPart 8 Index of Firm Customers

    Texas Eastern Transmission, LPEighth Revised Volume No. 1

  • 8/6/2019 TETLPVolumeNo1

    9/626

    FERC GAS TARIFF

    EIGHTH REVISED VOLUME NO. 1

    (Supersedes Texas Eastern Transmission, LP

    Seventh Revised Volume No. 1)

    of

    TEXAS EASTERN TRANSMISSION, LP

    FILED WITH

    FEDERAL ENERGY REGULATORY COMMISSION

    Communications Concerning This Tariff

    Should Be Addressed To:

    Janice K. Devers

    General Manager, Tariffs and Commercial Development

    Texas Eastern Transmission, LP

    Mailing Address: Post Office Box 1642

    Houston, Texas 77251-1642

    Street Address: 5400 Westheimer Court

    Houston, Texas 77056-5310

    Telephone Number: (713) 627-6170

    Facsimile Number: (713) 627-5041

  • 8/6/2019 TETLPVolumeNo1

    10/626

    Texas Eastern Transmission, LP Part 1 - Table of ContentsFERC Gas Tariff Version 0.0.0

    Eighth Revised Volume No. 1 Page 1 of 5

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    PART 1 - TABLE OF CONTENTS

    Section Description and Title

    Eighth Revised Volume No. 1

    Part 1 - Table of Contents

    Part 2 - Preliminary Statement

    Part 3 - Maps (Index)1. System Map

    2. Access Zone "STX"

    3. Access Zone "ETX"

    4. Access Zone "WLA"

    5. Access Zone "ELA"6. Market Zone "1"

    7. Market Zone "2"8. Market Zone "3"

    Part 4 - Statements of Rates (Index)

    Open-access Transportation Rate Schedules

    1. Rate Schedule CDS

    2. Rate Schedule FT-1

    3. Rate Schedule SCT

    4. Rate Schedule IT-1

    5. Rate Schedule LLFT and LLIT6. Rate Schedule VKFT and VKIT

    7. Rate Schedule MLS-1

    Market Centers-Aggregation and Balancing Services

    8. Rate Schedule PAL

    Open-access Storage Rate Schedules

    9. Rate Schedule SS-110. Rate Schedule FSS-1

    11. Rate Schedule ISS-1

    Individual Certificated Transportation Rate Schedules

    12. Rate Schedules FTS, FTS-2, FTS-4, FTS-5, FTS-7, and FTS-8

    Individual Certificated Storage Rate Schedule

    13. Rate Schedule SS

    14. Notice of Rate Change Adjustments15. Negotiated Rates

    16. Percentages for Applicable Shrinkage

    17. Effective Base Electric Power Cost Units

  • 8/6/2019 TETLPVolumeNo1

    11/626

    Texas Eastern Transmission, LP Part 1 - Table of ContentsFERC Gas Tariff Version 0.0.0

    Eighth Revised Volume No. 1 Page 2 of 5

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    Part 5 - Rate Schedules (Index)

    Open-access Transportation Rate Schedules

    1. Rate Schedule CDS

    2. Rate Schedule FT-1

    3. Rate Schedule SCT4. Rate Schedule IT-1

    5. Rate Schedule LLFT

    6. Rate Schedule LLIT7. Rate Schedule VKFT

    8. Rate Schedule VKIT

    9. Rate Schedule MLS-1

    Market Centers-Aggregation and Balancing Services

    10. Rate Schedule TABS-1

    11. Rate Schedule TABS-2

    12. Rate Schedule MBA

    13. Rate Schedule PALOpen-access Storage Rate Schedules

    14. Rate Schedule SS-1

    15. Rate Schedule FSS-116. Rate Schedule ISS-1

    Individual Certificated Transportation Rate Schedules

    17. Rate Schedule FTS

    18. Rate Schedule FTS-219. Rate Schedule FTS-4

    20. Rate Schedule FTS-5

    21. Rate Schedule FTS-7

    22. Rate Schedule FTS-8

    Individual Certificated Storage Rate Schedule

    23. Rate Schedule SS

    Part 6 - General Terms and Conditions (Index)

    1. Definitions

    2. Electronic Communications

    3. Procedures for Contracting for and Abandonment of Service3.1 - 3.2 Request for Service - Submission

    3.3 Credit Evaluation

    3.4 [Reserved for Future Use]

    3.5 - 3.10 Request for Service - Processing3.11 Allocation of Available Firm Capacity

    3.12 Execution of Service Agreements and Amendments

    3.13 Pregranted Abandonment and Right of First Refusal3.14 Capacity Release

    3.15 [Reserved for Future Use]

    3.16 Off-system Pipeline Capacity

  • 8/6/2019 TETLPVolumeNo1

    12/626

    Texas Eastern Transmission, LP Part 1 - Table of ContentsFERC Gas Tariff Version 0.0.0

    Eighth Revised Volume No. 1 Page 3 of 5

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    3.17 Extension of Service Agreements3.18 Materially Non-Conforming Agreements

    4. Scheduling of Services and Curtailment of Services

    4.1 Scheduling of Storage and Transportation Services

    4.2 Capacity Curtailment and Interruption Procedures4.3 Action Alerts and Operational Flow Orders

    5. Quality of Gas

    6. Pressure7. Measurement & Measurement Equipment

    8. Imbalance Resolution Procedures

    9. Segment Capacity Entitlements10. Billing and Payment

    11. Fees and Construction of New Facilities

    12. Possession of Gas

    13. Warranty of Title to Gas

    14. Point(s) of Receipt and Point(s) of Delivery15. Periodic Rate Adjustments

    16. Standards of Conduct Compliance Procedures17. Force Majeure

    18. Allocation of Receipts and Deliveries

    19. Joint Obligations

    20. Non-discriminatory Waiver of Tariff Provisions21. Modification

    22. Termination for Default

    23. Governmental Regulation24. Descriptive Headings

    25. Assignments

    26. Article VI Adjustment

    27. North American Energy Standards Board ("NAESB")28. Discount Terms

    29. Negotiated Rates

    30. Segmentation, Point Rights, and Related Scheduling

    Part 7 - Form of Service Agreements (Index)

    Rate Schedule(s)

    1. CDS2. FT-1

    3. SCT4. IT-1

    5. LLFT6. LLIT

    7. VKFT

    8. VKIT9. MLS-1

    10. TABS-1

  • 8/6/2019 TETLPVolumeNo1

    13/626

    Texas Eastern Transmission, LP Part 1 - Table of ContentsFERC Gas Tariff Version 0.0.0

    Eighth Revised Volume No. 1 Page 4 of 5

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    11. TABS-212. MBA

    13. PAL

    14. SS-1

    15. FSS-116. ISS-1

    17. FTS

    18. FTS-219. FTS-4

    20. FTS-5

    21. FTS-722. FTS-8

    23. SS

    Other

    24. LINK System

    25. Capacity Release Umbrella26. Multiple Shipper Option Agreement

    Part 8 - Index of Firm Customers

    Second Revised Volume No. 2

    Part 1 - Table of Active X-Rate Schedules

    Part 2 - Table of Terminated, Cancelled & Superseded X-Rate Schedules

    Part 3 - Summary of Rates (Index)

    Part 4 - Rate Schedules (Index)

    Active Volume No. 2 Rate Schedules

    1. Rate Schedule X-6, Exchange of Natural Gas with

    United Gas Pipe Line Company

    3. Rate Schedule X-12, Transfer to New York State Natural

    Gas Corporation of title to one-half

    the base storage gas under "Oakford

    Storage Contract"

    5. Rate Schedule X-28, Storage Agreement withTranscontinental Gas Pipe

    Line Corporation

    8. Rate Schedule X-52, Exchange Agreement withAlgonquin Gas Transmission

    Company

  • 8/6/2019 TETLPVolumeNo1

    14/626

    Texas Eastern Transmission, LP Part 1 - Table of ContentsFERC Gas Tariff Version 0.0.0

    Eighth Revised Volume No. 1 Page 5 of 5

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    10. Rate Schedule X-57, Exchange Agreement with

    United Gas Pipe Line Company

    12. Rate Schedule X-62, Exchange Agreement with

    Columbia Gas TransmissionCorporation

    13. Rate Schedule X-75, Transportation Agreement with

    United Gas Pipe Line Company

    17. Rate Schedule X-121, Transportation Agreement withColumbia Gas Transmission Corporation

    18. Rate Schedule X-127, Transportation Agreement with

    New Jersey Natural Gas Company

    19. Rate Schedule X-128, Exchange Agreement with

    Columbia Gas Transmission

    Corporation20. Rate Schedule X-129, Transportation Agreement with

    New Jersey Natural Gas Company

    21. Rate Schedule X-130, Transportation Agreement withThe Brooklyn Union Gas Company

    22. Rate Schedule X-135, Transportation Agreement with

    CNG Transmission Corporation

    23. Rate Schedule X-137, Transportation Agreement withCNG Transmission Corporation

  • 8/6/2019 TETLPVolumeNo1

    15/626

    Texas Eastern Transmission, LP Part 2 - Preliminary StatementFERC Gas Tariff Version 0.0.0

    Eighth Revised Volume No. 1 Page 1 of 1

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    PART 2 - PRELIMINARY STATEMENT

    This Federal Energy Regulatory Commission (FERC) Gas Tariff is filed by Texas

    Eastern Transmission, LP (Texas Eastern) in compliance with Part 154, Subchapter E, Chapter 1,

    Title 18, of the Code of Federal Regulations and in compliance with Order No. 636 of the FERC.This FERC Gas Tariff reflects the unbundling of services in compliance with Order No. 636 and

    sets forth the terms and conditions of the transportation and storage services rendered by Texas

    Eastern. Texas Eastern is a Natural Gas company engaged in the business of transporting andstoring Natural Gas in interstate commerce under authorization granted by and subject to the

    jurisdiction of the FERC.

    The facilities owned and operated by Texas Eastern consist of a pipeline system which

    extends (1) from the State of Texas through the States of Louisiana, Arkansas, Missouri, Illinois,

    Indiana, Ohio, West Virginia, Pennsylvania and New Jersey to the State of New York, (2) from

    the State of Mississippi through the States of Alabama, Tennessee, Kentucky and Ohio to the

    State of Pennsylvania; and which includes storage fields in Maryland and Pennsylvania.

    The transportation and storage of Natural Gas is undertaken by Texas Eastern only underwritten contract acceptable to Texas Eastern after consideration of its commitments to others,

    delivery capacity and other factors deemed pertinent by Texas Eastern. If any such contract is to

    become operative only upon performance of certain precedent conditions, Texas Eastern reserves

    the right to require a separate written agreement specifying the conditions which must besatisfied before the contract for the transportation and/or storage of Natural Gas becomes

    operative.

    Nothing in this tariff is intended to inhibit development of, or discriminate against the use

    of, Imbalance Management Services or Title Transfer Tracking services provided by third parties

    or Texas Eastern's Customers. Any party interested in providing Imbalance Management

    Services or Title Transfer Tracking services must coordinate with Texas Eastern.

