Transcript of Testing and Commissioning JY

  • 8/3/2019 Testing and Commissioning JY

    1/39

    1

  • 8/3/2019 Testing and Commissioning JY

    2/39

    2

  • 8/3/2019 Testing and Commissioning JY

    3/39

  • 8/3/2019 Testing and Commissioning JY

    4/39

    4

  • 8/3/2019 Testing and Commissioning JY

    5/39

    5

  • 8/3/2019 Testing and Commissioning JY

    6/39

    6

  • 8/3/2019 Testing and Commissioning JY

    7/39

    7

  • 8/3/2019 Testing and Commissioning JY

    8/39

    8

  • 8/3/2019 Testing and Commissioning JY

    9/39

    Quote is from John C. Maxwell,Ethics 101: What Every Leader Needs to Know, New York:

    Center Street, 2003, pp. 5051.

    9

  • 8/3/2019 Testing and Commissioning JY

    10/39

    10

  • 8/3/2019 Testing and Commissioning JY

    11/39

    11

  • 8/3/2019 Testing and Commissioning JY

    12/39

    12

  • 8/3/2019 Testing and Commissioning JY

    13/39

    13

  • 8/3/2019 Testing and Commissioning JY

    14/39

  • 8/3/2019 Testing and Commissioning JY

    15/39

  • 8/3/2019 Testing and Commissioning JY

    16/39

  • 8/3/2019 Testing and Commissioning JY

    17/39

  • 8/3/2019 Testing and Commissioning JY

    18/39

  • 8/3/2019 Testing and Commissioning JY

    19/39

  • 8/3/2019 Testing and Commissioning JY

    20/39

  • 8/3/2019 Testing and Commissioning JY

    21/39

  • 8/3/2019 Testing and Commissioning JY

    22/39

  • 8/3/2019 Testing and Commissioning JY

    23/39

    23

  • 8/3/2019 Testing and Commissioning JY

    24/39

    The following describes SELs recommended approach to relay testing and best practices:

    1. Perform com rehensive commissioning testing at the time of installation. Use thorou h checklists, simulations, laborator testin ,

    and/or field checks to verify the performance of the protection system, including inputs, outputs, and settings.

    2. Monitor the relay self-test alarm contact in real time via SCADA (supervisory control and data acquisition) or other monitoring

    system. If an alarm contact asserts, take immediate steps to repair, replace, or take corrective action for the alarmed relay.

    3. Monitor potential relay failures not detected by self-tests. Specifically, these are logic inputs, contact outputs, and analog (voltage and

    current) inputs. Use continuous check of inputs (e.g., loss-of-potential logic) when available. If a secondary relay system is in place, compare

    the metering values between the primary and secondary systems.

    . , .

    validate correct operation of the protection system.

    If Steps 1 through 4 are followed, no periodic testing is required.

    Many users follow Steps 1 and 2 but do not perform Steps 3 and 4 consistently. In this case, perform periodic testing (e.g., once every ten

    years) on portions of the relay not tested by self-tests. This includes injecting known current and voltage signals to verify relay measuring

    accuracy, asserting inputs, and pulsing output contacts. This need not include re-verifying settings, plotting time-current curves or mho circles,

    etc. These characteristics are verified at commissioning and do not change. This testing may identify the small number of failures not detected

    b self-tests (e. ., usin the revious failure rates, testin ever ten ears would detect 0.05% 10 = 0.5% failures).

    This philosophy also applies to systems that do not operate frequently (e.g., bus or transformer differential protection).

    In some rare applications (installations without SCADA or communications), the self-test alarm is not monitored. This is not recommended.

    For these applications, the relays should be tested every one to five years, including the following:

    Check that the self-test alarm is not asserted.

    Inject known current and voltage signals to verify proper metering.

    Assert inputs, and pulse outputs.

    This need not include re-verifying settings, plotting time-current curves or mho circles, etc. These characteristics are verified at

    commissioning and do not change.

  • 8/3/2019 Testing and Commissioning JY

    25/39

    25

  • 8/3/2019 Testing and Commissioning JY

    26/39

    26

  • 8/3/2019 Testing and Commissioning JY

    27/39

    27

  • 8/3/2019 Testing and Commissioning JY

    28/39

    28

  • 8/3/2019 Testing and Commissioning JY

    29/39

    29

  • 8/3/2019 Testing and Commissioning JY

    30/39

    30

  • 8/3/2019 Testing and Commissioning JY

    31/39

    31

  • 8/3/2019 Testing and Commissioning JY

    32/39

    32

  • 8/3/2019 Testing and Commissioning JY

    33/39

    33

  • 8/3/2019 Testing and Commissioning JY

    34/39

    34

  • 8/3/2019 Testing and Commissioning JY

    35/39

    35

  • 8/3/2019 Testing and Commissioning JY

    36/39

    36

  • 8/3/2019 Testing and Commissioning JY

    37/39

    37

  • 8/3/2019 Testing and Commissioning JY

    38/39

    38

  • 8/3/2019 Testing and Commissioning JY

    39/39