  • 8/6/2019 TETLPVolumeNo1

    16/626

    Texas Eastern Transmission, LP Part 3 - MapsFERC Gas Tariff Version 0.0.0

    Eighth Revised Volume No. 1 Page 1 of 1

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    PART 3 - MAPS

    INDEX

    Section Description and Title

    1. System Map

    2. Access Zone "STX"

    3. Access Zone "ETX"4. Access Zone "WLA"

    5. Access Zone "ELA"

    6. Market Zone "1"7. Market Zone "2"

    8. Market Zone "3"

  • 8/6/2019 TETLPVolumeNo1

    17/626

    Texas Eastern Transmission, LP Part 3 - MapsFERC Gas Tariff 1. System Map

    Eighth Revised Volume No. 1 Version 0.0.0

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    SYSTEM MAP

  • 8/6/2019 TETLPVolumeNo1

    18/626

    Texas Eastern Transmission, LP Part 3 - MapsFERC Gas Tariff 2. Access Zone STX

    Eighth Revised Volume No. 1 Version 0.0.0

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    ACCESS ZONE STX

  • 8/6/2019 TETLPVolumeNo1

    19/626

    Texas Eastern Transmission, LP Part 3 - MapsFERC Gas Tariff 3. Access Zone ETX

    Eighth Revised Volume No. 1 Version 0.0.0

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    ACCESS ZONE ETX

  • 8/6/2019 TETLPVolumeNo1

    20/626

    Texas Eastern Transmission, LP Part 3 - MapsFERC Gas Tariff 4. Access Zone WLA

    Eighth Revised Volume No. 1 Version 0.0.0

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    ACCESS ZONE WLA

  • 8/6/2019 TETLPVolumeNo1

    21/626

    Texas Eastern Transmission, LP Part 3 - MapsFERC Gas Tariff 5. Access Zone ELA

    Eighth Revised Volume No. 1 Version 0.0.0

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    ACCESS ZONE ELA

  • 8/6/2019 TETLPVolumeNo1

    22/626

    Texas Eastern Transmission, LP Part 3 - MapsFERC Gas Tariff 6. Market Zone 1

    Eighth Revised Volume No. 1 Version 0.0.0

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    MARKET ZONE 1

  • 8/6/2019 TETLPVolumeNo1

    23/626

    Texas Eastern Transmission, LP Part 3 - MapsFERC Gas Tariff 7. Market Zone 2

    Eighth Revised Volume No. 1 Version 0.0.0

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    MARKET ZONE 2

  • 8/6/2019 TETLPVolumeNo1

    24/626

    Texas Eastern Transmission, LP Part 3 - MapsFERC Gas Tariff 8. Market Zone 3

    Eighth Revised Volume No. 1 Version 0.0.0

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    MARKET ZONE 3

  • 8/6/2019 TETLPVolumeNo1

    25/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff Version 0.0.0

    Eighth Revised Volume No. 1 Page 1 of 1

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    PART 4 - STATEMENTS OF RATES

    INDEX

    Section Description and Title

    Open-access Transportation Rate Schedules

    1. Rate Schedule CDS

    2. Rate Schedule FT-13. Rate Schedule SCT

    4. Rate Schedule IT-1

    5. Rate Schedule LLFT and LLIT6. Rate Schedule VKFT and VKIT

    7. Rate Schedule MLS-1

    Market Centers-Aggregation and Balancing Services

    8. Rate Schedule PAL

    Open-access Storage Rate Schedules

    9. Rate Schedule SS-1

    10. Rate Schedule FSS-1

    11. Rate Schedule ISS-1

    Individual Certificated Transportation Rate Schedules

    12. Rate Schedules FTS, FTS-2, FTS-4, FTS-5, FTS-7, and FTS-8

    Individual Certificated Storage Rate Schedule

    13. Rate Schedule SS

    14. Notice of Rate Change Adjustments

    15. Negotiated Rates

    16. Percentages for Applicable Shrinkage

    17. Effective Base Electric Power Cost Units

  • 8/6/2019 TETLPVolumeNo1

    26/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 1. Rate Schedule CDS

    Eighth Revised Volume No. 1 Version 5.0.0Page 1 of 4

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    CDSRESERVATION

    CHARGES

    Pursuant to Sections 3.2, 3.3, and 3.5 of Rate Schedule CDS:CDS RESERVATION

    CDS RESERVATION CHARGE* CHARGE ADJUSTMENT$/dth $/dth

    ______________________________ _________________________________ACCESS AREA MAXIMUM MINIMUM MAXIMUM MINIMUM

    STX-AAB 6.7878 0.0000 0.2232 0.0000WLA-AAB 2.8175 0.0000 0.0926 0.0000ELA-AAB 2.3701 0.0000 0.0779 0.0000ETX-AAB 2.1665 0.0000 0.0712 0.0000STX-STX 5.7236 0.0000 0.1882 0.0000STX-WLA 5.8820 0.0000 0.1934 0.0000STX-ELA 6.7928 0.0000 0.2233 0.0000STX-ETX 6.7928 0.0000 0.2233 0.0000WLA-WLA 2.0525 0.0000 0.0675 0.0000WLA-ELA 2.8225 0.0000 0.0928 0.0000WLA-ETX 2.8225 0.0000 0.0928 0.0000

    ELA-ELA 2.3731 0.0000 0.0780 0.0000ETX-ETX 2.1695 0.0000 0.0713 0.0000ETX-ELA 2.3555 0.0000 0.0774 0.0000

    MARKET AREA MAXIMUM MINIMUM MAXIMUM MINIMUMM1-M1 4.5230 0.0000 0.1487 0.0000M1-M2 8.3700 0.0000 0.2752 0.0000M1-M3 10.9950 0.0000 0.3615 0.0000M2-M2 6.5020 0.0000 0.2137 0.0000M2-M3 9.2650 0.0000 0.3046 0.0000M3-M3 5.2810 0.0000 0.1736 0.0000

    * Reservation Charge reflects a storage surcharge of: 0.3200

    ALL ZONES$/dth

    PRE-INJECTION CREDIT APPLICABLE TO CUSTOMERS' RESERVATION CHARGEPURSUANT TO SECTION 2.4 OF RATE SCHEDULE CDS. 0.0053

  • 8/6/2019 TETLPVolumeNo1

    27/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 1. Rate Schedule CDS

    Eighth Revised Volume No. 1 Version 5.0.0Page 2 of 4

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    CDSUSAGE ZONE RATECHARGES $/dth

    Pursuant to Sections 3.2 and 3.3 of Rate Schedule CDS:

    STX WLA ELA ETX M1 M2 M3USAGE-1 - MAXIMUM

    from STX 0.0000 0.0000 0.0000 0.0000 0.0112 0.0367 0.0534from WLA 0.0000 0.0000 0.0000 0.0112 0.0367 0.0534from ELA 0.0000 0.0000 0.0112 0.0367 0.0534from ETX 0.0000 0.0112 0.0367 0.0534from M1 0.0112 0.0367 0.0534from M2 0.0240 0.0412from M3 0.0156

    USAGE-1 - MINIMUMfrom STX 0.0000 0.0000 0.0000 0.0000 0.0027 0.0282 0.0449from WLA 0.0000 0.0000 0.0000 0.0027 0.0282 0.0449from ELA 0.0000 0.0000 0.0027 0.0282 0.0449from ETX 0.0000 0.0027 0.0282 0.0449from M1 0.0070 0.0325 0.0492from M2 0.0198 0.0370from M3 0.0114

    USAGE-1 - BACKHAUL MAXIMUMfrom STX 0.0088from WLA 0.0096 0.0059from ELA 0.0140 0.0103 0.0087from ETX 0.0140 0.0103 0.0087 0.0087from M1 0.0346 0.0309 0.0293 0.0293 0.0206from M2 0.0682 0.0645 0.0629 0.0629 0.0542 0.0378from M3 0.0912 0.0875 0.0859 0.0859 0.0772 0.0608 0.0272

    USAGE-1 - BACKHAUL MINIMUMfrom STX 0.0046from WLA 0.0054 0.0017from ELA 0.0097 0.0060 0.0044from ETX 0.0097 0.0060 0.0044 0.0044from M1 0.0261 0.0224 0.0208 0.0208 0.0164from M2 0.0597 0.0560 0.0544 0.0544 0.0500 0.0336from M3 0.0827 0.0790 0.0774 0.0774 0.0730 0.0566 0.0230

    USAGE-2 0.0000 0.0000 0.0000 0.0000 0.0112 0.0367 0.0534

    USAGE-3 0.1034 0.1034 0.1034 0.1034 0.2560 0.4080 0.5110

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    28/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 1. Rate Schedule CDS

    Eighth Revised Volume No. 1 Version 5.0.0Page 3 of 4

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    Pursuant to Section 3.14 of the General Terms and Conditions:CDSCAPACITY RELEASE RESERVATION CHARGE ADJUSTMENT/CHARGES RESERVATION CHARGE* VOLUMETRIC RESERVATION CHARGE*

    $/dth $/dth______________________________ ______________________________

    NON- NON-ACCESS AREA MILEAGE MILEAGE TOTAL MILEAGE MILEAGE TOTAL

    STX-AAB 4.1510 2.6368 6.7878 0.1365 0.0867 0.2232WLA-AAB 1.3110 1.5065 2.8175 0.0431 0.0495 0.0926ELA-AAB 0.9150 1.4551 2.3701 0.0301 0.0478 0.0779ETX-AAB 0.8320 1.3345 2.1665 0.0274 0.0438 0.0712STX-STX 3.0800 2.6436 5.7236 0.1013 0.0869 0.1882STX-WLA 3.2370 2.6450 5.8820 0.1064 0.0870 0.1934STX-ELA 4.1510 2.6418 6.7928 0.1365 0.0868 0.2233STX-ETX 4.1510 2.6418 6.7928 0.1365 0.0868 0.2233WLA-WLA 0.3980 1.6545 2.0525 0.0131 0.0544 0.0675WLA-ELA 1.3120 1.5105 2.8225 0.0431 0.0497 0.0928WLA-ETX 1.3120 1.5105 2.8225 0.0431 0.0497 0.0928ELA-ELA 0.9150 1.4581 2.3731 0.0301 0.0479 0.0780ETX-ETX 0.8320 1.3375 2.1695 0.0274 0.0439 0.0713ETX-ELA 0.9150 1.4405 2.3555 0.0301 0.0473 0.0774

    MARKET AREAM1-M1 1.8640 2.6590 4.5230 0.0613 0.0874 0.1487M1-M2 5.7090 2.6610 8.3700 0.1877 0.0875 0.2752M1-M3 8.3320 2.6630 10.9950 0.2739 0.0876 0.3615M2-M2 3.8430 2.6590 6.5020 0.1264 0.0873 0.2137M2-M3 6.6040 2.6610 9.2650 0.2171 0.0875 0.3046M3-M3 2.6240 2.6570 5.2810 0.0863 0.0873 0.1736

    *Rates are exclusive of surcharges which can also be recovered.

  • 8/6/2019 TETLPVolumeNo1

    29/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 1. Rate Schedule CDS

    Eighth Revised Volume No. 1 Version 5.0.0Page 4 of 4

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    Pursuant to Section 3.14 of the General Terms and Conditions:CDSCAPACITY RELEASECHARGES $/DTH

    USAGE-1 RATE* STX WLA ELA ETX M1 M2 M3MILEAGE

    from STX 0.0000 0.0000 0.0000 0.0000 0.0027 0.0282 0.0449from WLA 0.0000 0.0000 0.0000 0.0027 0.0282 0.0449from ELA 0.0000 0.0000 0.0027 0.0282 0.0449from ETX 0.0000 0.0027 0.0282 0.0449from M1 0.0070 0.0325 0.0492from M2 0.0198 0.0370from M3 0.0114

    NON-MILEAGEfrom STX 0.0000 0.0000 0.0000 0.0000 0.0085 0.0085 0.0085from WLA 0.0000 0.0000 0.0000 0.0085 0.0085 0.0085from ELA 0.0000 0.0000 0.0085 0.0085 0.0085from ETX 0.0000 0.0085 0.0085 0.0085from M1 0.0042 0.0042 0.0042from M2 0.0042 0.0042from M3 0.0042

    TOTAL

    from STX 0.0000 0.0000 0.0000 0.0000 0.0112 0.0367 0.0534from WLA 0.0000 0.0000 0.0000 0.0112 0.0367 0.0534from ELA 0.0000 0.0000 0.0112 0.0367 0.0534from ETX 0.0000 0.0112 0.0367 0.0534from M1 0.0112 0.0367 0.0534from M2 0.0240 0.0412from M3 0.0156

    USAGE-1 BACKHAUL RATE* STX WLA ELA ETX M1 M2 M3MILEAGE

    from STX 0.0046from WLA 0.0054 0.0017from ELA 0.0097 0.0060 0.0044from ETX 0.0097 0.0060 0.0044 0.0044from M1 0.0261 0.0224 0.0208 0.0208 0.0164from M2 0.0597 0.0560 0.0544 0.0544 0.0500 0.0336from M3 0.0827 0.0790 0.0774 0.0774 0.0730 0.0566 0.0230

    NON-MILEAGE

    from STX 0.0042from WLA 0.0042 0.0042from ELA 0.0043 0.0043 0.0043from ETX 0.0043 0.0043 0.0043 0.0043from M1 0.0085 0.0085 0.0085 0.0085 0.0042from M2 0.0085 0.0085 0.0085 0.0085 0.0042 0.0042from M3 0.0085 0.0085 0.0085 0.0085 0.0042 0.0042 0.0042

    TOTALfrom STX 0.0088from WLA 0.0096 0.0059from ELA 0.0140 0.0103 0.0087from ETX 0.0140 0.0103 0.0087 0.0087from M1 0.0346 0.0309 0.0293 0.0293 0.0206from M2 0.0682 0.0645 0.0629 0.0629 0.0542 0.0378from M3 0.0912 0.0875 0.0859 0.0859 0.0772 0.0608 0.0272

    *Rates are exclusive of surcharges which can also be recovered.

  • 8/6/2019 TETLPVolumeNo1

    30/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 1 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1RESERVATIONCHARGES

    Pursuant to Sections 3.2, 3.3, and 3.5 of Rate Schedule FT-1:FT-1 RESERVATION

    FT-1 RESERVATION CHARGE* CHARGE ADJUSTMENT$/dth $/dth

    ______________________________ ______________________________ACCESS AREA MAXIMUM MINIMUM MAXIMUM MINIMUM

    STX-AAB 6.5648 0.0000 0.2158 0.0000WLA-AAB 2.5945 0.0000 0.0853 0.0000ELA-AAB 2.1471 0.0000 0.0706 0.0000ETX-AAB 1.9435 0.0000 0.0639 0.0000STX-STX 5.5006 0.0000 0.1808 0.0000STX-WLA 5.6590 0.0000 0.1860 0.0000STX-ELA 6.5698 0.0000 0.2160 0.0000STX-ETX 6.5698 0.0000 0.2160 0.0000WLA-WLA 1.8295 0.0000 0.0601 0.0000WLA-ELA 2.5995 0.0000 0.0855 0.0000WLA-ETX 2.5995 0.0000 0.0855 0.0000ELA-ELA 2.1501 0.0000 0.0707 0.0000

    ETX-ETX 1.9465 0.0000 0.0640 0.0000ETX-ELA 2.1325 0.0000 0.0701 0.0000

    MARKET AREA MAXIMUM MINIMUM MAXIMUM MINIMUMM1-M1 4.3000 0.0000 0.1414 0.0000M1-M2 8.1470 0.0000 0.2679 0.0000M1-M3 10.7720 0.0000 0.3542 0.0000M2-M2 6.2790 0.0000 0.2064 0.0000M2-M3 9.0420 0.0000 0.2973 0.0000M3-M3 5.0580 0.0000 0.1662 0.0000

    * Reservation Charge reflects a storage surcharge of: 0.0970

  • 8/6/2019 TETLPVolumeNo1

    31/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 2 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1USAGE ZONE RATECHARGES $/dth

    Pursuant to Sections 3.2 and 3.3 of Rate Schedule FT-1:

    STX WLA ELA ETX M1 M2 M3USAGE-1 - MAXIMUM

    from STX 0.0000 0.0000 0.0000 0.0000 0.0112 0.0367 0.0534from WLA 0.0000 0.0000 0.0000 0.0112 0.0367 0.0534from ELA 0.0000 0.0000 0.0112 0.0367 0.0534from ETX 0.0000 0.0112 0.0367 0.0534from M1 0.0112 0.0367 0.0534from M2 0.0240 0.0412from M3 0.0156

    USAGE-1 - MINIMUMfrom STX 0.0000 0.0000 0.0000 0.0000 0.0027 0.0282 0.0449from WLA 0.0000 0.0000 0.0000 0.0027 0.0282 0.0449from ELA 0.0000 0.0000 0.0027 0.0282 0.0449from ETX 0.0000 0.0027 0.0282 0.0449from M1 0.0070 0.0325 0.0492from M2 0.0198 0.0370from M3 0.0114

    USAGE-1 - BACKHAUL MAXIMUMfrom STX 0.0088from WLA 0.0096 0.0059from ELA 0.0140 0.0103 0.0087from ETX 0.0140 0.0103 0.0087 0.0087from M1 0.0346 0.0309 0.0293 0.0293 0.0206from M2 0.0682 0.0645 0.0629 0.0629 0.0542 0.0378from M3 0.0912 0.0875 0.0859 0.0859 0.0772 0.0608 0.0272

    USAGE-1 - BACKHAUL MINIMUMfrom STX 0.0046from WLA 0.0054 0.0017from ELA 0.0097 0.0060 0.0044from ETX 0.0097 0.0060 0.0044 0.0044from M1 0.0261 0.0224 0.0208 0.0208 0.0164from M2 0.0597 0.0560 0.0544 0.0544 0.0500 0.0336from M3 0.0827 0.0790 0.0774 0.0774 0.0730 0.0566 0.0230

    USAGE-2 0.1034 0.1034 0.1034 0.1034 0.2560 0.4080 0.5110

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    32/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 3 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    Pursuant to Section 3.14 of the General Terms and Conditions:FT-1CAPACITY RELEASE RESERVATION CHARGE ADJUSTMENT/CHARGES RESERVATION CHARGE* VOLUMETRIC RESERVATION CHARGE*

    $/dth $/dth______________________________ ______________________________

    NON- NON-ACCESS AREA MILEAGE MILEAGE TOTAL MILEAGE MILEAGE TOTAL

    STX-AAB 4.1510 2.4138 6.5648 0.1365 0.0793 0.2158WLA-AAB 1.3110 1.2835 2.5945 0.0431 0.0422 0.0853ELA-AAB 0.9150 1.2321 2.1471 0.0301 0.0405 0.0706ETX-AAB 0.8320 1.1115 1.9435 0.0274 0.0365 0.0639STX-STX 3.0800 2.4206 5.5006 0.1013 0.0795 0.1808STX-WLA 3.2370 2.4220 5.6590 0.1064 0.0796 0.1860STX-ELA 4.1510 2.4188 6.5698 0.1365 0.0795 0.2160STX-ETX 4.1510 2.4188 6.5698 0.1365 0.0795 0.2160WLA-WLA 0.3980 1.4315 1.8295 0.0131 0.0470 0.0601WLA-ELA 1.3120 1.2875 2.5995 0.0431 0.0424 0.0855WLA-ETX 1.3120 1.2875 2.5995 0.0431 0.0424 0.0855ELA-ELA 0.9150 1.2351 2.1501 0.0301 0.0406 0.0707ETX-ETX 0.8320 1.1145 1.9465 0.0274 0.0366 0.0640ETX-ELA 0.9150 1.2175 2.1325 0.0301 0.0400 0.0701

    MARKET AREAM1-M1 1.8640 2.4360 4.3000 0.0613 0.0801 0.1414M1-M2 5.7090 2.4380 8.1470 0.1877 0.0802 0.2679M1-M3 8.3320 2.4400 10.7720 0.2739 0.0803 0.3542M2-M2 3.8430 2.4360 6.2790 0.1264 0.0800 0.2064M2-M3 6.6040 2.4380 9.0420 0.2171 0.0802 0.2973M3-M3 2.6240 2.4340 5.0580 0.0863 0.0799 0.1662

    *Rates are exclusive of surcharges which can also be recovered.

  • 8/6/2019 TETLPVolumeNo1

    33/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 4 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    Pursuant to Section 3.14 of the General Terms and Conditions:FT-1CAPACITY RELEASECHARGES $/DTH

    USAGE-1 RATE* STX WLA ELA ETX M1 M2 M3MILEAGE

    from STX 0.0000 0.0000 0.0000 0.0000 0.0027 0.0282 0.0449from WLA 0.0000 0.0000 0.0000 0.0027 0.0282 0.0449from ELA 0.0000 0.0000 0.0027 0.0282 0.0449from ETX 0.0000 0.0027 0.0282 0.0449from M1 0.0070 0.0325 0.0492from M2 0.0198 0.0370from M3 0.0114

    NON-MILEAGEfrom STX 0.0000 0.0000 0.0000 0.0000 0.0085 0.0085 0.0085from WLA 0.0000 0.0000 0.0000 0.0085 0.0085 0.0085from ELA 0.0000 0.0000 0.0085 0.0085 0.0085from ETX 0.0000 0.0085 0.0085 0.0085from M1 0.0042 0.0042 0.0042from M2 0.0042 0.0042from M3 0.0042

    TOTAL

    from STX 0.0000 0.0000 0.0000 0.0000 0.0112 0.0367 0.0534from WLA 0.0000 0.0000 0.0000 0.0112 0.0367 0.0534from ELA 0.0000 0.0000 0.0112 0.0367 0.0534from ETX 0.0000 0.0112 0.0367 0.0534from M1 0.0112 0.0367 0.0534from M2 0.0240 0.0412from M3 0.0156

    USAGE-1 BACKHAUL RATE* STX WLA ELA ETX M1 M2 M3MILEAGE

    from STX 0.0046from WLA 0.0054 0.0017from ELA 0.0097 0.0060 0.0044from ETX 0.0097 0.0060 0.0044 0.0044from M1 0.0261 0.0224 0.0208 0.0208 0.0164from M2 0.0597 0.0560 0.0544 0.0544 0.0500 0.0336from M3 0.0827 0.0790 0.0774 0.0774 0.0730 0.0566 0.0230

    NON-MILEAGE

    from STX 0.0042from WLA 0.0042 0.0042from ELA 0.0043 0.0043 0.0043from ETX 0.0043 0.0043 0.0043 0.0043from M1 0.0085 0.0085 0.0085 0.0085 0.0042from M2 0.0085 0.0085 0.0085 0.0085 0.0042 0.0042from M3 0.0085 0.0085 0.0085 0.0085 0.0042 0.0042 0.0042

    TOTALfrom STX 0.0088from WLA 0.0096 0.0059from ELA 0.0140 0.0103 0.0087from ETX 0.0140 0.0103 0.0087 0.0087from M1 0.0346 0.0309 0.0293 0.0293 0.0206from M2 0.0682 0.0645 0.0629 0.0629 0.0542 0.0378from M3 0.0912 0.0875 0.0859 0.0859 0.0772 0.0608 0.0272

    *Rates are exclusive of surcharges which can also be recovered.

  • 8/6/2019 TETLPVolumeNo1

    34/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 5 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1 INCREMENTAL FACILITY CHARGE INCREMENTAL

    FACILITY CHARGE$/dth

    PURSUANT TO SECTION 3.4 OF RATE SCHEDULE FT-1: Maximum Minimum

    To applicable customers converting from Rate Schedule FTSin Docket No. CP82-446: RESERVATION CHARGE 0.6600 0.0000

    RESERVATION CHARGE ADJUSTMENT 0.0217 0.0000

    Customer dthBay State Gas Company 4,235Boston Gas Company d/b/a National Grid 21,394Colonial Gas Company d/b/a National Grid 1,951Connecticut Natural Gas Corporation 6,340Town of Middleborough, Massachusetts 116New Jersey Natural Gas Company 1,060Northern Utilities, Inc. 965Southern Connecticut Gas Company 4,922Yankee Gas Services Company 6,066

    To applicable customers converting from Rate Schedule FTS-4in Docket No. CP87-4: RESERVATION CHARGE 3.0110 0.0000

    RESERVATION CHARGE ADJUSTMENT 0.0990 0.0000

    Customer dthBrooklyn Union Gas Company d/b/a National Grid 27,500KeySpan Gas East Corporation d/b/a National Grid 22,500New Jersey Natural Gas Company 40,000Pivotal Utility Holdings, Inc. 10,000Public Service Electric & Gas Company 40,000

    To applicable customers converting from Rate Schedule FTS-5in Docket No. CP87-312:RESERVATION CHARGE 0.0000 0.0000

    RESERVATION CHARGE ADJUSTMENT 0.0000 0.0000

    Customer dthColonial Gas Company d/b/a National Grid 2,326

    UGI Central Penn Gas, Inc. 4,000Yankee Gas Services Company 125

    To applicable customers converting from Rate Schedule FTS-7in Docket No. CP80-170:RESERVATION CHARGE 0.0000 0.0000

    RESERVATION CHARGE ADJUSTMENT 0.0000 0.0000

    Customer dthConnecticut Natural Gas Corporation 4,231Yankee Gas Services Company 3,015

    To applicable customers converting from Rate Schedule FTS-8in Docket No. CP85-803:RESERVATION CHARGE 0.0000 0.0000

    RESERVATION CHARGE ADJUSTMENT 0.0000 0.0000

    Customer dthYankee Gas Services Company 39

  • 8/6/2019 TETLPVolumeNo1

    35/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 6 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1 CHARGESCHARGES $/dth

    APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTALFACILITY EXPANSIONS IMPLEMENTED ON OR AFTER JUNE 1, 1993: Maximum Minimum

    Docket No. CP00-404-000(Columbia Liberty Expansion):__________________________________________________

    Customer dth______________________________________ _______Liberty Electric Power, LLC 84,000

    Rates Pursuant to Section 3.2 of Rate Schedule FT-1:

    RESERVATION CHARGE 4.4610 0.1180USAGE-2 CHARGE 0.1467RESERVATION CHARGE ADJUSTMENT 0.1467 0.0000

    Rates Pursuant to Section 3.14 of the General Terms and Conditions:

    VOLUMETRIC RESERVATION CHARGE 0.1467 0.0000

    APPLICABLE SHRINKAGE PERCENTAGE

    Effective Year Around:June 1 through May 31 0.00 %

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    36/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 7 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1 CHARGESCHARGES $/dth

    APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTALFACILITY EXPANSIONS IMPLEMENTED ON OR AFTER JUNE 1, 1993:

    Docket No. CP02-32, TIME Project:__________________________________________________

    Customer dth______________________________ ______

    New Jersey Natural Gas Company 100,000

    Maximum MinimumRates Pursuant to Section 3.2 of Rate Schedule FT-1: _______ _______

    RESERVATION CHARGE 14.5169 0.0000USAGE-2 CHARGE 0.4773RESERVATION CHARGE ADJUSTMENT 0.4773 0.0000

    Rates Pursuant to Section 3.14 of the General Terms and Conditions:

    VOLUMETRIC RESERVATION CHARGE 0.4773 0.0000

    BASE UNIT ELECTRIC POWER COST 0.2917ELECTRIC POWER COST ADJUSTMENT 0.6420ADJUSTED ELECTRIC POWER COST 0.9337

    ASA SURCHARGE 1.0225

    APPLICABLE SHRINKAGE PERCENTAGEDecember 1 through November 30:

    In-Path 4.28%Out-of-Path 4.69%

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    37/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 8 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1 CHARGESCHARGES $/dth

    APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTALFACILITY EXPANSIONS IMPLEMENTED ON NOVEMBER 1, 2008:

    Docket No. CP06-115, TIME II Project:__________________________________________________

    Customer dth______________________________ ______

    New Jersey Natural Gas Company 100,000PSEG Power, LLC 50,000

    Maximum MinimumRates Pursuant to Section 3.2 of Rate Schedule FT-1: _______ _______

    RESERVATION CHARGE 23.3313 0.1110USAGE-2 CHARGE 0.7670

    RESERVATION CHARGE ADJUSTMENT 0.7670 0.0036

    Rates Pursuant to Section 3.14 of the General Terms and Conditions:

    VOLUMETRIC RESERVATION CHARGE 0.7670 0.0036

    BASE UNIT ELECTRIC POWER COST 1.9722ELECTRIC POWER COST ADJUSTMENT -0.1200ADJUSTED ELECTRIC POWER COST 1.8522

    ASA SURCHARGE -0.4207

    APPLICABLE SHRINKAGE PERCENTAGEDecember 1 through November 30:

    In-Path 3.69%Out-of-Path 4.63%

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    38/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 9 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1 CHARGESCHARGES $/dth

    APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTALFACILITY EXPANSIONS IMPLEMENTED ON OR AFTER JUNE 1, 1993: Maximum Minimum

    Docket No. CP92-165 (North Carolina Project):________________________________________________________

    Customer dth______________________________________ ______Dominion Transmission, Inc. 30,000

    Rates Pursuant to Section 3.2 of Rate Schedule FT-1:

    RESERVATION CHARGE 6.5590 0.080USAGE-2 CHARGE 0.2156

    RESERVATION CHARGE ADJUSTMENT 0.2156 0.0000

    Rates Pursuant to Section 3.14 of the General Terms and Conditions:

    VOLUMETRIC RESERVATION CHARGE 0.2156 0.0000

    APPLICABLE SHRINKAGE PERCENTAGE

    Effective Year Around:June 1 through May 31 0.00 %

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    39/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 10 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1 CHARGESCHARGES $/dth

    APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTALFACILITY EXPANSIONS IMPLEMENTED ON OR AFTER JUNE 1, 1993: Maximum Minimum

    Docket No. CP94-654 (Riverside Storage Project):_____________________________________________

    Customer dth______________________________________ ______PECO Energy Company 29,210UGI Utilities, Inc. 4,000

    Rates Pursuant to Section 3.2 of Rate Schedule FT-1:

    RESERVATION CHARGE 10.4380 0.000USAGE-2 CHARGE 0.3432RESERVATION CHARGE ADJUSTMENT 0.3432 0.0000

    Rates Pursuant to Section 3.14 of the General Terms and Conditions:

    VOLUMETRIC RESERVATION CHARGE 0.3432 0.0000

    APPLICABLE SHRINKAGE PERCENTAGE

    Effective Year Around:June 1 through May 31 0.00 %

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    40/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 11 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1 CHARGESCHARGES $/dth

    APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTALFACILITY EXPANSIONS IMPLEMENTED ON OR AFTER JUNE 1, 1993: Maximum Minimum

    Docket No. CP95-76 and CP95-2 (Philadelphia Lateral Expansion):____________________________________________________

    Customer dth______________________________________ ______Grays Ferry Cogeneration Partnership 15,000Sun Company, Inc. 15,000

    Rates Pursuant to Section 3.2 of Rate Schedule FT-1:

    RESERVATION CHARGE 1.9410 0.0000USAGE-2 CHARGE 0.0638RESERVATION CHARGE ADJUSTMENT 0.0638 0.0000

    Rates Pursuant to Section 3.14 of the General Terms and Conditions:

    VOLUMETRIC RESERVATION CHARGE 0.0638 0.0000

    APPLICABLE SHRINKAGE PERCENTAGE

    Effective Year Around:June 1 through May 31 0.00 %

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    41/626

  • 8/6/2019 TETLPVolumeNo1

    42/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 13 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1 CHARGESCHARGES $/dth

    APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTALFACILITY EXPANSIONS IMPLEMENTED ON OR AFTER JUNE 1, 1993: Maximum Minimum

    Docket No. CP99-621 (Ironwood Lateral):__________________________________________________

    Customer dth____________________________________ _______PPL Energy Plus, LLC 120,000

    Rates Pursuant to Section 3.2 of Rate Schedule FT-1:

    Effective October 1 through April 30RESERVATION CHARGE 0.6040 0.0000USAGE-2 CHARGE 0.0199RESERVATION CHARGE ADJUSTMENT 0.0199 0.0000

    Effective May 1 through September 30RESERVATION CHARGE 1.2690 0.0000

    USAGE-2 CHARGE 0.0417RESERVATION CHARGE ADJUSTMENT 0.0417 0.0000

    Rates Pursuant to Section 3.14 of the General Terms and Conditions:

    Effective October 1 through April 30VOLUMETRIC RESERVATION CHARGE 0.0199 0.0000

    Effective May 1 through September 30VOLUMETRIC RESERVATION CHARGE 0.0417 0.0000

    APPLICABLE SHRINKAGE PERCENTAGE

    Effective Year Around:October 1 through September 30 0.00 %

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    43/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 14 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1 CHARGESCHARGES $/dth

    APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTALFACILITY EXPANSIONS IMPLEMENTED ON OR AFTER JUNE 1, 1993: Maximum Minimum

    Docket No. CP02-381 (M1 Expansion Project):

    Rates Pursuant to Section 3.2 of Rate Schedule FT-1:RESERVATION CHARGE 10.2010 0.0000USAGE-2 CHARGE 0.3354RESERVATION CHARGE ADJUSTMENT 0.3354 0.0000

    Rates Pursuant to Section 3.14 of the General Terms and Conditions:VOLUMETRIC RESERVATION CHARGE 0.3354 0.0000

    BASE UNIT ELECTRIC POWER COST 0.7921ELECTRIC POWER COST ADJUSTMENT 2.9890ADJUSTED ELECTRIC POWER COST 3.7811

    APPLICABLE SHRINKAGE PERCENTAGE (LAUF)Effective Year Around:

    December 1 through November 30 0.37%

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    44/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 15 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATE

    SCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1 CHARGES

    CHARGES $/dth

    APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTAL

    FACILITY EXPANSIONS IMPLEMENTED ON NOVEMBER 1, 2010:

    Docket No. CP09-68-000, TIME III Project:

    ______________________________________

    Customer dth

    ______________________________ ______

    CenterPoint Energy Services, Inc. 25,000

    PPL Energy Plus, LLC 30,000

    Maximum Minimum

    Rates Pursuant to Section 3.2(C&D) of Rate Schedule FT-1: _______ _______

    RESERVATION CHARGE $23.4630 $0.0480

    USAGE-1 CHARGE $0.0000

    USAGE-2 CHARGE $0.7714

    RESERVATION CHARGE ADJUSTMENT $0.7714 $0.0016

    Rates Pursuant to Section 3.14 of the General Terms and Conditions:

    VOLUMETRIC RESERVATION CHARGE $0.7714 $0.0016

    BASE UNIT ELECTRIC POWER COST 1.0597

    ELECTRIC POWER COST ADJUSTMENT 0.1820

    ADJUSTED ELECTRIC POWER COST 1.2417

    ASA USAGE SURCHARGE 0.0000

    APPLICABLE SHRINKAGE PERCENTAGE

    December 1 through November 30: 0.75%

    ALL ZONES

    $/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TO

    SECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    45/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 2. Rate Schedule FT-1

    Eighth Revised Volume No. 1 Version 8.0.0Page 16 of 16

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATE

    SCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FT-1 CHARGES

    CHARGES $/dth

    APPLICABLE TO CUSTOMERS UTILIZING CAPACITY PURSUANT TO INCREMENTAL

    FACILITY EXPANSIONS IMPLEMENTED ON NOVEMBER 1, 2010:

    Docket No. CP09-68-000, TEMAX Project:

    ___________________________________

    Customer dth

    ______________________________ ______

    ConocoPhillips Company 395,000

    Maximum Minimum

    Rates Pursuant to Section 3.2(C&D) of Rate Schedule FT-1: _______ _______

    RESERVATION CHARGE $19.0730 $0.0710

    USAGE-1 CHARGE $0.0000

    USAGE-2 CHARGE $0.6271

    RESERVATION CHARGE ADJUSTMENT $0.6271 $0.0023

    Rates Pursuant to Section 3.14 of the General Terms and Conditions:

    VOLUMETRIC RESERVATION CHARGE $0.6271 $0.0023

    BASE UNIT ELECTRIC POWER COST 1.6032

    ELECTRIC POWER COST ADJUSTMENT -0.9660

    ADJUSTED ELECTRIC POWER COST 0.6372

    ASA USAGE SURCHARGE 0.0000

    APPLICABLE SHRINKAGE PERCENTAGES

    P RIMARY RECEIPT POINT TO A PRIMARY OR SECONDARY DELIVERY POINT IN M2 OR M3

    December 1 through November 30: 0.64%

    SECONDARY RECEIPT POINT TO A PRIMARY OR SECONDARY DELIVERY POINT IN M2 OR M3

    December 1 through March 31: 4.30%

    April 1 through November 30: 3.73%

    ALL ZONES

    $/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TO

    SECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    46/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 3. Rate Schedule SCT

    Eighth Revised Volume No. 1 Version 5.0.0Page 1 of 5

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    SCTRESERVATIONCHARGES

    Pursuant to Sections 3.2, 3.3, and 3.5 of Rate Schedule SCT:SCT RESERVATION

    SCT RESERVATION CHARGE* CHARGE ADJUSTMENT$/dth $/dth

    ______________________________ ______________________________ACCESS AREA MAXIMUM MINIMUM MAXIMUM MINIMUM

    STX-AAB 2.7220 0.0000 0.0895 0.0000WLA-AAB 1.1300 0.0000 0.0372 0.0000ELA-AAB 0.9500 0.0000 0.0312 0.0000ETX-AAB 0.8760 0.0000 0.0288 0.0000STX-STX 2.2920 0.0000 0.0754 0.0000STX-WLA 2.3560 0.0000 0.0775 0.0000STX-ELA 2.7220 0.0000 0.0895 0.0000STX-ETX 2.7220 0.0000 0.0895 0.0000WLA-WLA 0.8220 0.0000 0.0270 0.0000WLA-ELA 1.1300 0.0000 0.0372 0.0000WLA-ETX 1.1300 0.0000 0.0372 0.0000ELA-ELA 0.9500 0.0000 0.0312 0.0000ETX-ETX 0.8760 0.0000 0.0288 0.0000

    ETX-ELA 0.9500 0.0000 0.0312 0.0000

    MARKET AREA MAXIMUM MINIMUM MAXIMUM MINIMUMM1-M1 1.8070 0.0000 0.0594 0.0000M1-M2 3.3440 0.0000 0.1099 0.0000M1-M3 4.3940 0.0000 0.1444 0.0000M2-M2 2.5980 0.0000 0.0854 0.0000M2-M3 3.7020 0.0000 0.1217 0.0000M3-M3 2.1100 0.0000 0.0694 0.0000

    SCT DEMAND CHARGE**$/dth

    ______________________________MAXIMUM MINIMUM

    ACCESS AREA 0.0020 0.0000

    MARKET AREA MAXIMUM MINIMUMM1-M1 0.0030 0.0000M1-M2 0.0040 0.0000

    M1-M3 0.0050 0.0000

    * Reservation Charge reflects a storage surcharge of: 0.128

    **Pursuant to Section 26 of the General Terms and Conditions.

  • 8/6/2019 TETLPVolumeNo1

    47/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 3. Rate Schedule SCT

    Eighth Revised Volume No. 1 Version 5.0.0Page 2 of 5

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    SCTUSAGE ZONE RATECHARGES $/dth

    Pursuant to Sections 3.2 and 3.3 of Rate Schedule SCT:

    STX WLA ELA ETX M1 M2 M3USAGE-1 - MAXIMUM

    from STX 0.1811 0.1863 0.2164 0.2164 0.3687 0.5206 0.6235from WLA 0.0602 0.0856 0.0856 0.2379 0.3898 0.4927from ELA 0.0708 0.0708 0.2231 0.3750 0.4779from ETX 0.0646 0.2170 0.3689 0.4718from M1 0.1524 0.3043 0.4072from M2 0.2302 0.3382from M3 0.1817

    USAGE-1 - MINIMUMfrom STX 0.0000 0.0000 0.0000 0.0000 0.0027 0.0282 0.0449from WLA 0.0000 0.0000 0.0000 0.0027 0.0282 0.0449from ELA 0.0000 0.0000 0.0027 0.0282 0.0449from ETX 0.0000 0.0027 0.0282 0.0449from M1 0.0070 0.0325 0.0492from M2 0.0198 0.0370

    from M3 0.0114

    USAGE-1 - BACKHAUL MAXIMUMfrom STX 0.1899from WLA 0.1959 0.0661from ELA 0.2304 0.0959 0.0795from ETX 0.2304 0.0959 0.0795 0.0733from M1 0.3921 0.2576 0.2412 0.2351 0.1618from M2 0.5521 0.4176 0.4012 0.3951 0.3218 0.2440from M3 0.6613 0.5268 0.5104 0.5043 0.4310 0.3578 0.1933

    USAGE-1 - BACKHAUL MINIMUMfrom STX 0.0046from WLA 0.0054 0.0017from ELA 0.0097 0.0060 0.0044from ETX 0.0097 0.0060 0.0044 0.0044from M1 0.0261 0.0224 0.0208 0.0208 0.0164from M2 0.0597 0.0560 0.0544 0.0544 0.0500 0.0336from M3 0.0827 0.0790 0.0774 0.0774 0.0730 0.0566 0.0230

    USAGE-2 0.1037 0.1037 0.1037 0.1037 0.2561 0.4080 0.5109

    USAGE-3 0.1034 0.1034 0.1034 0.1034 0.2560 0.4080 0.5110

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    48/626

  • 8/6/2019 TETLPVolumeNo1

    49/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 3. Rate Schedule SCT

    Eighth Revised Volume No. 1 Version 5.0.0Page 4 of 5

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    Pursuant to Section 3.14 of the General Terms and Conditions:SCTCAPACITY RELEASE RESERVATION CHARGE ADJUSTMENT/CHARGES RESERVATION CHARGE* VOLUMETRIC RESERVATION CHARGE*

    $/dth $/dth______________________________ ______________________________

    NON- NON-ACCESS AREA MILEAGE MILEAGE TOTAL MILEAGE MILEAGE TOTAL

    STX-AAB 1.6610 1.0610 2.7220 0.0546 0.0349 0.0895WLA-AAB 0.5230 0.6070 1.1300 0.0172 0.0200 0.0372ELA-AAB 0.3660 0.5840 0.9500 0.0120 0.0192 0.0312ETX-AAB 0.3320 0.5440 0.8760 0.0109 0.0179 0.0288STX-STX 1.2320 1.0600 2.2920 0.0405 0.0349 0.0754STX-WLA 1.2950 1.0610 2.3560 0.0426 0.0349 0.0775STX-ELA 1.6610 1.0610 2.7220 0.0546 0.0349 0.0895STX-ETX 1.6610 1.0610 2.7220 0.0546 0.0349 0.0895WLA-WLA 0.1600 0.6620 0.8220 0.0053 0.0217 0.0270WLA-ELA 0.5230 0.6070 1.1300 0.0172 0.0200 0.0372WLA-ETX 0.5230 0.6070 1.1300 0.0172 0.0200 0.0372ELA-ELA 0.3660 0.5840 0.9500 0.0120 0.0192 0.0312ETX-ETX 0.3320 0.5440 0.8760 0.0109 0.0179 0.0288ETX-ELA 0.3660 0.5840 0.9500 0.0120 0.0192 0.0312

    MARKET AREAM1-M1 0.7450 1.0620 1.8070 0.0245 0.0349 0.0594M1-M2 2.2830 1.0610 3.3440 0.0751 0.0348 0.1099M1-M3 3.3330 1.0610 4.3940 0.1096 0.0348 0.1444M2-M2 1.5370 1.0610 2.5980 0.0505 0.0349 0.0854M2-M3 2.6410 1.0610 3.7020 0.0868 0.0349 0.1217M3-M3 1.0500 1.0600 2.1100 0.0345 0.0349 0.0694

    DEMAND CHARGE**$/dth

    ______________________________NON-

    MILEAGE MILEAGE TOTALACCESS AREA 0.0000 0.0020 0.0020

    NON-MARKET AREA MILEAGE MILEAGE TOTAL

    M1-M1 0.0000 0.0030 0.0030

    M1-M2 0.0000 0.0040 0.0040M1-M3 0.0000 0.0050 0.0050

    *Rates are exclusive of surcharges which can also be recovered.

    **Pursuant to Section 26 of the General Terms and Conditions.

  • 8/6/2019 TETLPVolumeNo1

    50/626

  • 8/6/2019 TETLPVolumeNo1

    51/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 4. Rate Schedule IT-1

    Eighth Revised Volume No. 1 Version 5.0.0Page 1 of 1

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATE

    SCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    IT-1

    USAGE ZONE RATE

    CHARGES $/dth

    Pursuant to Sections 3.2 and 3.3 of Rate Schedule IT-1:

    STX WLA ELA ETX M1 M2 M3

    USAGE-1 MAXIMUM

    from STX 0.1812 0.1864 0.2166 0.2166 0.3692 0.5211 0.6242

    from WLA 0.0603 0.0857 0.0857 0.2383 0.3902 0.4933

    from ELA 0.0709 0.0709 0.2235 0.3754 0.4785

    from ETX 0.0647 0.2173 0.3692 0.4723

    from M1 0.1526 0.3045 0.4076

    from M2 0.2304 0.3385

    from M3 0.1819

    USAGE-1 MINIMUM

    from STX 0.0000 0.0000 0.0000 0.0000 0.0027 0.0282 0.0449

    from WLA 0.0000 0.0000 0.0000 0.0027 0.0282 0.0449

    from ELA 0.0000 0.0000 0.0027 0.0282 0.0449

    from ETX 0.0000 0.0027 0.0282 0.0449

    from M1 0.0070 0.0325 0.0492

    from M2 0.0198 0.0370

    from M3 0.0114

    USAGE-1 BACKHAUL MAXIMUM

    from STX 0.1900

    from WLA 0.1960 0.0662

    from ELA 0.2306 0.0960 0.0796

    from ETX 0.2306 0.0960 0.0796 0.0734

    from M1 0.3926 0.2580 0.2416 0.2354 0.1620

    from M2 0.5526 0.4180 0.4016 0.3954 0.3220 0.2442

    from M3 0.6620 0.5274 0.5110 0.5048 0.4314 0.3581 0.1935

    USAGE-1 BACKHAUL MINIMUM

    from STX 0.0046

    from WLA 0.0054 0.0017

    from ELA 0.0097 0.0060 0.0044

    from ETX 0.0097 0.0060 0.0044 0.0044

    from M1 0.0261 0.0224 0.0208 0.0208 0.0164

    from M2 0.0597 0.0560 0.0544 0.0544 0.0500 0.0336

    from M3 0.0827 0.0790 0.0774 0.0774 0.0730 0.0566 0.0230

    USAGE-2 0.1037 0.1037 0.1037 0.1037 0.2562 0.4082 0.5113

    ALL ZONES

    $/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TO

    SECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    52/626

  • 8/6/2019 TETLPVolumeNo1

    53/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 6. Rate Schedules VKFT and VKIT

    Eighth Revised Volume No. 1 Version 0.0.0Page 1 of 1

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATE

    SCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    RATE$/dth

    _____________________Maximum Minimum

    VKFT Pursuant to Sections 3.2 and 3.3 of Rate Schedule VKFT:

    RESERVATION CHARGE 0.0945 0.0000USAGE-2 CHARGE 0.0945 0.0000RESERVATION CHARGE ADJUSTMENT (RCA) 0.0945 0.0000

    VKFT Pursuant to Section 3.14 of the General Terms and Conditions:

    VOLUMETRIC RESERVATION CHARGE* 0.0945 0.0000

    VKIT Pursuant to Section 3.2 of Rate Schedule VKIT:USAGE-1 CHARGE 0.0945 0.0000

    USAGE-2 CHARGE 0.0945 0.0000

    * Rates are exclusive of surcharges which can also be recovered.

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    54/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 7. Rate Schedule MLS-1

    Eighth Revised Volume No. 1 Version 4.0.0Page 1 of 3

    Issued on: May 17, 2011

    Effective on: June 17, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    MLS-1 CHARGESMARKET LATERAL FACILITY CHARGES $/dth

    Maximum Minimum

    Docket No. CP02-17-000 (Freehold Lateral):

    Rates Pursuant to Section 3.2 of Rate Schedule MLS-1:

    RESERVATION CHARGE 0.6340 0.0000USAGE-2 CHARGE 0.0208RESERVATION CHARGE ADJUSTMENT 0.0208 0.0000

    Rates Pursuant to Section 3.14 of the General Terms and Conditions:

    VOLUMETRIC RESERVATION CHARGE 0.0208 0.0000

    BASE UNIT ELECTRIC POWER COST 0.0422ELECTRIC POWER COST ADJUSTMENT -0.0240ADJUSTED ELECTRIC POWER COST 0.0182

    APPLICABLE SHRINKAGE PERCENTAGEDecember 1 through November 30: 0.01%

    Docket No. CP02-45-000 (Hanging Rock Lateral):

    Rates Pursuant to Section 3.2 of Rate Schedule MLS-1:

    RESERVATION CHARGE 1.1120 0.0000USAGE-2 CHARGE 0.0366RESERVATION CHARGE ADJUSTMENT 0.0366 0.0000

    Rates Pursuant to Section 3.3 of Rate Schedule MLS-1:

    USAGE-1 0.0366USAGE-2 0.0366

    Rates Pursuant to Section 3.14 of the General Terms and Conditions:

    VOLUMETRIC RESERVATION CHARGE 0.0366 0.0000

    APPLICABLE SHRINKAGE PERCENTAGEDecember 1 through November 30: 0.01%

  • 8/6/2019 TETLPVolumeNo1

    55/626

  • 8/6/2019 TETLPVolumeNo1

    56/626

  • 8/6/2019 TETLPVolumeNo1

    57/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 8. Rate Schedule PAL

    Eighth Revised Volume No. 1 Version 0.0.0Page 1 of 1

    Issued on: April 22, 2010

    Effective on: April 22, 2010

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATE

    SCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    PAL

    DAILY

    CHARGES

    Pursuant to Sections 3.1 of Rate Schedule PAL:

    RATE

    $/dth

    Maximum Minimum

    Park and Loan Daily Charges at PAL points in:

    Zone STX 0.1300 0.0000

    Zone WLA 0.1300 0.0000

    Zone ELA 0.1300 0.0000Zone ETX 0.1300 0.0000

    Zone M1 0.1644 0.0000

    Zone M2 0.2426 0.0000

    Zone M3 0.1947 0.0000

    ALL ZONES

    $/DTH

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TO

    SECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS 0.0019

  • 8/6/2019 TETLPVolumeNo1

    58/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 9. Rate Schedule SS-1

    Eighth Revised Volume No. 1 Version 5.0.0Page 1 of 2

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    SS-1CHARGES

    Pursuant to Sections 3.2 and 3.4 of Rate Schedule SS-1:

    RATE$/dth

    MAXIMUM RESERVATION CHARGE* 5.5260SPACE CHARGE 0.1293INJECTION CHARGE 0.0267WITHDRAWAL CHARGE 0.0393EXCESS INJECTION CHARGE 0.1514EXCESS WITHDRAWAL CHARGE 1.0003RESERVATION CHARGE ADJUSTMENT 0.1817

    TRANSMISSION COMPONENT OF RESERVATION CHARGE 4.6310TRANSMISSION COMPONENT OF WITHDRAWAL CHARGE 0.0235

    MINIMUM RESERVATION CHARGE 0.0000SPACE CHARGE 0.0000INJECTION CHARGE 0.0267WITHDRAWAL CHARGE 0.0393EXCESS INJECTION CHARGE 0.0267EXCESS WITHDRAWAL CHARGE 0.0393

    RESERVATION CHARGE ADJUSTMENT 0.0000

    * Reservation Charge reflects a storage surcharge of: 0.0970

    ALL ZONES$/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TOSECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    59/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 9. Rate Schedule SS-1

    Eighth Revised Volume No. 1 Version 5.0.0Page 2 of 2

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATESCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    SS-1CAPACITY RELEASECHARGES*

    Pursuant to Section 3.14 of the General Terms and Conditions:

    RATE$/dth

    _______________________________NON-

    MILEAGE MILEAGE TOTALMAXIMUM RESERVATION CHARGE 2.1720 3.3540 5.5260

    SPACE CHARGE 0.0000 0.1293 0.1293VOLUMETRIC RESERVATION CHARGE 0.0713 0.1104 0.1817DAILY SPACE CHARGE 0.0000 0.0004 0.0004

    MINIMUM RESERVATION CHARGE 0.0000 0.0000 0.0000SPACE CHARGE 0.0000 0.0000 0.0000VOLUMETRIC RESERVATION CHARGE 0.0000 0.0000 0.0000DAILY SPACE CHARGE 0.0000 0.0000 0.0000

    *Rates are exclusive of surcharges which can also be recovered.

  • 8/6/2019 TETLPVolumeNo1

    60/626

  • 8/6/2019 TETLPVolumeNo1

    61/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 10. Rate Schedule FSS-1

    Eighth Revised Volume No. 1 Version 1.0.0Page 2 of 3

    Issued on: October 22, 2010

    Effective on: December 1, 2010

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO OPEN ACCESS, PART 284, RATE

    SCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    FSS-1

    CAPACITY RELEASE

    CHARGES*

    Pursuant to Section 3.14 of the General Terms and Conditions:

    RATE

    $/dth

    MAXIMUM RESERVATION CHARGE 0.8950

    SPACE CHARGE 0.1293

    VOLUMETRIC RESERVATION CHARGE 0.0294

    DAILY SPACE CHARGE 0.0004

    MINIMUM RESERVATION CHARGE 0.0000

    SPACE CHARGE 0.0000

    VOLUMETRIC RESERVATION CHARGE 0.0000

    DAILY SPACE CHARGE 0.0000

    *Rates are exclusive of surcharges which can also be recovered.

  • 8/6/2019 TETLPVolumeNo1

    62/626

  • 8/6/2019 TETLPVolumeNo1

    63/626

  • 8/6/2019 TETLPVolumeNo1

    64/626

  • 8/6/2019 TETLPVolumeNo1

    65/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 13. Rate Schedule SS

    Eighth Revised Volume No. 1 Version 4.0.0Page 1 of 1

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    CURRENTLY EFFECTIVE SERVICE RATES APPLICABLE TO NGA SECTION 7(C) RATE

    SCHEDULES IN FERC GAS TARIFF, EIGHTH REVISED VOLUME NO. 1

    SS

    CHARGES

    Pursuant to Sections 3.2 and 3.3 of Rate Schedule SS:

    RATE

    $/dth

    RESERVATION CHARGE 5.4290

    SPACE CHARGE 0.1293

    INJECTION CHARGE 0.0267

    WITHDRAWAL CHARGE 0.0394

    EXCESS WITHDRAWAL CHARGE 0.9701

    RESERVATION CHARGE ADJUSTMENT 0.1785

    ALL ZONES

    $/dth

    ACA COMMODITY SURCHARGE TO APPLICABLE CUSTOMERS, PURSUANT TO

    SECTION 15.5 OF THE GENERAL TERMS AND CONDITIONS. 0.0019

  • 8/6/2019 TETLPVolumeNo1

    66/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 14. Notice of Rate Change Adjustments

    Eighth Revised Volume No. 1 Version 5.0.0Page 1 of 32

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    NOTICE OF RATE CHANGE ADJUSTMENTS

    Base Electric

    Tariff Power Cost ASA Adjusted

    Rate* Adjustment Surcharge Rate

    $/dth $/dth $/dth $/dth

    Pursuant to Sections 3.2, 3.3, and 3.5 of Rate Schedule CDS:CDS RESERVATION CHARGES

    ACCESS AREA

    MAXIMUM - STX-AAB 6.8050 -0.0010 -0.0162 6.7878

    WLA-AAB 2.8260 -0.0010 -0.0075 2.8175

    ELA-AAB 2.3750 0.0000 -0.0049 2.3701

    ETX-AAB 2.1890 0.0000 -0.0225 2.1665

    STX-STX 5.7350 -0.0010 -0.0104 5.7236

    STX-WLA 5.8940 -0.0010 -0.0110 5.8820

    STX-ELA 6.8100 -0.0010 -0.0162 6.7928

    STX-ETX 6.8100 -0.0010 -0.0162 6.7928

    WLA-WLA 2.0570 0.0000 -0.0045 2.0525

    WLA-ELA 2.8300 0.0000 -0.0075 2.8225

    WLA-ETX 2.8300 0.0000 -0.0075 2.8225

    ELA-ELA 2.3780 0.0000 -0.0049 2.3731

    ETX-ETX 2.1920 0.0000 -0.0225 2.1695

    ETX-ELA 2.3780 0.0000 -0.0225 2.3555

    MINIMUM - STX-AAB 0.0000 0.0000 0.0000

    WLA-AAB 0.0000 0.0000 0.0000

    ELA-AAB 0.0000 0.0000 0.0000ETX-AAB 0.0000 0.0000 0.0000

    STX-STX 0.0000 0.0000 0.0000

    STX-WLA 0.0000 0.0000 0.0000

    STX-ELA 0.0000 0.0000 0.0000

    STX-ETX 0.0000 0.0000 0.0000

    WLA-WLA 0.0000 0.0000 0.0000

    WLA-ELA 0.0000 0.0000 0.0000

    WLA-ETX 0.0000 0.0000 0.0000

    ELA-ELA 0.0000 0.0000 0.0000

    ETX-ETX 0.0000 0.0000 0.0000

    ETX-ELA 0.0000 0.0000 0.0000

    MARKET AREA

    MAXIMUM - M1-M1 4.4290 0.0940 0.0000 4.5230

    M1-M2 8.0840 0.2860 0.0000 8.3700

    M1-M3 10.5780 0.4170 0.0000 10.9950

    M2-M2 6.3100 0.1920 0.0000 6.5020

    M2-M3 8.9410 0.3240 0.0000 9.2650

    M3-M3 5.1500 0.1310 0.0000 5.2810

    MINIMUM - M1-M1 0.0000 0.0000 0.0000

    M1-M2 0.0000 0.0000 0.0000

    M1-M3 0.0000 0.0000 0.0000

    M2-M2 0.0000 0.0000 0.0000

    M2-M3 0.0000 0.0000 0.0000

    M3-M3 0.0000 0.0000 0.0000

    *The base tariff rate is the effective rate on file with the

    Commission, excluding adjustments approved by the Commission.

  • 8/6/2019 TETLPVolumeNo1

    67/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 14. Notice of Rate Change Adjustments

    Eighth Revised Volume No. 1 Version 5.0.0Page 2 of 32

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    NOTICE OF RATE CHANGE ADJUSTMENTS

    Base Electric

    Tariff Power Cost ASA Adjusted

    Rate* Adjustment Surcharge Rate

    $/dth $/dth $/dth $/dth

    Pursuant to Sections 3.2, 3.3, and 3.5 of Rate Schedule CDS:CDS RESERVATION CHARGE ADJUSTMENT

    ACCESS AREA

    MAXIMUM - STX-AAB 0.2237 0.0000 -0.0005 0.2232

    WLA-AAB 0.0929 -0.0001 -0.0002 0.0926

    ELA-AAB 0.0781 0.0000 -0.0002 0.0779

    ETX-AAB 0.0720 0.0000 -0.0007 0.0712

    STX-STX 0.1885 0.0001 -0.0003 0.1882

    STX-WLA 0.1937 0.0001 -0.0004 0.1934

    STX-ELA 0.2239 -0.0001 -0.0005 0.2233

    STX-ETX 0.2239 -0.0001 -0.0005 0.2233

    WLA-WLA 0.0677 0.0000 -0.0001 0.0675

    WLA-ELA 0.0930 0.0000 -0.0002 0.0928

    WLA-ETX 0.0930 0.0000 -0.0002 0.0928

    ELA-ELA 0.0782 0.0000 -0.0002 0.0780

    ETX-ETX 0.0721 -0.0001 -0.0007 0.0713

    ETX-ELA 0.0782 -0.0001 -0.0007 0.0774

    MINIMUM - STX-AAB 0.0000 0.0000 0.0000

    WLA-AAB 0.0000 0.0000 0.0000

    ELA-AAB 0.0000 0.0000 0.0000ETX-AAB 0.0000 0.0000 0.0000

    STX-STX 0.0000 0.0000 0.0000

    STX-WLA 0.0000 0.0000 0.0000

    STX-ELA 0.0000 0.0000 0.0000

    STX-ETX 0.0000 0.0000 0.0000

    WLA-WLA 0.0000 0.0000 0.0000

    WLA-ELA 0.0000 0.0000 0.0000

    WLA-ETX 0.0000 0.0000 0.0000

    ELA-ELA 0.0000 0.0000 0.0000

    ETX-ETX 0.0000 0.0000 0.0000

    ETX-ELA 0.0000 0.0000 0.0000

    MARKET AREA

    MAXIMUM - M1-M1 0.1456 0.0031 0.0000 0.1487

    M1-M2 0.2658 0.0094 0.0000 0.2752

    M1-M3 0.3478 0.0137 0.0000 0.3615

    M2-M2 0.2074 0.0063 0.0000 0.2137

    M2-M3 0.2940 0.0106 0.0000 0.3046

    M3-M3 0.1693 0.0043 0.0000 0.1736

    MINIMUM - M1-M1 0.0000 0.0000 0.0000

    M1-M2 0.0000 0.0000 0.0000

    M1-M3 0.0000 0.0000 0.0000

    M2-M2 0.0000 0.0000 0.0000

    M2-M3 0.0000 0.0000 0.0000

    M3-M3 0.0000 0.0000 0.0000

    *The base tariff rate is the effective rate on file with the

    Commission, excluding adjustments approved by the Commission.

  • 8/6/2019 TETLPVolumeNo1

    68/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 14. Notice of Rate Change Adjustments

    Eighth Revised Volume No. 1 Version 5.0.0Page 3 of 32

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    NOTICE OF RATE CHANGE ADJUSTMENTS

    Base Electric

    Tariff Power Cost ASA Adjusted

    Rate* Adjustment Surcharge Rate

    $/dth $/dth $/dth $/dth

    Pursuant to Sections 3.2 and 3.3 of Rate Schedule CDS:CDS USAGE CHARGES

    USAGE-1 - MAXIMUM

    STX-STX 0.0088 0.0000 -0.0088 0.0000

    STX-WLA 0.0096 0.0000 -0.0096 0.0000

    STX-ELA 0.0140 0.0000 -0.0140 0.0000

    STX-ETX 0.0140 0.0000 -0.0140 0.0000

    STX-M1 0.0275 0.0071 -0.0234 0.0112

    STX-M2 0.0467 0.0215 -0.0315 0.0367

    STX-M3 0.0598 0.0314 -0.0378 0.0534

    WLA-WLA 0.0059 0.0000 -0.0059 0.0000

    WLA-ELA 0.0103 0.0000 -0.0103 0.0000

    WLA-ETX 0.0103 0.0000 -0.0103 0.0000

    WLA-M1 0.0238 0.0071 -0.0197 0.0112

    WLA-M2 0.0430 0.0215 -0.0278 0.0367

    WLA-M3 0.0561 0.0314 -0.0341 0.0534

    ELA-ELA 0.0087 0.0000 -0.0087 0.0000

    ETX-ELA 0.0087 0.0000 -0.0087 0.0000

    ELA-M1 0.0222 0.0071 -0.0181 0.0112

    ELA-M2 0.0414 0.0215 -0.0262 0.0367ELA-M3 0.0545 0.0314 -0.0325 0.0534

    ETX-ETX 0.0087 0.0000 -0.0087 0.0000

    ETX-M1 0.0222 0.0071 -0.0181 0.0112

    ETX-M2 0.0414 0.0215 -0.0262 0.0367

    ETX-M3 0.0545 0.0314 -0.0325 0.0534

    M1-M1 0.0135 0.0071 -0.0094 0.0112

    M1-M2 0.0327 0.0215 -0.0175 0.0367

    M1-M3 0.0458 0.0314 -0.0238 0.0534

    M2-M2 0.0234 0.0144 -0.0138 0.0240

    M2-M3 0.0365 0.0243 -0.0196 0.0412

    M3-M3 0.0173 0.0099 -0.0116 0.0156

    *The base tariff rate is the effective rate on file with the

    Commission, excluding adjustments approved by the Commission.

  • 8/6/2019 TETLPVolumeNo1

    69/626

  • 8/6/2019 TETLPVolumeNo1

    70/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 14. Notice of Rate Change Adjustments

    Eighth Revised Volume No. 1 Version 5.0.0Page 5 of 32

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    NOTICE OF RATE CHANGE ADJUSTMENTS

    Base Electric

    Tariff Power Cost ASA Adjusted

    Rate* Adjustment Surcharge Rate

    $/dth $/dth $/dth $/dth

    Pursuant to Sections 3.2 and 3.3 of Rate Schedule CDS:CDS USAGE CHARGES

    USAGE-1 - BACKHAUL MAXIMUM

    STX-STX 0.0088 0.0000 0.0088

    WLA-STX 0.0096 0.0000 0.0096

    ELA-STX 0.0140 0.0000 0.0140

    ETX-STX 0.0140 0.0000 0.0140

    M1-STX 0.0275 0.0071 0.0346

    M2-STX 0.0467 0.0215 0.0682

    M3-STX 0.0598 0.0314 0.0912

    WLA-WLA 0.0059 0.0000 0.0059

    ELA-WLA 0.0103 0.0000 0.0103

    ETX-WLA 0.0103 0.0000 0.0103

    M1-WLA 0.0238 0.0071 0.0309

    M2-WLA 0.0430 0.0215 0.0645

    M3-WLA 0.0561 0.0314 0.0875

    ELA-ELA 0.0087 0.0000 0.0087

    ELA-ETX 0.0087 0.0000 0.0087

    M1-ELA 0.0222 0.0071 0.0293

    M2-ELA 0.0414 0.0215 0.0629M3-ELA 0.0545 0.0314 0.0859

    ETX-ETX 0.0087 0.0000 0.0087

    M1-ETX 0.0222 0.0071 0.0293

    M2-ETX 0.0414 0.0215 0.0629

    M3-ETX 0.0545 0.0314 0.0859

    M1-M1 0.0135 0.0071 0.0206

    M2-M1 0.0327 0.0215 0.0542

    M3-M1 0.0458 0.0314 0.0772

    M2-M2 0.0234 0.0144 0.0378

    M3-M2 0.0365 0.0243 0.0608

    M3-M3 0.0173 0.0099 0.0272

    *The base tariff rate is the effective rate on file with the

    Commission, excluding adjustments approved by the Commission.

  • 8/6/2019 TETLPVolumeNo1

    71/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 14. Notice of Rate Change Adjustments

    Eighth Revised Volume No. 1 Version 5.0.0Page 6 of 32

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    NOTICE OF RATE CHANGE ADJUSTMENTS

    Base Electric

    Tariff Power Cost ASA Adjusted

    Rate* Adjustment Surcharge Rate

    $/dth $/dth $/dth $/dth

    Pursuant to Sections 3.2 and 3.3 of Rate Schedule CDS:CDS USAGE CHARGES

    USAGE-1 - BACKHAUL MINIMUM

    STX-STX 0.0046 0.0000 0.0046

    WLA-STX 0.0054 0.0000 0.0054

    ELA-STX 0.0097 0.0000 0.0097

    ETX-STX 0.0097 0.0000 0.0097

    M1-STX 0.0190 0.0071 0.0261

    M2-STX 0.0382 0.0215 0.0597

    M3-STX 0.0513 0.0314 0.0827

    WLA-WLA 0.0017 0.0000 0.0017

    ELA-WLA 0.0060 0.0000 0.0060

    ETX-WLA 0.0060 0.0000 0.0060

    M1-WLA 0.0153 0.0071 0.0224

    M2-WLA 0.0345 0.0215 0.0560

    M3-WLA 0.0476 0.0314 0.0790

    ELA-ELA 0.0044 0.0000 0.0044

    ELA-ETX 0.0044 0.0000 0.0044

    M1-ELA 0.0137 0.0071 0.0208

    M2-ELA 0.0329 0.0215 0.0544M3-ELA 0.0460 0.0314 0.0774

    ETX-ETX 0.0044 0.0000 0.0044

    M1-ETX 0.0137 0.0071 0.0208

    M2-ETX 0.0329 0.0215 0.0544

    M3-ETX 0.0460 0.0314 0.0774

    M1-M1 0.0093 0.0071 0.0164

    M2-M1 0.0285 0.0215 0.0500

    M3-M1 0.0416 0.0314 0.0730

    M2-M2 0.0192 0.0144 0.0336

    M3-M2 0.0323 0.0243 0.0566

    M3-M3 0.0131 0.0099 0.0230

    USAGE-2 STX 0.0090 0.0000 -0.0090 0.0000

    WLA 0.0090 0.0000 -0.0090 0.0000

    ELA 0.0090 0.0000 -0.0090 0.0000

    ETX 0.0090 0.0000 -0.0090 0.0000

    M1 0.0225 0.0071 -0.0184 0.0112

    M2 0.0417 0.0215 -0.0265 0.0367

    M3 0.0548 0.0314 -0.0328 0.0534

    USAGE-3 STX 0.1127 -0.0003 -0.0090 0.1034

    WLA 0.1127 -0.0003 -0.0090 0.1034

    ELA 0.1127 -0.0003 -0.0090 0.1034

    ETX 0.1127 -0.0003 -0.0090 0.1034

    M1 0.2645 0.0099 -0.0184 0.2560

    M2 0.4038 0.0307 -0.0265 0.4080

    M3 0.4990 0.0448 -0.0328 0.5110

    *The base tariff rate is the effective rate on file with the

    Commission, excluding adjustments approved by the Commission.

  • 8/6/2019 TETLPVolumeNo1

    72/626

  • 8/6/2019 TETLPVolumeNo1

    73/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 14. Notice of Rate Change Adjustments

    Eighth Revised Volume No. 1 Version 5.0.0Page 8 of 32

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    NOTICE OF RATE CHANGE ADJUSTMENTS

    Base Electric

    Tariff Power Cost ASA Adjusted

    Rate* Adjustment Surcharge Rate

    $/dth $/dth $/dth $/dth

    Pursuant to Sections 3.2, 3.3, and 3.5 of Rate Schedule FT-1:FT-1 RESERVATION CHARGE ADJUSTMENT

    ACCESS AREA

    MAXIMUM - STX-AAB 0.2164 -0.0001 -0.0005 0.2158

    WLA-AAB 0.0856 -0.0001 -0.0002 0.0853

    ELA-AAB 0.0708 0.0001 -0.0002 0.0706

    ETX-AAB 0.0646 0.0000 -0.0007 0.0639

    STX-STX 0.1812 0.0000 -0.0003 0.1808

    STX-WLA 0.1864 0.0001 -0.0004 0.1860

    STX-ELA 0.2166 -0.0001 -0.0005 0.2160

    STX-ETX 0.2166 -0.0001 -0.0005 0.2160

    WLA-WLA 0.0603 0.0000 -0.0001 0.0601

    WLA-ELA 0.0857 0.0000 -0.0002 0.0855

    WLA-ETX 0.0857 0.0000 -0.0002 0.0855

    ELA-ELA 0.0709 0.0000 -0.0002 0.0707

    ETX-ETX 0.0647 0.0000 -0.0007 0.0640

    ETX-ELA 0.0709 -0.0001 -0.0007 0.0701

    MINIMUM - STX-AAB 0.0000 0.0000 0.0000

    WLA-AAB 0.0000 0.0000 0.0000

    ELA-AAB 0.0000 0.0000 0.0000ETX-AAB 0.0000 0.0000 0.0000

    STX-STX 0.0000 0.0000 0.0000

    STX-WLA 0.0000 0.0000 0.0000

    STX-ELA 0.0000 0.0000 0.0000

    STX-ETX 0.0000 0.0000 0.0000

    WLA-WLA 0.0000 0.0000 0.0000

    WLA-ELA 0.0000 0.0000 0.0000

    WLA-ETX 0.0000 0.0000 0.0000

    ELA-ELA 0.0000 0.0000 0.0000

    ETX-ETX 0.0000 0.0000 0.0000

    ETX-ELA 0.0000 0.0000 0.0000

    MARKET AREA

    MAXIMUM - M1-M1 0.1383 0.0031 0.0000 0.1414

    M1-M2 0.2584 0.0095 0.0000 0.2679

    M1-M3 0.3405 0.0137 0.0000 0.3542

    M2-M2 0.2001 0.0063 0.0000 0.2064

    M2-M3 0.2866 0.0107 0.0000 0.2973

    M3-M3 0.1620 0.0042 0.0000 0.1662

    MINIMUM - M1-M1 0.0000 0.0000 0.0000

    M1-M2 0.0000 0.0000 0.0000

    M1-M3 0.0000 0.0000 0.0000

    M2-M2 0.0000 0.0000 0.0000

    M2-M3 0.0000 0.0000 0.0000

    M3-M3 0.0000 0.0000 0.0000

    *The base tariff rate is the effective rate on file with the

    Commission, excluding adjustments approved by the Commission.

  • 8/6/2019 TETLPVolumeNo1

    74/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 14. Notice of Rate Change Adjustments

    Eighth Revised Volume No. 1 Version 5.0.0Page 9 of 32

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    NOTICE OF RATE CHANGE ADJUSTMENTS

    Base Electric

    Tariff Power Cost ASA Adjusted

    Rate* Adjustment Surcharge Rate

    $/dth $/dth $/dth $/dth

    Pursuant to Sections 3.2 and 3.3 of Rate Schedule FT-1:FT-1 USAGE CHARGES

    USAGE-1 - MAXIMUM

    STX-STX 0.0088 0.0000 -0.0088 0.0000

    STX-WLA 0.0096 0.0000 -0.0096 0.0000

    STX-ELA 0.0140 0.0000 -0.0140 0.0000

    STX-ETX 0.0140 0.0000 -0.0140 0.0000

    STX-M1 0.0275 0.0071 -0.0234 0.0112

    STX-M2 0.0467 0.0215 -0.0315 0.0367

    STX-M3 0.0598 0.0314 -0.0378 0.0534

    WLA-WLA 0.0059 0.0000 -0.0059 0.0000

    WLA-ELA 0.0103 0.0000 -0.0103 0.0000

    WLA-ETX 0.0103 0.0000 -0.0103 0.0000

    WLA-M1 0.0238 0.0071 -0.0197 0.0112

    WLA-M2 0.0430 0.0215 -0.0278 0.0367

    WLA-M3 0.0561 0.0314 -0.0341 0.0534

    ELA-ELA 0.0087 0.0000 -0.0087 0.0000

    ETX-ELA 0.0087 0.0000 -0.0087 0.0000

    ELA-M1 0.0222 0.0071 -0.0181 0.0112

    ELA-M2 0.0414 0.0215 -0.0262 0.0367ELA-M3 0.0545 0.0314 -0.0325 0.0534

    ETX-ETX 0.0087 0.0000 -0.0087 0.0000

    ETX-M1 0.0222 0.0071 -0.0181 0.0112

    ETX-M2 0.0414 0.0215 -0.0262 0.0367

    ETX-M3 0.0545 0.0314 -0.0325 0.0534

    M1-M1 0.0135 0.0071 -0.0094 0.0112

    M1-M2 0.0327 0.0215 -0.0175 0.0367

    M1-M3 0.0458 0.0314 -0.0238 0.0534

    M2-M2 0.0234 0.0144 -0.0138 0.0240

    M2-M3 0.0365 0.0243 -0.0196 0.0412

    M3-M3 0.0173 0.0099 -0.0116 0.0156

    *The base tariff rate is the effective rate on file with the

    Commission, excluding adjustments approved by the Commission.

  • 8/6/2019 TETLPVolumeNo1

    75/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 14. Notice of Rate Change Adjustments

    Eighth Revised Volume No. 1 Version 5.0.0Page 10 of 32

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    NOTICE OF RATE CHANGE ADJUSTMENTS

    Base Electric

    Tariff Power Cost ASA Adjusted

    Rate* Adjustment Surcharge Rate

    $/dth $/dth $/dth $/dth

    Pursuant to Sections 3.2 and 3.3 of Rate Schedule FT-1:FT-1 USAGE CHARGES

    USAGE-1 - MINIMUM

    STX-STX 0.0046 0.0000 -0.0088 0.0000

    STX-WLA 0.0054 0.0000 -0.0096 0.0000

    STX-ELA 0.0097 0.0000 -0.0140 0.0000

    STX-ETX 0.0097 0.0000 -0.0140 0.0000

    STX-M1 0.0190 0.0071 -0.0234 0.0027

    STX-M2 0.0382 0.0215 -0.0315 0.0282

    STX-M3 0.0513 0.0314 -0.0378 0.0449

    WLA-WLA 0.0017 0.0000 -0.0059 0.0000

    WLA-ELA 0.0060 0.0000 -0.0103 0.0000

    WLA-ETX 0.0060 0.0000 -0.0103 0.0000

    WLA-M1 0.0153 0.0071 -0.0197 0.0027

    WLA-M2 0.0345 0.0215 -0.0278 0.0282

    WLA-M3 0.0476 0.0314 -0.0341 0.0449

    ELA-ELA 0.0044 0.0000 -0.0087 0.0000

    ETX-ELA 0.0044 0.0000 -0.0087 0.0000

    ELA-M1 0.0137 0.0071 -0.0181 0.0027

    ELA-M2 0.0329 0.0215 -0.0262 0.0282ELA-M3 0.0460 0.0314 -0.0325 0.0449

    ETX-ETX 0.0044 0.0000 -0.0087 0.0000

    ETX-M1 0.0137 0.0071 -0.0181 0.0027

    ETX-M2 0.0329 0.0215 -0.0262 0.0282

    ETX-M3 0.0460 0.0314 -0.0325 0.0449

    M1-M1 0.0093 0.0071 -0.0094 0.0070

    M1-M2 0.0285 0.0215 -0.0175 0.0325

    M1-M3 0.0416 0.0314 -0.0238 0.0492

    M2-M2 0.0192 0.0144 -0.0138 0.0198

    M2-M3 0.0323 0.0243 -0.0196 0.0370

    M3-M3 0.0131 0.0099 -0.0116 0.0114

    *The base tariff rate is the effective rate on file with the

    Commission, excluding adjustments approved by the Commission.

  • 8/6/2019 TETLPVolumeNo1

    76/626

  • 8/6/2019 TETLPVolumeNo1

    77/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 14. Notice of Rate Change Adjustments

    Eighth Revised Volume No. 1 Version 5.0.0Page 12 of 32

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    NOTICE OF RATE CHANGE ADJUSTMENTS

    Base Electric

    Tariff Power Cost ASA Adjusted

    Rate* Adjustment Surcharge Rate

    $/dth $/dth $/dth $/dth

    Pursuant to Sections 3.2 and 3.3 of Rate Schedule FT-1:FT-1 USAGE CHARGES

    USAGE-1 - BACKHAUL MINIMUM

    STX-STX 0.0046 0.0000 0.0046

    WLA-STX 0.0054 0.0000 0.0054

    ELA-STX 0.0097 0.0000 0.0097

    ETX-STX 0.0097 0.0000 0.0097

    M1-STX 0.0190 0.0071 0.0261

    M2-STX 0.0382 0.0215 0.0597

    M3-STX 0.0513 0.0314 0.0827

    WLA-WLA 0.0017 0.0000 0.0017

    ELA-WLA 0.0060 0.0000 0.0060

    ETX-WLA 0.0060 0.0000 0.0060

    M1-WLA 0.0153 0.0071 0.0224

    M2-WLA 0.0345 0.0215 0.0560

    M3-WLA 0.0476 0.0314 0.0790

    ELA-ELA 0.0044 0.0000 0.0044

    ELA-ETX 0.0044 0.0000 0.0044

    M1-ELA 0.0137 0.0071 0.0208

    M2-ELA 0.0329 0.0215 0.0544M3-ELA 0.0460 0.0314 0.0774

    ETX-ETX 0.0044 0.0000 0.0044

    M1-ETX 0.0137 0.0071 0.0208

    M2-ETX 0.0329 0.0215 0.0544

    M3-ETX 0.0460 0.0314 0.0774

    M1-M1 0.0093 0.0071 0.0164

    M2-M1 0.0285 0.0215 0.0500

    M3-M1 0.0416 0.0314 0.0730

    M2-M2 0.0192 0.0144 0.0336

    M3-M2 0.0323 0.0243 0.0566

    M3-M3 0.0131 0.0099 0.0230

    USAGE-2 STX 0.1127 -0.0003 -0.0090 0.1034

    WLA 0.1127 -0.0003 -0.0090 0.1034

    ELA 0.1127 -0.0003 -0.0090 0.1034

    ETX 0.1127 -0.0003 -0.0090 0.1034

    M1 0.2645 0.0099 -0.0184 0.2560

    M2 0.4038 0.0307 -0.0265 0.4080

    M3 0.4990 0.0448 -0.0328 0.5110

    *The base tariff rate is the effective rate on file with the

    Commission, excluding adjustments approved by the Commission.

  • 8/6/2019 TETLPVolumeNo1

    78/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 14. Notice of Rate Change Adjustments

    Eighth Revised Volume No. 1 Version 5.0.0Page 13 of 32

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    NOTICE OF RATE CHANGE ADJUSTMENTS

    Base Electric

    Tariff Power Cost ASA Adjusted

    Rate* Adjustment Surcharge Rate

    $/dth $/dth $/dth $/dth

    Pursuant to Sections 3.2, 3.3, and 3.5 of Rate Schedule SCT:SCT RESERVATION CHARGES

    ACCESS AREA

    MAXIMUM - STX-AAB 2.7220 0.0000 2.7220

    WLA-AAB 1.1310 -0.0010 1.1300

    ELA-AAB 0.9500 0.0000 0.9500

    ETX-AAB 0.8760 0.0000 0.8760

    STX-STX 2.2930 -0.0010 2.2920

    STX-WLA 2.3560 0.0000 2.3560

    STX-ELA 2.7220 0.0000 2.7220

    STX-ETX 2.7220 0.0000 2.7220

    WLA-WLA 0.8220 0.0000 0.8220

    WLA-ELA 1.1310 -0.0010 1.1300

    WLA-ETX 1.1310 -0.0010 1.1300

    ELA-ELA 0.9500 0.0000 0.9500

    ETX-ETX 0.8760 0.0000 0.8760

    ETX-ELA 0.9500 0.0000 0.9500

    MINIMUM - STX-AAB 0.0000 0.0000 0.0000

    WLA-AAB 0.0000 0.0000 0.0000

    ELA-AAB 0.0000 0.0000 0.0000ETX-AAB 0.0000 0.0000 0.0000

    STX-STX 0.0000 0.0000 0.0000

    STX-WLA 0.0000 0.0000 0.0000

    STX-ELA 0.0000 0.0000 0.0000

    STX-ETX 0.0000 0.0000 0.0000

    WLA-WLA 0.0000 0.0000 0.0000

    WLA-ELA 0.0000 0.0000 0.0000

    WLA-ETX 0.0000 0.0000 0.0000

    ELA-ELA 0.0000 0.0000 0.0000

    ETX-ETX 0.0000 0.0000 0.0000

    ETX-ELA 0.0000 0.0000 0.0000

    MARKET AREA

    MAXIMUM - M1-M1 1.7700 0.0370 1.8070

    M1-M2 3.2300 0.1140 3.3440

    M1-M3 4.2270 0.1670 4.3940

    M2-M2 2.5220 0.0760 2.5980

    M2-M3 3.5730 0.1290 3.7020

    M3-M3 2.0570 0.0530 2.1100

    MINIMUM - M1-M1 0.0000 0.0000 0.0000

    M1-M2 0.0000 0.0000 0.0000

    M1-M3 0.0000 0.0000 0.0000

    M2-M2 0.0000 0.0000 0.0000

    M2-M3 0.0000 0.0000 0.0000

    M3-M3 0.0000 0.0000 0.0000

    *The base tariff rate is the effective rate on file with the

    Commission, excluding adjustments approved by the Commission.

  • 8/6/2019 TETLPVolumeNo1

    79/626

    Texas Eastern Transmission, LP Part 4 - Statements of RatesFERC Gas Tariff 14. Notice of Rate Change Adjustments

    Eighth Revised Volume No. 1 Version 5.0.0Page 14 of 32

    Issued on: June 30, 2011

    Effective on: August 1, 2011

    NOTICE OF RATE CHANGE ADJUSTMENTS

    Base Electric